|
|
Sen. Michael W. Frerichs
Filed: 4/11/2008
|
|
09500SB2567sam003 |
|
LRB095 19903 HLH 49242 a |
|
|
| 1 |
| AMENDMENT TO SENATE BILL 2567
|
| 2 |
| AMENDMENT NO. ______. Amend Senate Bill 2567, AS AMENDED, |
| 3 |
| with reference to page and line numbers of Senate Amendment No. |
| 4 |
| 1, on page 2, by replacing lines 24 through 26 with "with 12 |
| 5 |
| inches of soil, within 30 days after the final placement and |
| 6 |
| completion of the structural fill project or within 120 days of |
| 7 |
| the last placement of the structural fill in cases where |
| 8 |
| filling is incomplete and no filling takes place for a period |
| 9 |
| of 90 days,"; and
|
| 10 |
| on page 3, by replacing lines 7 through 12 with the following: |
| 11 |
| "For each project utilizing 10,000 tons or more of CCB, |
| 12 |
| within 30 days after the placement of the 12 inches of cover |
| 13 |
| soil required under this item (8), the person using the CCB as |
| 14 |
| structural fill must submit to the Agency a certification |
| 15 |
| demonstrating that the use meets the requirements of this |
| 16 |
| Section. The certification shall also include the information |
| 17 |
| required to be submitted to the Agency under item (C) of |