Sen. Mike Jacobs
Filed: 3/21/2007
|
|
09500SB1400sam002 |
|
LRB095 11080 BDD 34270 a |
|
|
1 |
| AMENDMENT TO SENATE BILL 1400
|
2 |
| AMENDMENT NO. ______. Amend Senate Bill 1400, AS AMENDED, |
3 |
| by replacing everything after the enacting clause with the |
4 |
| following:
|
5 |
| "Section 1. Short title. This Act may be cited as the Wind |
6 |
| Energy Indemnity Fund Act. |
7 |
| Section 5. Definitions. As used in this Act: |
8 |
| "Abandonment" means (a) in the case of a landowner: (i) failure |
9 |
| by the wind energy company to operate a wind turbine or wind |
10 |
| turbines for the purpose for which they were designed and |
11 |
| installed, for a period of 12 consecutive months, and (ii) |
12 |
| failure to pay the landowner moneys owed to him or her in |
13 |
| accordance with the underlying agreement, for a period of 6 |
14 |
| consecutive months; (b) in the case of a county board: (i) |
15 |
| failure by the wind energy company to operate a wind turbine or |
16 |
| wind turbines for the purposes for which they were designed and |
|
|
|
09500SB1400sam002 |
- 2 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| installed, for a period of 12 consecutive months, and (ii) |
2 |
| failure to adhere to any or all of the restrictions and |
3 |
| conditions that were part of the approval process of the |
4 |
| appropriate county authority for the granting of the special |
5 |
| use permit, conditional use permit, zoning change, or zoning or |
6 |
| permitting ordinance of any kind given in order to allow the |
7 |
| installation and operation of the wind turbine or wind |
8 |
| turbines. |
9 |
| "Board" means the governing body of the Wind Energy |
10 |
| Indemnity Fund Corporation. |
11 |
| "Claimant" means either a landowner or a county board |
12 |
| seeking to have a deconstruction paid for from the Fund and |
13 |
| carried out by the Department. |
14 |
| "Corporation" means the Wind Energy Indemnity Fund |
15 |
| Corporation, as established in this Act. |
16 |
| "County board" has the meaning set forth in Section 1.07 of |
17 |
| the Statute on Statutes. |
18 |
| "Deconstruction" means removal of all property comprising |
19 |
| a wind energy generation facility from the property of a |
20 |
| landowner and restoration of the property to the condition in |
21 |
| which it existed immediately prior to the construction of the |
22 |
| facility, including, but not limited to, soil type and |
23 |
| topography; provided, however, that foundations, pads, |
24 |
| electrical lines, and any other underground facilities must be |
25 |
| removed to a depth of 4 feet below the surface of the ground. |
26 |
| "Department" means the Department of Agriculture. |
|
|
|
09500SB1400sam002 |
- 3 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| "Director", unless otherwise provided, means the Director |
2 |
| of Agriculture, or the Director's designee. |
3 |
| "Fund" means the Wind Energy Indemnity Fund. |
4 |
| "Landowner" means any person with an ownership interest in |
5 |
| property subject to an underlying agreement. |
6 |
| "Person" means any individual or entity, including, but not |
7 |
| limited to, a sole proprietorship, a partnership, a |
8 |
| corporation, a cooperative, an association, a limited |
9 |
| liability company, an estate, a trust, or a governmental |
10 |
| agency. |
11 |
| "Underlying agreement" means a written arrangement with a |
12 |
| landowner, including, but not limited to, an easement, under |
13 |
| the terms of which a person constructs or intends to construct |
14 |
| a wind energy generation facility on the property of the |
15 |
| landowner. |
16 |
| "Wind energy generation facility" means all property of any |
17 |
| nature whatsoever comprising an operation designed to harness |
18 |
| wind energy and create electricity therefrom, including, but |
19 |
| not limited to, turbines, towers, roadways, concrete |
20 |
| foundations, transmission lines, and poles, all situated on, |
21 |
| under, or over the property of a landowner. |
22 |
| "Wind energy indemnity trust account" means a trust account |
23 |
| established by the Director that is used for the receipt and |
24 |
| disbursement of moneys paid from the Fund. |
25 |
| "Wind turbine" means each tower, blade, and propeller |
26 |
| housing designed for wind energy generation. |
|
|
|
09500SB1400sam002 |
- 4 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| Section 10. Powers and duties of the Director. The Director |
2 |
| has all powers necessary and proper to fully and effectively |
3 |
| execute the provisions of this Act and has the general duty to |
4 |
| implement this Act. The Director's powers and duties include, |
5 |
| but are not limited to, the following: |
6 |
| 1. The Director shall personally serve as president of |
7 |
| the Corporation. |
8 |
| 2. The Director may take any action that may be |
9 |
| reasonable or appropriate to enforce this Act and its |
10 |
| rules. |
11 |
| Section 15. Administrative procedure. The Illinois |
12 |
| Administrative Procedure Act applies to this Act. |
13 |
| Section 20. Administrative review and venue. Final |
14 |
| administrative decisions of the Department are subject to |
15 |
| judicial review under Article III of the Code of Civil |
16 |
| Procedure and its rules. The term "administrative decision" is |
17 |
| defined as in Section 3-101 of the Code of Civil Procedure. An |
18 |
| action to review a final administrative decision under this Act |
19 |
| may be commenced in the circuit court of any county in which |
20 |
| any part of the transaction occurred that gave rise to the |
21 |
| claim that was the subject of the proceedings before the |
22 |
| Department. |
|
|
|
09500SB1400sam002 |
- 5 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| Section 25. Rules. The Department may promulgate rules that |
2 |
| are necessary for the implementation and administration of this |
3 |
| Act. |
4 |
| Section 30. Fund assessments. There is an assessment of |
5 |
| $10,000 for each wind turbine constructed or under construction |
6 |
| as of the effective date of this Act and for each turbine |
7 |
| constructed thereafter, under the provisions of an underlying |
8 |
| agreement. The assessment is an obligation of the owner of each |
9 |
| wind turbine and is payable in one initial payment of $5,000 |
10 |
| and $5,000 in equal annual installments of $250 over a period |
11 |
| of 20 years; provided, however, that the subsequent annual |
12 |
| installments must be adjusted based on inflation, as reflected |
13 |
| in the Consumer Price Index, on an annual basis. The initial |
14 |
| payment is payable within 90 days after the effective date of |
15 |
| this Act for wind turbines already constructed or under |
16 |
| construction, and, in all other cases, prior to the |
17 |
| commencement of construction. |
18 |
| All installments under this Section must be sent to the |
19 |
| Department and made payable to the Corporation. |
20 |
| It is the responsibility of all parties to an underlying |
21 |
| agreement to report the existence and specific provisions of |
22 |
| the underlying agreement to the Department. |
23 |
| The Department shall mail all assessment notices to owners |
24 |
| of wind energy generation facilities at least 30 days before |
25 |
| the assessment installment is due. |
|
|
|
09500SB1400sam002 |
- 6 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| All wind turbines already constructed, under construction, |
2 |
| or issued a building permit before the effective date of this |
3 |
| Act are to provide proof to the county of payment to the Fund |
4 |
| within 95 days of the effective date of this Act. If such proof |
5 |
| of payment is not provided, then the county must order the wind |
6 |
| energy company to stop all operation and construction |
7 |
| activities until the county receives proof of payment to the |
8 |
| Fund. For all other wind turbines, no county may issue a |
9 |
| building permit without being provided proof that the above |
10 |
| assessment has been paid to the Fund. |
11 |
| Section 35. Abandonment. Upon an administrative finding in |
12 |
| a hearing held by the Department that a deconstruction has been |
13 |
| validly determined and ordered by either a court of competent |
14 |
| jurisdiction or an arbitrator in binding arbitration, and |
15 |
| deconstruction, after a period of at least 8 months, has not |
16 |
| been completed satisfactorily, the Director has all the powers |
17 |
| for the benefit of claimants as established under this Act, |
18 |
| including, but not limited to, the power to do the following: |
19 |
| 1. request the transfer of moneys from the Fund to the |
20 |
| Trust Account for the purpose of paying the cost of |
21 |
| deconstruction in accordance with this Act; |
22 |
| 2. disburse the funds in the Trust Account for the |
23 |
| deconstruction in accordance with this Act; |
24 |
| 3. cause the sale of the deconstructed assets; |
25 |
| 4. retain from the sale of the deconstructed assets |
|
|
|
09500SB1400sam002 |
- 7 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| moneys adequate to cover the costs to the Department of the |
2 |
| deconstruction, and pay those amounts to the Fund; |
3 |
| 5. return all moneys over and above the costs to the |
4 |
| Department for the deconstruction to the owner or owners of |
5 |
| the deconstructed assets, or to the holders of valid liens |
6 |
| on those assets. |
7 |
| Section 40. Statutory lien. The Department has a lien prior |
8 |
| and paramount to all other liens of any sort on the assets of |
9 |
| the wind energy system to the extent of the costs incurred by |
10 |
| the Department to accomplish the deconstruction of the |
11 |
| abandoned wind energy system, which arises and attach upon |
12 |
| construction of said wind energy system; provided, however, |
13 |
| that the lien herein granted to the Department is not prior and |
14 |
| paramount to the statutory lien in favor of real property |
15 |
| taxes. |
16 |
| Section 45. Claims. |
17 |
| (a) A claimant shall file a complaint, on forms supplied by |
18 |
| the Department, that contains at least the following: |
19 |
| (1) the name and address of the claimant; |
20 |
| (2) the name and address of the owner of the wind |
21 |
| energy generation facility in question; |
22 |
| (3) the location of the wind energy generation facility |
23 |
| in question; |
24 |
| (4) a copy of either a court decision, or the finding |
|
|
|
09500SB1400sam002 |
- 8 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| of an arbitrator in a binding arbitration proceeding, that |
2 |
| indicates a finding of abandonment of the wind energy |
3 |
| generation facility in question; a determination that the |
4 |
| underlying agreement is null, void, and of no further force |
5 |
| and effect; and an order for deconstruction of same. The |
6 |
| court order or arbitration decision must have been rendered |
7 |
| at least 8 months previously, and the time for all appeals |
8 |
| and related proceedings must have lapsed. |
9 |
| (5) evidence showing that the deconstruction ordered |
10 |
| by a court, or by an arbitrator in a proceeding for binding |
11 |
| arbitration, has not been carried to a satisfactory |
12 |
| conclusion, as defined in this Act; and |
13 |
| (6) a request that the funds necessary to perform the |
14 |
| deconstruction be paid to the Department from the Fund and |
15 |
| that the Department carry out the deconstruction in |
16 |
| accordance with the order of the court or the arbitrator |
17 |
| and in accordance with the definition of deconstruction as |
18 |
| contained in this Act. |
19 |
| (b) A hearing shall be held by the Department and a |
20 |
| decision rendered as to the validity of the claimant's |
21 |
| complaint. In the event of a finding that the complaint is |
22 |
| valid, then, within 90 days after the date, the Department |
23 |
| shall obtain at least 2 bids from contractors to carry out the |
24 |
| specific deconstruction. One bidder must be chosen by the |
25 |
| Department within the following 60 days, and the Department, |
26 |
| within 60 days thereafter, shall enter into a written agreement |
|
|
|
09500SB1400sam002 |
- 9 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| with the successful bidder for the deconstruction, which must |
2 |
| be accomplished within 6 months thereafter. |
3 |
| (c) It is the responsibility of the Department to monitor |
4 |
| the progress of the deconstruction and provide the necessary |
5 |
| supervisory oversight to ensure that it is accomplished in |
6 |
| accordance with the deconstruction agreement and the |
7 |
| provisions of this Act. |
8 |
| Section 50. Illinois Wind Energy Indemnity Fund |
9 |
| Corporation; creation; powers. |
10 |
| (a) There is hereby created the Illinois Wind Energy |
11 |
| Indemnity Fund Corporation, a political subdivision, body |
12 |
| politic, and public corporation. The governing powers of the |
13 |
| Corporation are vested in the Board of Directors composed of |
14 |
| the Director, who shall personally serve as President; the |
15 |
| Attorney General or his or her designee, who shall serve as |
16 |
| Secretary; the State Treasurer or his or her designee, who |
17 |
| shall serve as Treasurer; and the Chairman of the Illinois |
18 |
| Commerce Commission, or his or her designee. Three members of |
19 |
| the Board constitute a quorum at any meeting of the Board, and |
20 |
| the affirmative vote of 3 members is necessary for any action |
21 |
| taken by the Board at a meeting, except that a lesser number |
22 |
| may adjourn a meeting from time to time. A vacancy in the |
23 |
| membership of the Board does not impair the right of a quorum |
24 |
| to exercise all the rights and perform all the duties of the |
25 |
| Board and Corporation. |
|
|
|
09500SB1400sam002 |
- 10 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| (b) The Corporation has the following powers, together with |
2 |
| all powers incidental or necessary to the discharge of those |
3 |
| powers in corporate form: |
4 |
| (1) To have perpetual succession by its corporate name |
5 |
| as a corporate body. |
6 |
| (2) To adopt, alter, and repeal by-laws, not |
7 |
| inconsistent with the provisions of this Act, for the |
8 |
| regulation and conduct of its affairs and business. |
9 |
| (3) To adopt and make use of a corporate seal and to |
10 |
| alter the seal at pleasure. |
11 |
| (4) To avail itself of the use of information, |
12 |
| services, facilities, and employees of the State of |
13 |
| Illinois in carrying out the provisions of this Act. |
14 |
| (5) To receive funds assessed by the Department under |
15 |
| this Act. |
16 |
| (6) To administer the Fund by investing funds of the |
17 |
| Corporation that the Board may determine are not presently |
18 |
| needed for its corporate purposes. |
19 |
| (7) Upon the request of the Director, to make payment |
20 |
| from the Fund to the Trust Account when payment is |
21 |
| necessary to pay costs of deconstruction in accordance with |
22 |
| the provisions of this Act. |
23 |
| (8) To authorize, receive, and disburse funds by |
24 |
| electronic means. |
25 |
| (9) To have those powers that are necessary or |
26 |
| appropriate for the exercise of the powers specifically |
|
|
|
09500SB1400sam002 |
- 11 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| conferred upon the Corporation and all incidental powers |
2 |
| that are customary in corporations. |
3 |
| (c) All assessments by the Department must be held by the |
4 |
| Corporation in the Fund. |
5 |
| (d) Subject to applicable law, the assets of the Fund may |
6 |
| be invested and reinvested at the discretion of the |
7 |
| Corporation, and the income from these investments must be |
8 |
| deposited into the Fund and must be available for the same |
9 |
| purposes as all other assets of the Fund. |
10 |
| (e) The assets of the Fund may not be available for any |
11 |
| purposes other than the payment of deconstruction costs under |
12 |
| this Act and the payment of refunds of amounts that the Board |
13 |
| determines have been inappropriately paid into the Fund, and |
14 |
| may not be transferred to any other fund, other than the Trust |
15 |
| Account when necessary to pay deconstruction costs under this |
16 |
| Act or to pay refunds authorized by the Board. |
17 |
| Section 55. No waiver. The provisions of this Act, |
18 |
| including the definitions, may not be altered, varied, or |
19 |
| revised by agreement. |
20 |
| Section 900. The Illinois Resource Development and Energy |
21 |
| Security Act is amended by adding Section 21 as follows: |
22 |
| (20 ILCS 688/21 new) |
23 |
| Sec. 21. Legislative findings. The General Assembly finds |
|
|
|
09500SB1400sam002 |
- 12 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| and declares that: |
2 |
| (1) a wind energy Act that provides for a renewable |
3 |
| portfolio standard, a consistent property valuation |
4 |
| method, a restoration indemnity fund, and mechanic's lien |
5 |
| clarification will provide a favorable environmental and |
6 |
| economic climate for development of wind energy; |
7 |
| (2) it is desirable to develop both renewable and |
8 |
| alternative energy resources to obtain environmental |
9 |
| quality and public health benefit; |
10 |
| (3) the benefits of electricity from renewable and |
11 |
| alternative energy resources accrue to the public at large, |
12 |
| thus consumers and electric utilities and alternative |
13 |
| retail electric suppliers share an interest in developing |
14 |
| and using a significant level of these environmentally |
15 |
| preferable resources in the State's electricity supply |
16 |
| portfolio and stability of taxes for extended periods of |
17 |
| time; |
18 |
| (4) encouraging energy efficiency will improve the |
19 |
| environmental quality and public health in the State of |
20 |
| Illinois; |
21 |
| (5) wind energy is one alternative energy source that |
22 |
| can be used to provide electricity to utility consumers; |
23 |
| (6) some regions in the State are ideal locations for |
24 |
| wind energy system development; |
25 |
| (7) as the facilities are typically constructed on |
26 |
| property owned by others, and deconstruction of the |
|
|
|
09500SB1400sam002 |
- 13 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| facilities is costly, it is desirable to create an |
2 |
| indemnity fund to pay for deconstruction in the event that |
3 |
| the wind energy company fails to do so in a timely manner; |
4 |
| and |
5 |
| (8) it is appropriate to protect the owners of the |
6 |
| underlying lands from mechanics liens imposed on those |
7 |
| lands in the event that the entities constructing the wind |
8 |
| energy facilities fail to pay suppliers of labor and |
9 |
| materials.
|
10 |
| Section 905. The Public Utilities Act is amended by adding |
11 |
| Section 9-220.3 as follows: |
12 |
| (220 ILCS 5/9-220.3 new) |
13 |
| Sec. 9-220.3. Renewable energy portfolio standards. |
14 |
| (a) "Renewable energy resources" has the meaning set
forth |
15 |
| in subsection (f) of Section 6-3 of The Renewable Energy,
|
16 |
| Energy Efficiency, and Coal Resources Development Law of 1997.
|
17 |
| However, for the limited purposes of this Section, energy
|
18 |
| produced by methane recovered from landfills in Illinois may be
|
19 |
| counted as a renewable energy resource for up to, but no more
|
20 |
| than, 25% of the amount of renewable energy resources provided
|
21 |
| by the electric utility or alternative retail electric supplier
|
22 |
| in meeting the standards set forth in subsection (c). |
23 |
| (b) The objective of this Section is to ensure the
|
24 |
| development and use of renewable energy resources to advance
|
|
|
|
09500SB1400sam002 |
- 14 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| the goals stated in Section 5 of the Illinois Resource
|
2 |
| Development and Energy Security Act. |
3 |
| (c) Each electric utility or alternative retail electric
|
4 |
| supplier shall provide sufficient renewable energy resources
|
5 |
| to comprise: |
6 |
| (1) at least 2% of the total electricity
|
7 |
| (megawatthours) that it supplies to its Illinois customers |
8 |
| as
of December 31, 2007; |
9 |
| (2) at least 3% of the total electricity
|
10 |
| (megawatthours) that it supplies to its Illinois customers |
11 |
| as
of December 31, 2008; |
12 |
| (3) at least 4% of the total electricity
|
13 |
| (megawatthours) that it supplies to its Illinois customers |
14 |
| as
of December 31, 2009; |
15 |
| (4) at least 5% of the total electricity
|
16 |
| (megawatthours) that it supplies to its Illinois customers |
17 |
| as
of December 31, 2010; |
18 |
| (5) at least 6% of the total electricity
|
19 |
| (megawattshours) that it supplies to its Illinois |
20 |
| customers as
of December 31, 2011; |
21 |
| (6) at least 7% of the total electricity
|
22 |
| (megawattshours) that it supplies to its Illinois |
23 |
| customers as
of December 31, 2012; |
24 |
| (7) at least 8% of the total electricity
|
25 |
| (megawattshours) that it supplies to its Illinois |
26 |
| customers as
of December 31, 2013; |
|
|
|
09500SB1400sam002 |
- 15 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| (8) at least 9% of the total electricity
|
2 |
| (megawattshours) that it supplies to its Illinois |
3 |
| customers as
of December 31, 2014; |
4 |
| (9) and at least 10% of the total electricity
|
5 |
| (megawattshours) that it supplies to its Illinois |
6 |
| customers as
of December 31, 2015. |
7 |
| The electric utilities or alternative
retail electric |
8 |
| suppliers shall report to the Commission on
their compliance |
9 |
| with these standards by April 1, 2008 and by
April 1st of each |
10 |
| succeeding year. |
11 |
| (d) In order to help achieve improved air quality, public
|
12 |
| health, and environmental quality for Illinois, renewable
|
13 |
| energy resources may be counted for purposes of meeting the
|
14 |
| renewable energy portfolio standards set forth in subsection
|
15 |
| (c) only if they are generated from facilities located in this
|
16 |
| State or in a directly adjacent serious or severe ozone
|
17 |
| non-attainment area as designated by the United States
|
18 |
| Environmental Protection Agency. However, the renewable energy
|
19 |
| resources may be counted for purposes of the renewable energy
|
20 |
| portfolio standards after January 1, 2007 if generated from a
|
21 |
| facility in an adjacent state that has entered into an
|
22 |
| agreement with Illinois as provided in subsection (e) and the
|
23 |
| renewable energy resource provided meets the definition set
|
24 |
| forth in subsection (f) of Section 6-3 of the Renewable Energy,
|
25 |
| Energy Efficiency, and Coal Resources Development Law of 1997. |
26 |
| (e) Illinois officials may work with public officials in
|
|
|
|
09500SB1400sam002 |
- 16 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| adjacent states to develop a regional agreement in which
|
2 |
| Illinois electric utilities and alternative retail electricity
|
3 |
| suppliers will be allowed, after January 1, 2007, to count for
|
4 |
| purposes of meeting the designated renewable energy portfolio
|
5 |
| standards set forth in subsection (c) some renewable energy
|
6 |
| resources generated in an adjacent state if that other state
|
7 |
| has enacted statutory renewable energy portfolio standards
|
8 |
| that are similar to the standards set forth in subsection (c)
|
9 |
| and that other state also allows renewable energy resources
|
10 |
| generated in Illinois to be counted toward meeting its
|
11 |
| statutory renewable energy portfolio standards on a similar
|
12 |
| basis. For the purposes of such an agreement, only those
|
13 |
| renewable energy resources meeting the definition set forth in
|
14 |
| subsection (f) of Section 6-3 of the Renewable Energy, Energy
|
15 |
| Efficiency, and Coal Resources Development Law of 1997 may be
|
16 |
| included. |
17 |
| (f) Costs of obtaining renewable energy resources to meet
|
18 |
| the renewable energy portfolio standards, after January 1,
|
19 |
| 2007, pursuant to subsection (c), shall be recoverable by a
|
20 |
| utility from its ratepayers to the same extent as other fuel or
|
21 |
| purchase power costs as allowed by law after January 1, 2007. |
22 |
| (g) If an electric utility or alternative retail electric
|
23 |
| supplier does not purchase and supply all of the amounts of
|
24 |
| renewable energy specified by the standards in subsection (c),
|
25 |
| then the electric utility or alternative retail electric
|
26 |
| supplier shall pay a penalty of $25 per megawatthour each year
|
|
|
|
09500SB1400sam002 |
- 17 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| for any shortfall in supply. That payment shall be deposited
|
2 |
| into the Renewable Energy Resources Trust Fund to be used by
|
3 |
| the Department of Commerce and Economic Opportunity for the
|
4 |
| purposes of supporting the actual development, construction,
|
5 |
| and utilization of renewable energy projects in Illinois.
|
6 |
| However, if the electric utility or alternative retail electric
|
7 |
| supplier compellingly demonstrates that renewable energy
|
8 |
| resources are not available in sufficient quantities to meet
|
9 |
| the renewable energy portfolio standards set forth in
|
10 |
| subsection (c), and makes such a force majeure showing as to
|
11 |
| the shortfall and any obstacles to availability, and if the
|
12 |
| Illinois Commerce Commission finds that the electric utility or
|
13 |
| alternative retail electric supplier, after notice and a
|
14 |
| hearing with an opportunity for the public to be heard, has, in
|
15 |
| fact, made such a compelling demonstration, then the electric
|
16 |
| utility or alternative retail electric supplier may avoid
|
17 |
| paying the penalty. The penalty payments shall be set aside in
|
18 |
| a separate escrow fund pending the hearing. In any case where
|
19 |
| the Commission finds that such a compelling demonstration has
|
20 |
| been made, the electric utility or alternative retail electric
|
21 |
| supplier must provide a mutually acceptable alternative means
|
22 |
| of developing and utilizing renewable energy resources in
the |
23 |
| State, subject to the review and approval of the Illinois
|
24 |
| Commerce Commission and the Department of Commerce and Economic
|
25 |
| Opportunity. |
26 |
| (h) This Act exempts any public utility with fewer than |
|
|
|
09500SB1400sam002 |
- 18 - |
LRB095 11080 BDD 34270 a |
|
|
1 |
| 200,000
electric customers in Illinois on January 1, 2007.
|
2 |
| Section 910. The Mechanics Lien Act is amended by adding |
3 |
| Section 1.01 as follows: |
4 |
| (770 ILCS 60/1.01 new) |
5 |
| Sec. 1.01. Definitions. Person entitled to lien; extent of |
6 |
| lien on wind energy parcel. |
7 |
| (a) Definitions. |
8 |
| "Wind energy conversion device" means any device |
9 |
| including, but not limited to, a wind charger, windmill, or |
10 |
| wind turbine that coverts wind energy to a form of usable |
11 |
| energy. |
12 |
| "Wind energy conversion parcel" means all property rights |
13 |
| obtained by the wind energy system owner to the platted parcel |
14 |
| including the wind energy conversion devices, associated |
15 |
| equipment, easements, contracts, and leases. |
16 |
| (b) A lien for work or materials on wind energy conversion |
17 |
| parcels is limited to the platted parcel, including all |
18 |
| property rights obtained by the wind energy system owner to the |
19 |
| platted parcel including the wind energy conversion devices, |
20 |
| associated equipment, easements, contracts, and leases.
|
21 |
| Section 999. Effective date. This Act takes effect upon |
22 |
| becoming law.".
|