95TH GENERAL ASSEMBLY
State of Illinois
2007 and 2008
SB2307

 

Introduced 2/14/2008, by Sen. Susan Garrett

 

SYNOPSIS AS INTRODUCED:
 
415 ILCS 5/30   from Ch. 111 1/2, par. 1030
415 ILCS 5/39   from Ch. 111 1/2, par. 1039

    Amends the Environmental Protection Act. Authorizes local health departments to aid in investigations, make recommendations, and initiate enforcement actions concerning permits for community-based wastewater systems. Provides that, as part of its review process, and for ongoing oversight, local health departments are authorized to charge a reasonable fee to the wastewater system owners.


LRB095 18526 BDD 44612 b

FISCAL NOTE ACT MAY APPLY

 

 

A BILL FOR

 

SB2307 LRB095 18526 BDD 44612 b

1     AN ACT concerning environmental safety.
 
2     Be it enacted by the People of the State of Illinois,
3 represented in the General Assembly:
 
4     Section 5. The Environmental Protection Act is amended by
5 changing Sections 30 and 39 as follows:
 
6     (415 ILCS 5/30)  (from Ch. 111 1/2, par. 1030)
7     Sec. 30. Investigations. The Agency shall cause
8 investigations to be made upon the request of the Board or upon
9 receipt of information concerning an alleged violation of this
10 Act, any rule or regulation adopted under this Act, any permit
11 or term or condition of a permit, or any Board order, and may
12 cause to be made such other investigations as it shall deem
13 advisable.
14     To aid in investigations, if the Agency has approved a
15 permit for a community-based wastewater system, then the local
16 health department must be provided all system inspection or
17 effluent quality monitoring reports. The local health
18 department may initiate an enforcement action following
19 investigations into violations of Agency performance standards
20 for community-based wastewater systems.
21 (Source: P.A. 92-574, eff. 6-26-02; 93-152, eff. 7-10-03.)
 
22     (415 ILCS 5/39)  (from Ch. 111 1/2, par. 1039)

 

 

SB2307 - 2 - LRB095 18526 BDD 44612 b

1     Sec. 39. Issuance of permits; procedures.
2     (a) When the Board has by regulation required a permit for
3 the construction, installation, or operation of any type of
4 facility, equipment, vehicle, vessel, or aircraft, the
5 applicant shall apply to the Agency for such permit and it
6 shall be the duty of the Agency to issue such a permit upon
7 proof by the applicant that the facility, equipment, vehicle,
8 vessel, or aircraft will not cause a violation of this Act or
9 of regulations hereunder. The Agency shall adopt such
10 procedures as are necessary to carry out its duties under this
11 Section. In making its determinations on permit applications
12 under this Section the Agency may consider prior adjudications
13 of noncompliance with this Act by the applicant that involved a
14 release of a contaminant into the environment. In granting
15 permits, the Agency may impose reasonable conditions
16 specifically related to the applicant's past compliance
17 history with this Act as necessary to correct, detect, or
18 prevent noncompliance. The Agency may impose such other
19 conditions as may be necessary to accomplish the purposes of
20 this Act, and as are not inconsistent with the regulations
21 promulgated by the Board hereunder. Except as otherwise
22 provided in this Act, a bond or other security shall not be
23 required as a condition for the issuance of a permit. If the
24 Agency denies any permit under this Section, the Agency shall
25 transmit to the applicant within the time limitations of this
26 Section specific, detailed statements as to the reasons the

 

 

SB2307 - 3 - LRB095 18526 BDD 44612 b

1 permit application was denied. Such statements shall include,
2 but not be limited to the following:
3         (i) the Sections of this Act which may be violated if
4     the permit were granted;
5         (ii) the provision of the regulations, promulgated
6     under this Act, which may be violated if the permit were
7     granted;
8         (iii) the specific type of information, if any, which
9     the Agency deems the applicant did not provide the Agency;
10     and
11         (iv) a statement of specific reasons why the Act and
12     the regulations might not be met if the permit were
13     granted.
14     If there is no final action by the Agency within 90 days
15 after the filing of the application for permit, the applicant
16 may deem the permit issued; except that this time period shall
17 be extended to 180 days when (1) notice and opportunity for
18 public hearing are required by State or federal law or
19 regulation, (2) the application which was filed is for any
20 permit to develop a landfill subject to issuance pursuant to
21 this subsection, or (3) the application that was filed is for a
22 MSWLF unit required to issue public notice under subsection (p)
23 of Section 39. The 90-day and 180-day time periods for the
24 Agency to take final action do not apply to NPDES permit
25 applications under subsection (b) of this Section, to RCRA
26 permit applications under subsection (d) of this Section, or to

 

 

SB2307 - 4 - LRB095 18526 BDD 44612 b

1 UIC permit applications under subsection (e) of this Section.
2     The Agency shall publish notice of all final permit
3 determinations for development permits for MSWLF units and for
4 significant permit modifications for lateral expansions for
5 existing MSWLF units one time in a newspaper of general
6 circulation in the county in which the unit is or is proposed
7 to be located.
8     After January 1, 1994 and until July 1, 1998, operating
9 permits issued under this Section by the Agency for sources of
10 air pollution permitted to emit less than 25 tons per year of
11 any combination of regulated air pollutants, as defined in
12 Section 39.5 of this Act, shall be required to be renewed only
13 upon written request by the Agency consistent with applicable
14 provisions of this Act and regulations promulgated hereunder.
15 Such operating permits shall expire 180 days after the date of
16 such a request. The Board shall revise its regulations for the
17 existing State air pollution operating permit program
18 consistent with this provision by January 1, 1994.
19     After June 30, 1998, operating permits issued under this
20 Section by the Agency for sources of air pollution that are not
21 subject to Section 39.5 of this Act and are not required to
22 have a federally enforceable State operating permit shall be
23 required to be renewed only upon written request by the Agency
24 consistent with applicable provisions of this Act and its
25 rules. Such operating permits shall expire 180 days after the
26 date of such a request. Before July 1, 1998, the Board shall

 

 

SB2307 - 5 - LRB095 18526 BDD 44612 b

1 revise its rules for the existing State air pollution operating
2 permit program consistent with this paragraph and shall adopt
3 rules that require a source to demonstrate that it qualifies
4 for a permit under this paragraph.
5     (b) The Agency may issue NPDES permits exclusively under
6 this subsection for the discharge of contaminants from point
7 sources into navigable waters, all as defined in the Federal
8 Water Pollution Control Act, as now or hereafter amended,
9 within the jurisdiction of the State, or into any well.
10     All NPDES permits shall contain those terms and conditions,
11 including but not limited to schedules of compliance, which may
12 be required to accomplish the purposes and provisions of this
13 Act.
14     The Agency may issue general NPDES permits for discharges
15 from categories of point sources which are subject to the same
16 permit limitations and conditions. Such general permits may be
17 issued without individual applications and shall conform to
18 regulations promulgated under Section 402 of the Federal Water
19 Pollution Control Act, as now or hereafter amended.
20     The Agency may include, among such conditions, effluent
21 limitations and other requirements established under this Act,
22 Board regulations, the Federal Water Pollution Control Act, as
23 now or hereafter amended, and regulations pursuant thereto, and
24 schedules for achieving compliance therewith at the earliest
25 reasonable date.
26     The Agency shall adopt filing requirements and procedures

 

 

SB2307 - 6 - LRB095 18526 BDD 44612 b

1 which are necessary and appropriate for the issuance of NPDES
2 permits, and which are consistent with the Act or regulations
3 adopted by the Board, and with the Federal Water Pollution
4 Control Act, as now or hereafter amended, and regulations
5 pursuant thereto.
6     The Agency, subject to any conditions which may be
7 prescribed by Board regulations, may issue NPDES permits to
8 allow discharges beyond deadlines established by this Act or by
9 regulations of the Board without the requirement of a variance,
10 subject to the Federal Water Pollution Control Act, as now or
11 hereafter amended, and regulations pursuant thereto.
12     (c) Except for those facilities owned or operated by
13 sanitary districts organized under the Metropolitan Water
14 Reclamation District Act, no permit for the development or
15 construction of a new pollution control facility may be granted
16 by the Agency unless the applicant submits proof to the Agency
17 that the location of the facility has been approved by the
18 County Board of the county if in an unincorporated area, or the
19 governing body of the municipality when in an incorporated
20 area, in which the facility is to be located in accordance with
21 Section 39.2 of this Act. For purposes of this subsection (c),
22 and for purposes of Section 39.2 of this Act, the appropriate
23 county board or governing body of the municipality shall be the
24 county board of the county or the governing body of the
25 municipality in which the facility is to be located as of the
26 date when the application for siting approval is filed. Prior

 

 

SB2307 - 7 - LRB095 18526 BDD 44612 b

1 to issuance of an agency permit for a community-based
2 wastewater system, local health departments may make
3 substantive and actionable recommendations for system design,
4 construction, and management issues. The local health
5 department must forward these recommendations to the Agency for
6 its consideration within 60 days after the filing of an
7 application. As part of this review process, and for ongoing
8 oversight, the local health department is authorized to charge
9 a reasonable fee to the wastewater system owners.
10     In the event that siting approval granted pursuant to
11 Section 39.2 has been transferred to a subsequent owner or
12 operator, that subsequent owner or operator may apply to the
13 Agency for, and the Agency may grant, a development or
14 construction permit for the facility for which local siting
15 approval was granted. Upon application to the Agency for a
16 development or construction permit by that subsequent owner or
17 operator, the permit applicant shall cause written notice of
18 the permit application to be served upon the appropriate county
19 board or governing body of the municipality that granted siting
20 approval for that facility and upon any party to the siting
21 proceeding pursuant to which siting approval was granted. In
22 that event, the Agency shall conduct an evaluation of the
23 subsequent owner or operator's prior experience in waste
24 management operations in the manner conducted under subsection
25 (i) of Section 39 of this Act.
26     Beginning August 20, 1993, if the pollution control

 

 

SB2307 - 8 - LRB095 18526 BDD 44612 b

1 facility consists of a hazardous or solid waste disposal
2 facility for which the proposed site is located in an
3 unincorporated area of a county with a population of less than
4 100,000 and includes all or a portion of a parcel of land that
5 was, on April 1, 1993, adjacent to a municipality having a
6 population of less than 5,000, then the local siting review
7 required under this subsection (c) in conjunction with any
8 permit applied for after that date shall be performed by the
9 governing body of that adjacent municipality rather than the
10 county board of the county in which the proposed site is
11 located; and for the purposes of that local siting review, any
12 references in this Act to the county board shall be deemed to
13 mean the governing body of that adjacent municipality;
14 provided, however, that the provisions of this paragraph shall
15 not apply to any proposed site which was, on April 1, 1993,
16 owned in whole or in part by another municipality.
17     In the case of a pollution control facility for which a
18 development permit was issued before November 12, 1981, if an
19 operating permit has not been issued by the Agency prior to
20 August 31, 1989 for any portion of the facility, then the
21 Agency may not issue or renew any development permit nor issue
22 an original operating permit for any portion of such facility
23 unless the applicant has submitted proof to the Agency that the
24 location of the facility has been approved by the appropriate
25 county board or municipal governing body pursuant to Section
26 39.2 of this Act.

 

 

SB2307 - 9 - LRB095 18526 BDD 44612 b

1     After January 1, 1994, if a solid waste disposal facility,
2 any portion for which an operating permit has been issued by
3 the Agency, has not accepted waste disposal for 5 or more
4 consecutive calendars years, before that facility may accept
5 any new or additional waste for disposal, the owner and
6 operator must obtain a new operating permit under this Act for
7 that facility unless the owner and operator have applied to the
8 Agency for a permit authorizing the temporary suspension of
9 waste acceptance. The Agency may not issue a new operation
10 permit under this Act for the facility unless the applicant has
11 submitted proof to the Agency that the location of the facility
12 has been approved or re-approved by the appropriate county
13 board or municipal governing body under Section 39.2 of this
14 Act after the facility ceased accepting waste.
15     Except for those facilities owned or operated by sanitary
16 districts organized under the Metropolitan Water Reclamation
17 District Act, and except for new pollution control facilities
18 governed by Section 39.2, and except for fossil fuel mining
19 facilities, the granting of a permit under this Act shall not
20 relieve the applicant from meeting and securing all necessary
21 zoning approvals from the unit of government having zoning
22 jurisdiction over the proposed facility.
23     Before beginning construction on any new sewage treatment
24 plant or sludge drying site to be owned or operated by a
25 sanitary district organized under the Metropolitan Water
26 Reclamation District Act for which a new permit (rather than

 

 

SB2307 - 10 - LRB095 18526 BDD 44612 b

1 the renewal or amendment of an existing permit) is required,
2 such sanitary district shall hold a public hearing within the
3 municipality within which the proposed facility is to be
4 located, or within the nearest community if the proposed
5 facility is to be located within an unincorporated area, at
6 which information concerning the proposed facility shall be
7 made available to the public, and members of the public shall
8 be given the opportunity to express their views concerning the
9 proposed facility.
10     The Agency may issue a permit for a municipal waste
11 transfer station without requiring approval pursuant to
12 Section 39.2 provided that the following demonstration is made:
13         (1) the municipal waste transfer station was in
14     existence on or before January 1, 1979 and was in
15     continuous operation from January 1, 1979 to January 1,
16     1993;
17         (2) the operator submitted a permit application to the
18     Agency to develop and operate the municipal waste transfer
19     station during April of 1994;
20         (3) the operator can demonstrate that the county board
21     of the county, if the municipal waste transfer station is
22     in an unincorporated area, or the governing body of the
23     municipality, if the station is in an incorporated area,
24     does not object to resumption of the operation of the
25     station; and
26         (4) the site has local zoning approval.

 

 

SB2307 - 11 - LRB095 18526 BDD 44612 b

1     (d) The Agency may issue RCRA permits exclusively under
2 this subsection to persons owning or operating a facility for
3 the treatment, storage, or disposal of hazardous waste as
4 defined under this Act.
5     All RCRA permits shall contain those terms and conditions,
6 including but not limited to schedules of compliance, which may
7 be required to accomplish the purposes and provisions of this
8 Act. The Agency may include among such conditions standards and
9 other requirements established under this Act, Board
10 regulations, the Resource Conservation and Recovery Act of 1976
11 (P.L. 94-580), as amended, and regulations pursuant thereto,
12 and may include schedules for achieving compliance therewith as
13 soon as possible. The Agency shall require that a performance
14 bond or other security be provided as a condition for the
15 issuance of a RCRA permit.
16     In the case of a permit to operate a hazardous waste or PCB
17 incinerator as defined in subsection (k) of Section 44, the
18 Agency shall require, as a condition of the permit, that the
19 operator of the facility perform such analyses of the waste to
20 be incinerated as may be necessary and appropriate to ensure
21 the safe operation of the incinerator.
22     The Agency shall adopt filing requirements and procedures
23 which are necessary and appropriate for the issuance of RCRA
24 permits, and which are consistent with the Act or regulations
25 adopted by the Board, and with the Resource Conservation and
26 Recovery Act of 1976 (P.L. 94-580), as amended, and regulations

 

 

SB2307 - 12 - LRB095 18526 BDD 44612 b

1 pursuant thereto.
2     The applicant shall make available to the public for
3 inspection all documents submitted by the applicant to the
4 Agency in furtherance of an application, with the exception of
5 trade secrets, at the office of the county board or governing
6 body of the municipality. Such documents may be copied upon
7 payment of the actual cost of reproduction during regular
8 business hours of the local office. The Agency shall issue a
9 written statement concurrent with its grant or denial of the
10 permit explaining the basis for its decision.
11     (e) The Agency may issue UIC permits exclusively under this
12 subsection to persons owning or operating a facility for the
13 underground injection of contaminants as defined under this
14 Act.
15     All UIC permits shall contain those terms and conditions,
16 including but not limited to schedules of compliance, which may
17 be required to accomplish the purposes and provisions of this
18 Act. The Agency may include among such conditions standards and
19 other requirements established under this Act, Board
20 regulations, the Safe Drinking Water Act (P.L. 93-523), as
21 amended, and regulations pursuant thereto, and may include
22 schedules for achieving compliance therewith. The Agency shall
23 require that a performance bond or other security be provided
24 as a condition for the issuance of a UIC permit.
25     The Agency shall adopt filing requirements and procedures
26 which are necessary and appropriate for the issuance of UIC

 

 

SB2307 - 13 - LRB095 18526 BDD 44612 b

1 permits, and which are consistent with the Act or regulations
2 adopted by the Board, and with the Safe Drinking Water Act
3 (P.L. 93-523), as amended, and regulations pursuant thereto.
4     The applicant shall make available to the public for
5 inspection, all documents submitted by the applicant to the
6 Agency in furtherance of an application, with the exception of
7 trade secrets, at the office of the county board or governing
8 body of the municipality. Such documents may be copied upon
9 payment of the actual cost of reproduction during regular
10 business hours of the local office. The Agency shall issue a
11 written statement concurrent with its grant or denial of the
12 permit explaining the basis for its decision.
13     (f) In making any determination pursuant to Section 9.1 of
14 this Act:
15         (1) The Agency shall have authority to make the
16     determination of any question required to be determined by
17     the Clean Air Act, as now or hereafter amended, this Act,
18     or the regulations of the Board, including the
19     determination of the Lowest Achievable Emission Rate,
20     Maximum Achievable Control Technology, or Best Available
21     Control Technology, consistent with the Board's
22     regulations, if any.
23         (2) The Agency shall, after conferring with the
24     applicant, give written notice to the applicant of its
25     proposed decision on the application including the terms
26     and conditions of the permit to be issued and the facts,

 

 

SB2307 - 14 - LRB095 18526 BDD 44612 b

1     conduct or other basis upon which the Agency will rely to
2     support its proposed action.
3         (3) Following such notice, the Agency shall give the
4     applicant an opportunity for a hearing in accordance with
5     the provisions of Sections 10-25 through 10-60 of the
6     Illinois Administrative Procedure Act.
7     (g) The Agency shall include as conditions upon all permits
8 issued for hazardous waste disposal sites such restrictions
9 upon the future use of such sites as are reasonably necessary
10 to protect public health and the environment, including
11 permanent prohibition of the use of such sites for purposes
12 which may create an unreasonable risk of injury to human health
13 or to the environment. After administrative and judicial
14 challenges to such restrictions have been exhausted, the Agency
15 shall file such restrictions of record in the Office of the
16 Recorder of the county in which the hazardous waste disposal
17 site is located.
18     (h) A hazardous waste stream may not be deposited in a
19 permitted hazardous waste site unless specific authorization
20 is obtained from the Agency by the generator and disposal site
21 owner and operator for the deposit of that specific hazardous
22 waste stream. The Agency may grant specific authorization for
23 disposal of hazardous waste streams only after the generator
24 has reasonably demonstrated that, considering technological
25 feasibility and economic reasonableness, the hazardous waste
26 cannot be reasonably recycled for reuse, nor incinerated or

 

 

SB2307 - 15 - LRB095 18526 BDD 44612 b

1 chemically, physically or biologically treated so as to
2 neutralize the hazardous waste and render it nonhazardous. In
3 granting authorization under this Section, the Agency may
4 impose such conditions as may be necessary to accomplish the
5 purposes of the Act and are consistent with this Act and
6 regulations promulgated by the Board hereunder. If the Agency
7 refuses to grant authorization under this Section, the
8 applicant may appeal as if the Agency refused to grant a
9 permit, pursuant to the provisions of subsection (a) of Section
10 40 of this Act. For purposes of this subsection (h), the term
11 "generator" has the meaning given in Section 3.205 of this Act,
12 unless: (1) the hazardous waste is treated, incinerated, or
13 partially recycled for reuse prior to disposal, in which case
14 the last person who treats, incinerates, or partially recycles
15 the hazardous waste prior to disposal is the generator; or (2)
16 the hazardous waste is from a response action, in which case
17 the person performing the response action is the generator.
18 This subsection (h) does not apply to any hazardous waste that
19 is restricted from land disposal under 35 Ill. Adm. Code 728.
20     (i) Before issuing any RCRA permit, any permit for a waste
21 storage site, sanitary landfill, waste disposal site, waste
22 transfer station, waste treatment facility, waste incinerator,
23 or any waste-transportation operation, or any permit or interim
24 authorization for a clean construction or demolition debris
25 fill operation, the Agency shall conduct an evaluation of the
26 prospective owner's or operator's prior experience in waste

 

 

SB2307 - 16 - LRB095 18526 BDD 44612 b

1 management operations and clean construction or demolition
2 debris fill operations. The Agency may deny such a permit, or
3 deny or revoke interim authorization, if the prospective owner
4 or operator or any employee or officer of the prospective owner
5 or operator has a history of:
6         (1) repeated violations of federal, State, or local
7     laws, regulations, standards, or ordinances in the
8     operation of waste management facilities or sites or clean
9     construction or demolition debris fill operation
10     facilities or sites; or
11         (2) conviction in this or another State of any crime
12     which is a felony under the laws of this State, or
13     conviction of a felony in a federal court; or conviction in
14     this or another state or federal court of any of the
15     following crimes: forgery, official misconduct, bribery,
16     perjury, or knowingly submitting false information under
17     any environmental law, regulation, or permit term or
18     condition; or
19         (3) proof of gross carelessness or incompetence in
20     handling, storing, processing, transporting or disposing
21     of waste or clean construction or demolition debris, or
22     proof of gross carelessness or incompetence in using clean
23     construction or demolition debris as fill.
24     (i-5) Before issuing any permit or approving any interim
25 authorization for a clean construction or demolition debris
26 fill operation in which any ownership interest is transferred

 

 

SB2307 - 17 - LRB095 18526 BDD 44612 b

1 between January 1, 2005, and the effective date of the
2 prohibition set forth in Section 22.52 of this Act, the Agency
3 shall conduct an evaluation of the operation if any previous
4 activities at the site or facility may have caused or allowed
5 contamination of the site. It shall be the responsibility of
6 the owner or operator seeking the permit or interim
7 authorization to provide to the Agency all of the information
8 necessary for the Agency to conduct its evaluation. The Agency
9 may deny a permit or interim authorization if previous
10 activities at the site may have caused or allowed contamination
11 at the site, unless such contamination is authorized under any
12 permit issued by the Agency.
13     (j) The issuance under this Act of a permit to engage in
14 the surface mining of any resources other than fossil fuels
15 shall not relieve the permittee from its duty to comply with
16 any applicable local law regulating the commencement, location
17 or operation of surface mining facilities.
18     (k) A development permit issued under subsection (a) of
19 Section 39 for any facility or site which is required to have a
20 permit under subsection (d) of Section 21 shall expire at the
21 end of 2 calendar years from the date upon which it was issued,
22 unless within that period the applicant has taken action to
23 develop the facility or the site. In the event that review of
24 the conditions of the development permit is sought pursuant to
25 Section 40 or 41, or permittee is prevented from commencing
26 development of the facility or site by any other litigation

 

 

SB2307 - 18 - LRB095 18526 BDD 44612 b

1 beyond the permittee's control, such two-year period shall be
2 deemed to begin on the date upon which such review process or
3 litigation is concluded.
4     (l) No permit shall be issued by the Agency under this Act
5 for construction or operation of any facility or site located
6 within the boundaries of any setback zone established pursuant
7 to this Act, where such construction or operation is
8 prohibited.
9     (m) The Agency may issue permits to persons owning or
10 operating a facility for composting landscape waste. In
11 granting such permits, the Agency may impose such conditions as
12 may be necessary to accomplish the purposes of this Act, and as
13 are not inconsistent with applicable regulations promulgated
14 by the Board. Except as otherwise provided in this Act, a bond
15 or other security shall not be required as a condition for the
16 issuance of a permit. If the Agency denies any permit pursuant
17 to this subsection, the Agency shall transmit to the applicant
18 within the time limitations of this subsection specific,
19 detailed statements as to the reasons the permit application
20 was denied. Such statements shall include but not be limited to
21 the following:
22         (1) the Sections of this Act that may be violated if
23     the permit were granted;
24         (2) the specific regulations promulgated pursuant to
25     this Act that may be violated if the permit were granted;
26         (3) the specific information, if any, the Agency deems

 

 

SB2307 - 19 - LRB095 18526 BDD 44612 b

1     the applicant did not provide in its application to the
2     Agency; and
3         (4) a statement of specific reasons why the Act and the
4     regulations might be violated if the permit were granted.
5     If no final action is taken by the Agency within 90 days
6 after the filing of the application for permit, the applicant
7 may deem the permit issued. Any applicant for a permit may
8 waive the 90 day limitation by filing a written statement with
9 the Agency.
10     The Agency shall issue permits for such facilities upon
11 receipt of an application that includes a legal description of
12 the site, a topographic map of the site drawn to the scale of
13 200 feet to the inch or larger, a description of the operation,
14 including the area served, an estimate of the volume of
15 materials to be processed, and documentation that:
16         (1) the facility includes a setback of at least 200
17     feet from the nearest potable water supply well;
18         (2) the facility is located outside the boundary of the
19     10-year floodplain or the site will be floodproofed;
20         (3) the facility is located so as to minimize
21     incompatibility with the character of the surrounding
22     area, including at least a 200 foot setback from any
23     residence, and in the case of a facility that is developed
24     or the permitted composting area of which is expanded after
25     November 17, 1991, the composting area is located at least
26     1/8 mile from the nearest residence (other than a residence

 

 

SB2307 - 20 - LRB095 18526 BDD 44612 b

1     located on the same property as the facility);
2         (4) the design of the facility will prevent any compost
3     material from being placed within 5 feet of the water
4     table, will adequately control runoff from the site, and
5     will collect and manage any leachate that is generated on
6     the site;
7         (5) the operation of the facility will include
8     appropriate dust and odor control measures, limitations on
9     operating hours, appropriate noise control measures for
10     shredding, chipping and similar equipment, management
11     procedures for composting, containment and disposal of
12     non-compostable wastes, procedures to be used for
13     terminating operations at the site, and recordkeeping
14     sufficient to document the amount of materials received,
15     composted and otherwise disposed of; and
16         (6) the operation will be conducted in accordance with
17     any applicable rules adopted by the Board.
18     The Agency shall issue renewable permits of not longer than
19 10 years in duration for the composting of landscape wastes, as
20 defined in Section 3.155 of this Act, based on the above
21 requirements.
22     The operator of any facility permitted under this
23 subsection (m) must submit a written annual statement to the
24 Agency on or before April 1 of each year that includes an
25 estimate of the amount of material, in tons, received for
26 composting.

 

 

SB2307 - 21 - LRB095 18526 BDD 44612 b

1     (n) The Agency shall issue permits jointly with the
2 Department of Transportation for the dredging or deposit of
3 material in Lake Michigan in accordance with Section 18 of the
4 Rivers, Lakes, and Streams Act.
5     (o) (Blank.)
6     (p) (1) Any person submitting an application for a permit
7 for a new MSWLF unit or for a lateral expansion under
8 subsection (t) of Section 21 of this Act for an existing MSWLF
9 unit that has not received and is not subject to local siting
10 approval under Section 39.2 of this Act shall publish notice of
11 the application in a newspaper of general circulation in the
12 county in which the MSWLF unit is or is proposed to be located.
13 The notice must be published at least 15 days before submission
14 of the permit application to the Agency. The notice shall state
15 the name and address of the applicant, the location of the
16 MSWLF unit or proposed MSWLF unit, the nature and size of the
17 MSWLF unit or proposed MSWLF unit, the nature of the activity
18 proposed, the probable life of the proposed activity, the date
19 the permit application will be submitted, and a statement that
20 persons may file written comments with the Agency concerning
21 the permit application within 30 days after the filing of the
22 permit application unless the time period to submit comments is
23 extended by the Agency.
24     When a permit applicant submits information to the Agency
25 to supplement a permit application being reviewed by the
26 Agency, the applicant shall not be required to reissue the

 

 

SB2307 - 22 - LRB095 18526 BDD 44612 b

1 notice under this subsection.
2     (2) The Agency shall accept written comments concerning the
3 permit application that are postmarked no later than 30 days
4 after the filing of the permit application, unless the time
5 period to accept comments is extended by the Agency.
6     (3) Each applicant for a permit described in part (1) of
7 this subsection shall file a copy of the permit application
8 with the county board or governing body of the municipality in
9 which the MSWLF unit is or is proposed to be located at the
10 same time the application is submitted to the Agency. The
11 permit application filed with the county board or governing
12 body of the municipality shall include all documents submitted
13 to or to be submitted to the Agency, except trade secrets as
14 determined under Section 7.1 of this Act. The permit
15 application and other documents on file with the county board
16 or governing body of the municipality shall be made available
17 for public inspection during regular business hours at the
18 office of the county board or the governing body of the
19 municipality and may be copied upon payment of the actual cost
20 of reproduction.
21 (Source: P.A. 94-272, eff. 7-19-05; 94-725, eff. 6-1-06;
22 95-288, eff. 8-20-07.)