104TH GENERAL ASSEMBLY
State of Illinois
2025 and 2026
SB3629

 

Introduced 2/5/2026, by Sen. Terri Bryant

 

SYNOPSIS AS INTRODUCED:
 
55 ILCS 5/5-12020

    Amends the Counties Code. Provides that the amendments made by Public Act 102-1123 to provisions concerning commercial wind energy facilities and commercial solar energy facilities do not apply to a commercial wind energy development, a commercial solar energy development, or an energy storage development on property in that located South of Interstate 70 and Edwards County, Franklin County, Hamilton County, Jackson County, Jefferson County, Madison County, Monroe County, Perry County, Randolph County, St. Clair County, Union County, Wabash County, Washington County, Wayne County, or White County.


LRB104 20614 RTM 34106 b

 

 

A BILL FOR

 

SB3629LRB104 20614 RTM 34106 b

1    AN ACT concerning local government.
 
2    Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
 
4    Section 5. The Counties Code is amended by changing
5Section 5-12020 as follows:
 
6    (55 ILCS 5/5-12020)
7    (Text of Section before amendment by P.A. 104-458)
8    Sec. 5-12020. Commercial wind energy facilities and
9commercial solar energy facilities.
10    (a) As used in this Section:
11    "Commercial solar energy facility" means a "commercial
12solar energy system" as defined in Section 10-720 of the
13Property Tax Code. "Commercial solar energy facility" does not
14mean a utility-scale solar energy facility being constructed
15at a site that was eligible to participate in a procurement
16event conducted by the Illinois Power Agency pursuant to
17subsection (c-5) of Section 1-75 of the Illinois Power Agency
18Act.
19    "Commercial wind energy facility" means a wind energy
20conversion facility of equal or greater than 500 kilowatts in
21total nameplate generating capacity. "Commercial wind energy
22facility" includes a wind energy conversion facility seeking
23an extension of a permit to construct granted by a county or

 

 

SB3629- 2 -LRB104 20614 RTM 34106 b

1municipality before January 27, 2023 (the effective date of
2Public Act 102-1123).
3    "Facility owner" means (i) a person with a direct
4ownership interest in a commercial wind energy facility or a
5commercial solar energy facility, or both, regardless of
6whether the person is involved in acquiring the necessary
7rights, permits, and approvals or otherwise planning for the
8construction and operation of the facility, and (ii) at the
9time the facility is being developed, a person who is acting as
10a developer of the facility by acquiring the necessary rights,
11permits, and approvals or by planning for the construction and
12operation of the facility, regardless of whether the person
13will own or operate the facility.
14    "Nonparticipating property" means real property that is
15not a participating property.
16    "Nonparticipating residence" means a residence that is
17located on nonparticipating property and that is existing and
18occupied on the date that an application for a permit to
19develop the commercial wind energy facility or the commercial
20solar energy facility is filed with the county.
21    "Occupied community building" means any one or more of the
22following buildings that is existing and occupied on the date
23that the application for a permit to develop the commercial
24wind energy facility or the commercial solar energy facility
25is filed with the county: a school, place of worship, day care
26facility, public library, or community center.

 

 

SB3629- 3 -LRB104 20614 RTM 34106 b

1    "Participating property" means real property that is the
2subject of a written agreement between a facility owner and
3the owner of the real property that provides the facility
4owner an easement, option, lease, or license to use the real
5property for the purpose of constructing a commercial wind
6energy facility, a commercial solar energy facility, or
7supporting facilities. "Participating property" also includes
8real property that is owned by a facility owner for the purpose
9of constructing a commercial wind energy facility, a
10commercial solar energy facility, or supporting facilities.
11    "Participating residence" means a residence that is
12located on participating property and that is existing and
13occupied on the date that an application for a permit to
14develop the commercial wind energy facility or the commercial
15solar energy facility is filed with the county.
16    "Protected lands" means real property that is:
17        (1) subject to a permanent conservation right
18    consistent with the Real Property Conservation Rights Act;
19    or
20        (2) registered or designated as a nature preserve,
21    buffer, or land and water reserve under the Illinois
22    Natural Areas Preservation Act.
23    "Supporting facilities" means the transmission lines,
24substations, access roads, meteorological towers, storage
25containers, and equipment associated with the generation and
26storage of electricity by the commercial wind energy facility

 

 

SB3629- 4 -LRB104 20614 RTM 34106 b

1or commercial solar energy facility.
2    "Wind tower" includes the wind turbine tower, nacelle, and
3blades.
4    (b) Notwithstanding any other provision of law or whether
5the county has formed a zoning commission and adopted formal
6zoning under Section 5-12007, a county may establish standards
7for commercial wind energy facilities, commercial solar energy
8facilities, or both. The standards may include all of the
9requirements specified in this Section but may not include
10requirements for commercial wind energy facilities or
11commercial solar energy facilities that are more restrictive
12than specified in this Section. A county may also regulate the
13siting of commercial wind energy facilities with standards
14that are not more restrictive than the requirements specified
15in this Section in unincorporated areas of the county that are
16outside the zoning jurisdiction of a municipality and that are
17outside the 1.5-mile radius surrounding the zoning
18jurisdiction of a municipality.
19    (c) If a county has elected to establish standards under
20subsection (b), before the county grants siting approval or a
21special use permit for a commercial wind energy facility or a
22commercial solar energy facility, or modification of an
23approved siting or special use permit, the county board of the
24county in which the facility is to be sited or the zoning board
25of appeals for the county shall hold at least one public
26hearing. The public hearing shall be conducted in accordance

 

 

SB3629- 5 -LRB104 20614 RTM 34106 b

1with the Open Meetings Act and shall be held not more than 60
2days after the filing of the application for the facility. The
3county shall allow interested parties to a special use permit
4an opportunity to present evidence and to cross-examine
5witnesses at the hearing, but the county may impose reasonable
6restrictions on the public hearing, including reasonable time
7limitations on the presentation of evidence and the
8cross-examination of witnesses. The county shall also allow
9public comment at the public hearing in accordance with the
10Open Meetings Act. The county shall make its siting and
11permitting decisions not more than 30 days after the
12conclusion of the public hearing. Notice of the hearing shall
13be published in a newspaper of general circulation in the
14county. A facility owner must enter into an agricultural
15impact mitigation agreement with the Department of Agriculture
16prior to the date of the required public hearing. A commercial
17wind energy facility owner seeking an extension of a permit
18granted by a county prior to July 24, 2015 (the effective date
19of Public Act 99-132) must enter into an agricultural impact
20mitigation agreement with the Department of Agriculture prior
21to a decision by the county to grant the permit extension.
22Counties may allow test wind towers or test solar energy
23systems to be sited without formal approval by the county
24board.
25    (d) A county with an existing zoning ordinance in conflict
26with this Section shall amend that zoning ordinance to be in

 

 

SB3629- 6 -LRB104 20614 RTM 34106 b

1compliance with this Section within 120 days after January 27,
22023 (the effective date of Public Act 102-1123).
3    (e) A county may require:
4        (1) a wind tower of a commercial wind energy facility
5    to be sited as follows, with setback distances measured
6    from the center of the base of the wind tower:
 
7Setback Description           Setback Distance
 
8Occupied Community            2.1 times the maximum blade tip
9Buildings                     height of the wind tower to the
10                              nearest point on the outside
11                              wall of the structure
 
12Participating Residences      1.1 times the maximum blade tip
13                              height of the wind tower to the
14                              nearest point on the outside
15                              wall of the structure
 
16Nonparticipating Residences   2.1 times the maximum blade tip
17                              height of the wind tower to the
18                              nearest point on the outside
19                              wall of the structure
 
20Boundary Lines of             None
21Participating Property 
 

 

 

SB3629- 7 -LRB104 20614 RTM 34106 b

1Boundary Lines of             1.1 times the maximum blade tip
2Nonparticipating Property     height of the wind tower to the
3                              nearest point on the property
4                              line of the nonparticipating
5                              property
 
6Public Road Rights-of-Way     1.1 times the maximum blade tip
7                              height of the wind tower
8                              to the center point of the
9                              public road right-of-way
 
10Overhead Communication and    1.1 times the maximum blade tip
11Electric Transmission         height of the wind tower to the
12and Distribution Facilities   nearest edge of the property
13(Not Including Overhead       line, easement, or 
14Utility Service Lines to      right-of-way 
15Individual Houses or          containing the overhead line
16Outbuildings)
 
17Overhead Utility Service      None
18Lines to Individual
19Houses or Outbuildings
 
20Fish and Wildlife Areas       2.1 times the maximum blade
21and Illinois Nature           tip height of the wind tower

 

 

SB3629- 8 -LRB104 20614 RTM 34106 b

1Preserve Commission           to the nearest point on the
2Protected Lands               property line of the fish and
3                              wildlife area or protected
4                              land
5    This Section does not exempt or excuse compliance with
6    electric facility clearances approved or required by the
7    National Electrical Code, the National Electrical Safety
8    Code, the Illinois Commerce Commission, and the Federal
9    Energy Regulatory Commission and their designees or
10    successors;
11        (2) a wind tower of a commercial wind energy facility
12    to be sited so that industry standard computer modeling
13    indicates that any occupied community building or
14    nonparticipating residence will not experience more than
15    30 hours per year of shadow flicker under planned
16    operating conditions;
17        (3) a commercial solar energy facility to be sited as
18    follows, with setback distances measured from the nearest
19    edge of any component of the facility:
 
20Setback Description           Setback Distance
 
21Occupied Community            150 feet from the nearest
22Buildings and Dwellings on    point on the outside wall 
23Nonparticipating Properties   of the structure
 

 

 

SB3629- 9 -LRB104 20614 RTM 34106 b

1Boundary Lines of             None
2Participating Property    
 
3Public Road Rights-of-Way     50 feet from the nearest
4                              edge
 
5Boundary Lines of             50 feet to the nearest
6Nonparticipating Property     point on the property
7                              line of the nonparticipating
8                              property
 
9        (4) a commercial solar energy facility to be sited so
10    that the facility's perimeter is enclosed by fencing
11    having a height of at least 6 feet and no more than 25
12    feet; and
13        (5) a commercial solar energy facility to be sited so
14    that no component of a solar panel has a height of more
15    than 20 feet above ground when the solar energy facility's
16    arrays are at full tilt.
17    The requirements set forth in this subsection (e) may be
18waived subject to the written consent of the owner of each
19affected nonparticipating property.
20    (f) A county may not set a sound limitation for wind towers
21in commercial wind energy facilities or any components in
22commercial solar energy facilities that is more restrictive
23than the sound limitations established by the Illinois

 

 

SB3629- 10 -LRB104 20614 RTM 34106 b

1Pollution Control Board under 35 Ill. Adm. Code Parts 900,
2901, and 910.
3    (g) A county may not place any restriction on the
4installation or use of a commercial wind energy facility or a
5commercial solar energy facility unless it adopts an ordinance
6that complies with this Section. A county may not establish
7siting standards for supporting facilities that preclude
8development of commercial wind energy facilities or commercial
9solar energy facilities.
10    A request for siting approval or a special use permit for a
11commercial wind energy facility or a commercial solar energy
12facility, or modification of an approved siting or special use
13permit, shall be approved if the request is in compliance with
14the standards and conditions imposed in this Act, the zoning
15ordinance adopted consistent with this Code, and the
16conditions imposed under State and federal statutes and
17regulations.
18    (h) A county may not adopt zoning regulations that
19disallow, permanently or temporarily, commercial wind energy
20facilities or commercial solar energy facilities from being
21developed or operated in any district zoned to allow
22agricultural or industrial uses.
23    (i) A county may not require permit application fees for a
24commercial wind energy facility or commercial solar energy
25facility that are unreasonable. All application fees imposed
26by the county shall be consistent with fees for projects in the

 

 

SB3629- 11 -LRB104 20614 RTM 34106 b

1county with similar capital value and cost.
2    (j) Except as otherwise provided in this Section, a county
3shall not require standards for construction, decommissioning,
4or deconstruction of a commercial wind energy facility or
5commercial solar energy facility or related financial
6assurances that are more restrictive than those included in
7the Department of Agriculture's standard wind farm
8agricultural impact mitigation agreement, template 81818, or
9standard solar agricultural impact mitigation agreement,
10version 8.19.19, as applicable and in effect on December 31,
112022. The amount of any decommissioning payment shall be in
12accordance with the financial assurance required by those
13agricultural impact mitigation agreements.
14    (j-5) A commercial wind energy facility or a commercial
15solar energy facility shall file a farmland drainage plan with
16the county and impacted drainage districts outlining how
17surface and subsurface drainage of farmland will be restored
18during and following construction or deconstruction of the
19facility. The plan is to be created independently by the
20facility developer and shall include the location of any
21potentially impacted drainage district facilities to the
22extent this information is publicly available from the county
23or the drainage district, plans to repair any subsurface
24drainage affected during construction or deconstruction using
25procedures outlined in the agricultural impact mitigation
26agreement entered into by the commercial wind energy facility

 

 

SB3629- 12 -LRB104 20614 RTM 34106 b

1owner or commercial solar energy facility owner, and
2procedures for the repair and restoration of surface drainage
3affected during construction or deconstruction. All surface
4and subsurface damage shall be repaired as soon as reasonably
5practicable.
6    (k) A county may not condition approval of a commercial
7wind energy facility or commercial solar energy facility on a
8property value guarantee and may not require a facility owner
9to pay into a neighboring property devaluation escrow account.
10    (l) A county may require certain vegetative screening
11surrounding a commercial wind energy facility or commercial
12solar energy facility but may not require earthen berms or
13similar structures.
14    (m) A county may set blade tip height limitations for wind
15towers in commercial wind energy facilities but may not set a
16blade tip height limitation that is more restrictive than the
17height allowed under a Determination of No Hazard to Air
18Navigation by the Federal Aviation Administration under 14 CFR
19Part 77.
20    (n) A county may require that a commercial wind energy
21facility owner or commercial solar energy facility owner
22provide:
23        (1) the results and recommendations from consultation
24    with the Illinois Department of Natural Resources that are
25    obtained through the Ecological Compliance Assessment Tool
26    (EcoCAT) or a comparable successor tool; and

 

 

SB3629- 13 -LRB104 20614 RTM 34106 b

1        (2) the results of the United States Fish and Wildlife
2    Service's Information for Planning and Consulting
3    environmental review or a comparable successor tool that
4    is consistent with (i) the "U.S. Fish and Wildlife
5    Service's Land-Based Wind Energy Guidelines" and (ii) any
6    applicable United States Fish and Wildlife Service solar
7    wildlife guidelines that have been subject to public
8    review.
9    (o) A county may require a commercial wind energy facility
10or commercial solar energy facility to adhere to the
11recommendations provided by the Illinois Department of Natural
12Resources in an EcoCAT natural resource review report under 17
13Ill. Adm. Code Part 1075.
14    (p) A county may require a facility owner to:
15        (1) demonstrate avoidance of protected lands as
16    identified by the Illinois Department of Natural Resources
17    and the Illinois Nature Preserve Commission; or
18        (2) consider the recommendations of the Illinois
19    Department of Natural Resources for setbacks from
20    protected lands, including areas identified by the
21    Illinois Nature Preserve Commission.
22    (q) A county may require that a facility owner provide
23evidence of consultation with the Illinois State Historic
24Preservation Office to assess potential impacts on
25State-registered historic sites under the Illinois State
26Agency Historic Resources Preservation Act.

 

 

SB3629- 14 -LRB104 20614 RTM 34106 b

1    (r) To maximize community benefits, including, but not
2limited to, reduced stormwater runoff, flooding, and erosion
3at the ground mounted solar energy system, improved soil
4health, and increased foraging habitat for game birds,
5songbirds, and pollinators, a county may (1) require a
6commercial solar energy facility owner to plant, establish,
7and maintain for the life of the facility vegetative ground
8cover, consistent with the goals of the Pollinator-Friendly
9Solar Site Act and (2) require the submittal of a vegetation
10management plan that is in compliance with the agricultural
11impact mitigation agreement in the application to construct
12and operate a commercial solar energy facility in the county
13if the vegetative ground cover and vegetation management plan
14comply with the requirements of the underlying agreement with
15the landowner or landowners where the facility will be
16constructed.
17    No later than 90 days after January 27, 2023 (the
18effective date of Public Act 102-1123), the Illinois
19Department of Natural Resources shall develop guidelines for
20vegetation management plans that may be required under this
21subsection for commercial solar energy facilities. The
22guidelines must include guidance for short-term and long-term
23property management practices that provide and maintain native
24and non-invasive naturalized perennial vegetation to protect
25the health and well-being of pollinators.
26    (s) If a facility owner enters into a road use agreement

 

 

SB3629- 15 -LRB104 20614 RTM 34106 b

1with the Illinois Department of Transportation, a road
2district, or other unit of local government relating to a
3commercial wind energy facility or a commercial solar energy
4facility, the road use agreement shall require the facility
5owner to be responsible for (i) the reasonable cost of
6improving roads used by the facility owner to construct the
7commercial wind energy facility or the commercial solar energy
8facility and (ii) the reasonable cost of repairing roads used
9by the facility owner during construction of the commercial
10wind energy facility or the commercial solar energy facility
11so that those roads are in a condition that is safe for the
12driving public after the completion of the facility's
13construction. Roadways improved in preparation for and during
14the construction of the commercial wind energy facility or
15commercial solar energy facility shall be repaired and
16restored to the improved condition at the reasonable cost of
17the developer if the roadways have degraded or were damaged as
18a result of construction-related activities.
19    The road use agreement shall not require the facility
20owner to pay costs, fees, or charges for road work that is not
21specifically and uniquely attributable to the construction of
22the commercial wind energy facility or the commercial solar
23energy facility. Road-related fees, permit fees, or other
24charges imposed by the Illinois Department of Transportation,
25a road district, or other unit of local government under a road
26use agreement with the facility owner shall be reasonably

 

 

SB3629- 16 -LRB104 20614 RTM 34106 b

1related to the cost of administration of the road use
2agreement.
3    (s-5) The facility owner shall also compensate landowners
4for crop losses or other agricultural damages resulting from
5damage to the drainage system caused by the construction of
6the commercial wind energy facility or the commercial solar
7energy facility. The commercial wind energy facility owner or
8commercial solar energy facility owner shall repair or pay for
9the repair of all damage to the subsurface drainage system
10caused by the construction of the commercial wind energy
11facility or the commercial solar energy facility in accordance
12with the agriculture impact mitigation agreement requirements
13for repair of drainage. The commercial wind energy facility
14owner or commercial solar energy facility owner shall repair
15or pay for the repair and restoration of surface drainage
16caused by the construction or deconstruction of the commercial
17wind energy facility or the commercial solar energy facility
18as soon as reasonably practicable.
19    (t) Notwithstanding any other provision of law, a facility
20owner with siting approval from a county to construct a
21commercial wind energy facility or a commercial solar energy
22facility is authorized to cross or impact a drainage system,
23including, but not limited to, drainage tiles, open drainage
24ditches, culverts, and water gathering vaults, owned or under
25the control of a drainage district under the Illinois Drainage
26Code without obtaining prior agreement or approval from the

 

 

SB3629- 17 -LRB104 20614 RTM 34106 b

1drainage district in accordance with the farmland drainage
2plan required by subsection (j-5).
3    (u) The amendments to this Section adopted in Public Act
4102-1123 do not apply to: (1) an application for siting
5approval or for a special use permit for a commercial wind
6energy facility or commercial solar energy facility if the
7application was submitted to a unit of local government before
8January 27, 2023 (the effective date of Public Act 102-1123);
9(2) a commercial wind energy facility or a commercial solar
10energy facility if the facility owner has submitted an
11agricultural impact mitigation agreement to the Department of
12Agriculture before January 27, 2023 (the effective date of
13Public Act 102-1123); or (3) a commercial wind energy or
14commercial solar energy development on property that is
15located within an enterprise zone certified under the Illinois
16Enterprise Zone Act, that was classified as industrial by the
17appropriate zoning authority on or before January 27, 2023,
18and that is located within 4 miles of the intersection of
19Interstate 88 and Interstate 39.
20(Source: P.A. 103-81, eff. 6-9-23; 103-580, eff. 12-8-23;
21104-417, eff. 8-15-25.)
 
22    (Text of Section after amendment by P.A. 104-458)
23    Sec. 5-12020. Commercial wind energy facilities and
24commercial solar energy facilities.
25    (a) As used in this Section:

 

 

SB3629- 18 -LRB104 20614 RTM 34106 b

1    "Commercial solar energy facility" means a "commercial
2solar energy system" as defined in Section 10-720 of the
3Property Tax Code. "Commercial solar energy facility" does not
4mean a utility-scale solar energy facility being constructed
5at a site that was eligible to participate in a procurement
6event conducted by the Illinois Power Agency pursuant to
7subsection (c-5) of Section 1-75 of the Illinois Power Agency
8Act.
9    "Commercial wind energy facility" means a wind energy
10conversion facility of equal or greater than 500 kilowatts in
11total nameplate generating capacity. "Commercial wind energy
12facility" includes a wind energy conversion facility seeking
13an extension of a permit to construct granted by a county or
14municipality before January 27, 2023 (the effective date of
15Public Act 102-1123).
16    "Facility owner" means (i) a person with a direct
17ownership interest in a commercial wind energy facility or a
18commercial solar energy facility, or both, regardless of
19whether the person is involved in acquiring the necessary
20rights, permits, and approvals or otherwise planning for the
21construction and operation of the facility, and (ii) at the
22time the facility is being developed, a person who is acting as
23a developer of the facility by acquiring the necessary rights,
24permits, and approvals or by planning for the construction and
25operation of the facility, regardless of whether the person
26will own or operate the facility.

 

 

SB3629- 19 -LRB104 20614 RTM 34106 b

1    "Nonparticipating property" means real property that is
2not a participating property.
3    "Nonparticipating residence" means a residence that is
4located on nonparticipating property and that is existing and
5occupied on the date that an application for a permit to
6develop the commercial wind energy facility or the commercial
7solar energy facility is filed with the county.
8    "Occupied community building" means any one or more of the
9following buildings that is existing and occupied on the date
10that the application for a permit to develop the commercial
11wind energy facility or the commercial solar energy facility
12is filed with the county: a school, place of worship, day care
13facility, public library, or community center.
14    "Participating property" means real property that is the
15subject of a written agreement between a facility owner and
16the owner of the real property that provides the facility
17owner an easement, option, lease, or license to use the real
18property for the purpose of constructing a commercial wind
19energy facility, a commercial solar energy facility, or
20supporting facilities. "Participating property" also includes
21real property that is owned by a facility owner for the purpose
22of constructing a commercial wind energy facility, a
23commercial solar energy facility, or supporting facilities.
24    "Participating residence" means a residence that is
25located on participating property and that is existing and
26occupied on the date that an application for a permit to

 

 

SB3629- 20 -LRB104 20614 RTM 34106 b

1develop the commercial wind energy facility or the commercial
2solar energy facility is filed with the county.
3    "Protected lands" means real property that is:
4        (1) subject to a permanent conservation right
5    consistent with the Real Property Conservation Rights Act;
6    or
7        (2) registered or designated as a nature preserve,
8    buffer, or land and water reserve under the Illinois
9    Natural Areas Preservation Act.
10    "Supporting facilities" means the transmission lines,
11substations, access roads, meteorological towers, storage
12containers, and equipment associated with the generation and
13storage of electricity by the commercial wind energy facility
14or commercial solar energy facility. "Supporting facilities"
15includes energy storage systems capable of absorbing energy
16and storing it for use at a later time, including, but not
17limited to, batteries and other electrochemical and
18electromechanical technologies or systems.
19    "Wind tower" includes the wind turbine tower, nacelle, and
20blades.
21    (b) Notwithstanding any other provision of law or whether
22the county has formed a zoning commission and adopted formal
23zoning under Section 5-12007, a county may establish standards
24for commercial wind energy facilities, commercial solar energy
25facilities, or both. The standards may include all of the
26requirements specified in this Section but may not include

 

 

SB3629- 21 -LRB104 20614 RTM 34106 b

1requirements for commercial wind energy facilities or
2commercial solar energy facilities that are more restrictive
3than specified in this Section. A county may also regulate the
4siting of commercial wind energy facilities with standards
5that are not more restrictive than the requirements specified
6in this Section in unincorporated areas of the county that are
7outside the zoning jurisdiction of a municipality and that are
8outside the 1.5-mile radius surrounding the zoning
9jurisdiction of a municipality. A county may also regulate the
10siting of commercial solar energy facilities with standards
11that are not more restrictive than the requirements specified
12in this Section in unincorporated areas of the county that are
13outside of the zoning jurisdiction of a municipality.
14    (c) If a county has elected to establish standards under
15subsection (b), before the county grants siting approval or a
16special use permit for a commercial wind energy facility or a
17commercial solar energy facility, or modification of an
18approved siting or special use permit, the county board of the
19county in which the facility is to be sited or the zoning board
20of appeals for the county shall hold at least one public
21hearing. The public hearing shall be conducted in accordance
22with the Open Meetings Act and shall conclude not more than 60
23days after the filing of the application for the facility. The
24county shall allow interested parties to a special use permit
25an opportunity to present evidence and to cross-examine
26witnesses at the hearing, but the county may impose reasonable

 

 

SB3629- 22 -LRB104 20614 RTM 34106 b

1restrictions on the public hearing, including reasonable time
2limitations on the presentation of evidence and the
3cross-examination of witnesses. The county shall also allow
4public comment at the public hearing in accordance with the
5Open Meetings Act. The county shall make its siting and
6permitting decisions not more than 30 days after the
7conclusion of the public hearing. Notice of the hearing shall
8be published in a newspaper of general circulation in the
9county. A facility owner must enter into an agricultural
10impact mitigation agreement with the Department of Agriculture
11prior to the date of the required public hearing. A commercial
12wind energy facility owner seeking an extension of a permit
13granted by a county prior to July 24, 2015 (the effective date
14of Public Act 99-132) must enter into an agricultural impact
15mitigation agreement with the Department of Agriculture prior
16to a decision by the county to grant the permit extension.
17Counties may allow test wind towers or test solar energy
18systems to be sited without formal approval by the county
19board.
20    (d) A county with an existing zoning ordinance in conflict
21with this Section shall amend that zoning ordinance to be in
22compliance with this Section within 120 days after January 27,
232023 (the effective date of Public Act 102-1123).
24    (e) A county may require:
25        (1) a wind tower of a commercial wind energy facility
26    to be sited as follows, with setback distances measured

 

 

SB3629- 23 -LRB104 20614 RTM 34106 b

1    from the center of the base of the wind tower:
 
2Setback Description           Setback Distance
 
3Occupied Community            2.1 times the maximum blade tip
4Buildings                     height of the wind tower to the
5                              nearest point on the outside
6                              wall of the structure
 
7Participating Residences      1.1 times the maximum blade tip
8                              height of the wind tower to the
9                              nearest point on the outside
10                              wall of the structure
 
11Nonparticipating Residences   2.1 times the maximum blade tip
12                              height of the wind tower to the
13                              nearest point on the outside
14                              wall of the structure
 
15Boundary Lines of             None
16Participating Property 
 
17Boundary Lines of             1.1 times the maximum blade tip
18Nonparticipating Property     height of the wind tower to the
19                              nearest point on the property
20                              line of the nonparticipating

 

 

SB3629- 24 -LRB104 20614 RTM 34106 b

1                              property
 
2Public Road Rights-of-Way     1.1 times the maximum blade tip
3                              height of the wind tower
4                              to the center point of the
5                              public road right-of-way
 
6Overhead Communication and    1.1 times the maximum blade tip
7Electric Transmission         height of the wind tower to the
8and Distribution Facilities   nearest edge of the property
9(Not Including Overhead       line, easement, or 
10Utility Service Lines to      right-of-way 
11Individual Houses or          containing the overhead line
12Outbuildings)
 
13Overhead Utility Service      None
14Lines to Individual
15Houses or Outbuildings
 
16Fish and Wildlife Areas       2.1 times the maximum blade
17and Illinois Nature           tip height of the wind tower
18Preserve Commission           to the nearest point on the
19Protected Lands               property line of the fish and
20                              wildlife area or protected
21                              land
22    This Section does not exempt or excuse compliance with

 

 

SB3629- 25 -LRB104 20614 RTM 34106 b

1    electric facility clearances approved or required by the
2    National Electrical Code, the National Electrical Safety
3    Code, the Illinois Commerce Commission, and the Federal
4    Energy Regulatory Commission and their designees or
5    successors;
6        (2) a wind tower of a commercial wind energy facility
7    to be sited so that industry standard computer modeling
8    indicates that any occupied community building or
9    nonparticipating residence will not experience more than
10    30 hours per year of shadow flicker under planned
11    operating conditions;
12        (3) a commercial solar energy facility to be sited as
13    follows, with setback distances measured from the nearest
14    edge of any above-ground component of the facility,
15    excluding fencing:
 
16Setback Description           Setback Distance
 
17Occupied Community            150 feet from the nearest
18Buildings and Dwellings on    point on the outside wall 
19Nonparticipating Properties   of the structure
 
20Boundary Lines of             None
21Participating Property    
 
22Public Road Rights-of-Way     50 feet from the nearest

 

 

SB3629- 26 -LRB104 20614 RTM 34106 b

1                              edge of the public 
2                              right-of-way 
 
3Boundary Lines of             50 feet to the nearest
4Nonparticipating Property     point on the property
5                              line of the nonparticipating
6                              property
 
7        (4) a commercial solar energy facility to be sited so
8    that the facility's perimeter is enclosed by fencing
9    having a height of at least 6 feet and no more than 25
10    feet; and
11        (5) a commercial solar energy facility to be sited so
12    that no component of a solar panel has a height of more
13    than 20 feet above ground when the solar energy facility's
14    arrays are at full tilt.
15    This subsection (e) shall not preclude the ability of a
16county to require a reasonable setback distance between
17fencing and public rights-of-way if the requirement is not
18specific to commercial wind energy facilities or commercial
19solar energy facilities and does not preclude the development
20of commercial wind energy facilities or commercial solar
21energy facilities or the ability of commercial wind energy
22facilities or commercial solar energy facilities to comply
23with the requirements set forth in this subsection (e).
24    The requirements set forth in this subsection (e) may be

 

 

SB3629- 27 -LRB104 20614 RTM 34106 b

1waived subject to the written consent of the owner of each
2affected nonparticipating property.
3    (f) A county may not set a sound limitation for wind towers
4in commercial wind energy facilities or any components in
5commercial solar energy facilities that is more restrictive
6than the sound limitations established by the Illinois
7Pollution Control Board under 35 Ill. Adm. Code Parts 900,
8901, and 910. Additionally, in accordance with Section 25 of
9the Environmental Protection Act, a participating property,
10participating residence, nonparticipating property,
11nonparticipating residence, or any combination of those
12properties or residences may waive enforcement of the rules
13adopted by the Illinois Pollution Control Board under 35 Ill.
14Adm. Code Parts 900, 901, and 910 by written waiver that
15complies with the applicable directive established in Section
1625 of the Environmental Protection Act and is recorded in the
17Office of the Recorder of the county in which the
18participating property, participating residence,
19nonparticipating property, or nonparticipating residence is
20located. Once recorded, such a waiver shall be binding on any
21current and future owners, residents, lessees, invitees, and
22users of the participating property, participating residence,
23nonparticipating property, or nonparticipating residence for
24enforcement purposes. An owner of any participating residence
25or nonparticipating residence shall disclose the existence of
26such a waiver to any lessee before entering any new lease for

 

 

SB3629- 28 -LRB104 20614 RTM 34106 b

1the residence.
2    A seller or transferor of a participating property,
3participating residence, nonparticipating property,
4nonparticipating residence, or any combination of those
5properties or residences shall disclose the existence of such
6a waiver to any buyer or transferee before any sale or transfer
7of the property. If disclosure of the waiver occurs after the
8buyer has made an offer to purchase the property, the seller
9shall disclose the existence of the waiver before accepting
10the buyer's offer and shall (1) allow the buyer an opportunity
11to review the disclosure and (2) inform the buyer that the
12buyer has the right to amend the buyer's offer.
13    (g) A county may not place any restriction on the
14installation or use of a commercial wind energy facility or a
15commercial solar energy facility unless it adopts an ordinance
16that complies with this Section. A county may not establish
17siting standards for supporting facilities that preclude
18development of commercial wind energy facilities or commercial
19solar energy facilities.
20    A request for siting approval or a special use permit for a
21commercial wind energy facility or a commercial solar energy
22facility, or modification of an approved siting or special use
23permit, shall be approved if the request is in compliance with
24the standards and conditions imposed in this Act, the zoning
25ordinance adopted consistent with this Act, and the conditions
26imposed under State and federal statutes and regulations.

 

 

SB3629- 29 -LRB104 20614 RTM 34106 b

1    (h) A county may not adopt zoning regulations that
2disallow, permanently or temporarily, commercial wind energy
3facilities or commercial solar energy facilities from being
4developed or operated in any district zoned to allow
5agricultural or industrial uses.
6    (i) (Blank).
7    (i-5) All siting approval or special use permit
8application fees for a commercial wind energy facility or
9commercial solar energy facility must be reasonable. Fees that
10do not exceed $5,000 per each megawatt of nameplate capacity
11of the energy facility, up to a maximum of $125,000, shall be
12considered presumptively reasonable. A county may also require
13reimbursement from the applicant for any reasonable expenses
14incurred by the county in processing the siting approval or
15special use permit application in excess of the maximum fee. A
16siting approval or special use permit shall not be subject to
17any time deadline to start construction or obtain a building
18permit of less than 5 years from the date of siting approval or
19special use permit approval. A county shall allow an applicant
20to request an extension of the deadline based upon reasonable
21cause for the extension request. The exemption shall not be
22unreasonably withheld, conditioned, or denied.
23    (i-10) A county may require, for a commercial wind energy
24facility or commercial solar energy facility, a single
25building permit and a reasonable permit fee for the facility
26which includes all supporting facilities. County building

 

 

SB3629- 30 -LRB104 20614 RTM 34106 b

1permit fees for commercial wind energy facility or commercial
2solar energy facility that do not exceed $5,000 per each
3megawatt of nameplate capacity of the energy facility, up to a
4maximum of $75,000, shall be considered presumptively
5reasonable. A county may also require reimbursement from the
6applicant for any reasonable expenses incurred by the county
7in processing the building permit in excess of the maximum
8fee. A county may require an applicant, upon start of
9construction of the facility, to maintain liability insurance
10that is commercially reasonable and consistent with prevailing
11industry standards for similar energy facilities.
12    (j) Except as otherwise provided in this Section, a county
13shall not require standards for construction, decommissioning,
14or deconstruction of a commercial wind energy facility or
15commercial solar energy facility or related financial
16assurances that are more restrictive than those included in
17the Department of Agriculture's standard wind farm
18agricultural impact mitigation agreement, template 81818, or
19standard solar agricultural impact mitigation agreement,
20version 8.19.19, as applicable and in effect on December 31,
212022. The amount of any decommissioning payment shall be in
22accordance with the financial assurance required by those
23agricultural impact mitigation agreements.
24    (j-5) A commercial wind energy facility or a commercial
25solar energy facility shall file a farmland drainage plan with
26the county and impacted drainage districts outlining how

 

 

SB3629- 31 -LRB104 20614 RTM 34106 b

1surface and subsurface drainage of farmland will be restored
2during and following construction or deconstruction of the
3facility. The plan is to be created independently by the
4facility developer and shall include the location of any
5potentially impacted drainage district facilities to the
6extent this information is publicly available from the county
7or the drainage district, plans to repair any subsurface
8drainage affected during construction or deconstruction using
9procedures outlined in the agricultural impact mitigation
10agreement entered into by the commercial wind energy facility
11owner or commercial solar energy facility owner, and
12procedures for the repair and restoration of surface drainage
13affected during construction or deconstruction. All surface
14and subsurface damage shall be repaired as soon as reasonably
15practicable.
16    (k) A county may not condition approval of a commercial
17wind energy facility or commercial solar energy facility on a
18property value guarantee and may not require a facility owner
19to pay into a neighboring property devaluation escrow account.
20    (l) A county may require certain vegetative screening
21between a commercial solar energy facility and
22nonparticipating residences. A county may not require earthen
23berms or similar structures. Vegetative screening requirements
24shall be commercially reasonable and limited in height at full
25maturity to avoid reduction of the productive energy output of
26the commercial solar energy facility. A county may not require

 

 

SB3629- 32 -LRB104 20614 RTM 34106 b

1vegetative screening to exceed 5 feet in height when first
2installed or prior to commercial operation date. The screening
3requirements shall take into account the size and location of
4the facility, visibility from nonparticipating residences,
5compatibility of native plant species, cost and feasibility of
6installation and maintenance, and industry standards and best
7practices for commercial solar energy facilities.
8    (m) A county may set blade tip height limitations for wind
9towers in commercial wind energy facilities but may not set a
10blade tip height limitation that is more restrictive than the
11height allowed under a Determination of No Hazard to Air
12Navigation by the Federal Aviation Administration under 14 CFR
13Part 77.
14    (n) A county may require that a commercial wind energy
15facility owner or commercial solar energy facility owner
16provide:
17        (1) the results and recommendations from consultation
18    with the Illinois Department of Natural Resources that are
19    obtained through the Ecological Compliance Assessment Tool
20    (EcoCAT) or a comparable successor tool; and
21        (2) (blank).
22    (o) A county may require a commercial wind energy facility
23or commercial solar energy facility to adhere to the
24recommendations provided by the Illinois Department of Natural
25Resources in an EcoCAT natural resource review report under 17
26Ill. Adm. Code Part 1075.

 

 

SB3629- 33 -LRB104 20614 RTM 34106 b

1    (p) A county may require a facility owner to:
2        (1) demonstrate avoidance of protected lands as
3    identified by the Illinois Department of Natural Resources
4    and the Illinois Nature Preserve Commission; or
5        (2) consider the recommendations of the Illinois
6    Department of Natural Resources for setbacks from
7    protected lands, including areas identified by the
8    Illinois Nature Preserve Commission.
9    (q) A county may require that a facility owner provide
10evidence of consultation with the Illinois State Historic
11Preservation Office to assess potential impacts on
12State-registered historic sites under the Illinois State
13Agency Historic Resources Preservation Act.
14    (r) To maximize community benefits, including, but not
15limited to, reduced stormwater runoff, flooding, and erosion
16at the ground mounted solar energy system, improved soil
17health, and increased foraging habitat for game birds,
18songbirds, and pollinators, a county may (1) require a
19commercial solar energy facility owner to plant, establish,
20and maintain for the life of the facility vegetative ground
21cover, consistent with the goals of the Pollinator-Friendly
22Solar Site Act and (2) require the submittal of a vegetation
23management plan that is in compliance with the agricultural
24impact mitigation agreement in the application to construct
25and operate a commercial solar energy facility in the county
26if the vegetative ground cover and vegetation management plan

 

 

SB3629- 34 -LRB104 20614 RTM 34106 b

1comply with the requirements of the underlying agreement with
2the landowner or landowners where the facility will be
3constructed.
4    No later than 90 days after January 27, 2023 (the
5effective date of Public Act 102-1123), the Illinois
6Department of Natural Resources shall develop guidelines for
7vegetation management plans that may be required under this
8subsection for commercial solar energy facilities. The
9guidelines must include guidance for short-term and long-term
10property management practices that provide and maintain native
11and non-invasive naturalized perennial vegetation to protect
12the health and well-being of pollinators.
13    (s) If a facility owner enters into a road use agreement
14with the Illinois Department of Transportation, a road
15district, or other unit of local government relating to a
16commercial wind energy facility or a commercial solar energy
17facility, the road use agreement shall require the facility
18owner to be responsible for (i) the reasonable cost of
19improving roads used by the facility owner to construct the
20commercial wind energy facility or the commercial solar energy
21facility and (ii) the reasonable cost of repairing roads used
22by the facility owner during construction of the commercial
23wind energy facility or the commercial solar energy facility
24so that those roads are in a condition that is safe for the
25driving public after the completion of the facility's
26construction. Roadways improved in preparation for and during

 

 

SB3629- 35 -LRB104 20614 RTM 34106 b

1the construction of the commercial wind energy facility or
2commercial solar energy facility shall be repaired and
3restored to the improved condition at the reasonable cost of
4the developer if the roadways have degraded or were damaged as
5a result of construction-related activities.
6    The road use agreement shall not require the facility
7owner to pay costs, fees, or charges for road work that is not
8specifically and uniquely attributable to the construction of
9the commercial wind energy facility or the commercial solar
10energy facility. No road district or other unit of local
11government may request or require permit fees, fines, or other
12payment obligations as a requirement for a road use agreement
13with a facility owner unless the amount of the reasonable
14permit fee or payment is equivalent to the amount of actual
15expenses incurred by the road district or other unit of local
16government for negotiating, executing, constructing, or
17implementing the road use agreement. The road use agreement
18shall not require any road work to be performed by or paid for
19by the facility owner that is not specifically and uniquely
20attributable to the road improvements required for the
21construction of the commercial wind energy facility or the
22commercial solar energy facility or the restoration of the
23roads used by the facility owner during construction-related
24activities.
25    (s-5) The facility owner shall also compensate landowners
26for crop losses or other agricultural damages resulting from

 

 

SB3629- 36 -LRB104 20614 RTM 34106 b

1damage to the drainage system caused by the construction of
2the commercial wind energy facility or the commercial solar
3energy facility. The commercial wind energy facility owner or
4commercial solar energy facility owner shall repair or pay for
5the repair of all damage to the subsurface drainage system
6caused by the construction of the commercial wind energy
7facility or the commercial solar energy facility in accordance
8with the agriculture impact mitigation agreement requirements
9for repair of drainage. The commercial wind energy facility
10owner or commercial solar energy facility owner shall repair
11or pay for the repair and restoration of surface drainage
12caused by the construction or deconstruction of the commercial
13wind energy facility or the commercial solar energy facility
14as soon as reasonably practicable.
15    (t) Notwithstanding any other provision of law, a facility
16owner with siting approval from a county to construct a
17commercial wind energy facility or a commercial solar energy
18facility is authorized to cross or impact a drainage system,
19including, but not limited to, drainage tiles, open drainage
20ditches, culverts, and water gathering vaults, owned or under
21the control of a drainage district under the Illinois Drainage
22Code without obtaining prior agreement or approval from the
23drainage district in accordance with the farmland drainage
24plan required by subsection (j-5).
25    (u) The amendments to this Section adopted in Public Act
26102-1123 do not apply to: (1) an application for siting

 

 

SB3629- 37 -LRB104 20614 RTM 34106 b

1approval or for a special use permit for a commercial wind
2energy facility or commercial solar energy facility if the
3application was submitted to a unit of local government before
4January 27, 2023 (the effective date of Public Act 102-1123);
5(2) a commercial wind energy facility or a commercial solar
6energy facility if the facility owner has submitted an
7agricultural impact mitigation agreement to the Department of
8Agriculture before January 27, 2023 (the effective date of
9Public Act 102-1123); (3) a commercial wind energy or
10commercial solar energy development on property that is
11located within an enterprise zone certified under the Illinois
12Enterprise Zone Act, that was classified as industrial by the
13appropriate zoning authority on or before January 27, 2023,
14and that is located within 4 miles of the intersection of
15Interstate 88 and Interstate 39; or (4) a commercial wind
16energy or commercial solar energy development on property in
17Madison County that is located within the area that has as its
18northern boundary the portion of Drexelius Road that is
19between the intersection of Drexelius Road and Wolf Road and
20the intersection of Drexelius Road and Fosterburg Road, that
21has as its eastern boundary the portion of Fosterburg Road
22that is between the intersection of Fosterburg Road and
23Drexelius Road and the intersection of Fosterburg Road and
24Wolf Road, and that has as its southern and western boundaries
25the portion of Wolf Road that is between the intersection of
26Fosterburg Road and Wolf Road and the intersection of

 

 

SB3629- 38 -LRB104 20614 RTM 34106 b

1Drexelius Road and Wolf Road; or (5) a commercial wind energy
2development, a commercial solar energy development, or an
3energy storage development on property that is located South
4of Interstate Route 70 and within Edwards County, Franklin
5County, Hamilton County, Jackson County, Jefferson County,
6Madison County, Monroe County, Perry County, Randolph County,
7St. Clair County, Union County, Wabash County, Washington
8County, Wayne County, or White County.
9(Source: P.A. 103-81, eff. 6-9-23; 103-580, eff. 12-8-23;
10104-417, eff. 8-15-25; 104-458, eff. 6-1-26.)
 
11    Section 95. No acceleration or delay. Where this Act makes
12changes in a statute that is represented in this Act by text
13that is not yet or no longer in effect (for example, a Section
14represented by multiple versions), the use of that text does
15not accelerate or delay the taking effect of (i) the changes
16made by this Act or (ii) provisions derived from any other
17Public Act.