093_HB2313 LRB093 07456 JLS 07622 b 1 AN ACT concerning public utilities. 2 Be it enacted by the People of the State of Illinois, 3 represented in the General Assembly: 4 Section 5. The Public Utilities Act is amended by adding 5 Section 9-220.3 as follows: 6 (220 ILCS5/9-220.3 new) 7 Sec. 9-220.3. Asbestos surcharges authorized. 8 (a) The Commission shall authorize an electric or gas 9 utility to implement a surcharge ("asbestos rider"), to be 10 effective no earlier than January 1, 2007, to recover costs 11 associated with asbestos. 12 (b) Recoverable costs under an asbestos rider for a 13 given year shall include, but not be limited to, the prudent 14 costs incurred by the electric or gas utility for: 15 (1) injury and damage awards relating to asbestos 16 exposure; 17 (2) litigation expenses, including legal, 18 consulting, dispute resolution, and settlement costs; and 19 (3) costs related to insurance coverage and 20 insurance claims. 21 Recoverable costs under an asbestos rider, however, shall 22 not include any internal labor costs of the electric or gas 23 utility. 24 (c) The cost of site remediation (including removal, 25 encapsulation, or other appropriate remediation methods) 26 shall also be recoverable under an asbestos rider if the 27 costs are associated with remediation of electric property or 28 gas property and the site remediation is performed by a 29 workforce of skilled and trained employees equipped with 30 appropriate technical training and experience. Adequate 31 skill, training, and expertise shall be demonstrated by -2- LRB093 07456 JLS 07622 b 1 factors such as completion by the employee of an accredited 2 or otherwise recognized apprenticeship program for the 3 particular craft, trade, or skill. "Electric property" or 4 "gas property" shall mean all plant and property in the rate 5 base of the electric utility or gas utility as of or 6 subsequent to October 1, 1996, regardless of whether the 7 electric or gas utility has subsequently retired, sold, 8 leased, or otherwise transferred such plant or property. 9 (d) Under an asbestos rider, all related insurance 10 recoveries shall be offset against costs charged through the 11 rider, and allowable costs and revenues under the rider shall 12 be reconciled on a periodic basis to be determined by the 13 Commission, but not to exceed 3 years. Recoverable costs, 14 net of insurance recoveries, incurred between the effective 15 date of this amendatory Act of the 93rd General Assembly and 16 December 31, 2006 may be deferred by an electric utility for 17 recovery through an asbestos rider provided that those costs 18 and recoveries are booked to deferred accounts that are not 19 the subject of the Commission's determination of the return 20 on common equity pursuant to subsection (d) or (e) of Section 21 16-111. Recoverable costs, net of insurance recoveries, 22 incurred between the effective date of this amendatory Act of 23 the 93rd General Assembly and December 31, 2006 may be 24 deferred by a gas utility for recovery through an asbestos 25 rider provided that those costs and recoveries are booked to 26 deferred accounts that are not the subject of the 27 Commission's determination of the gas utility's return on 28 common equity. The electric or gas utility may accrue a 29 carrying charge on the deferred amounts each month at a rate 30 equal to the Monthly Treasury Long-Term Average Rate for that 31 month, as published by the Board of Governors of the Federal 32 Reserve System in its weekly H.15 Statistical Release or 33 successor publication. The Commission may determine that any 34 such deferred amount and associated carrying costs may be -3- LRB093 07456 JLS 07622 b 1 amortized over a period not to exceed 24 months; provided 2 that the deferred amounts shall continue to accrue carrying 3 charges at the stated rate during the amortization period. 4 (e) An electric or gas utility seeking to implement an 5 asbestos rider shall file with the Commission a proposed 6 rider complying with this Section and, to the extent 7 necessary, revised electric or gas base rates removing the 8 effect of any recoverable costs (as defined therein) 9 reflected in electric or gas base rates at the time of the 10 filing. The surcharge under an asbestos rider shall be 11 applicable to all customers, on a delivered per kWh or 12 delivered per therm basis. The Commission shall issue a 13 final order approving or rejecting a proposed asbestos rider 14 no later than 120 days after its filing with the Commission. 15 The Commission may reject a proposed asbestos rider only if 16 the proposed rider fails to conform to the requirements of 17 this Section. 18 Section 99. Effective date. This Act takes effect upon 19 becoming law.