Electric Utility Oversight Committee
Adopted in House Comm. on May 30, 2007
|
|
09500SB1299ham001 |
|
LRB095 03672 MJR 37298 a |
|
|
1 |
| AMENDMENT TO SENATE BILL 1299
|
2 |
| AMENDMENT NO. ______. Amend Senate Bill 1299 by replacing |
3 |
| everything after the enacting clause with the following:
|
4 |
| "Section 5. The Public Utilities Act is amended by changing |
5 |
| Sections 8-406, 8-503, and 16-118 and by adding Section 20-130 |
6 |
| as follows:
|
7 |
| (220 ILCS 5/8-406) (from Ch. 111 2/3, par. 8-406)
|
8 |
| Sec. 8-406. Certificate of public convenience and |
9 |
| necessity.
|
10 |
| (a) No public utility not owning any city or village
|
11 |
| franchise nor engaged in performing any public service or in |
12 |
| furnishing any
product or commodity within this State as of |
13 |
| July 1, 1921 and not
possessing a certificate of
public |
14 |
| convenience and necessity from the Illinois Commerce |
15 |
| Commission,
the State Public Utilities Commission or
the Public |
16 |
| Utilities Commission, at the time this amendatory Act of 1985 |
|
|
|
09500SB1299ham001 |
- 2 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| goes
into effect, shall transact any business in this State |
2 |
| until it shall have
obtained a certificate from the Commission |
3 |
| that public convenience and
necessity require the transaction |
4 |
| of such business.
|
5 |
| (b) No public utility shall begin the construction of any |
6 |
| new plant,
equipment, property or facility which is not in |
7 |
| substitution of any
existing plant, equipment, property or |
8 |
| facility or any extension or
alteration thereof or in addition |
9 |
| thereto,
unless and until it shall have obtained from the
|
10 |
| Commission a certificate that public convenience and necessity |
11 |
| require such
construction. Whenever after a hearing the |
12 |
| Commission determines that any
new construction or the |
13 |
| transaction of any business by a public utility will
promote |
14 |
| the public convenience and is necessary thereto, it shall have |
15 |
| the
power to issue certificates of public convenience and |
16 |
| necessity. The
Commission shall determine that proposed |
17 |
| construction will promote the
public convenience and necessity |
18 |
| only if the utility demonstrates: (1) that the
proposed |
19 |
| construction is necessary to provide adequate, reliable, and
|
20 |
| efficient service to its customers and is the
least-cost means |
21 |
| of
satisfying the service needs of its customers or that the |
22 |
| proposed construction will promote the development of an |
23 |
| effectively competitive electricity market that operates |
24 |
| efficiently, is equitable to all customers, and is the least |
25 |
| cost means of satisfying those objectives ;
(2) that the utility |
26 |
| is capable of efficiently managing and
supervising the |
|
|
|
09500SB1299ham001 |
- 3 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| construction process and has taken sufficient action to
ensure |
2 |
| adequate and efficient construction and supervision thereof; |
3 |
| and (3)
that the utility is capable of financing the proposed |
4 |
| construction without
significant adverse financial |
5 |
| consequences for the utility or its
customers.
|
6 |
| (c) After the effective date of this amendatory Act of |
7 |
| 1987, no
construction shall commence on any new nuclear
power |
8 |
| plant to be located within this State, and no certificate of |
9 |
| public
convenience and necessity or other authorization shall |
10 |
| be issued therefor
by the Commission, until the Director of the |
11 |
| Illinois Environmental
Protection Agency finds that the United |
12 |
| States Government, through its
authorized agency, has |
13 |
| identified and approved a demonstrable technology or
means for |
14 |
| the disposal of high level nuclear waste, or until such
|
15 |
| construction has been specifically approved by a statute |
16 |
| enacted by the General
Assembly.
|
17 |
| As used in this Section, "high level nuclear waste" means |
18 |
| those aqueous
wastes resulting from the operation of the first |
19 |
| cycle of the solvent
extraction system or equivalent and the |
20 |
| concentrated wastes of the
subsequent extraction cycles or |
21 |
| equivalent in a facility for reprocessing
irradiated reactor |
22 |
| fuel and shall include spent fuel assemblies prior to
fuel |
23 |
| reprocessing.
|
24 |
| (d) In making its determination, the Commission shall |
25 |
| attach primary
weight to the cost or cost savings to the |
26 |
| customers of the utility. The
Commission may consider any or |
|
|
|
09500SB1299ham001 |
- 4 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| all factors which will or may affect such
cost or cost savings.
|
2 |
| (e) The Commission may issue a temporary certificate which |
3 |
| shall remain
in force not to exceed one year in cases of |
4 |
| emergency, to assure maintenance
of adequate service or to |
5 |
| serve particular customers, without notice or
hearing, pending |
6 |
| the determination of an application for a certificate, and
may |
7 |
| by regulation exempt from the requirements of this Section |
8 |
| temporary
acts or operations for which the issuance of a |
9 |
| certificate will not be
required in the public interest.
|
10 |
| A public utility shall not be required to obtain but may |
11 |
| apply for and
obtain a certificate of public convenience and |
12 |
| necessity pursuant to this
Section with respect to any matter |
13 |
| as to which it has received the
authorization or order of the |
14 |
| Commission under the Electric Supplier Act,
and any such |
15 |
| authorization or order granted a public utility by the
|
16 |
| Commission under that Act shall as between public utilities be |
17 |
| deemed to
be, and shall have except as provided in that Act the |
18 |
| same force and effect
as, a certificate of public convenience |
19 |
| and necessity issued pursuant to this
Section.
|
20 |
| No electric cooperative shall be made or shall become a |
21 |
| party to or shall
be entitled to be heard or to otherwise |
22 |
| appear or participate in any
proceeding initiated under this |
23 |
| Section for authorization of power plant
construction and as to |
24 |
| matters as to which a remedy is available under The
Electric |
25 |
| Supplier Act.
|
26 |
| (f) Such certificates may be altered or modified by the |
|
|
|
09500SB1299ham001 |
- 5 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| Commission, upon
its own motion or upon application by the |
2 |
| person or corporation affected.
Unless exercised within a |
3 |
| period of 2 years from the grant thereof
authority conferred by |
4 |
| a certificate of convenience and necessity issued by
the |
5 |
| Commission shall be null and void.
|
6 |
| No certificate of public convenience and necessity shall be |
7 |
| construed as
granting a monopoly or an exclusive privilege, |
8 |
| immunity or franchise.
|
9 |
| (Source: P.A. 90-561, eff. 12-16-97.)
|
10 |
| (220 ILCS 5/8-503) (from Ch. 111 2/3, par. 8-503)
|
11 |
| Sec. 8-503. Whenever the Commission, after a hearing, shall |
12 |
| find that
additions, extensions, repairs or improvements to, or |
13 |
| changes in, the
existing plant, equipment, apparatus, |
14 |
| facilities or other physical property
of any public utility or |
15 |
| of any 2 or more public utilities are
necessary
and ought |
16 |
| reasonably to be made or that a new structure or structures is |
17 |
| or
are necessary and should be erected, to promote the security |
18 |
| or convenience
of its employees or the public or promote the |
19 |
| development of an effectively competitive electricity market , |
20 |
| or in any other way to secure adequate
service or facilities, |
21 |
| the Commission shall make and serve an order
authorizing or |
22 |
| directing that such additions, extensions, repairs,
|
23 |
| improvements or changes be made, or such structure or |
24 |
| structures be erected
at the location, in the manner and within |
25 |
| the time specified in said order;
provided, however, that the
|
|
|
|
09500SB1299ham001 |
- 6 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| Commission shall have no authority to order the construction,
|
2 |
| addition or extension of any electric generating plant unless
|
3 |
| the public utility requests a certificate for the construction
|
4 |
| of the plant pursuant to Section 8-406 and in conjunction with
|
5 |
| such request also requests the entry of an order under this
|
6 |
| Section.
If any additions, extensions, repairs, improvements |
7 |
| or changes, or any new
structure or structures, which the |
8 |
| Commission has authorized or ordered to
be erected, require |
9 |
| joint action by 2 or more public utilities, the
Commission |
10 |
| shall notify the said public utilities that such additions,
|
11 |
| extensions, repairs, improvements or changes or new structure |
12 |
| or structures
have been authorized or ordered and that the same |
13 |
| shall be made at the
joint cost whereupon the said public |
14 |
| utilities shall have such reasonable
time as the Commission may |
15 |
| grant within which to agree upon the
apportionment or division |
16 |
| of cost of such additions, extensions, repairs,
improvements or |
17 |
| changes or new structure or structures, which each shall
bear. |
18 |
| If at the expiration of such time such public utilities shall |
19 |
| fail to
file with the Commission a statement that an agreement |
20 |
| has been made for a
division or apportionment of the cost or |
21 |
| expense of such additions,
extensions, repairs, improvements |
22 |
| or changes, or new structure or
structures, the Commission |
23 |
| shall have authority, after further hearing, to
make an order |
24 |
| fixing the proportion of such cost or expense to be borne by
|
25 |
| each public utility and the manner in which the same shall be |
26 |
| paid or secured.
|
|
|
|
09500SB1299ham001 |
- 7 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| Nothing in this Act shall prevent the Commission, upon its |
2 |
| own motion
or upon petition, from ordering, after a hearing, |
3 |
| the extension, construction,
connection or interconnection of |
4 |
| plant, equipment, pipe, line, facilities
or other physical |
5 |
| property of a public utility in whatever configuration the
|
6 |
| Commission finds necessary to ensure that natural gas is made |
7 |
| available to
consumers at no increased cost to the customers of |
8 |
| the utility supplying the gas.
|
9 |
| Whenever the Commission finds, after a hearing, that the |
10 |
| public convenience
or necessity requires it, the Commission may |
11 |
| order public utilities subject
to its jurisdiction to work |
12 |
| jointly (1) for the purpose of purchasing and
distributing |
13 |
| natural gas or gas substitutes, provided it shall not increase
|
14 |
| the cost of gas to the customers of the participating |
15 |
| utilities, or (2) for
any other reasonable purpose.
|
16 |
| (Source: P.A. 90-561, eff. 12-16-97.)
|
17 |
| (220 ILCS 5/16-118)
|
18 |
| Sec. 16-118. Services provided by electric utilities to
|
19 |
| alternative retail electric suppliers.
|
20 |
| (a) It is in the best interest of Illinois energy
consumers |
21 |
| to promote fair and open competition in the
provision of |
22 |
| electric power and energy and to prevent
anticompetitive |
23 |
| practices in the provision of electric power
and energy.
|
24 |
| Therefore, to the extent an electric utility provides electric |
25 |
| power and energy
or delivery services to alternative retail |
|
|
|
09500SB1299ham001 |
- 8 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| electric suppliers and such services
are not subject to the |
2 |
| jurisdiction of the Federal Energy
Regulatory Commission, and |
3 |
| are not competitive services, they
shall be provided through |
4 |
| tariffs that are filed with the
Commission, pursuant to Article |
5 |
| IX of this Act.
Each electric utility shall permit alternative
|
6 |
| retail electric suppliers to interconnect facilities to those
|
7 |
| owned by the utility provided they meet established standards
|
8 |
| for such interconnection, and may provide standby or other
|
9 |
| services to alternative retail electric suppliers. The
|
10 |
| alternative retail electric supplier shall sign a contract
|
11 |
| setting forth the prices, terms and conditions for
|
12 |
| interconnection with the electric utility and the prices,
terms |
13 |
| and conditions for services provided by the electric
utility to |
14 |
| the alternative retail electric supplier in
connection with the |
15 |
| delivery by the electric utility of
electric power and energy |
16 |
| supplied by the alternative retail
electric supplier.
|
17 |
| (b) An electric utility shall file a tariff pursuant to |
18 |
| Article IX of the
Act that would allow alternative retail |
19 |
| electric suppliers or electric
utilities other than the |
20 |
| electric utility in whose service area retail
customers are
|
21 |
| located to issue single bills to the retail customers for both |
22 |
| the services
provided by such alternative retail electric |
23 |
| supplier or other electric utility
and the delivery services |
24 |
| provided by the electric utility to such customers.
The tariff |
25 |
| filed pursuant to this subsection shall (i) require partial |
26 |
| payments
made by retail customers to be credited first to the |
|
|
|
09500SB1299ham001 |
- 9 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| electric utility's
tariffed services, (ii) impose commercially |
2 |
| reasonable terms with respect to
credit and collection, |
3 |
| including requests for deposits, (iii) retain the
electric |
4 |
| utility's right to disconnect the retail customers, if it does |
5 |
| not
receive payment for its tariffed services, in the same |
6 |
| manner that it would be
permitted to if it had billed for the |
7 |
| services itself, and (iv) require the
alternative retail |
8 |
| electric supplier or other electric utility that elects the
|
9 |
| billing option provided by this tariff to include on each bill |
10 |
| to retail
customers an identification of the electric utility |
11 |
| providing the delivery
services and a listing of the charges |
12 |
| applicable to such services. The tariff
filed pursuant to this |
13 |
| subsection may also include other just and reasonable
terms and |
14 |
| conditions. In addition,
an electric utility, an alternative |
15 |
| retail electric
supplier or electric utility other than the |
16 |
| electric utility
in whose service area the customer is located, |
17 |
| and a customer
served by such alternative retail electric |
18 |
| supplier or other
electric utility, may enter into an agreement |
19 |
| pursuant to
which the alternative retail electric supplier or |
20 |
| other
electric utility pays the charges specified in Section |
21 |
| 16-108,
or other customer-related charges, including taxes and |
22 |
| fees,
in lieu of such charges being recovered by the electric
|
23 |
| utility directly from the customer. |
24 |
| (c) An electric utility with more than 100,000 customers |
25 |
| shall file a tariff pursuant to Article IX of this Act that |
26 |
| provides alternative retail electric suppliers, and electric |
|
|
|
09500SB1299ham001 |
- 10 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| utilities other than the electric utility in whose service area |
2 |
| the retail customers are located with the option to have the |
3 |
| electric utility purchase their receivables for power and |
4 |
| energy service provided to retail customers with a |
5 |
| non-coincident peak demand of less than 400 kilowatts. |
6 |
| Receivables for power and energy of alternative retail electric |
7 |
| suppliers or electric utilities other than the electric utility |
8 |
| in whose service area the retail customers are located shall be |
9 |
| purchased by the electric utility at a just and reasonable |
10 |
| discount rate to be reviewed and approved by the Commission |
11 |
| after notice and hearing. The discount rate shall be based on |
12 |
| the electric utility's historical bad debt and any |
13 |
| administrative costs associated with the electric utility's |
14 |
| purchase of receivables. The discounted rate for purchase of |
15 |
| receivables shall be included in the tariff filed pursuant to |
16 |
| this subsection (c). The discount rate filed pursuant to this |
17 |
| subsection shall be subject to periodic reconciliations and |
18 |
| Commission review. The electric utility shall impose the same |
19 |
| terms on retail customers with respect to credit and |
20 |
| collection, including requests for deposits, and retain the |
21 |
| electric utility's right to disconnect the retail customers, if |
22 |
| it does not receive payment for its tariffed services or |
23 |
| purchased receivables, in the same manner that it would be |
24 |
| permitted to if the retail customers purchased power and energy |
25 |
| from the electric utility. The tariff filed pursuant to this |
26 |
| subsection (c) may also include other just and reasonable terms |
|
|
|
09500SB1299ham001 |
- 11 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| and conditions. |
2 |
| (d) An electric utility with more than 100,000 customers |
3 |
| shall file a tariff pursuant to Article IX of this Act that |
4 |
| would provide alternative retail electric suppliers or |
5 |
| electric utilities other than the electric utility in whose |
6 |
| service area retail customers are located with the option to |
7 |
| have the electric utility produce and provide single bills to |
8 |
| the retail customers for both the services provided by the |
9 |
| alternative retail electric supplier or other electric utility |
10 |
| and the delivery services provided by the electric utility to |
11 |
| the customers. The tariffs filed pursuant to this subsection |
12 |
| shall require the electric utility to collect and remit |
13 |
| customer payments for services provided by alternative retail |
14 |
| electric suppliers or electric utilities other than the |
15 |
| electric utility in whose service area retail customers are |
16 |
| located. The tariff filed pursuant to this subsection shall |
17 |
| require the electric utility to include on each bill to retail |
18 |
| customers an identification of the alternative retail electric |
19 |
| supplier or other electric utility that elects the billing |
20 |
| option. The tariff filed pursuant to this subsection (d) may |
21 |
| also include other just and reasonable terms and conditions and |
22 |
| provide for the recovery of prudently incurred costs associated |
23 |
| with the provision of service pursuant to this subsection (d). |
24 |
| The costs associated with the provision of service pursuant to |
25 |
| this section shall be subject to periodic Commission review.
|
26 |
| (e) Within 45 days after the effective date of this |
|
|
|
09500SB1299ham001 |
- 12 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| amendatory Act of the 95th General Assembly, each electric |
2 |
| utility with more than 100,000 customers in this State shall |
3 |
| file a tariff pursuant to Article IX of this Act that provides |
4 |
| alternative retail electric suppliers with the option to have |
5 |
| the electric utility purchase 2 billing cycles worth of |
6 |
| uncollectible receivables for power and energy service |
7 |
| provided to a retail customer with a non-coincident peak demand |
8 |
| of less than 400 kilowatts upon returning that customer to that |
9 |
| electric utility for delivery and energy service after that |
10 |
| alternative retail electric supplier has made reasonable |
11 |
| collection efforts on that account. The electric utility shall |
12 |
| recover any prudently incurred administrative expenses |
13 |
| incurred in connection with this subsection through its |
14 |
| delivery case filings with the Commission but shall not permit |
15 |
| the double recovery of utility bad debt expenses from |
16 |
| customers.
|
17 |
| (Source: P.A. 90-561, eff. 12-16-97.)
|
18 |
| (220 ILCS 5/20-130 new) |
19 |
| Sec. 20-130. Retail choice and referral programs. |
20 |
| (a) The Commission shall have the authority to establish |
21 |
| retail choice and referral programs to be administered by an |
22 |
| electric utility or the State in which residential and small |
23 |
| commercial customers receive incentives, including, but not |
24 |
| limited to, discounted rate introductory offers for switching |
25 |
| to participating electric suppliers. |
|
|
|
09500SB1299ham001 |
- 13 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| (b) Reasonable costs associated with the implementation |
2 |
| and operation of customer choice and referral programs may be |
3 |
| recovered in an electric utility's distribution rates. |
4 |
| Reasonable costs associated with the implementation and |
5 |
| operation of a customer choice program may also be recovered |
6 |
| from retail electric suppliers participating in a customer |
7 |
| choice and referral program. In no event, however, shall the |
8 |
| Commission mandate a cost recovery mechanism without first |
9 |
| providing all interested parties notice and an opportunity to |
10 |
| be heard in a hearing before the Commission. |
11 |
| (c) The Office of Retail Market Development shall serve as |
12 |
| the clearinghouse for the development of retail choice and |
13 |
| referral programs and shall work with electric utilities and |
14 |
| interested parties on a continuous basis to implement and |
15 |
| improve upon the programs. Nothing in this Section, however, |
16 |
| shall prevent an electric utility on its own accord from |
17 |
| implementing retail choice and referral programs. |
18 |
| (d) Only customers that qualify for utility service shall |
19 |
| be eligible for retail choice and referral programs. |
20 |
| (e) The Office of Retail Market Development shall |
21 |
| immediately upon the effective date of this amendatory Act of |
22 |
| the 95th General Assembly explore for possible implementation |
23 |
| on as expedited basis as possible the following retail choice |
24 |
| and referral programs: |
25 |
| (1) An introductory fixed discount program in which |
26 |
| suppliers participating in the program offer customers a |
|
|
|
09500SB1299ham001 |
- 14 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| fixed percentage discount off of the electric utility's |
2 |
| supply rate for a set number of billing periods. Customers |
3 |
| would be able to enroll in the program by using an online |
4 |
| enrollment form, completing an enrollment card found in |
5 |
| their monthly electric utility bill, or by calling a |
6 |
| toll-free number. Customers would be free to withdraw from |
7 |
| the program at any time and select another alternative |
8 |
| retail electric supplier or return to the electric utility. |
9 |
| (2) A new customer program in which electric utilities |
10 |
| would offer consumers initiating new electric service a |
11 |
| choice of offers from participating electric suppliers to |
12 |
| provide the consumer's electric supply service. Customers |
13 |
| expressing a preference for a specific electric supplier |
14 |
| would be enrolled with that supplier. Customers not |
15 |
| expressing a preference for a specific electric supplier |
16 |
| would be offered the opportunity to enroll with an electric |
17 |
| supplier selected randomly on a rotating basis. |
18 |
| (3) A customer service call center referral program in |
19 |
| which customers calling an electric utility's call center |
20 |
| would be offered enrollment with an alternative retail |
21 |
| electric supplier and informed that they have the option to |
22 |
| receive immediate savings or introductory offers by |
23 |
| participating in the referral program. Customers choosing |
24 |
| to participate would be transferred to a customer service |
25 |
| representative for the program and would either select the |
26 |
| electric supplier from which they would like to take |
|
|
|
09500SB1299ham001 |
- 15 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| service or be placed with a participating electric supplier |
2 |
| chosen at random on a rotating basis.
|
3 |
| Nothing in this Section shall prevent the Office of Retail |
4 |
| Market Development or the Commission from considering retail |
5 |
| choice and referral programs in addition to the programs |
6 |
| outlined in this Section.
|
7 |
| Section 10. The Consumer Fraud and Deceptive Business |
8 |
| Practices Act is amended by changing Section 2EE as follows:
|
9 |
| (815 ILCS 505/2EE)
|
10 |
| Sec. 2EE. Electric service provider selection. An electric |
11 |
| service provider shall not submit or execute
a change in a |
12 |
| subscriber's selection of a provider of electric
service unless |
13 |
| and until the request for a change has been confirmed in |
14 |
| accordance with one of the following procedures
except as |
15 |
| follows :
|
16 |
| (a) The new electric service provider has obtained the
|
17 |
| subscriber's
customer's written or electronically signed
|
18 |
| authorization in a form that meets the
following requirements:
|
19 |
| (1) An electric service provider shall obtain any
|
20 |
| necessary written authorization from a subscriber for a
|
21 |
| change in electric service by using a letter of agency as
|
22 |
| specified in this
Section. Any letter of agency that does
|
23 |
| not conform with this
Section is invalid.
|
24 |
| (2) The letter of agency shall be a separate
document |
|
|
|
09500SB1299ham001 |
- 16 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| (an easily separable document containing only
the |
2 |
| authorization language described in subparagraph (a) (5)
of |
3 |
| this
Section) whose sole purpose is to authorize an
|
4 |
| electric service provider change. The letter of agency
must |
5 |
| be signed and dated by the subscriber requesting the
|
6 |
| electric service provider change.
|
7 |
| (3) The letter of agency shall not be combined with
|
8 |
| inducements of any kind on the same document.
|
9 |
| (4) Notwithstanding subparagraphs (a) (1) and (a) (2) of
|
10 |
| this
Section, the letter of agency may be combined with
|
11 |
| checks that contain only the required letter of agency
|
12 |
| language prescribed in subparagraph (a)(5)
paragraph (5)
|
13 |
| of this Section and
the necessary information to make the |
14 |
| check a negotiable
instrument. The letter of agency check |
15 |
| shall not contain
any promotional language or material. The |
16 |
| letter of
agency check shall contain in easily readable, |
17 |
| bold-face
type on the face of the check, a notice that the |
18 |
| consumer
is authorizing an electric service provider |
19 |
| change by
signing the check. The letter of agency language |
20 |
| also
shall be placed near the signature line on the back of
|
21 |
| the check.
|
22 |
| (5) At a minimum, the letter of agency must be
printed |
23 |
| with a print of sufficient size to be clearly
legible, and |
24 |
| must contain clear and unambiguous language
that confirms:
|
25 |
| (i) The subscriber's billing name and address;
|
26 |
| (ii) The decision to change the electric service
|
|
|
|
09500SB1299ham001 |
- 17 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| provider from the current provider to the
prospective |
2 |
| provider;
|
3 |
| (iii) The terms, conditions, and nature of the
|
4 |
| service to be provided to the subscriber must be
|
5 |
| clearly and conspicuously disclosed, in writing, and
|
6 |
| an electric service provider must directly establish
|
7 |
| the rates for the service contracted for by the
|
8 |
| subscriber; and
|
9 |
| (iv) That the subscriber understand that any
|
10 |
| electric service provider selection the subscriber
|
11 |
| chooses may involve a charge to the subscriber for
|
12 |
| changing the subscriber's electric service provider.
|
13 |
| (6) Letters of agency shall not suggest or require
that |
14 |
| a subscriber take some action in order to retain the
|
15 |
| subscriber's current electric service provider.
|
16 |
| (7) If any portion of a letter of agency is
translated |
17 |
| into another language, then all portions of
the letter of |
18 |
| agency must be translated into that
language.
|
19 |
| (b) An appropriately qualified independent third party has |
20 |
| obtained, in accordance with the procedures set forth in |
21 |
| paragraphs (1) through (4) of this subsection (b), the |
22 |
| subscriber's oral authorization to change electric suppliers |
23 |
| that confirms and includes appropriate verification data. The |
24 |
| independent third party (i) must not be owned, managed, |
25 |
| controlled, or directed by the supplier or the supplier's |
26 |
| marketing agent; (ii) must not have any financial incentive to |
|
|
|
09500SB1299ham001 |
- 18 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| confirm supplier change requests for the supplier or the |
2 |
| supplier's marketing agent; and (iii) must operate in a |
3 |
| location physically separate from the supplier or the |
4 |
| supplier's marketing agent.
|
5 |
| Automated third-party verification systems and 3-way |
6 |
| conference calls may be used for verification purposes so long |
7 |
| as the other requirements of paragraphs (2) through (4) of this |
8 |
| subsection (b) are satisfied. |
9 |
| A supplier or supplier's sales representative initiating a |
10 |
| 3-way conference call or a call through an automated |
11 |
| verification system must drop off the call once the 3-way |
12 |
| connection has been established. |
13 |
| All third-party verification methods shall elicit, at a |
14 |
| minimum, the following information: (i) the identify of the |
15 |
| subscriber; (ii) confirmation that the person on the call is |
16 |
| authorized to make the supplier change; (iii) confirmation that |
17 |
| the person on the call wants to make the supplier change; (iv) |
18 |
| the names of the suppliers affected by the change; and (v) the |
19 |
| service address of the supply to be switched. Third-party |
20 |
| verifiers may not market the supplier's services by providing |
21 |
| additional information, including information regarding |
22 |
| procedures to block or otherwise freeze an account against |
23 |
| further changes. |
24 |
| All third-party verifications shall be conducted in the |
25 |
| same language that was used in the underlying sales transaction |
26 |
| and shall be recorded in their entirety. Submitting suppliers |
|
|
|
09500SB1299ham001 |
- 19 - |
LRB095 03672 MJR 37298 a |
|
|
1 |
| shall maintain and preserve audio records of verification of |
2 |
| subscriber authorization for a minimum period of 2 years after |
3 |
| obtaining the verification. Automated systems must provide |
4 |
| consumers with an option to speak with a live person at any |
5 |
| time during the call.
|
6 |
| (c) When a subscriber initiates the call to the prospective |
7 |
| electric supplier and the prospective electric supplier has, |
8 |
| with the consent of the customer, made a date-stamped and |
9 |
| time-stamped audio recording that elicits, at a minimum, the |
10 |
| following information: |
11 |
| (1) the identity of the subscriber; |
12 |
| (2) confirmation that the person on the call is |
13 |
| authorized to make the supplier change; |
14 |
| (3) confirmation that the person on the call wants to |
15 |
| make the supplier change; |
16 |
| (4) the names of the suppliers affected by the change; |
17 |
| and |
18 |
| (5) the service address of the supply to be switched. |
19 |
| Submitting suppliers shall maintain and preserve the audio |
20 |
| records containing the information set forth above for a |
21 |
| minimum period of 2 years.
|
22 |
| (d) For purposes of this
Section, "electric service |
23 |
| provider"
shall have the meaning given that phrase in
Section |
24 |
| 6.5 of the
Attorney General Act.
|
25 |
| (Source: P.A. 90-561, eff. 12-16-97.)".
|