|
|||||||||||||||||||||||||
|
|||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
| |||||||||||||||||||||||||
1 | AN ACT concerning safety.
| ||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||
4 | Section 5. The Environmental Protection Act is amended by | ||||||||||||||||||||||||
5 | changing Section 3.160 as follows:
| ||||||||||||||||||||||||
6 | (415 ILCS 5/3.160) (was 415 ILCS 5/3.78 and 3.78a)
| ||||||||||||||||||||||||
7 | Sec. 3.160. Construction or demolition debris.
| ||||||||||||||||||||||||
8 | (a) General construction or demolition debris" means | ||||||||||||||||||||||||
9 | non-hazardous,
uncontaminated materials resulting from the | ||||||||||||||||||||||||
10 | construction, remodeling, repair,
and demolition of utilities, | ||||||||||||||||||||||||
11 | structures, and roads, limited to the following:
bricks, | ||||||||||||||||||||||||
12 | concrete, and other masonry materials; soil; rock; wood, | ||||||||||||||||||||||||
13 | including
non-hazardous painted, treated, and coated wood and | ||||||||||||||||||||||||
14 | wood products; wall
coverings; plaster; drywall; plumbing | ||||||||||||||||||||||||
15 | fixtures; non-asbestos insulation;
roofing shingles and other | ||||||||||||||||||||||||
16 | roof coverings; reclaimed asphalt pavement; glass;
plastics | ||||||||||||||||||||||||
17 | that are not sealed in a manner that conceals waste; electrical
| ||||||||||||||||||||||||
18 | wiring and components containing no hazardous substances; and | ||||||||||||||||||||||||
19 | piping or metals
incidental to any of those materials.
| ||||||||||||||||||||||||
20 | General construction or demolition debris does not include | ||||||||||||||||||||||||
21 | uncontaminated
soil generated during construction, remodeling, | ||||||||||||||||||||||||
22 | repair, and demolition of
utilities, structures, and roads | ||||||||||||||||||||||||
23 | provided the uncontaminated soil is not
commingled with any |
| |||||||
| |||||||
1 | general construction or demolition debris or other waste.
| ||||||
2 | To the extent allowed by federal law, uncontaminated | ||||||
3 | concrete with protruding rebar shall be considered clean | ||||||
4 | construction or demolition debris and shall not be considered | ||||||
5 | "waste" if it is separated or processed and returned to the | ||||||
6 | economic mainstream in the form of raw materials or products | ||||||
7 | within 4 years of its generation, if it is not speculatively | ||||||
8 | accumulated and, if used as a fill material, it is used in | ||||||
9 | accordance with item (i) in subsection (b) of this Section | ||||||
10 | within 30 days of its generation.
| ||||||
11 | (b) "Clean construction or demolition debris" means
| ||||||
12 | uncontaminated broken concrete without protruding metal bars, | ||||||
13 | bricks, rock,
stone, reclaimed asphalt pavement, or soil | ||||||
14 | generated from construction or
demolition activities.
| ||||||
15 | Clean construction or demolition debris does not include | ||||||
16 | uncontaminated soil
generated during construction, remodeling, | ||||||
17 | repair, and demolition of utilities,
structures, and roads | ||||||
18 | provided the uncontaminated soil is not commingled with
any | ||||||
19 | clean construction or demolition debris or other waste.
| ||||||
20 | To the extent allowed by federal law, clean construction or | ||||||
21 | demolition debris
shall not be considered "waste" if it is (i) | ||||||
22 | used as fill material outside of a setback zone if the fill is | ||||||
23 | placed no higher than the
highest point of elevation existing | ||||||
24 | prior to the filling immediately adjacent
to the fill area, and | ||||||
25 | if covered by sufficient uncontaminated soil to
support | ||||||
26 | vegetation within 30 days of the completion of filling or if |
| |||||||
| |||||||
1 | covered
by a road or structure, or (ii) separated or processed | ||||||
2 | and returned to the
economic mainstream in the form of raw | ||||||
3 | materials or products, if it is not
speculatively accumulated | ||||||
4 | and, if used as a fill material, it is used in
accordance with | ||||||
5 | item (i) within 30 days of its generation, or (iii) solely
| ||||||
6 | broken concrete without protruding metal bars used for erosion | ||||||
7 | control, or
(iv) generated from the construction or demolition | ||||||
8 | of a building, road, or
other structure and used to construct, | ||||||
9 | on the site where the construction or
demolition has taken | ||||||
10 | place, a manmade
functional structure not to exceed 20 feet | ||||||
11 | above the highest point of
elevation of the property | ||||||
12 | immediately adjacent to the new manmade functional
structure as | ||||||
13 | that elevation existed prior to the creation of that new
| ||||||
14 | structure,
provided that the structure shall be covered with | ||||||
15 | sufficient soil
materials to sustain vegetation or by a road or | ||||||
16 | structure, and further
provided that no such structure shall be | ||||||
17 | constructed within
a home rule municipality with a population | ||||||
18 | over 500,000 without the consent
of the municipality. For | ||||||
19 | purposes of this subsection (b) of this Section, reclaimed | ||||||
20 | asphalt pavement shall be deemed not speculatively accumulated | ||||||
21 | if it is returned to the economic mainstream within 4 years | ||||||
22 | after the date of its generation or if a properly executed | ||||||
23 | bond, that has been approved by the Director of the Agency, | ||||||
24 | exists between the owner of the reclaimed asphalt pavement and | ||||||
25 | the Agency for the removal of the reclaimed asphalt pavement.
| ||||||
26 | (Source: P.A. 93-179, eff. 7-11-03; 94-272, eff. 7-19-05.)
|
| |||||||
| |||||||
1 | Section 99. Effective date. This Act takes effect upon | ||||||
2 | becoming law.
|