|
Sen. J. Bradley Burzynski
Filed: 3/22/2004
|
|
09300SB2696sam002 |
|
LRB093 20575 LCB 48679 a |
|
|
1 |
| AMENDMENT TO SENATE BILL 2696
|
2 |
| AMENDMENT NO. ______. Amend Senate Bill 2696, AS AMENDED, |
3 |
| by replacing everything after the enacting clause with the |
4 |
| following:
|
5 |
| "Section 5. The Drilling Operations Act is amended by |
6 |
| changing Section 4 and by adding Section 3.5 as follows: |
7 |
| (765 ILCS 530/3.5 new)
|
8 |
| Sec. 3.5. Information pamphlet. The Department of Natural |
9 |
| Resources shall prepare an information pamphlet concerning a |
10 |
| property owner's rights relating to drilling operations and the |
11 |
| laws pertaining to those rights. The Department of Natural |
12 |
| Resources shall provide the drilling operator with a copy of |
13 |
| the pamphlet at the time that the operator is given a permit to |
14 |
| perform the drilling operations.
|
15 |
| (765 ILCS 530/4) (from Ch. 96 1/2, par. 9654)
|
16 |
| Sec. 4. Notice.
|
17 |
| (a) Prior to commencement of the drilling of a well, the |
18 |
| operator shall
give written notice to the surface owner of the |
19 |
| operator's intent to commence
drilling operations. In addition |
20 |
| to the notice, the operator shall give the surface owner the |
21 |
| pamphlet prepared by the Department of Natural Resources |
22 |
| informing the owner of the law and the owner's rights |
23 |
| concerning the drilling operations.
|
|
|
|
09300SB2696sam002 |
- 2 - |
LRB093 20575 LCB 48679 a |
|
|
1 |
| (b) The operator shall, for the purpose of giving notice as |
2 |
| herein
required, secure from the assessor's office within 90 |
3 |
| days prior to the
giving of the notice, a certification which |
4 |
| shall identify the person in
whose name the lands on which |
5 |
| drilling operations are to be commenced and who
is assessed at |
6 |
| the time the certification is made. The written certification
|
7 |
| made by the assessor of the surface owner shall be conclusive |
8 |
| evidence of
the surface ownership and of the operator's |
9 |
| compliance with the provisions of
this Act.
|
10 |
| (c) The notice required to be given by the operator to the |
11 |
| surface owner
shall identify the following:
|
12 |
| (1) The location of the proposed entry on the
surface |
13 |
| for drilling operations, and the date on or after which |
14 |
| drilling
operations shall be commenced.
|
15 |
| (2) A photocopy of the drilling application to the |
16 |
| Department
of Natural Resources for
the well to be drilled.
|
17 |
| (3) The name, address and telephone number of the |
18 |
| operator.
|
19 |
| (4) An offer to discuss with the surface owner those |
20 |
| matters set forth
in Section 5 hereof prior to commencement |
21 |
| of drilling operations.
|
22 |
| (5) If the surface owner elects to meet the operator, |
23 |
| the surface owner
shall request the operator to schedule a |
24 |
| meeting at a mutually agreed time
and place within the |
25 |
| limitations set forth herein. Failure of the surface
owner |
26 |
| to contact the operator at least 5 days prior to the |
27 |
| proposed
commencement of drilling operations shall be |
28 |
| conclusively deemed a waiver
of the right to meet by the |
29 |
| surface owner.
|
30 |
| (6) The meeting shall be scheduled between the hours of |
31 |
| 9:00 in the
morning
and the setting of the sun of the same |
32 |
| day and shall be at least 3 days prior
to commencement of |
33 |
| drilling operations. Unless agreed to otherwise, the
place |
34 |
| shall be located within the county in which drilling |
|
|
|
09300SB2696sam002 |
- 3 - |
LRB093 20575 LCB 48679 a |
|
|
1 |
| operations are
to be commenced where the operator or his |
2 |
| agent shall be available to
discuss with the surface owner |
3 |
| or his agent those matters set forth in Section
5 hereof.
|
4 |
| (7) The notice herein required shall be given to the |
5 |
| surface owner by
either:
|
6 |
| (A) certified mail addressed to the surface owner |
7 |
| at the address shown
in the certification obtained from |
8 |
| the assessor, which shall be postmarked
at least 10 |
9 |
| days prior to the commencement of drilling operations; |
10 |
| or
|
11 |
| (B) personal delivery to the surface owner at least |
12 |
| 8 days prior to the
commencement of drilling |
13 |
| operations.
|
14 |
| (C) Notice to the surface owner as defined in this |
15 |
| Act shall be deemed
conclusive notice to the record |
16 |
| owners of all interest in the surface.
|
17 |
| (Source: P.A. 89-445, eff. 2-7-96.)".
|