|
|
|
HB0215 Engrossed |
- 2 - |
LRB095 04359 CMK 24402 b |
|
|
1 |
| not less than the amount of waste generated
during 150 |
2 |
| days of facility operation at design capacity ; the |
3 |
| owner or operator of a livestock waste handling |
4 |
| facility constructed with concrete with a design |
5 |
| capacity of less than 300 animal units may demonstrate |
6 |
| to the Department that a reduced storage volume, not |
7 |
| less than 60 days, is feasible due to (i) the |
8 |
| availability of land application areas that can |
9 |
| receive manure at agronomic rates or (ii) another |
10 |
| manure disposal method is proposed that will allow for |
11 |
| the reduced manure storage design capacity; the |
12 |
| Department shall evaluate the proposal and determine |
13 |
| whether a reduced manure storage design capacity is |
14 |
| appropriate for the site ; and
|
15 |
| (C) Storage structures not covered or otherwise |
16 |
| protected from
precipitation shall, in addition to the |
17 |
| waste storage volume requirements of
subparagraph (B) |
18 |
| of paragraph (1) of this subsection, include a 2-foot
|
19 |
| freeboard.
|
20 |
| (2) A livestock waste handling facility in a |
21 |
| prefabricated form shall meet
the
strength, load, and |
22 |
| compatibility factors for its intended use. Those factors
|
23 |
| shall be
verified by the manufacturer's specifications.
|
24 |
| (3) Livestock waste handling facilities holding |
25 |
| semi-solid livestock
waste,
including but not limited to |
26 |
| picket dam structures, shall be constructed
according to
|
|
|
|
HB0215 Engrossed |
- 3 - |
LRB095 04359 CMK 24402 b |
|
|
1 |
| the requirements set forth in the Midwest Plan Service's |
2 |
| Livestock Waste
Facilities
Handbook (MWPS-18) and future |
3 |
| updates or similar standards used by the Natural
Resources |
4 |
| Conservation Service of the United States Department of |
5 |
| Agriculture.
|
6 |
| (4) Livestock waste handling facilities holding solid |
7 |
| livestock waste
shall be
constructed according to the |
8 |
| requirements set forth in the Midwest Plan
Service's
|
9 |
| Livestock Waste Facilities Handbook (MWPS-18) and future |
10 |
| updates or similar
standards used by the Natural Resources |
11 |
| Conservation Service of the United
States
Department of |
12 |
| Agriculture. In addition, solid livestock waste stacking
|
13 |
| structures shall
be sized to store not less than the amount |
14 |
| of waste generated during
6 months
of facility
operation at |
15 |
| design capacity . The owner or operator of a livestock waste |
16 |
| handling facility holding solid livestock waste with a |
17 |
| design capacity of less than 300 animal units may |
18 |
| demonstrate to the Department that a reduced storage |
19 |
| volume, not less than 2 months, is feasible due to (i) the |
20 |
| availability of land application areas that can receive |
21 |
| manure at agronomic rates or (ii) another manure disposal |
22 |
| method is proposed that will allow for the reduced storage |
23 |
| design capacity. The Department shall evaluate the |
24 |
| proposal and determine whether a reduced manure storage |
25 |
| design capacity is appropriate for the site .
|
26 |
| (5) Holding ponds used for the temporary storage of |
|
|
|
HB0215 Engrossed |
- 4 - |
LRB095 04359 CMK 24402 b |
|
|
1 |
| livestock feedlot
run-off
shall be constructed according |
2 |
| to the requirements set forth in the Midwest
Plan
Service's |
3 |
| Livestock Waste Facilities Handbook (MWPS-18) and future |
4 |
| updates or
similar standards used by the Natural Resources |
5 |
| Conservation Service of the
United
States Department of |
6 |
| Agriculture.
|
7 |
| (b) New livestock management facilities and livestock |
8 |
| waste handling
facilities
constructed after the effective date |
9 |
| of this amendatory Act of 1999 shall be
subject to the
|
10 |
| additional construction requirements and siting prohibitions |
11 |
| provided in this
subsection (b).
|
12 |
| (1) No new non-lagoon livestock management facility or |
13 |
| livestock waste
handling facility may be constructed |
14 |
| within the floodway of a 100-year
floodplain. A
new |
15 |
| livestock management facility or livestock waste handling |
16 |
| facility may be
constructed within the portion of a |
17 |
| 100-year floodplain that is within the
flood fringe
and |
18 |
| outside the floodway provided that the facility is designed |
19 |
| and constructed
to be
protected from flooding and meets the |
20 |
| requirements set forth in the Rivers,
Lakes, and Streams |
21 |
| Act, Section 5-40001 of the Counties Code,
and Executive |
22 |
| Order Number 4 (1979). The delineation of
floodplains, |
23 |
| floodways, and flood fringes shall be in compliance with |
24 |
| the
National Flood
Insurance Program. Protection from |
25 |
| flooding shall be consistent with the
National
Flood |
26 |
| Insurance Program and shall be designed so that stored |
|
|
|
HB0215 Engrossed |
- 5 - |
LRB095 04359 CMK 24402 b |
|
|
1 |
| livestock waste is
not
readily removed.
|
2 |
| (2) A new non-lagoon livestock waste handling facility |
3 |
| constructed in a
karst
area shall be designed to prevent |
4 |
| seepage of the stored material into
groundwater in
|
5 |
| accordance with ASAE 393.2 or future updates. Owners or |
6 |
| operators of proposed
facilities should consult with the |
7 |
| local soil and water conservation district,
the
University |
8 |
| of Illinois Cooperative Extension Service, or other local, |
9 |
| county,
or State
resources relative to determining the |
10 |
| possible presence or absence of such
areas.
|
11 |
| Notwithstanding the other provisions of this paragraph |
12 |
| (2), after the
effective date
of this amendatory Act of |
13 |
| 1999, no non-lagoon livestock waste handling facility
may |
14 |
| be
constructed within 400 feet of any natural depression in |
15 |
| a karst area formed as
a result
of subsurface removal of |
16 |
| soil or rock materials that has caused the formation
of a
|
17 |
| collapse feature that exhibits internal drainage. For the |
18 |
| purposes of this
paragraph
(2), the existence of such a |
19 |
| natural depression in a karst area shall be
indicated by
|
20 |
| the uppermost closed depression contour lines on a USGS 7 |
21 |
| 1/2 minute quadrangle
topographic map or as determined by |
22 |
| Department field investigation in a karst
area.
|
23 |
| (3) A new non-lagoon livestock waste handling facility |
24 |
| constructed in an
area
where aquifer material is present |
25 |
| within 5 feet of the bottom of the facility
shall be
|
26 |
| designed to ensure the structural integrity of the |
|
|
|
HB0215 Engrossed |
- 6 - |
LRB095 04359 CMK 24402 b |
|
|
1 |
| containment structure and to
prevent
seepage of the stored |
2 |
| material to groundwater. Footings and underlying
structure
|
3 |
| support shall be incorporated into the design standards of |
4 |
| the storage
structure in
accordance with the requirements |
5 |
| of Section 4.1 of the American Society of
Agricultural |
6 |
| Engineers (ASAE) EP 393.2 or future updates.
|
7 |
| (c) A livestock waste handling facility owner may rely on |
8 |
| guidance from the
local soil
and water conservation district, |
9 |
| the Natural Resources Conservation Service of
the United
States |
10 |
| Department of Agriculture, or the University of Illinois |
11 |
| Cooperative
Extension Service
for soil type and associated |
12 |
| information.
|
13 |
| (d) The standards in subsections (a) and (b) shall serve as |
14 |
| interim
construction
standards until such time as permanent |
15 |
| rules promulgated pursuant to Section 55
of this Act
become |
16 |
| effective. In addition, the Department and the Board shall |
17 |
| utilize the
interim
standards in subsections (a) and (b) as a |
18 |
| basis for the development of such
permanent rules.
|
19 |
| (e) The owner or operator of a livestock management |
20 |
| facility or livestock
waste
handling facility may, with the |
21 |
| approval of the Department, elect to exceed the
strength and
|
22 |
| load requirements as set forth in this Section.
|
23 |
| (f) The owner or operator of a livestock management |
24 |
| facility or livestock
waste
handling facility shall send, by |
25 |
| certified mail or in person, to the Department
a certification
|
26 |
| of compliance together with copies of verification documents |
|
|
|
HB0215 Engrossed |
- 7 - |
LRB095 04359 CMK 24402 b |
|
|
1 |
| upon completion of
construction.
In the case of structures |
2 |
| constructed with the design standards used by the
Natural |
3 |
| Resources
Conservation Service of the United States Department |
4 |
| of Agriculture, copies of
the design
standards and a statement |
5 |
| of verification signed by a representative of the
United States
|
6 |
| Department of Agriculture shall accompany the owner's or |
7 |
| operator's
certification of
compliance. The certification |
8 |
| shall state that the structure meets or exceeds
the |
9 |
| requirements
in subsection (a) of this Section. A $250 filing |
10 |
| fee shall accompany the
statement.
|
11 |
| (g) The Department shall inspect the construction site |
12 |
| prior to
construction, during
construction, and within 10 |
13 |
| business days following receipt of the
certification of |
14 |
| compliance
to determine compliance with the construction |
15 |
| standards.
|
16 |
| (h) The Department shall require modification when |
17 |
| necessary to bring the
construction into compliance with the |
18 |
| standards set forth in this Section. The
person making
the |
19 |
| inspection shall discuss with the owner, operator, or certified |
20 |
| livestock
manager an
evaluation of the livestock waste handling |
21 |
| facility construction and shall (i)
provide on-site
written |
22 |
| recommendations to the owner, operator, or certified livestock |
23 |
| manager
of what
modifications are necessary or (ii) inform the |
24 |
| owner, operator, or certified
livestock manager
that the |
25 |
| facility meets the standards set forth in this Section. On the |
26 |
| day of
the inspection, the
person making the inspection shall |
|
|
|
HB0215 Engrossed |
- 8 - |
LRB095 04359 CMK 24402 b |
|
|
1 |
| give the owner, operator, or certified
livestock manager a
|
2 |
| written report of findings based on the inspection together |
3 |
| with an explanation
of remedial
measures necessary to enable |
4 |
| the livestock waste handling facility to meet the
standards set
|
5 |
| forth in this Section. The Department shall, within 5 business |
6 |
| days of the date of inspection,
send an official written notice |
7 |
| to the owner or operator of the livestock waste handling |
8 |
| facility
by certified mail, return receipt requested, |
9 |
| indicating that the facility meets the standards set
forth in |
10 |
| this Section or identifying the remedial measures necessary to |
11 |
| enable the livestock
waste handling facility to meet the |
12 |
| standards set forth in this Section. The owner or operator
|
13 |
| shall, within 10 business days of receipt of an official |
14 |
| written notice of deficiencies, contact the
Department to |
15 |
| develop the principles of an agreement of compliance. The owner |
16 |
| or operator
and the Department shall enter into an agreement of |
17 |
| compliance setting forth the specific
changes to be made to |
18 |
| bring the construction into compliance with the standards
|
19 |
| required under
this Section. If an agreement of compliance |
20 |
| cannot be achieved, the Department
shall issue a
compliance |
21 |
| order to the owner or operator outlining the specific changes |
22 |
| to be
made to bring
the construction into compliance with the |
23 |
| standards required under this
Section.
The owner
or operator |
24 |
| can request an administrative hearing to contest the provisions |
25 |
| of
the
Department's compliance order.
|
26 |
| (j) If any owner or operator operates in violation of an |
|
|
|
HB0215 Engrossed |
- 9 - |
LRB095 04359 CMK 24402 b |
|
|
1 |
| agreement of
compliance, the
Department shall seek an |
2 |
| injunction in circuit court to prohibit the operation
of the |
3 |
| facility
until construction and certification of the livestock |
4 |
| waste handling facility
are in compliance
with the provisions |
5 |
| of this Section.
|
6 |
| (k) When any livestock management facility not using an |
7 |
| earthen livestock
waste
lagoon is removed from service, the |
8 |
| accumulated livestock waste remaining within the facility
|
9 |
| shall be removed and applied to land at rates consistent with a |
10 |
| waste management plan for the
facility. Removal of the waste |
11 |
| shall occur within 12 months after the date
livestock |
12 |
| production
at the facility ceases. In addition, the owner or |
13 |
| operator shall make
provisions to prevent the
accumulation of |
14 |
| precipitation within the livestock waste handling facility.
|
15 |
| Upon completion
of the removal of manure, the owner or operator |
16 |
| of the facility shall notify
the Department that
the facility |
17 |
| is being removed from service and the remaining manure has been
|
18 |
| removed. The
Department shall conduct an inspection of the |
19 |
| livestock waste handling facility
and inform the
owner or |
20 |
| operator in writing that the requirements imposed under this
|
21 |
| subsection (k) have been met or that
additional actions are |
22 |
| necessary. Commencement of operations at a facility
that has |
23 |
| livestock
shelters left intact and that has completed the |
24 |
| requirements imposed under this
subsection
(k)
and that has |
25 |
| been
operated as a livestock management facility or livestock |
26 |
| waste handling
facility for 4
consecutive months at any time |
|
|
|
HB0215 Engrossed |
- 10 - |
LRB095 04359 CMK 24402 b |
|
|
1 |
| within the previous 10 years shall not be
considered a new or
|
2 |
| expanded livestock management or waste handling facility. A new |
3 |
| facility
constructed after May 21, 1996 that has
been removed
|
4 |
| from service for a period of 2 or more years shall not be |
5 |
| placed back into
service prior to an
inspection of the |
6 |
| livestock waste handling facility and receipt of written
|
7 |
| approval by the
Department.
|
8 |
| (Source: P.A. 91-110, eff. 7-13-99.)
|