|
|
||||||||||||||||||||||||
|
||||||||||||||||||||||||
| ||||||||||||||||||||||||
|
||||||||||||||||||||||||
| ||||||||||||||||||||||||
| 1 | AN ACT concerning drilling operations.
| |||||||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||||||
| 3 | represented in the General Assembly:
| |||||||||||||||||||||||
| 4 | Section 5. The Drilling Operations Act is amended by | |||||||||||||||||||||||
| 5 | changing Sections 2, 4,
and
6 as follows:
| |||||||||||||||||||||||
| 6 | (765 ILCS 530/2)
(from Ch. 96 1/2, par. 9652)
| |||||||||||||||||||||||
| 7 | Sec. 2. As used in this Act:
| |||||||||||||||||||||||
| 8 | (a) "Person" means any natural person, corporation, firm, | |||||||||||||||||||||||
| 9 | partnership,
venture, receiver, trustee, executor, | |||||||||||||||||||||||
| 10 | administrator, guardian, fiduciary or
other representative of | |||||||||||||||||||||||
| 11 | any kind and includes any government or any
political | |||||||||||||||||||||||
| 12 | subdivision or agency thereof;
| |||||||||||||||||||||||
| 13 | (b) "Drilling operations" means the drilling, deepening or | |||||||||||||||||||||||
| 14 | conversion of
a well for oil or gas production, including the | |||||||||||||||||||||||
| 15 | production and storage of
methane gas, core hole or drill hole | |||||||||||||||||||||||
| 16 | for a stratigraphic
test;
| |||||||||||||||||||||||
| 17 | (c) "Entry" means the moving upon the surface of land with | |||||||||||||||||||||||
| 18 | equipment to
commence drilling operations, but shall not | |||||||||||||||||||||||
| 19 | include entry for the survey
for or ascertaining or | |||||||||||||||||||||||
| 20 | identification of a well location;
| |||||||||||||||||||||||
| 21 | (d) "Operator" means the person, whether the owner or not, | |||||||||||||||||||||||
| 22 | who applies
for or holds a permit for drilling operations or | |||||||||||||||||||||||
| 23 | who is named as the
principal on a bond for a permit for a well | |||||||||||||||||||||||
| 24 | that was issued by the
Department of Natural Resources;
| |||||||||||||||||||||||
| 25 | (e) "Surface owner" means the person in whose name the | |||||||||||||||||||||||
| 26 | surface of the
land on which drilling operations are | |||||||||||||||||||||||
| 27 | contemplated, and who is assessed for
purposes of taxes imposed | |||||||||||||||||||||||
| 28 | pursuant to the Property Tax Code according to the
records of | |||||||||||||||||||||||
| 29 | the assessor of the county where the land
is located as | |||||||||||||||||||||||
| 30 | certified by said assessor;
| |||||||||||||||||||||||
| 31 | (f) "Assessor" means the supervisor of assessments, board | |||||||||||||||||||||||
| 32 | of assessors,
or county assessor, as the case may be, for the | |||||||||||||||||||||||
| |||||||
|
|||||||
| 1 | county in which the land is
located;
| ||||||
| 2 | (g) "Production operation" means the operation of a well | ||||||
| 3 | for the
production of oil or gas including all acts, | ||||||
| 4 | structures, equipment, and
roadways necessary for such | ||||||
| 5 | operation;
| ||||||
| 6 | (h) "New well" means a well that is spudded after the | ||||||
| 7 | effective date of
this Act and does not utilize any part of a | ||||||
| 8 | well bore or drilling location
that existed prior to the | ||||||
| 9 | effective date of this Act;
| ||||||
| 10 | (i) "Completion of the well" means completion of those | ||||||
| 11 | processes
necessary before production occurs, including the | ||||||
| 12 | laying of flow lines and
the construction of the tank battery. | ||||||
| 13 | If the well is not productive, the
date of completion of the | ||||||
| 14 | well is the day it is plugged and abandoned.
| ||||||
| 15 | (j) "Agricultural production" means the production of any | ||||||
| 16 | growing grass,
crops, or trees attached to the surface of the | ||||||
| 17 | land, whether or not the grass,
crops, or trees are to be sold | ||||||
| 18 | commercially, and the production of any farm
animals, whether | ||||||
| 19 | or not the animals are to be sold commercially.
| ||||||
| 20 | (Source: P.A. 88-670, eff. 12-2-94; 89-445, eff. 2-7-96.)
| ||||||
| 21 | (765 ILCS 530/4) (from Ch. 96 1/2, par. 9654)
| ||||||
| 22 | Sec. 4. Notice.
| ||||||
| 23 | (a) At least 30 days prior
Prior to commencement of the | ||||||
| 24 | drilling of a well, the operator shall
give written notice to | ||||||
| 25 | the surface owner of the operator's intent to commence
drilling | ||||||
| 26 | operations.
| ||||||
| 27 | (b) The operator shall, for the purpose of giving notice as | ||||||
| 28 | herein
required, secure from the assessor's office within 90 | ||||||
| 29 | days prior to the
giving of the notice, a certification which | ||||||
| 30 | shall identify the person in
whose name the lands on which | ||||||
| 31 | drilling operations are to be commenced and who
is assessed at | ||||||
| 32 | the time the certification is made. The written certification
| ||||||
| 33 | made by the assessor of the surface owner shall be conclusive | ||||||
| 34 | evidence of
the surface ownership and of the operator's | ||||||
| 35 | compliance with the provisions of
this Act.
| ||||||
| |||||||
|
|||||||
| 1 | (c) The notice required to be given by the operator to the | ||||||
| 2 | surface owner
shall identify the following:
| ||||||
| 3 | (1) The location of the proposed entry on the
surface | ||||||
| 4 | for drilling operations, and the date on or after which | ||||||
| 5 | drilling
operations shall be commenced.
| ||||||
| 6 | (2) A photocopy of the drilling application to the | ||||||
| 7 | Department
of Natural Resources for
the well to be drilled.
| ||||||
| 8 | (3) The name, address and telephone number of the | ||||||
| 9 | operator.
| ||||||
| 10 | (3.5) A statement advising the surface owner that he or | ||||||
| 11 | she may have a right to damages and advising the surface | ||||||
| 12 | owner to seek legal counsel.
| ||||||
| 13 | (4) An offer to discuss with the surface owner those | ||||||
| 14 | matters set forth
in Section 5 hereof prior to commencement | ||||||
| 15 | of drilling operations.
| ||||||
| 16 | (5) If the surface owner elects to meet the operator, | ||||||
| 17 | the surface owner
shall request the operator to schedule a | ||||||
| 18 | meeting at a mutually agreed time
and place within the | ||||||
| 19 | limitations set forth herein. Failure of the surface
owner | ||||||
| 20 | to contact the operator at least 5 days prior to the | ||||||
| 21 | proposed
commencement of drilling operations shall be | ||||||
| 22 | conclusively deemed a waiver
of the right to meet by the | ||||||
| 23 | surface owner.
| ||||||
| 24 | (6) The meeting shall be scheduled between the hours of | ||||||
| 25 | 9:00 in the
morning
and the setting of the sun of the same | ||||||
| 26 | day and shall be at least 3 days prior
to commencement of | ||||||
| 27 | drilling operations. Unless agreed to otherwise, the
place | ||||||
| 28 | shall be located within the county in which drilling | ||||||
| 29 | operations are
to be commenced where the operator or his | ||||||
| 30 | agent shall be available to
discuss with the surface owner | ||||||
| 31 | or his agent those matters set forth in Section
5 hereof.
| ||||||
| 32 | (7) The notice herein required shall be given to the | ||||||
| 33 | surface owner by
either:
| ||||||
| 34 | (A) certified mail addressed to the surface owner | ||||||
| 35 | at the address shown
in the certification obtained from | ||||||
| 36 | the assessor, which shall be postmarked
at least 10 | ||||||
| |||||||
|
|||||||
| 1 | days prior to the commencement of drilling operations; | ||||||
| 2 | or
| ||||||
| 3 | (B) personal delivery to the surface owner at least | ||||||
| 4 | 8 days prior to the
commencement of drilling | ||||||
| 5 | operations.
| ||||||
| 6 | (C) Notice to the surface owner as defined in this | ||||||
| 7 | Act shall be deemed
conclusive notice to the record | ||||||
| 8 | owners of all interest in the surface.
| ||||||
| 9 | (Source: P.A. 89-445, eff. 2-7-96.)
| ||||||
| 10 | (765 ILCS 530/6)
(from Ch. 96 1/2, par. 9656)
| ||||||
| 11 | Sec. 6. Compensation of surface owners for drilling and | ||||||
| 12 | producing
operations and duties after cessation of production.
| ||||||
| 13 | (A) The surface owner shall be entitled to reasonable | ||||||
| 14 | compensation from
the operator for damages to agricultural | ||||||
| 15 | production and income, growing
crops, trees, shrubs, fences, | ||||||
| 16 | roads,
structures, improvements and livestock thereon caused | ||||||
| 17 | by the drilling of a new
well, including compensation for the | ||||||
| 18 | diminution in value, if any, of the
surface lands and other | ||||||
| 19 | property after completion of the surface disturbance,
| ||||||
| 20 | determined according to the actual use made thereof by the | ||||||
| 21 | surface owner
immediately prior to the commencement of the | ||||||
| 22 | drilling operations, the cost of
repair of personal property up | ||||||
| 23 | to the value of replacement by personal property
of like age, | ||||||
| 24 | wear, and quality, and lost use of and access to the surface
| ||||||
| 25 | owner's land. The surface owner shall also be entitled to | ||||||
| 26 | reasonable
compensation
from the operator for subsequent | ||||||
| 27 | damages to agricultural production and
income, growing crops, | ||||||
| 28 | trees, shrubs,
fences, roads, structures, improvements and | ||||||
| 29 | livestock thereon caused by
subsequent production operations | ||||||
| 30 | of the operator thereon, including
compensation for the | ||||||
| 31 | diminution in value, if any, of the surface lands and
other
| ||||||
| 32 | property after completion of the surface disturbance, | ||||||
| 33 | determined according to
the actual use made thereof by the | ||||||
| 34 | surface owner immediately prior to the
commencement of the | ||||||
| 35 | drilling operations, the cost of repair
of personal property up | ||||||
| |||||||
|
|||||||
| 1 | to the value of replacement by personal property of
like age, | ||||||
| 2 | wear, and quality, and lost use of and access to the surface | ||||||
| 3 | owner's
land. The surface
owner shall also be entitled to | ||||||
| 4 | reasonable compensation for all negligent
acts of operator that | ||||||
| 5 | cause measurable damage to the productive capacity of
the soil. | ||||||
| 6 | In addition, the operator shall not utilize any more of the
| ||||||
| 7 | surface estate than is reasonably necessary for the | ||||||
| 8 | exploration, production
and development of the mineral estate.
| ||||||
| 9 | (B) The compensation required pursuant to paragraph (A) | ||||||
| 10 | above shall be
paid in any manner mutually agreed upon by the | ||||||
| 11 | operator and the surface
owner, but the failure to agree upon, | ||||||
| 12 | or make the compensation required,
shall not prevent the | ||||||
| 13 | operator from commencement of drilling operations;
provided, | ||||||
| 14 | however, that operator shall tender to the surface owner | ||||||
| 15 | payment by
check or draft in accordance with the provisions | ||||||
| 16 | herein no later than 90 days
after completion of the well. The | ||||||
| 17 | surface owner's remedy shall be an
action for compensation in | ||||||
| 18 | the circuit court in which the lands or the
greater part | ||||||
| 19 | thereof are located on which drilling operations were
| ||||||
| 20 | conducted; provided, however, that if operator fails to tender | ||||||
| 21 | payment
within the 90-day period or if the tender is not | ||||||
| 22 | reasonable, surface owner
shall be entitled to reasonable | ||||||
| 23 | compensation as provided herein as well as
attorney's fees.
| ||||||
| 24 | If operator relies on a third party appraiser or fair | ||||||
| 25 | market value, such
amount shall be conclusively deemed to be | ||||||
| 26 | reasonable, and there shall be no
award of attorney's fees.
| ||||||
| 27 | (C) In conjunction with the plugging and abandonment of any | ||||||
| 28 | well, the
operator shall restore the surface to a condition as | ||||||
| 29 | near as practicable to
the condition of the surface prior to | ||||||
| 30 | commencement of drilling operations;
provided, however, that | ||||||
| 31 | the surface owner and operator may waive this
requirement in | ||||||
| 32 | writing, subject to the approval of the Department of Natural
| ||||||
| 33 | Resources that the waiver is in accordance with its
rules.
| ||||||
| 34 | (D) Where practicable and absent a written agreement to the | ||||||
| 35 | contrary
with the surface owner, all flow lines and other | ||||||
| 36 | underground structures
must be buried to a depth not less than | ||||||
| |||||||
|
|||||||
| 1 | 36 inches from the surface.
| ||||||
| 2 | (Source: P.A. 89-445, eff. 2-7-96.)
| ||||||