|
Labor Committee
Filed: 3/4/2009
|
|
09600HB0163ham001 |
|
LRB096 00918 RLC 22521 a |
|
|
1 |
| AMENDMENT TO HOUSE BILL 163
|
2 |
| AMENDMENT NO. ______. Amend House Bill 163 by replacing |
3 |
| everything after the enacting clause with the following:
|
4 |
| "Section 5. The Prevailing Wage Act is amended by changing |
5 |
| Section 4 as follows:
|
6 |
| (820 ILCS 130/4) (from Ch. 48, par. 39s-4)
|
7 |
| Sec. 4. Ascertaining prevailing wage. |
8 |
| (a) The public body awarding any contract for public work |
9 |
| or
otherwise undertaking any public works, shall ascertain the |
10 |
| general
prevailing rate of hourly wages in the locality in |
11 |
| which the work is to
be performed, for each craft or type of |
12 |
| worker or mechanic needed to
execute the contract, and where |
13 |
| the public body performs the work
without letting a contract |
14 |
| therefor, shall ascertain the prevailing rate
of wages on a per |
15 |
| hour basis in the locality, and such public body shall
specify |
16 |
| in the resolution or ordinance and in the call for bids for the
|
|
|
|
09600HB0163ham001 |
- 2 - |
LRB096 00918 RLC 22521 a |
|
|
1 |
| contract, that the general prevailing rate of wages in the |
2 |
| locality for
each craft or type of worker or mechanic needed to |
3 |
| execute the contract
or perform such work, also the general |
4 |
| prevailing rate for legal holiday
and overtime work, as |
5 |
| ascertained by the public body or by the
Department of Labor |
6 |
| shall be paid for each craft or type of worker
needed to |
7 |
| execute the contract or to perform such work, and it shall be
|
8 |
| mandatory upon the contractor to whom the contract is awarded |
9 |
| and upon
any subcontractor under him, and where the public body |
10 |
| performs the
work, upon the public body, to pay not less than |
11 |
| the specified rates to
all laborers, workers and mechanics |
12 |
| employed by them in the execution of
the contract or such work; |
13 |
| provided, however, that if the public body
desires that the |
14 |
| Department of Labor ascertain the prevailing rate of
wages, it |
15 |
| shall notify the Department of Labor to ascertain the general
|
16 |
| prevailing rate of hourly wages for work under contract, or for |
17 |
| work
performed by a public body without letting a contract as |
18 |
| required in the
locality in which the work is to be performed, |
19 |
| for each craft or type of
worker or mechanic needed to execute |
20 |
| the contract or project or work to
be performed. Upon such |
21 |
| notification the Department of Labor shall
ascertain such |
22 |
| general prevailing rate of wages, and certify the
prevailing |
23 |
| wage to such public body. |
24 |
| (a-1) The public body or other entity awarding the
contract |
25 |
| shall cause to be inserted in the project specifications and |
26 |
| the
contract a stipulation to the
effect that not less than the |
|
|
|
09600HB0163ham001 |
- 3 - |
LRB096 00918 RLC 22521 a |
|
|
1 |
| prevailing rate of wages as found by the
public body or |
2 |
| Department of Labor or determined by the court on review
shall |
3 |
| be paid to all laborers, workers and mechanics performing work
|
4 |
| under the contract.
|
5 |
| (a-2) When a public body or other entity covered by this |
6 |
| Act has awarded work to a contractor without a public bid, |
7 |
| contract or project specification, such public body or other |
8 |
| entity shall comply with subsection (a-1) by providing the |
9 |
| contractor with written notice on the purchase order related to |
10 |
| the work to be done or on a separate document indicating that |
11 |
| not less than the prevailing rate of wages as found by the |
12 |
| public body or Department of Labor or determined by the court |
13 |
| on review shall be paid to all laborers, workers, and mechanics |
14 |
| performing work on the project. |
15 |
| (a-3) Where a complaint is made and the Department of Labor |
16 |
| determines that a violation occurred, the Department of Labor |
17 |
| shall determine if proper written notice under this Section 4 |
18 |
| was given. If proper written notice was not provided to the |
19 |
| contractor by the public body or other entity, the Department |
20 |
| of Labor shall order the public body or other entity to pay any |
21 |
| interest, penalties or fines that would have been owed by the |
22 |
| contractor if proper written notice were provided. The failure |
23 |
| by a public body or other entity to provide written notice does |
24 |
| not relieve the contractor of the duty to comply with the |
25 |
| prevailing wage rate, nor of the obligation to pay any back |
26 |
| wages, as determined under this Act. For the purposes of this |
|
|
|
09600HB0163ham001 |
- 4 - |
LRB096 00918 RLC 22521 a |
|
|
1 |
| subsection, back wages shall be limited to the difference |
2 |
| between the actual amount paid and the prevailing rate of wages |
3 |
| required to be paid for the project. The failure of a public |
4 |
| body or other entity to provide written notice under this |
5 |
| Section 4 does not diminish the right of a laborer, worker, or |
6 |
| mechanic to the prevailing rate of wages as determined under |
7 |
| this Act. |
8 |
| (b) It shall also be mandatory upon the contractor to whom |
9 |
| the contract is
awarded
to insert into each subcontract and |
10 |
| into the project specifications for each
subcontract a written |
11 |
| stipulation to the effect that not less than the
prevailing
|
12 |
| rate of wages shall be paid to all laborers, workers, and |
13 |
| mechanics performing
work under the contract. It shall also be |
14 |
| mandatory upon each subcontractor to
cause to be inserted into |
15 |
| each lower tiered subcontract
and into the project |
16 |
| specifications for each lower tiered subcontract a
stipulation |
17 |
| to the effect that not less
than the prevailing rate of wages |
18 |
| shall be paid to all laborers, workers, and
mechanics |
19 |
| performing work under the contract. A contractor or |
20 |
| subcontractor who
fails to comply with this subsection (b) is |
21 |
| in violation of this Act.
|
22 |
| (b-1) When a contractor has awarded work to a subcontractor |
23 |
| without a contract or contract specification, the contractor |
24 |
| shall comply with subsection (b) by providing a subcontractor |
25 |
| with a written statement indicating that not less than the |
26 |
| prevailing rate of wages shall be paid to all laborers, |
|
|
|
09600HB0163ham001 |
- 5 - |
LRB096 00918 RLC 22521 a |
|
|
1 |
| workers, and mechanics performing work on the project. A |
2 |
| contractor or subcontractor who fails to comply with this |
3 |
| subsection (b-1) is in violation of this Act. |
4 |
| (b-2) Where a complaint is made and the Department of Labor |
5 |
| determines that a violation has occurred, the Department of |
6 |
| Labor shall determine if proper written notice under this |
7 |
| Section 4 was given. If proper written notice was not provided |
8 |
| to the subcontractor by the contractor, the Department of Labor |
9 |
| shall order the contractor to pay any interest, penalties, or |
10 |
| fines that would have been owed by the subcontractor if proper |
11 |
| written notice were provided. The failure by a contractor to |
12 |
| provide written notice to a subcontractor does not relieve the |
13 |
| subcontractor of the duty to comply with the prevailing wage |
14 |
| rate, nor of the obligation to pay any back wages, as |
15 |
| determined under this Act. For the purposes of this subsection, |
16 |
| back wages shall be limited to the difference between the |
17 |
| actual amount paid and the prevailing rate of wages required |
18 |
| for the project. However, if proper written notice was not |
19 |
| provided to the contractor by the public body or other entity |
20 |
| under this Section 4, the Department of Labor shall order the |
21 |
| public body or other entity to pay any interest, penalties, or |
22 |
| fines that would have been owed by the subcontractor if proper |
23 |
| written notice were provided. The failure by a public body or |
24 |
| other entity to provide written notice does not relieve the |
25 |
| subcontractor of the duty to comply with the prevailing wage |
26 |
| rate, nor of the obligation to pay any back wages, as |
|
|
|
09600HB0163ham001 |
- 6 - |
LRB096 00918 RLC 22521 a |
|
|
1 |
| determined under this Act. For the purposes of this subsection, |
2 |
| back wages shall be limited to the difference between the |
3 |
| actual amount paid and the prevailing rate of wages required |
4 |
| for the project. The failure to provide written notice by a |
5 |
| public body, other entity, or contractor does not diminish the |
6 |
| right of a laborer, worker, or mechanic to the prevailing rate |
7 |
| of wages as determined under this Act. |
8 |
| (c) A public body or other entity It shall also require in |
9 |
| all contractor's and subcontractor's such contractor's bonds
|
10 |
| that the contractor or subcontractor include such provision as |
11 |
| will guarantee the
faithful performance of such prevailing wage |
12 |
| clause as provided by
contract or other written instrument . All |
13 |
| bid specifications shall list the specified rates to all
|
14 |
| laborers, workers and mechanics in the locality for each craft |
15 |
| or type of
worker or mechanic needed to execute the contract.
|
16 |
| (d) If the Department of Labor
revises the prevailing rate |
17 |
| of hourly wages to be paid by the public body, the
revised rate |
18 |
| shall apply to such contract, and the public body shall be
|
19 |
| responsible to notify the contractor and each subcontractor, of |
20 |
| the revised
rate.
|
21 |
| (e) Two or more investigatory hearings under this Section |
22 |
| on the issue
of establishing a new prevailing wage |
23 |
| classification for a particular craft
or type of worker shall |
24 |
| be consolidated in a single hearing before the
Department. Such |
25 |
| consolidation shall occur whether each separate investigatory
|
26 |
| hearing is conducted by a public body or the Department. The |
|
|
|
09600HB0163ham001 |
- 7 - |
LRB096 00918 RLC 22521 a |
|
|
1 |
| party requesting
a consolidated investigatory hearing shall |
2 |
| have the burden of establishing that
there is no existing |
3 |
| prevailing wage classification for the particular craft or
type |
4 |
| of worker in any of the localities under consideration.
|
5 |
| (f) It shall be mandatory upon the contractor or |
6 |
| construction manager
to whom a contract for public works is |
7 |
| awarded to post, at a
location on the project site of the |
8 |
| public works that is
easily accessible to the workers engaged |
9 |
| on the project,
the prevailing wage rates for each craft or |
10 |
| type of worker
or mechanic needed to execute the contract or |
11 |
| project or
work to be performed. In lieu of posting on the |
12 |
| project site of the public works, a contractor which has a |
13 |
| business location where laborers, workers, and mechanics |
14 |
| regularly visit may: (1) post in a conspicuous location at that |
15 |
| business the current prevailing wage rates for each county in |
16 |
| which the contractor is performing work; or (2) provide such |
17 |
| laborer, worker, or mechanic engaged on the public works |
18 |
| project a written notice indicating the prevailing wage rates |
19 |
| for the public works project. A failure to post or provide a |
20 |
| prevailing wage
rate as required by this Section is a violation |
21 |
| of this Act.
|
22 |
| (Source: P.A. 95-331, eff. 8-21-07.)".
|