Local Government Committee
Adopted in House Comm. on Mar 04, 2004
|
|
09300HB4238ham001 |
|
LRB093 15901 MKM 48171 a |
|
|
1 |
| AMENDMENT TO HOUSE BILL 4238
|
2 |
| AMENDMENT NO. ______. Amend House Bill 4238 by replacing |
3 |
| everything after the enacting clause with the following:
|
4 |
| "Section 5. The Counties Code is amended by changing |
5 |
| Section 5-12001.1 as
follows:
|
6 |
| (55 ILCS 5/5-12001.1)
|
7 |
| Sec. 5-12001.1. Authority to regulate certain specified |
8 |
| facilities of a
telecommunications carrier.
|
9 |
| (a) Notwithstanding any other Section in this Division, the |
10 |
| county board or
board of county commissioners of any county |
11 |
| shall have the power to
regulate the location of the |
12 |
| facilities, as defined in subsection (c), of a
|
13 |
| telecommunications carrier established outside the corporate |
14 |
| limits of cities,
villages, and incorporated towns that have |
15 |
| municipal zoning ordinances in
effect. The power shall only be |
16 |
| exercised to the extent and in the manner set
forth in this |
17 |
| Section.
|
18 |
| (b) The provisions of this Section shall not abridge any |
19 |
| rights created by
or authority confirmed in the federal |
20 |
| Telecommunications Act of 1996, P.L.
104-104.
|
21 |
| (c) As used in this Section, unless the context otherwise |
22 |
| requires:
|
23 |
| (1) "county jurisdiction area" means those portions of |
24 |
| a county that lie
outside the corporate limits of cities, |
|
|
|
09300HB4238ham001 |
- 2 - |
LRB093 15901 MKM 48171 a |
|
|
1 |
| villages, and incorporated towns that
have municipal |
2 |
| zoning ordinances in effect;
|
3 |
| (2) "county board" means the county board or board of |
4 |
| county commissioners
of any county;
|
5 |
| (3) "residential zoning district" means a zoning |
6 |
| district that is
designated under a county zoning ordinance |
7 |
| and is zoned predominantly for
residential uses;
|
8 |
| (4) "non-residential zoning district" means the county |
9 |
| jurisdiction area
of a county, except for those portions |
10 |
| within a residential zoning district;
|
11 |
| (5) "residentially zoned lot" means a zoning lot in a |
12 |
| residential zoning
district;
|
13 |
| (6) "non-residentially zoned lot" means a zoning lot in |
14 |
| a non-residential
zoning district;
|
15 |
| (7) "telecommunications carrier" means a |
16 |
| telecommunications carrier as
defined in the Public |
17 |
| Utilities Act as of January 1, 1997;
|
18 |
| (8) "facility" means that part of the signal |
19 |
| distribution system used or
operated by a |
20 |
| telecommunications carrier under a license from the FCC
|
21 |
| consisting of a combination of improvements and equipment |
22 |
| including (i) one or
more antennas, (ii) a supporting |
23 |
| structure and the hardware by which antennas
are attached; |
24 |
| (iii) equipment housing; and (iv) ancillary equipment such |
25 |
| as
signal transmission cables and miscellaneous hardware;
|
26 |
| (9) "FAA" means the Federal Aviation Administration of |
27 |
| the United States
Department of Transportation;
|
28 |
| (10) "FCC" means the Federal Communications |
29 |
| Commission;
|
30 |
| (11) "antenna" means an antenna device by which radio |
31 |
| signals are
transmitted, received, or both;
|
32 |
| (12) "supporting structure" means a structure, whether |
33 |
| an antenna tower or
another type of structure, that |
34 |
| supports one or more antennas as part of a
facility;
|
|
|
|
09300HB4238ham001 |
- 3 - |
LRB093 15901 MKM 48171 a |
|
|
1 |
| (13) "qualifying structure" means a supporting |
2 |
| structure that is (i) an
existing structure, if the height |
3 |
| of the facility, including the structure, is
not more than |
4 |
| 15 feet higher than the structure just before the facility |
5 |
| is
installed, or (ii) a substantially similar, |
6 |
| substantially same-location
replacement of an existing |
7 |
| structure, if the height of the facility, including
the |
8 |
| replacement structure, is not more than 15 feet higher than |
9 |
| the height of
the existing structure just before the |
10 |
| facility is installed;
|
11 |
| (14) "equipment housing" means a combination of one or |
12 |
| more equipment
buildings or enclosures housing equipment |
13 |
| that operates in conjunction with
the antennas of a |
14 |
| facility, and the equipment itself;
|
15 |
| (15) "height" of a facility means the total height of |
16 |
| the facility's
supporting structure and any antennas that |
17 |
| will extend above the top of the
supporting structure; |
18 |
| however, if the supporting structure's foundation extends
|
19 |
| more than 3 feet above the uppermost ground level along the |
20 |
| perimeter of the
foundation, then each full foot in excess |
21 |
| of 3 feet shall be counted as an
additional foot of |
22 |
| facility height. The height of a facility's supporting
|
23 |
| structure is to be measured from the highest point of the |
24 |
| supporting
structure's foundation;
|
25 |
| (16) "facility lot" means the zoning lot on which a |
26 |
| facility is or will be
located;
|
27 |
| (17) "principal residential building" has its common |
28 |
| meaning but shall not
include any building under the same |
29 |
| ownership as the land of the facility lot.
"Principal |
30 |
| residential building" shall not include any structure that |
31 |
| is not
designed for human habitation;
|
32 |
| (18) "horizontal separation distance" means the |
33 |
| distance measured from the
center of the base of the |
34 |
| facility's supporting structure to the point where
the |
|
|
|
09300HB4238ham001 |
- 4 - |
LRB093 15901 MKM 48171 a |
|
|
1 |
| ground meets a vertical wall of a principal residential |
2 |
| building; and
|
3 |
| (19) "lot line set back distance" means the distance |
4 |
| measured from the
center of the base of the facility's |
5 |
| supporting structure to the nearest point
on the common lot |
6 |
| line between the facility lot and the nearest residentially
|
7 |
| zoned lot. If there is no common lot line, the measurement |
8 |
| shall be made to
the nearest point on the lot line of the |
9 |
| nearest residentially zoned lot
without deducting the |
10 |
| width of any intervening right of way.
|
11 |
| (d) In choosing a location for a facility, a
|
12 |
| telecommunications carrier shall consider the following:
|
13 |
| (1) A non-residentially zoned lot is the most desirable |
14 |
| location.
|
15 |
| (2) A residentially zoned lot that is not used for |
16 |
| residential purposes is
the second most desirable |
17 |
| location.
|
18 |
| (3) A residentially zoned lot that is 2 acres or more |
19 |
| in size and is used
for residential purposes is the third |
20 |
| most desirable location.
|
21 |
| (4) A residentially zoned lot that is less than 2 acres |
22 |
| in size and is
used for residential purposes is the least |
23 |
| desirable location.
|
24 |
| The size of a lot shall be the lot's gross area in square |
25 |
| feet without
deduction of any unbuildable or unusable land, any |
26 |
| roadway, or any other
easement.
|
27 |
| (e) In designing a facility, a telecommunications carrier |
28 |
| shall consider the
following guidelines:
|
29 |
| (1) No building or tower that is part of a facility |
30 |
| should encroach onto
any recorded easement prohibiting the |
31 |
| encroachment unless the grantees of the
easement have given |
32 |
| their approval.
|
33 |
| (2) Lighting should be installed for security and |
34 |
| safety purposes only.
Except with respect to lighting |
|
|
|
09300HB4238ham001 |
- 5 - |
LRB093 15901 MKM 48171 a |
|
|
1 |
| required by the FCC or FAA, all lighting should
be shielded |
2 |
| so that no glare extends substantially beyond the |
3 |
| boundaries of a
facility.
|
4 |
| (3) No facility should encroach onto an existing septic |
5 |
| field.
|
6 |
| (4) Any facility located in a special flood hazard area |
7 |
| or wetland should
meet the legal requirements for those |
8 |
| lands.
|
9 |
| (5) Existing trees more than 3 inches in diameter |
10 |
| should be preserved if
reasonably feasible during |
11 |
| construction. If any tree more than 3 inches in
diameter is |
12 |
| removed during construction a tree 3 inches or more in |
13 |
| diameter of
the same or a similar species shall be planted |
14 |
| as a replacement if reasonably
feasible. Tree diameter |
15 |
| shall be measured at a point 3 feet above ground
level.
|
16 |
| (6) If any elevation of a facility faces an existing, |
17 |
| adjoining
residential use within a residential zoning |
18 |
| district, low maintenance
landscaping should be provided |
19 |
| on or near the facility lot to provide at least
partial |
20 |
| screening of the facility. The quantity and type of that |
21 |
| landscaping
should be in accordance with any county |
22 |
| landscaping regulations of general
applicability, except |
23 |
| that paragraph (5) of this subsection (e) shall control
|
24 |
| over any tree-related regulations imposing a greater |
25 |
| burden.
|
26 |
| (7) Fencing should be installed around a facility. The |
27 |
| height and
materials of the fencing should be in accordance |
28 |
| with any county fence
regulations of general |
29 |
| applicability.
|
30 |
| (8) Any building that is part of a facility located |
31 |
| adjacent to a
residentially zoned lot should be designed |
32 |
| with exterior materials and colors
that are reasonably |
33 |
| compatible with the residential character of the area.
|
34 |
| (f) The following provisions shall apply to all facilities |
|
|
|
09300HB4238ham001 |
- 6 - |
LRB093 15901 MKM 48171 a |
|
|
1 |
| established in
any county jurisdiction area after the effective |
2 |
| date of the amendatory Act of
1997:
|
3 |
| (1) Except as provided in this Section, no yard or set |
4 |
| back
regulations shall apply to or be required for a |
5 |
| facility.
|
6 |
| (2) A facility may be located on the same zoning lot as |
7 |
| one or more other
structures or uses without violating any |
8 |
| ordinance or regulation that prohibits
or limits multiple |
9 |
| structures, buildings, or uses on a zoning lot.
|
10 |
| (3) No minimum lot area, width, or depth shall be |
11 |
| required for a facility,
and unless the facility is to be |
12 |
| manned on a regular, daily basis, no
off-street parking |
13 |
| spaces shall be required for a facility. If the facility is
|
14 |
| to be manned on a regular, daily basis, one off-street |
15 |
| parking space shall be
provided for each employee regularly |
16 |
| at the facility. No loading facilities
are required.
|
17 |
| (4) No portion of a facility's supporting structure or |
18 |
| equipment housing
shall be less than 15 feet from the front |
19 |
| lot line of the facility lot or less
than 10 feet from any |
20 |
| other lot line.
|
21 |
| (5) No bulk regulations or lot coverage, building |
22 |
| coverage, or floor area
ratio limitations shall be applied |
23 |
| to a facility or to any existing use or
structure |
24 |
| coincident with the establishment of a facility. Except as |
25 |
| provided
in this Section, no height limits or restrictions |
26 |
| shall apply to a facility.
|
27 |
| (6) A county's review of a building permit application |
28 |
| for a facility
shall
be completed within 30 days. If a |
29 |
| decision of the county board is required to
permit the |
30 |
| establishment of a facility, the county's review of the |
31 |
| application
shall be simultaneous with the process leading |
32 |
| to the county board's decision.
|
33 |
| (7) The improvements and equipment comprising the |
34 |
| facility may be wholly
or partly freestanding or wholly or |
|
|
|
09300HB4238ham001 |
- 7 - |
LRB093 15901 MKM 48171 a |
|
|
1 |
| partly attached to, enclosed in, or
installed in or on a |
2 |
| structure or structures.
|
3 |
| (8) Any public hearing authorized under this Section |
4 |
| shall be conducted in
a manner determined by the county |
5 |
| board. Notice of any such public hearing
shall be published |
6 |
| at least 15 days before the hearing in a newspaper of
|
7 |
| general circulation published in the county.
|
8 |
| (9) Any decision regarding a facility by the county |
9 |
| board or a county
agency
or official shall be supported by |
10 |
| written findings of fact. The circuit court
shall have |
11 |
| jurisdiction to review the reasonableness of any adverse |
12 |
| decision
and the plaintiff shall bear the burden of proof, |
13 |
| but there shall be no
presumption of the validity of the |
14 |
| decision.
|
15 |
| (g) The following provisions shall apply to all facilities |
16 |
| established after
the effective date of this amendatory Act of |
17 |
| 1997 in the county jurisdiction
area of any county with a |
18 |
| population of less than 180,000:
|
19 |
| (1) A facility is permitted if its supporting structure |
20 |
| is a qualifying
structure or if both of the following |
21 |
| conditions are met:
|
22 |
| (A) the height of the facility shall not exceed 200 |
23 |
| feet, except that
if a facility is located more than |
24 |
| one and one-half miles from the corporate
limits of any |
25 |
| municipality with a population of 25,000 or more the |
26 |
| height of
the facility shall not exceed 350 feet; and
|
27 |
| (B) the horizontal separation distance to the |
28 |
| nearest principal
residential building shall not be |
29 |
| less than the height of the supporting
structure; |
30 |
| except that if the supporting structure exceeds 99 feet |
31 |
| in height,
the horizontal separation distance to the |
32 |
| nearest principal residential
building shall be at |
33 |
| least 100 feet or 80% of the height of the supporting
|
34 |
| structure, whichever is greater. Compliance with this |
|
|
|
09300HB4238ham001 |
- 8 - |
LRB093 15901 MKM 48171 a |
|
|
1 |
| paragraph shall only be
evaluated as of
the time that a |
2 |
| building permit application for the facility is |
3 |
| submitted. If
the supporting structure is not an |
4 |
| antenna tower this paragraph is satisfied.
|
5 |
| (2) Unless a facility is permitted under paragraph (1) |
6 |
| of this subsection
(g), a facility can be established only |
7 |
| after the county board gives its
approval following |
8 |
| consideration of the provisions of paragraph (3) of this
|
9 |
| subsection (g). The county board may give its approval |
10 |
| after one public
hearing on the proposal, but only by the |
11 |
| favorable vote of a majority of the
members present
at a |
12 |
| meeting held no later than 75 days after submission of a
|
13 |
| complete application by the telecommunications carrier. If |
14 |
| the county board
fails to act on the application within 75 |
15 |
| days after its submission,
the application shall be deemed |
16 |
| to have been approved. No more than one public
hearing |
17 |
| shall be required.
|
18 |
| (3) For purposes of paragraph (2) of this subsection |
19 |
| (g), the following
siting considerations, but no other |
20 |
| matter, shall be considered by the county
board or any |
21 |
| other body conducting the public hearing:
|
22 |
| (A) the criteria in subsection (d) of this Section;
|
23 |
| (B) whether a substantial adverse effect on public |
24 |
| safety will result
from some aspect of the facility's |
25 |
| design or proposed construction, but only if
that |
26 |
| aspect of design or construction is modifiable by the |
27 |
| applicant;
|
28 |
| (C) the benefits to be derived by the users of the |
29 |
| services to be
provided
or enhanced by the facility and |
30 |
| whether public safety and emergency response
|
31 |
| capabilities would benefit by the establishment of the |
32 |
| facility;
|
33 |
| (D) the existing uses on adjacent and nearby |
34 |
| properties; and
|
|
|
|
09300HB4238ham001 |
- 9 - |
LRB093 15901 MKM 48171 a |
|
|
1 |
| (E) the extent to which the design of the proposed |
2 |
| facility reflects
compliance with subsection (e) of |
3 |
| this Section.
|
4 |
| (4) On judicial review of an adverse decision, the |
5 |
| issue shall be the
reasonableness of the county board's |
6 |
| decision in light of the evidence
presented on the siting |
7 |
| considerations and the well-reasoned recommendations
of |
8 |
| any other body that conducts the public hearing.
|
9 |
| (h) The following provisions shall apply to all facilities |
10 |
| established
after the effective date of this amendatory Act of |
11 |
| 1997 in the county
jurisdiction area of any county with
a |
12 |
| population of 180,000 or more. A facility is
permitted in any |
13 |
| zoning district subject to the following:
|
14 |
| (1) A facility shall not be located on a lot under |
15 |
| paragraph (4) of
subsection (d) unless a variation is |
16 |
| granted by the county board under
paragraph
(4) of this |
17 |
| subsection (h).
|
18 |
| (2) Unless a height variation is granted by the county |
19 |
| board, the height
of a facility shall not exceed 75 feet if |
20 |
| the facility will
be located in a residential zoning |
21 |
| district or 200 feet if the facility will be
located in a |
22 |
| non-residential zoning district. However, the height of a
|
23 |
| facility may
exceed the height limit in this paragraph, and |
24 |
| no height variation shall be
required, if the supporting |
25 |
| structure is a qualifying structure.
|
26 |
| (3) The improvements and equipment of the facility |
27 |
| shall be placed to
comply
with the requirements of this |
28 |
| paragraph at the time a building permit
application for the |
29 |
| facility is submitted. If the supporting structure is an
|
30 |
| antenna tower other than a qualifying structure then (i) if |
31 |
| the facility will
be located in a residential zoning |
32 |
| district the lot line set back distance to
the
nearest |
33 |
| residentially zoned lot shall be at least 50% of the height |
34 |
| of the
facility's supporting structure or (ii) if the |
|
|
|
09300HB4238ham001 |
- 10 - |
LRB093 15901 MKM 48171 a |
|
|
1 |
| facility will be located in a
non-residential zoning |
2 |
| district the horizontal separation distance to the
nearest |
3 |
| principal residential building shall be at least equal to |
4 |
| the height of
the facility's supporting structure.
|
5 |
| (4) The county board may grant variations for any of |
6 |
| the regulations,
conditions, and restrictions of this |
7 |
| subsection (h), after one public hearing
on the
proposed |
8 |
| variations, by a favorable vote of a majority of the |
9 |
| members present
at a meeting held no later than 75 days |
10 |
| after submission of an application by
the |
11 |
| telecommunications carrier. If the county board fails to |
12 |
| act on the
application within 75 days after submission, the |
13 |
| application shall be deemed to
have been approved. In its |
14 |
| consideration of an application for variations,
the county
|
15 |
| board, and any other body conducting the public hearing, |
16 |
| shall consider the
following, and no other matters:
|
17 |
| (A) whether, but for the granting of a variation, |
18 |
| the service that the
telecommunications carrier seeks |
19 |
| to enhance or provide with the proposed
facility will |
20 |
| be less available, impaired, or diminished in quality, |
21 |
| quantity,
or scope of
coverage;
|
22 |
| (B) whether the conditions upon which the |
23 |
| application for variations is
based are unique in some |
24 |
| respect or, if not, whether the strict application of
|
25 |
| the regulations would result in a hardship on the |
26 |
| telecommunications carrier;
|
27 |
| (C) whether a substantial adverse effect on public |
28 |
| safety will result
from
some aspect of the facility's |
29 |
| design or proposed construction, but only if that
|
30 |
| aspect of design or construction is modifiable by the |
31 |
| applicant;
|
32 |
| (D) whether there are benefits to be derived by the |
33 |
| users of the
services to
be provided or enhanced by the |
34 |
| facility and whether public safety and emergency
|
|
|
|
09300HB4238ham001 |
- 11 - |
LRB093 15901 MKM 48171 a |
|
|
1 |
| response capabilities would benefit by the |
2 |
| establishment of the facility; and
|
3 |
| (E) the extent to which the design of the proposed |
4 |
| facility reflects
compliance with subsection (e) of |
5 |
| this Section.
|
6 |
| No more than one public hearing shall be required.
|
7 |
| (5) On judicial review of an adverse decision, the |
8 |
| issue shall be the
reasonableness of the county board's |
9 |
| decision in light of the evidence
presented and the |
10 |
| well-reasoned recommendations of any other body that
|
11 |
| conducted the public hearing.
|
12 |
| (Source: P.A. 90-522, eff. 1-1-98.)".
|