|
|
|
SB2547 Engrossed |
|
LRB095 19888 AMC 46301 b |
|
|
1 |
| AN ACT concerning regulation.
|
2 |
| Be it enacted by the People of the State of Illinois,
|
3 |
| represented in the General Assembly:
|
4 |
| Section 5. The Public Utilities Act is amended by changing |
5 |
| Section 9-220 as follows:
|
6 |
| (220 ILCS 5/9-220) (from Ch. 111 2/3, par. 9-220)
|
7 |
| Sec. 9-220. Rate changes based on changes in fuel costs.
|
8 |
| (a) Notwithstanding the provisions of Section 9-201, the
|
9 |
| Commission may authorize the increase or decrease of rates and |
10 |
| charges
based upon changes in the cost of fuel used in the |
11 |
| generation or production
of electric power, changes in the cost |
12 |
| of purchased power, or changes in
the cost of purchased gas |
13 |
| through the application of fuel adjustment
clauses or purchased |
14 |
| gas adjustment clauses. The Commission may also
authorize the |
15 |
| increase or decrease of rates and charges based upon |
16 |
| expenditures
or revenues resulting from the purchase or sale of |
17 |
| emission allowances created
under the federal Clean Air Act |
18 |
| Amendments of 1990,
through such fuel adjustment clauses, as a |
19 |
| cost of fuel. For the purposes of
this paragraph, cost of fuel |
20 |
| used in the generation or production of electric
power shall |
21 |
| include the amount of any fees paid by the utility for the
|
22 |
| implementation and operation of a process for the |
23 |
| desulfurization of the
flue gas when burning high sulfur coal |
|
|
|
SB2547 Engrossed |
- 2 - |
LRB095 19888 AMC 46301 b |
|
|
1 |
| at any location within the State of
Illinois irrespective of |
2 |
| the attainment status designation of such
location; but shall |
3 |
| not include transportation costs
of coal
(i) except to the |
4 |
| extent that for contracts entered into on
and after the |
5 |
| effective date of this amendatory Act of 1997,
the cost of the |
6 |
| coal, including transportation costs,
constitutes the lowest |
7 |
| cost for adequate and reliable fuel
supply reasonably available |
8 |
| to the public utility in
comparison to the cost, including |
9 |
| transportation costs, of
other adequate and reliable sources of |
10 |
| fuel supply reasonably
available to the public utility, or (ii)
|
11 |
| except as otherwise provided in the next 3 sentences of this |
12 |
| paragraph.
Such costs of fuel
shall, when requested by a |
13 |
| utility or at the conclusion of the utility's
next general |
14 |
| electric rate proceeding, whichever shall first occur, include
|
15 |
| transportation costs of coal purchased under existing coal |
16 |
| purchase
contracts. For purposes of this paragraph "existing |
17 |
| coal purchase
contracts" means contracts for the purchase of |
18 |
| coal in effect on the
effective date of this amendatory Act of |
19 |
| 1991, as such contracts may
thereafter be amended, but only to |
20 |
| the extent that any such amendment does
not increase the |
21 |
| aggregate quantity of coal to be purchased under such
contract.
|
22 |
| Nothing herein shall authorize an electric utility
to recover |
23 |
| through its fuel adjustment clause any amounts of
|
24 |
| transportation costs of coal that were included in the revenue
|
25 |
| requirement used to set base rates in its most recent general
|
26 |
| rate proceeding.
Cost shall be based upon uniformly applied |
|
|
|
SB2547 Engrossed |
- 3 - |
LRB095 19888 AMC 46301 b |
|
|
1 |
| accounting
principles. Annually, the Commission shall initiate |
2 |
| public hearings to
determine whether the clauses reflect actual |
3 |
| costs of fuel, gas, power, or
coal transportation purchased to |
4 |
| determine whether such purchases were
prudent, and to reconcile |
5 |
| any amounts collected with the actual costs of
fuel, power, |
6 |
| gas, or coal transportation prudently purchased. In each such
|
7 |
| proceeding, the burden of proof shall be upon the utility to |
8 |
| establish the
prudence of its cost of fuel, power, gas, or coal
|
9 |
| transportation purchases
and costs.
The Commission shall
issue |
10 |
| its final order in each such annual proceeding for an
electric |
11 |
| utility by December 31 of the year immediately
following the |
12 |
| year to which the proceeding pertains, provided,
that the |
13 |
| Commission shall issue its final order with respect
to such |
14 |
| annual proceeding for the years 1996 and earlier by December |
15 |
| 31, 1998.
|
16 |
| (b) A public utility providing electric service, other than |
17 |
| a public utility
described in subsections (e) or (f) of this |
18 |
| Section, may at
any time during the mandatory transition period |
19 |
| file with the
Commission proposed tariff sheets that eliminate |
20 |
| the public
utility's fuel adjustment clause and adjust the |
21 |
| public
utility's base rate tariffs by the amount necessary for |
22 |
| the
base fuel component of the base rates to recover the public
|
23 |
| utility's average fuel and power supply costs per kilowatt-hour |
24 |
| for the 2
most recent years for which the Commission
has issued |
25 |
| final orders in annual proceedings pursuant to
subsection (a), |
26 |
| where the average fuel and power supply costs
per kilowatt-hour |
|
|
|
SB2547 Engrossed |
- 4 - |
LRB095 19888 AMC 46301 b |
|
|
1 |
| shall be calculated as the sum of the public
utility's prudent |
2 |
| and allowable fuel and power supply costs as
found by the |
3 |
| Commission in the 2 proceedings divided by the
public utility's |
4 |
| actual jurisdictional kilowatt-hour sales for
those 2 years. |
5 |
| Notwithstanding any contrary or inconsistent
provisions in |
6 |
| Section 9-201 of this Act, in subsection (a) of
this Section or |
7 |
| in any rules or regulations promulgated by the
Commission |
8 |
| pursuant to subsection (g) of this Section, the
Commission |
9 |
| shall review and shall by order approve, or approve
as |
10 |
| modified, the proposed tariff sheets within 60 days after
the |
11 |
| date of the public utility's filing. The Commission may
modify |
12 |
| the public utility's proposed tariff sheets only to the
extent |
13 |
| the Commission finds necessary to achieve conformance
to the |
14 |
| requirements of this subsection (b). During the 5
years |
15 |
| following the date of the Commission's order, but in any
event |
16 |
| no earlier than January 1, 2007, a public utility whose
fuel |
17 |
| adjustment clause has been eliminated pursuant to this
|
18 |
| subsection shall not file proposed tariff sheets seeking, or
|
19 |
| otherwise petition the Commission for, reinstatement of a fuel
|
20 |
| adjustment clause.
|
21 |
| (c) Notwithstanding any contrary or inconsistent
|
22 |
| provisions in Section 9-201 of this Act, in subsection (a) of
|
23 |
| this Section or in any rules or regulations promulgated by the
|
24 |
| Commission pursuant to subsection (g) of this Section, a
public |
25 |
| utility providing electric service, other than a public utility
|
26 |
| described
in subsection (e) or (f) of this Section, may at any |
|
|
|
SB2547 Engrossed |
- 5 - |
LRB095 19888 AMC 46301 b |
|
|
1 |
| time
during the mandatory transition period file with the
|
2 |
| Commission proposed tariff sheets that establish the rate per
|
3 |
| kilowatt-hour to be applied pursuant to the public utility's
|
4 |
| fuel adjustment clause at the average value for such rate
|
5 |
| during the preceding 24 months, provided that such average
rate |
6 |
| results in a credit to customers' bills, without making
any |
7 |
| revisions to the public utility's base rate tariffs. The
|
8 |
| proposed tariff sheets shall establish the fuel adjustment
rate |
9 |
| for a specific time period of at least 3 years but not
more |
10 |
| than 5 years, provided that the terms and conditions for
any |
11 |
| reinstatement earlier than 5 years shall be set forth in
the |
12 |
| proposed tariff sheets and subject to modification or
approval |
13 |
| by the Commission. The Commission shall review and
shall by |
14 |
| order approve the proposed tariff sheets if it finds
that the |
15 |
| requirements of this subsection are met. The
Commission shall |
16 |
| not conduct the annual hearings specified in the
last 3 |
17 |
| sentences of subsection (a) of this Section for the
utility for |
18 |
| the period that the factor established pursuant to
this |
19 |
| subsection is in effect.
|
20 |
| (d) A public utility providing electric service, or a |
21 |
| public utility
providing gas service
may file with the |
22 |
| Commission proposed tariff sheets that
eliminate the public |
23 |
| utility's fuel or purchased gas
adjustment clause and adjust |
24 |
| the public utility's base rate
tariffs to provide for recovery |
25 |
| of power supply costs or gas
supply costs that would have been |
26 |
| recovered through such
clause; provided, that the provisions of |
|
|
|
SB2547 Engrossed |
- 6 - |
LRB095 19888 AMC 46301 b |
|
|
1 |
| this subsection (d) shall not be
available to a public utility |
2 |
| described in subsections (e) or (f) of this
Section to |
3 |
| eliminate its fuel adjustment clause. Notwithstanding any |
4 |
| contrary
or inconsistent
provisions in Section 9-201 of this |
5 |
| Act, in subsection (a) of
this Section, or in any rules or |
6 |
| regulations promulgated by
the Commission pursuant to |
7 |
| subsection (g) of this Section, the
Commission shall review and |
8 |
| shall by order approve, or approve
as modified in the |
9 |
| Commission's order, the proposed tariff
sheets within 240 days |
10 |
| after the date of the public utility's
filing. The Commission's |
11 |
| order shall approve rates and
charges that the Commission, |
12 |
| based on information in the
public utility's filing or on the |
13 |
| record if a hearing is held
by the Commission, finds will |
14 |
| recover the reasonable, prudent
and necessary jurisdictional |
15 |
| power supply costs or gas supply
costs incurred or to be |
16 |
| incurred by the public utility during
a 12 month period found |
17 |
| by the Commission to be appropriate
for these purposes, |
18 |
| provided, that such period shall be either
(i) a 12 month |
19 |
| historical period occurring during the 15
months ending on the |
20 |
| date of the public utility's filing, or
(ii) a 12 month future |
21 |
| period ending no later than 15 months
following the date of the |
22 |
| public utility's filing. The public
utility shall include with |
23 |
| its tariff filing information
showing both (1) its actual |
24 |
| jurisdictional power supply costs
or gas supply costs for a 12 |
25 |
| month historical period
conforming to (i) above and (2) its |
26 |
| projected jurisdictional
power supply costs or gas supply costs |
|
|
|
SB2547 Engrossed |
- 7 - |
LRB095 19888 AMC 46301 b |
|
|
1 |
| for a future 12 month
period conforming to (ii) above. If the |
2 |
| Commission's order
requires modifications in the tariff sheets |
3 |
| filed by the
public utility, the public utility shall have 7 |
4 |
| days following
the date of the order to notify the Commission |
5 |
| whether the
public utility will implement the modified tariffs |
6 |
| or elect to
continue its fuel or purchased gas adjustment |
7 |
| clause in force
as though no order had been entered. The |
8 |
| Commission's order
shall provide for any reconciliation of |
9 |
| power supply costs or
gas supply costs, as the case may be, and |
10 |
| associated revenues
through the date that the public utility's |
11 |
| fuel or purchased
gas adjustment clause is eliminated. During |
12 |
| the 5 years
following the date of the Commission's order, a |
13 |
| public utility
whose fuel or purchased gas adjustment clause |
14 |
| has been
eliminated pursuant to this subsection shall not file |
15 |
| proposed
tariff sheets seeking, or otherwise petition the |
16 |
| Commission
for, reinstatement or adoption of a fuel or |
17 |
| purchased gas
adjustment clause. Nothing in this subsection (d) |
18 |
| shall be
construed as limiting the Commission's authority to |
19 |
| eliminate
a public utility's fuel adjustment clause or |
20 |
| purchased gas
adjustment clause in accordance with any other |
21 |
| applicable
provisions of this Act.
|
22 |
| (e) Notwithstanding any contrary or inconsistent |
23 |
| provisions in
Section 9-201 of this Act, in subsection (a) of |
24 |
| this Section, or in
any rules promulgated by the Commission |
25 |
| pursuant
to subsection (g) of this Section, a public utility |
26 |
| providing
electric service to more than 1,000,000 customers in |
|
|
|
SB2547 Engrossed |
- 8 - |
LRB095 19888 AMC 46301 b |
|
|
1 |
| this State may, within the
first 6 months after the
effective |
2 |
| date of this amendatory Act of 1997, file with the
Commission |
3 |
| proposed tariff sheets that eliminate, effective
January 1, |
4 |
| 1997, the public utility's fuel adjustment clause
without |
5 |
| adjusting its base rates, and such tariff sheets shall be
|
6 |
| effective upon filing. To the extent the application of the |
7 |
| fuel
adjustment clause had resulted in net charges to customers |
8 |
| after
January 1, 1997, the utility shall also file a tariff |
9 |
| sheet that
provides for a refund stated on a per kilowatt-hour |
10 |
| basis of such
charges over a period not to exceed 6 months; |
11 |
| provided
however, that such refund shall not include the |
12 |
| proportional
amounts of taxes paid under the Use Tax Act, |
13 |
| Service Use Tax Act,
Service Occupation Tax Act, and Retailers' |
14 |
| Occupation Tax Act on
fuel used in generation. The Commission |
15 |
| shall issue an order
within 45 days after the date of the |
16 |
| public utility's filing
approving or approving as modified such |
17 |
| tariff sheet. If the fuel
adjustment clause is eliminated |
18 |
| pursuant to this subsection, the
Commission shall not conduct |
19 |
| the annual hearings specified in the
last 3 sentences of |
20 |
| subsection (a) of this Section for the
utility for any period |
21 |
| after December 31, 1996 and prior to any
reinstatement of such |
22 |
| clause. A public utility whose fuel
adjustment clause has been |
23 |
| eliminated pursuant to this subsection
shall not file a |
24 |
| proposed tariff sheet seeking, or otherwise
petition the |
25 |
| Commission for, reinstatement of the fuel adjustment
clause |
26 |
| prior to January 1, 2007.
|
|
|
|
SB2547 Engrossed |
- 9 - |
LRB095 19888 AMC 46301 b |
|
|
1 |
| (f) Notwithstanding any contrary or inconsistent |
2 |
| provisions in Section
9-201 of this Act, in subsection (a) of |
3 |
| this Section, or in any rules or
regulations promulgated by the |
4 |
| Commission pursuant to subsection (g) of this
Section, a public |
5 |
| utility providing electric service to more than 500,000
|
6 |
| customers but fewer than 1,000,000 customers in this State may, |
7 |
| within the
first
6 months after the effective date of this |
8 |
| amendatory Act of 1997, file with the
Commission proposed |
9 |
| tariff sheets that eliminate, effective January 1, 1997,
the |
10 |
| public utility's fuel adjustment clause and adjust its base |
11 |
| rates by the
amount necessary for the base fuel component of |
12 |
| the base rates to recover
91% of the public utility's average |
13 |
| fuel and power supply costs for the 2 most
recent years for |
14 |
| which the Commission, as of January 1, 1997, has issued final
|
15 |
| orders in annual proceedings pursuant to subsection (a), where |
16 |
| the average fuel
and power supply costs per kilowatt-hour shall |
17 |
| be calculated as the sum of the
public utility's prudent and |
18 |
| allowable fuel and power supply costs as found by
the |
19 |
| Commission in the 2 proceedings divided by the public utility's |
20 |
| actual
jurisdictional kilowatt-hour sales for those 2 years, |
21 |
| provided, that such
tariff sheets shall be effective upon |
22 |
| filing. To the extent the application of
the fuel adjustment |
23 |
| clause had resulted in net charges to customers after
January |
24 |
| 1, 1997, the utility shall also file a tariff sheet that |
25 |
| provides for a
refund stated on a per kilowatt-hour basis of |
26 |
| such charges over a period not to
exceed 6 months. Provided |
|
|
|
SB2547 Engrossed |
- 10 - |
LRB095 19888 AMC 46301 b |
|
|
1 |
| however, that such refund shall not include the
proportional |
2 |
| amounts of taxes paid under the Use Tax Act, Service Use Tax |
3 |
| Act,
Service Occupation Tax Act, and Retailers' Occupation Tax |
4 |
| Act on fuel used in
generation. The Commission shall issue an |
5 |
| order within 45 days after the date
of the public utility's |
6 |
| filing approving or approving as modified such tariff
sheet. If |
7 |
| the fuel adjustment clause is eliminated pursuant to this
|
8 |
| subsection, the Commission shall not conduct the annual |
9 |
| hearings specified in
the last 3 sentences of subsection (a) of |
10 |
| this Section for the utility for any
period after December 31, |
11 |
| 1996 and prior to any reinstatement of such clause.
A public |
12 |
| utility whose fuel adjustment clause has been eliminated |
13 |
| pursuant to
this subsection shall not file a proposed tariff |
14 |
| sheet seeking, or otherwise
petition the Commission for, |
15 |
| reinstatement of the fuel adjustment clause prior
to January 1, |
16 |
| 2007.
|
17 |
| (g) The Commission shall have authority to promulgate rules |
18 |
| and
regulations to
carry out the provisions of this Section.
|
19 |
| (h) Any gas utility may enter into a 20-year supply |
20 |
| contract for up to 20 years of supply with any company for the |
21 |
| purchase of synthetic natural gas produced from coal through |
22 |
| the gasification process if the company has commenced |
23 |
| construction of a coal gasification facility by July 1, 2009 |
24 |
| 2008 . The cost for the synthetic natural gas is reasonable and |
25 |
| prudent and recoverable through the purchased gas adjustment |
26 |
| clause for years one through 10 of the contract if: (i) the |
|
|
|
SB2547 Engrossed |
- 11 - |
LRB095 19888 AMC 46301 b |
|
|
1 |
| only coal used in the gasification process has high volatile |
2 |
| bituminous rank and greater than 1.7 pounds of sulfur per |
3 |
| million Btu content; (ii) at the time the contract term |
4 |
| commences, the price per million Btu does not exceed $6.85 $5 |
5 |
| in 2008 2004 dollars, adjusted annually based on the change in |
6 |
| the Annual Consumer Price Index for All Urban Consumers for the |
7 |
| Midwest Region as published in April by the United States |
8 |
| Department of Labor, Bureau of Labor Statistics (or a suitable |
9 |
| Consumer Price Index calculation if this Consumer Price Index |
10 |
| is not available) for the previous calendar year; provided that |
11 |
| the price per million Btu shall not exceed $7.75 $5.50 at any |
12 |
| time during the contract; (iii) the utility's aggregate |
13 |
| long-term supply contracts for the purchase of synthetic |
14 |
| natural gas produced from coal through the gasification process |
15 |
| does not exceed 25% of the annual system supply requirements of |
16 |
| the utility at the time the contract is entered into; and (iv) |
17 |
| the contract is entered into within 120 days one year after the |
18 |
| effective date of this amendatory Act of the 95th 94th General |
19 |
| Assembly and terminates no more than 20 years after the |
20 |
| commencement of the commercial production of synthetic natural |
21 |
| gas. Contracts greater than 10 years The contract shall provide |
22 |
| that if, at any time during supply years 11 through 20 of the |
23 |
| contract, the Commission determines that the cost for the |
24 |
| synthetic natural gas purchased under the contract during |
25 |
| supply years 11 through 20 is not reasonable and prudent, then |
26 |
| the company shall reimburse the utility for the difference |
|
|
|
SB2547 Engrossed |
- 12 - |
LRB095 19888 AMC 46301 b |
|
|
1 |
| between the cost deemed reasonable and prudent by the |
2 |
| Commission and the cost imposed under the contract. |
3 |
| (i) If a gas utility or an affiliate of a gas utility has |
4 |
| an ownership interest in any entity that produces or sells |
5 |
| synthetic natural gas, Article VII of this Act shall apply.
|
6 |
| (Source: P.A. 94-63, eff. 6-21-05.)
|
7 |
| Section 99. Effective date. This Act takes effect upon |
8 |
| becoming law.
|