|
|||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||
1 | AN ACT concerning transportation.
| ||||||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||||||
4 | Section 5. The Permanent Noise Monitoring Act is amended by | ||||||||||||||||||||||||||||
5 | changing Sections 5, 10, and 15 as follows:
| ||||||||||||||||||||||||||||
6 | (620 ILCS 35/5) (from Ch. 15 1/2, par. 755)
| ||||||||||||||||||||||||||||
7 | Sec. 5. Definitions. As used in this Act:
| ||||||||||||||||||||||||||||
8 | (a) "Airport" means an airport, as defined in Section 6 of | ||||||||||||||||||||||||||||
9 | the Illinois
Aeronautics Act, that has more than 500,000 | ||||||||||||||||||||||||||||
10 | aircraft operations (take-offs
and landings) per year. | ||||||||||||||||||||||||||||
11 | (a-1) "Airport sponsor" means any municipality, as defined | ||||||||||||||||||||||||||||
12 | in Section 20 of the Illinois
Aeronautics Act, that can own and | ||||||||||||||||||||||||||||
13 | operate an airport.
| ||||||||||||||||||||||||||||
14 | (b) "Permanent noise monitoring system" or "system" means a | ||||||||||||||||||||||||||||
15 | system that
includes at least:
| ||||||||||||||||||||||||||||
16 | (1) automated noise monitors capable of recording | ||||||||||||||||||||||||||||
17 | noise levels 24
hours per day 365 days per year; and
| ||||||||||||||||||||||||||||
18 | (2) computer equipment sufficient to process the data | ||||||||||||||||||||||||||||
19 | from each noise
monitor so that permanent noise monitoring | ||||||||||||||||||||||||||||
20 | reports in accordance with
Section 15 of this Act can be | ||||||||||||||||||||||||||||
21 | generated.
| ||||||||||||||||||||||||||||
22 | (c) "Division" means the Division of Aeronautics of the | ||||||||||||||||||||||||||||
23 | Illinois
Department of Transportation.
|
| |||||||
| |||||||
1 | (d) "Ldn" means day-night average sound level. "Day-night | ||||||
2 | average sound
level" has the meaning ascribed to it in Section | ||||||
3 | 150.7 of Part 150
of Title 14 of the Code of Federal | ||||||
4 | Regulations.
| ||||||
5 | (Source: P.A. 87-808.)
| ||||||
6 | (620 ILCS 35/10) (from Ch. 15 1/2, par. 760)
| ||||||
7 | Sec. 10. Establishment of permanent noise monitoring | ||||||
8 | systems. No
later than December 31, 2008 1992 , each airport | ||||||
9 | shall have an operable permanent
noise monitoring system. The | ||||||
10 | system shall be designed, constructed, and
operated by the | ||||||
11 | airport sponsor Division . The airport sponsor shall be | ||||||
12 | responsible for the construction or the design and construction | ||||||
13 | of any system not constructed or designed and constructed as of | ||||||
14 | the effective date of this amendatory Act of the 95th General | ||||||
15 | Assembly. The cost of the systems and of the permanent
noise | ||||||
16 | monitoring reports under Section 15 of this Act shall be borne
| ||||||
17 | by the airport sponsor State of Illinois .
| ||||||
18 | (Source: P.A. 87-808.)
| ||||||
19 | (620 ILCS 35/15) (from Ch. 15 1/2, par. 765)
| ||||||
20 | Sec. 15. Permanent noise monitoring reports. Beginning in | ||||||
21 | 1993 and through 2008 , the
Division shall, on June 30th and | ||||||
22 | December 31st of each
year, prepare a permanent noise | ||||||
23 | monitoring report and make the
report available to the public. | ||||||
24 | Beginning in 2009, the
airport sponsor shall, on June 30th and |
| |||||||
| |||||||
1 | December 31st of each
year, prepare a permanent noise | ||||||
2 | monitoring report and make the
report available to the public. | ||||||
3 | Copies of the report shall be
submitted to: the Office of the | ||||||
4 | Governor; the Office of the President of
the Senate; the Office | ||||||
5 | of the Senate Minority Leader; the Office of the
Speaker of the | ||||||
6 | House; the Office of the House Minority Leader; the United
| ||||||
7 | States Environmental Protection Agency, Region V; and the | ||||||
8 | Illinois
Environmental Protection Agency. Beginning in 2009, a | ||||||
9 | copy of the report shall also be submitted to the division. The | ||||||
10 | permanent noise monitoring report
shall contain all of the | ||||||
11 | following:
| ||||||
12 | (a) Copies of the actual data collected by each permanent | ||||||
13 | noise monitor
in the system.
| ||||||
14 | (b) A summary of the data collected by each permanent noise | ||||||
15 | monitor in
the system, showing the data organized by:
| ||||||
16 | (1) day of the week;
| ||||||
17 | (2) time of day;
| ||||||
18 | (3) week of the year;
| ||||||
19 | (4) type of aircraft; and
| ||||||
20 | (5) the single highest noise event recorded at each | ||||||
21 | monitor.
| ||||||
22 | (c) Noise contour maps showing the 65 Ldn, 70 Ldn and 75 | ||||||
23 | Ldn zones
around the airport.
| ||||||
24 | (d) Noise contour maps showing the 65 decibel (dBA), 70 | ||||||
25 | dBA, and 75
dBA zones around the airport for:
| ||||||
26 | (1) 7:00 a.m. to 10:00 p.m.;
|
| |||||||
| |||||||
1 | (2) 10:00 p.m. to 7:00 a.m.; and
| ||||||
2 | (3) types of aircraft.
| ||||||
3 | (e) The noise contour maps produced under subsections (c) | ||||||
4 | and (d)
shall also indicate:
| ||||||
5 | (1) residential areas (single and multi-family);
| ||||||
6 | (2) schools;
| ||||||
7 | (3) hospitals and nursing homes;
| ||||||
8 | (4) recreational areas, including but not limited to | ||||||
9 | parks and
forest preserves;
| ||||||
10 | (5) commercial areas;
| ||||||
11 | (6) industrial areas;
| ||||||
12 | (7) the boundary of the airport;
| ||||||
13 | (8) the number of residences (single and multi-family) | ||||||
14 | within each
contour;
| ||||||
15 | (9) the number of residents within each contour;
| ||||||
16 | (10) the number of schools within each contour; and
| ||||||
17 | (11) the number of school students within each contour.
| ||||||
18 | (f) Through 2008, a A certification by the Division that | ||||||
19 | the system was in proper
working order during the period or, if | ||||||
20 | it was not, a specific description
of any and all problems with | ||||||
21 | the System during the period. | ||||||
22 | (g) Beginning in 2009, a certification by the airport | ||||||
23 | sponsor that the system was in proper
working order during the | ||||||
24 | period or, if it was not, a specific description
of any and all | ||||||
25 | problems with the system during the period.
| ||||||
26 | (Source: P.A. 87-808.)
|
| |||||||
| |||||||
1 | Section 99. Effective date. This Act takes effect upon | ||||||
2 | becoming law.
|