AN ACT making appropriations.

 

        Be it enacted by the People of the State of Illinois, represented in the General Assembly:

 

. . ARTICLE 5

ARCHITECT OF THE CAPITOL

 

    Section 5.  The amount of $3,883, or so much of this amount as may be necessary and remains unexpended on June 30, 2009, from a reappropriation heretofore made for such purpose in Section 5 of Article 27 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for plans, specifications, and continuation of work pursuant to the report and recommendations of the architectural, structural, and mechanical surveys of the State Capitol Building. This is for the continuation of the rehabilitation of the Capitol Building.

 

    Section 10.  The sum of $553,641, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purposes in Section 10 of Article 27 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Office of the Architect of the Capitol for remodeling, planning, relocation, permanent equipment, and other related expenses, including architectural and engineering fees associated with construction, for the remodeling of office space and other support areas under the jurisdiction of the House of Representatives and the Senate.

 

    Section 15.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Sections 5 and 10 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 5                               $557,524

 

ARTICLE 10

DEPARTMENT OF AGRICULTURE

 

    Section 5.  The following named amounts, or so much thereof as may be necessary are appropriated to the Department of Agriculture for repairs, maintenance, and capital improvements including construction, reconstruction, improvement, repair and installation of capital facilities, cost of planning, supplies, materials, equipment, services and all other expenses required to complete the work:

Payable from Agricultural Premium Fund:

  For various projects at the State

   Fairgrounds.................................... 600,000

  For various projects at the DuQuoin State

   Fairgrounds.................................... 250,000

    Total                                          $850,000

 

    Section 15.  The amount of $2,612,500, or so much thereof as may be necessary, is appropriated from the Partners for Conservation Projects Fund to the Department of Agriculture for the Conservation Practices Cost-Share program.

 

    Section 20.  The amount of $2,612,500, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Agriculture for deposit into the Partners for Conservation Projects Fund.

 

    Total, Article 10                            $6,075,000

 

ARTICLE 15

DEPARTMENT OF CENTRAL MANAGEMENT SERVICES

 

    Section 5.  The amount of $13,500,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Central Management Services for infrastructure improvement, hardware and related costs.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 15                           $13,500,000

 

ARTICLE 20

DEPARTMENT OF CENTRAL MANAGEMENT SERVICES

 

    Section 5.  The sum of $8,094,074, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 29, Section 5 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Department of Central Management Services for Information Technology infrastructure expenses including but not limited to related hardware and equipment.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 20                            $8,094,074

 

ARTICLE 23

CAPITAL DEVELOPMENT BOARD

 

    Section 5.  The sum of $50,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Capital Development Board for grants awarded under the Community Health Center Construction Act.

 

ARTICLE 25

DEPARTMENT OF COMMERCE AND ECONOMIC OPPORTUNITY

 

    Section 5.  The sum of $3,000,000, or so much thereof as may be necessary, is appropriated from the Port Development Revolving Loan Fund to the Department of Commerce and Economic Opportunity for grants and loans associated with the Port Development Revolving Loan Program pursuant to 30 ILCS 750/9-11.

 

    Section 20.  The sum of $17,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Fermi National Accelerator Laboratory for the Illinois Accelerator Research Center.

 

    Section 25.  The sum of $13,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for the Advanced Protein Crystallization Facility.

 

    Section 30.  The sum of $60,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to University of Illinois at Urbana/Champaign for all costs associated with design and construction of a Petascale Computing Facility.

 

    Section 45.  The amount of $25,000,000 or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the redevelopment of brownfield sites.

 

    Section 50.  No contract shall be entered into or obligation incurred or any expenditure made from any appropriation herein made in this Article until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, Article 25                          $118,000,000

 

ARTICLE 30

DEPARTMENT OF COMMERCE AND ECONOMIC OPPORTUNITY

 

    Section 5.  The sum of $50,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 31, Section 10 of Public Act 95-734, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for grants pursuant to 20 ILCS 605/605-332 – Coal Revival Program.

 

    Section 10.  The sum of $1,975,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 31, Section 40 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the Illinois Renewable Fuels Development Act.

 

    Section 15.  The sum of $13,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 31, Section 45 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to the Argonne National Laboratory for the Rare Isotope Accelerator for bondable infrastructure improvements.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 20.  The amount of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 31, Section 75 of Public Act 95-734, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the specific purposes of acquisition, development, construction, reconstruction, improvement, financing, architectural and technical planning and installation of capital facilities consisting of buildings, structures, durable equipment, and land for the purpose of capital development of coal resources within the State.

 

    Section 25.  The amount of $17,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 31, Section 80 of Public Act 95-734, is reappropriated from the Coal Development Fund to the Department of Commerce and Economic Opportunity for the specific purposes of acquisition, development, construction, reconstruction, improvement, financing, architectural and technical planning and installation of capital facilities consisting of buildings, structures, durable equipment, and land for the purpose of capital development of coal resources within the State, including but not limited to a grant for a commercial scale project that produces electric power and hydrogen and demonstrates underground storage of up to 1 million metric tons annually of carbon dioxide.

 

    Section 30.  The amount of $7,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 31, Section 90 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Argonne National Laboratory for the Advanced Protein Crystallization Facility.

 

    Section 35.  The amount of $15,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 31, Section 95 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant for the Illinois Science and Technology Park.

 

    Section 40.  The amount of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 31, Section 105 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for a grant to Fermi National Accelerator Laboratory for the Illinois Accelerator Research Center.

 

    Section 45.  The amount of $20,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 31, Section 120 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the Illinois Renewable Fuels Development Act.

 

    Section 50.  The amount of $15,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 31, Section 125 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants associated with the redevelopment of brownfield sites.

 

    Section 55.  The sum of $2,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 1, Section 10 of Public Act 95-1030, is reappropriated from the FY09 Budget Relief Fund to the Department of Commerce and Economic Opportunity for the Illinois Rural HealthNet.

 

    Section 60.  The amount of $35,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 2, Section 20 of Public Act 95-1030, is reappropriated from the Coal Development Bond Fund to the Department of Commerce and Economic Opportunity for the purpose of facility cost reports prepared pursuant to Section 1-75(d)(4) of the Illinois Power Agency Act.

 

    Section 65.  No contract shall be entered into or obligation incurred or any expenditure made from any appropriation herein made in this Article in Sections 5 through 50, until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, Article 30                          $183,975,000

 

ARTICLE 35

DEPARTMENT OF NATURAL RESOURCES

GRANTS AND REIMBURSEMENTS - GENERAL OFFICE

 

    Section 10. The sum of $725,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.

 

    Section 15.  The sum of $120,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for the purposes of the Snowmobile Registration and Safety Act and for the administration and payment of grants to local governmental units for the construction, land acquisition, lease, maintenance and improvement of snowmobile trails and access areas.

 

    Section 20.  To the extent federal funds including reimbursements are available for such purposes, the sum of $75,000, or so much thereof as may be necessary, is appropriated from the State Boating Act Fund to the Department of Natural Resources for all costs for construction and development of facilities for transient, non-trailerable recreational boats, including grants for such purposes and authorized under the Boating Infrastructure Grant Program.

 

    Section 25.  The sum of $150,000, new appropriation, is appropriated from the State Boating Act Fund to the Department of Natural Resources for a grant to the Chain O’Lakes – Fox River Waterway Management Agency for the Agency’s operational expenses.

 

    Section 30.  The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:

Payable from State Boating Act Fund:

  For multiple use facilities and

   programs for boating purposes

   provided by the Department of Natural

   Resources, including construction

   and development, all costs for supplies,

   materials, labor, land acquisition,

   services, studies and all other

   expenses required to comply with the

   intent of this appropriation.................. 1,500,000

Payable from State Parks Fund:

  For multiple use facilities and programs

   for park and trail purposes provided by

   the Department of Natural Resources, including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies, and

   all other expenses required to comply with

   the intent of this appropriation................ 150,000

 

    Section 35.  The sum of $100,000, or so much thereof as may be necessary, is appropriated from the Wildlife and Fish Fund to the Department of Natural Resources for acquisition and development, including grants, for the implementation of the North American Waterfowl Management Plan within the Dominion of Canada or the United States which specifically provides waterfowl for the Mississippi Flyway.

 

    Section 40.  To the extent federal funds including reimbursements are available for such purposes, the sum of $100,000, or so much thereof as may be necessary, is appropriated from the Wildlife and Fish Fund to the Department of Natural Resources for construction and renovation of waste reception facilities for recreational boaters, including grants for such purposes authorized under the Clean Vessel Act.

 

    Section 50.  The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:

Payable from Forest Reserve Fund:

  For U.S. Forest Service Program.................. 500,000

 

    Section 55.  The sum of $110,000, or so much thereof as may be necessary, is appropriated from the Plugging and Restoration Fund to the Department of Natural Resources, Office of Mines and Minerals for the Landowner Grant Program authorized under the Oil and Gas Act, as amended by Public Act 90-0260.

 

    Section 60.  The sum of $1,500,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the Abandoned Mined Lands Set Aside Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines and any other expenses necessary for emergency response.

 

    Section 65.  The sum of $99,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the State Furbearer Fund for the conservation of fur bearing mammals in accordance with the provisions of Section 5/1.32 of the "Wildlife Code", as now or hereafter amended.

 

    Section 70.  The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:

Payable from Natural Areas Acquisition Fund:

  For the acquisition, preservation and

   stewardship of natural areas, including habitats

   for endangered and threatened species, high

   quality natural communities, wetlands

   and other areas with unique or unusual

   natural heritage qualities.................... 3,000,000

 

    Section 75.  The sum of $17,000,000, or so much thereof as may be necessary, is appropriated from the Open Space Lands Acquisition and Development Fund to the Department of Natural Resources for expenses connected with and to make grants to local governments and to distressed communities as provided in the "Open Space Lands Acquisition and Development Act".

 

    Section 80.  The sum of $495,000, or so much thereof as may be necessary, is appropriated from the State Pheasant Fund to the Department of Natural Resources for the conservation of pheasants in accordance with the provisions of Section 5/1.31 of the "Wildlife Code", as now or hereafter amended.

 

FOR ILLINOIS HABITAT FUND PROGRAM

    Section 85.  The sum of $1,215,000, or so much thereof as may be necessary, is appropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of high quality habitat lands in accordance with the provisions of the "Habitat Endowment Act", as now or hereafter amended.

 

    Section 90.  The sum of $225,000, or so much thereof as may be necessary, is appropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series license plates.

 

    Section 95.  The sum of $800,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources for expenditure by the Office of Water Resources from the Flood Control Land Lease Fund for disbursement of monies received pursuant to Act of Congress dated September 3, 1954 (68 Statutes 1266, same as appears in Section 701c-3, Title 33, United States Code Annotated), provided such disbursement shall be in compliance with 15 ILCS 515/1 Illinois Compiled Statutes.

 

    Section 100.  The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:

Payable from Land and Water Recreation Fund:

  For Outdoor Recreation Programs............... $6,200,000

 

    Section 105.  The sum of $600,000, or so much thereof as may be necessary, is appropriated from the Off Highway Vehicle Trails Fund to the Department of Natural Resources for grants to units of local governments, not-for-profit organizations, and other groups to operate, maintain and acquire land for off-highway vehicle trails and parks as provided for in the Recreational Trails of Illinois Act, including administration, enforcement, planning and implementation of this Act.

 

    Section 110.  The following named sums, or so much thereof as may be necessary, respectively, herein made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, are appropriated to the Department of Natural Resources for refunds and the purposes stated:

Payable from Federal Title IV Fire

 Protection Assistance Fund:

  For Rural Community Fire Protection

   Programs....................................... $325,000

 

    Section 115.  The sum of $80,000, or so much thereof as may be necessary, is appropriated from the Snowmobile Trail Establishment Fund to the Department of Natural Resources for the administration and payment of grants to nonprofit snowmobile clubs and organizations for construction, maintenance, and rehabilitation of snowmobile trails and areas for the use of snowmobiles.

 

    Section 120.  The sum of $625,000, or so much thereof as may be necessary, is appropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the payment of grants to timber growers for implementation of acceptable forestry management practices as provided in the "Illinois Forestry Development Act" as now or hereafter amended.

 

    Section 125.  To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $300,000, is appropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for Forest Stewardship Technical Assistance.

 

    Section 130.  The sum of $144,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the payment of grants for the implementation of the North American Waterfowl Management Plan within the Dominion of Canada or the United States which specifically provides waterfowl to the Mississippi Flyway as provided in the "Wildlife Code", as amended.

 

    Section 135.  The sum of $144,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the payment of grants for the development of waterfowl propagation areas within the Dominion of Canada or the United States which specifically provide waterfowl for the Mississippi Flyway as provided in the "Wildlife Code", as amended.

 

    Section 140.  The sum of $500,000, or so much thereof as may be necessary, is appropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the purpose of attracting waterfowl and improving public migratory waterfowl areas within the State.

 

    Section 145.  The sum of $3,000,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for grants to units of local government for the acquisition and development of bike paths.

 

    Section 150.  The sum of $750,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development and maintenance of bike paths and all other related expenses connected with the acquisition, development and maintenance of bike paths.

 

    Section 155.  The sum of $2,000,000, or so much thereof as may be necessary, is appropriated from the Park and Conservation Fund to the Department of Natural Resources for the development and maintenance, and other related expenses of recreational trails and trail-related projects authorized under the Intermodal Surface Transportation Efficiency Act of 1991, provided such amount shall not exceed funds to be made available for such purposes from state or federal sources.

 

    Section 160.  The following named sum, new appropriation, or so much thereof as may be necessary, for the object and purpose hereinafter named, is appropriated to the Department of Natural Resources:

Payable from the Park and Conservation Fund:

  For multiple use facilities and programs

   for park and trail purposes provided by

   the Department of Natural Resources, including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies, and

   all other expenses required to comply with

   the intent of this appropriation.............. 2,000,000

 

    Section 165.  The following named sums, new appropriations, or so much thereof as may be necessary, respectively, for the objects and purposes hereinafter named, are appropriated to the Department of Natural Resources:

Payable from the Adeline Jay Geo-Karis

 Illinois Beach Marina Fund:

  For rehabilitation, reconstruction, repair,

   replacing, fixed assets, and improvement

   of facilities at North Point Marina at

   Winthrop Harbor................................ $375,000

 

    Section 170.  The sum of $6,000,000, or so much thereof as may be necessary, is appropriated to the Department of Natural Resources from the Abandoned Mined Lands Reclamation Council Federal Trust Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines, and any other expenses necessary for emergency response.

 

    Section 175.  The sum of $45,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Natural Resources for the non-federal cost share of a Conservation Reserve Enhancement Program to establish long-term contracts and permanent conservation easements in the Illinois River Basin; to fund cost-share assistance to landowners to encourage approved conservation practices in environmentally sensitive and highly erodible areas of the Illinois River Basin; and to fund the monitoring of long-term improvements of these conservation practices as required in the Memorandum of Agreement between the State of Illinois and the United States Department of Agriculture.

 

Section 180. The sum of $42,015,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for water development projects at the approximate cost set forth below:

 

  Addison Creek - Cook & Dupage

   Counties - For construction

   of the Addison Creek Flood

   Control Project as developed

   by the Addison Creek Restoration

   Commission...................................... 500,000

  Ashland – Cass County – For

   construction of a flood

   control project to relieve flooding............. 500,000

  Blackberry Creek - Kane &

   Kendall Counties - For assistance

   in implementation of the Blackberry

   Creek Watershed Plan............................ 140,000

  County Stormwater Improvements –

   For funding to assist County

   Stormwater Programs with

   implementation of flood relief

   projects........................................ 600,000

  Crystal Creek – Cook County –

   To design and construct the

   Crystal Creek Flood Control Project

   in Schiller Park and Franklin Park............ 1,100,000

  Des Plaines River Phase 1 Big

   Bend Lake - Cook County –

   For non-federal cost sharing

   requirements of the Upper

   Des Plaines Flood Control Project,

   Phase 1...................................... 10,800,000

  East St. Louis Ecosystem and

   IFC - Madison & St. Clair

   Counties - For the non-federal

   funding to design and construct

   this multipurpose ecosystem project........... 1,700,000

  Edinburg - Christian County – For

   construction of a flood water

   storage facility and local

   channel modifications........................... 550,000

  Flood Hazard Mitigation –

   Statewide - For cost sharing

   to acquire repetitive and

   severely damaged flood prone

   structures................................... 10,000,000

  Granite City Groundwater Pumping –

   To implement the pilot project

   to reduce flood damages associated

   with high groundwater......................... 1,200,000

  Hickory/Spring Creek – Will County –

   For implementation of Stage IIIb-2

   of channel construction of

   Hickory/Spring Creeks flood

   control project in cooperation

   with the City of Joliet....................... 4,500,000

  Hickory/Spring Creek – Will County –

   For implementation of Stage IV-A

   of channel construction of

   Hickory/Spring Creeks flood

   control project in  cooperation

   with the City of Joliet....................... 7,600,000

  Mattoon - Coles County – For

   implementation of local

   improvements to reduce

   flood damages................................. 1,000,000

  North Branch Chicago River –

   Lake County - For assistance in

   implementation of flood damage

   reduction measures in the watershed.............. 30,000

  Village of Union - McHenry County -

   For the implementation of flood

   damage relief measures........................ 1,125,000

  Small Drainage and Flood

   Control Projects - to fund

   flood damage reduction projects

   in partnership with local

   units of government............................. 670,000

 

    Section 185.  The sum of $40,500,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for improvements needed at State-owned Dams for upgrading and rehabilitation of dams, spillways and supporting facilities, including dam removals and the required geotechnical investigations, preparation of plans and specifications, and the construction of the proposed rehabilitation to ensure reduced risk of injury to the public.

 

    Section 190.  The sum of $14,950,000, or so much thereof as may be necessary is appropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.

 

    Section 200.  To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $15,000,000 is appropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the purpose of advancing forestry resources in Illinois pursuant to the American Recovery and Reinvestment Act of 2009.

 

    Section 205.  The sum of $150,000,000, or so much thereof as may be necessary is appropriated from the Build Illinois Bond Fund to the Department of Natural Resources for capital grants to parks or reactional units for permanent improvements.

 

    Section 210.  The sum of $50,000,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Department of Natural Resources for capital grants to public museums for permanent improvements.

 

    Section 215. No contract shall be entered into or obligation incurred or any expenditure made from appropriations herein made in Sections 175, 180, 185, 190 and 195 of this Article until after the purpose and amount of such expenditure has been approved in writing by the Governor.

 

    Total, Article 35                          $408,372,000

 

ARTICLE 40

DEPARTMENT OF NATURAL RESOURCES

 

    Section 5.  The sum of $4,198,641, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 10 and Article 33, Section 5, of Public Act 95-734, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the administration and payment of grants to local governmental units for the construction, maintenance, and improvement of boat access areas.

 

    Section 15.  The sum of $405,158, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 15, and Article 33, Section 15, of Public Act 95-734, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for the purposes of the Snowmobile Registration and Safety Act and for the administration and payment of grants to local governmental units for the construction, land acquisition, lease, maintenance and improvement of snowmobile trails and access areas.

 

    Section 30.  To the extent federal funds including reimbursements are available for such purposes, the sum of $1,188,900, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 20, and Article 33, Section 30 of Public Act 95-734, as amended, is reappropriated from the State Boating Act Fund to the Department of Natural Resources for all costs for construction and development of facilities for transient, non-trailerable recreational boats, including grants for such purposes and authorized under the Boating Infrastructure Grant Program.

 

    Section 35.  The following named sums, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:

Payable from State Boating Act Fund:

    (From Article 32, Section 30,

    and Article 33, Section 35,

    of Public Act 95-734, as amended)

  For multiple use facilities and programs

   for boating purposes provided by the

   Department of Natural Resources including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies and all

   other expenses required to comply with

   the intent of this appropriation.............. 5,238,507

 

    Section 45.  The following named sums, or so much thereof as may be necessary, respectively, and as remain unexpended at the close of business on June 30, 2009, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:

Payable from the State Parks Fund:

    (From Article 32, Section 30,

    and Article 33, Section 45

    of Public Act 95-734, as amended)

  For multiple use facilities and programs

   for park and trail purposes provided

   by the Department of Natural Resources, including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies, and

   all other expenses required to comply with

   the intent of this appropriation.............. 1,162,721

(From Article 33, Section 45

    of Public Act 95-734, as amended)

  For multiple use facilities and

   purposes provided by the

   Department of Natural Resources, including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies, and

   all other expenses required to comply with

   the intent of this appropriation................ 244,857

 

    Section 48.  The sum of $1,563,081, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 33, Section 48 of Public Act 95-734, as amended, is reappropriated from the State Park Fund to the Department of Natural Resources, in coordination with the Capital Development Board, for the development of the World Shooting and Recreation Complex including all construction and debt service expenses required to comply with this appropriation.  Provided further, to the extent that revenues are received for such purposes, said revenues must come from non-State sources.

 

    Section 50.  The sum of $6,882,757, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 33, Section 50 of Public Act 95-734, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for wildlife conservation and restoration plans and programs from federal and/or state funds provided for such purposes.

 

    Section 60.  To the extent federal funds including reimbursements are available for such purposes, the sum of $726,672, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 40 and Article 33, Section 60 of Public Act 95-734, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for construction and renovation of waste reception facilities for recreational boaters, including grants for such purposes authorized under the Clean Vessel Act.

 

    Section 70.  The sum of $735,997, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 33, Section 70 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.

 

    Section 75.  The sum of $2,678,269, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 33, Section 75 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Department of Natural Resources for planning, design and construction of ecosystem rehabilitation, habitat restoration and associated development in cooperation with the U.S. Army Corps of Engineers.

 

    Section 80.  The sum of $16,825,331, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 33, Section 80, of Public Act 95-734, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources to acquire, protect and preserve open space and natural lands.

 

    Section 85.  The sum of $1,918,701, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 33, Section 85 of Public Act 95-734, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the non-federal cost share of a Conservation Reserve Enhancement Program to establish long-term contracts and permanent conservation easements in the Illinois River Basin; to fund cost-share assistance to landowners to encourage approved conservation practices in environmentally sensitive and highly erodible areas of the Illinois River Basin; and to fund the monitoring of long term improvements of these conservation practices as required in the Memorandum of Agreement between the State of Illinois and the United States Department of Agriculture.

 

    Section 95.  The sum of $503,341, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 33, Section 95 of Public Act 95-734, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for the acquisition of lands, buildings, and structures, including easements and other property interests, located in the 100-year floodplain in counties or portions of counties authorized to prepare stormwater management plans and for removing such buildings and structures and preparing the site for open space use.

 

    Section 100.  The sum of $8,145,019, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 33, Section 100 of Public Act 95-734, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for water development projects at the approximate cost set forth below:

Union - McHenry County - for flood control

 and drainage improvement of unnamed

 Kishwaukee River tributary........................ 200,000

Flood Hazard Mitigation - For implementation

 of flood hazard mitigation plans, and

 acquisition of wetland and tree mitigation

 sites for state and local joint

 flood control projects in

 cooperation with federal agencies, state

 agencies, and units of local government,

 in various counties............................. 3,170,130

Fox Chain of Lakes - Lake and McHenry

 Counties - For the state cost share in

 implementation of the comprehensive

 Dredging and Disposal Plan, including

 beneficial use of dredge material and

 island creation, for the Fox River and

 Chain of Lakes.................................... 274,889

Fox River Dams - Kane County - For

 rehabilitation, modification, and

 reconstruction of Batavia

 and Yorkville Dams.............................. 2,600,000

East St. Louis & Vicinity Flood Control -

 Madison and St. Clair Counties - For

 partial payment of the non-federal cost

 requirement of an interior flood protection

 project and ecosystem restoration at East

 St. Louis and Vicinity area..................... 1,800,000

Small Drainage and Flood Control Projects -

 For implementation of

 small drainage and flood control

 improvements in accordance with plans

 developed in cooperation with local

 governments and school districts, not

 to exceed $100,000 at any single

 locality.......................................... 100,000

    Total                                        $8,145,019

 

FOR WATERWAY IMPROVEMENTS

    Section 105.  The sum of $13,771,873, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 33, Section 105 of Public Act 95-734, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources for the following projects at the approximate costs set forth below:

Addison Creek Watershed - Cook

 and DuPage Counties............................... 214,700

Chicago Harbor Leakage Control -

 Cook County - For implementation

 of a project to identify, measure,

 control, and eliminate leakage

 flows through controlling structures at

 the mouth of the Chicago River in

 cooperation with federal agencies and

 units of local government......................... 990,400

Crisenberry Dam - Jackson County:

 For complete rehabilitation of the

 dam and spillway, including the

 required geotechnical investigation,

 the preparation of plans and

 specifications, and the construction

 of the proposed rehabilitation.................... 423,000

Crystal Creek - Cook County...................... 2,864,324

East St. Louis and Vicinity Flood Control -

 Madison and St. Clair Counties - For

 partial payment of the non-federal cost

 requirements of an interior flood protection

 project and ecosystem restoration at

 East St. Louis and Vicinity area.................. 376,500

Flood Mitigation - Disaster

 Declaration Areas............................... 1,909,188

Fox Chain O'Lakes - Lake and McHenry

 Counties  ...................................... 1,815,911

Fox River Dams - Kane, Kendall

 and McHenry Counties............................ 2,586,269

Granite City - Area Groundwater-

 Madison County.................................... 300,000

Hickory/Spring Creeks Watershed -

 Cook and Will Counties............................ 265,800

Kyte River - Rochelle, Ogle County................. 450,900

Loves Park - Winnebago County...................... 178,500

Prairie/Farmers Creek - Cook County................ 912,815

Rock River Dams - Rock Island and

 Whiteside Counties................................. 79,566

Small Drainage and Flood Control

 Projects - Statewide (not to exceed

 $100,000 at any locality)......................... 374,000

Union - McHenry County.............................. 30,000

    Total                                       $13,771,873

 

    Section 110.  The sum of $31,340, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 33, Section 110 of Public Act 95-734, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for expenditure by the Office of Water Resources in cooperation with federal agencies, state agencies and units of local government in the implementation of flood hazard mitigation plans in counties that received a Presidential Disaster Declaration as a result of flooding in calendar years 1993 and thereafter, in accordance with reports filed under Section 5 of the "Flood Control Act of 1945".

 

    Section 115.  The sum of $25,098, or so much thereof as may be necessary, and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 33, Section 115 of Public Act 95-734, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for grants to public museums for permanent improvements.

 

    Section 130.  The amount of $1,314,656, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 33, Section 130 of Public Act 95-734, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources for grants to public museums for permanent improvements.

 

    Section 135.  The sum of $238,020, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 65 and Article 33, Section 135 of Public Act 95-734, as amended, is reappropriated to the Department of Natural Resources from the State Furbearer Fund for the conservation of fur bearing mammals in accordance with the provisions of Section 5/1.32 of the "Wildlife Code", as now or hereafter amended.

 

    Section 145.  The following named sum, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made for such purposes, is reappropriated to the Department of Natural Resources for the objects and purposes set forth below:

Payable from Natural Areas Acquisition Fund:

    (From Article 32, Section 70 and

    Article 33, Section 145 of Public

    Act 95-734, as amended)

  For the acquisition, preservation and

   stewardship of natural areas,

   including habitats for endangered and

   threatened species, high quality natural

   communities, wetlands and other areas

   with unique or unusual natural

   heritage qualities........................... 20,792,069

 

    Section 150.  The sum of $109,943,523, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 75 and Article 33, Section 150 of Public Act 95-734, as amended, is reappropriated from the Open Space Lands Acquisition and Development Fund to the Department of Natural Resources for expenses connected with and to make grants to local governments as provided in the "Open Space Lands Acquisition and Development Act".

 

FOR STATE PHEASANT PROGRAM

    Section 160.  The sum of $883,412, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 80 and Article 33, Section 160, of Public Act 95-734, as amended, is reappropriated from the State Pheasant Fund to the Department of Natural Resources for the conservation of pheasants in accordance with the provisions of Section 5/1.31 of the "Wildlife Code", as now or hereafter amended.

 

    Section 170.  The sum of $3,192,250, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 85 and Article 33, Section 170 of Public Act 95-734, as amended, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of high quality habitat lands in accordance with the provisions of the "Habitat Endowment Act", as now or hereafter amended.

 

    Section 180.  The sum of $1,220,489, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 90, and Article 33, Section 180 of Public Act 95-734, as amended, is reappropriated from the Illinois Habitat Fund to the Department of Natural Resources for the preservation and maintenance of a high quality fish and wildlife habitat and to promote the heritage of outdoor sports in Illinois from revenue derived from the sale of Sportsmen Series license plates.

 

    Section 190.  The following named sum, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 100 and Article 33, Section 190 of Public Act 95-734, as amended, made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, is reappropriated to the Department of Natural Resources for refunds and the purposes stated:

Payable from Land and Water Recreation Fund:

  For Outdoor Recreation Programs............... 21,081,481

 

    Section 195.  The sum of $1,886,668, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 105 and Article 33, Section 195 of Public Act 95-734, as amended, is reappropriated from the Off Highway Vehicle Trails Fund to the Department of Natural Resources for grants to units of local governments, not-for-profit organizations, and other groups to operate, maintain and acquire land for off-highway vehicle trails and parks as provided for in the Recreational Trails of Illinois Act, including administration, enforcement, planning and implementation of this Act.

 

    Section 205.  The sum of $1,486,809, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made for such purposes in Article 33, Section 205 of Public Act 95-734, as amended, is reappropriated from the Partners for Conservation Projects Fund to the Department of Natural Resources for the acquisition, planning and development of land and long-term easements, and cost-shared natural resource management practices for ecosystem-based management of Illinois' natural resources, including grants for such purposes.

 

    Section 210.  The sum of $2,314,763, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made for such purposes in Article 33, Section 210 of Public Act 95-734, as amended, is reappropriated from the Partners for Conservation Projects Fund to the Department of Natural Resources for the acquisition, planning and development of land and long-term easements, and cost-shared natural resource management practices for ecosystem-based management of Illinois' natural resources, including grants for such purposes.

 

    Section 215.  The following named sum, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 110 and Article 33, Section 215 of Public Act 95-734, as amended, made either independently or in cooperation with the Federal Government or any agency thereof, any municipal corporation, or political subdivision of the State, or with any public or private corporation, organization, or individual, is reappropriated to the Department of Natural Resources for refunds and the purposes stated:

Payable from Federal Title IV Fire

 Protection Assistance Fund:

  For Rural Community Fire

   Protection Program............................ 1,033,568

 

    Section 225.  The sum of $143,498, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 115 and Article 33, Section 225 of Public Act 95-734, as amended, is reappropriated from the Snowmobile Trail Establishment Fund to the Department of Natural Resources for the administration and payment of grants to nonprofit snowmobile clubs and organizations for construction, maintenance, and rehabilitation of snowmobile trails and areas for the use of snowmobiles.

 

    Section 235.  The sum of $2,482,184, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 120 and Article 33, Section 235 of Public Act 95-734, as amended, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the payment of grants to timber growers for implementation of acceptable forestry management practices as provided in the "Illinois Forestry Development Act" as now or hereafter amended.

 

    Section 245.  To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $642,780, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 125, and Article 33, Section 245 of Public Act 95-734, as amended, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for Forest Stewardship Technical Assistance.

 

    Section 260.  The sum of $2,791,528, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 140, and Article 33, Section 260 of Public Act 95-734, as amended, is reappropriated from the State Migratory Waterfowl Stamp Fund to the Department of Natural Resources for the purpose of attracting waterfowl and improving public migratory waterfowl areas within the State.

 

FOR BIKEWAYS PROGRAMS

    Section 280.  The sum of $17,782,121, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 145, and Article 33, Section 280 of Public Act 95-734, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for grants to units of local government for the acquisition and development of bike paths.

 

    Section 285.  The following named sum, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 32, Section 160, and Article 33, Section 285 of Public Act 95-734, as amended, is reappropriated to the Department of Natural Resources:

Payable from the Park and Conservation Fund:

  For multiple use facilities and programs

   for park and trail purposes provided by

   the Department of Natural Resources, including

   construction and development, all costs

   for supplies, materials, labor, land

   acquisition, services, studies, and

   all other expenses required to comply with

   the intent of this appropriation.............. 1,529,436

 

    Section 300.  The sum of $686,826, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 33, Section 300 of Public Act 95-734, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for multiple use facilities and programs for conservation purposes provided by the Department of Natural Resources, including repairing, maintaining, reconstructing, rehabilitating, replacing fixed assets, construction and development, marketing and promotions, all costs for supplies, materials, labor, land acquisition and its related costs, services, studies, and all other expenses required to comply with the intent of this appropriation.

 

    Section 305.  The sum of $4,643,738, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 150, and Article 33, Section 305 of Public Act 95-734, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for land acquisition, development and maintenance of bike paths and all other related expenses connected with the acquisition, development and maintenance of bike paths.

 

    Section 310.  The sum of $1,307,357, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 33, Section 310 of Public Act 95-734, as amended, is reappropriated to the Department of Natural Resources from the Park and Conservation Fund for multiple use facilities and programs for conservation purposes provided by the Department of Natural Resources, including repairing, maintaining, reconstructing, rehabilitating, replacing fixed assets, construction and development, marketing and promotions, all costs for supplies, materials, labor, land acquisition and its related costs, services, studies, and all other expenses required to comply with the intent of this appropriation.

 

    Section 320.  The sum of $7,618,254, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 155, and Article 33, Section 320 of Public Act 95-734, as amended, is reappropriated from the Park and Conservation Fund to the Department of Natural Resources for the development and maintenance of recreational trails and trail-related projects authorized under the Intermodal Surface Transportation Efficiency Act of 1991, provided such amount shall not exceed funds to be made available for such purposes from state or federal sources.

 

    Section 385.  The following named sum, or so much thereof as may be necessary, respectively, and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made for such purposes, are reappropriated to the Department of Natural Resources for the objects and purposes set forth below:

Payable from the Illinois Beach Marina Fund:

    (From Article 32, Section 165

    and Article 33, Section 385

    of Public Act 95-734, as amended)

  For rehabilitation, reconstruction,

   repair, replacing, fixed assets,

   and improvement of facilities at

   North Point Marina at Winthrop

   Harbor........................................ 1,135,535

 

    Section 395.  The sum of $16,993,585, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 32, Section 170, and Article 33, Section 395 of Public Act 95-734, as amended, is reappropriated to the Department of Natural Resources from the Abandoned Mined Lands Reclamation Council Federal Trust Fund for grants and contracts to conduct research, planning and construction to eliminate hazards created by abandoned mines, and any other expenses necessary for emergency response.

 

    Section 405.  The sum of $4,535,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 33, Section 405 of Public Act 95-734, as amended, is reappropriated from the Capital Development Fund to the Department of Natural Resources to acquire, protect and preserve open space and natural lands.

 

    Section 410.  The sum of $1,319,251, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 33, Section 410 of Public Act 95-734, as amended, is reappropriated from the Wildlife and Fish Fund to the Department of Natural Resources for the acquisition, engineering and rehabilitation of dedicated hunting and fishing lands in conjunction with the Illinois Hunting Heritage Protection Act; however, no more than $1,500,000 of the total appropriation may be used for engineering and rehabilitation.

 

    Section 415.  The sum of $20,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 33, Section 415 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Department of Natural Resources for water resource management projects as authorized by subsection (g) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 420.  The sum of $10,077,640, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 33, Section 420 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Department of Natural Resources for grants to local governments for the acquisition, financing, architectural planning, development, alteration, installation, and construction of capital facilities consisting of buildings, structures, durable equipment, and land as authorized by subsection (l) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 425.  The sum of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 33, Section 425 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Department of Natural Resources for the Illinois Open Land Trust Program as defined by the Illinois Open Land Trust Act as authorized by subsection (m) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 426.  To the extent Federal Funds including reimbursements are made available for such purposes, the sum of $5,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 30, Section 170 of Public Act 95-731 as amended by Public Act 96-004, is reappropriated from the Illinois Forestry Development Fund to the Department of Natural Resources for the purpose of advancing forestry resources in Illinois pursuant to the American Recovery and Reinvestment Act of 2009.

 

    Section 430.  No contract shall be entered into or obligation incurred or any expenditure made from a reappropriation herein made in Sections:

  70 through 130,

  190, 205, 210,

  270 through 320,

  405, 410, 415, 420 and 425

until after the purpose and amount of such expenditure has been approved in writing by the Governor.

 

    Total, Article 40                          $355,322,128

 

ARTICLE 45

DEPARTMENT OF MILITARY AFFAIRS

 

    Section 5.  The sum of $238,800, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 34, Section 5 of Public Act 95-734, is reappropriated from the Illinois National Guard Armory Construction Fund to the Department of Military Affairs for land acquisition and construction of parking facilities at armories.

 

    Total, Article 45                              $238,800

 

ARTICLE 50

DEPARTMENT OF TRANSPORTATION

PERMANENT IMPROVEMENTS

    Section 5.  The sum of $5,400,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for Permanent Improvements to Illinois Department of Transportation facilities, including but not limited to the purchase of land, construction, repair, alterations and improvements to maintenance and traffic facilities, district and central headquarters facilities, storage facilities, grounds, parking areas and facilities, fencing and underground drainage, including plans, specifications, utilities and fixed equipment installed and all costs and charges incident to the completion thereof at various locations.

 

OTHER LUMP SUMS

    Section 10.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Road Fund to the Department of Transportation for the objects and purposes hereinafter named:

  For costs associated with the identification,

   corrective action, and disposal of hazardous

   materials at storage facilities............... 1,158,600

  For Maintenance, Traffic and Physical

   Research Purposes (A)........................ 30,129,100

  For repair of damages by motorists

   to highway guardrails, fencing,

   lighting units, bridges, underpasses,

   signs, traffic signals, crash

   attenuators, landscaping, roadside

   shelters, rest areas, fringe parking

   facilities, sanitary facilities,

   maintenance facilities including salt

   storage buildings, vehicle weight

   enforcement facilities including scale

   houses, and other highway appurtenances,

   provided such amount shall not exceed

   funds to be made available from collections

   from claims filed by the Department

   to recover the costs of such damages.......... 5,500,000

  For Maintenance, Traffic and Physical

   Research Purposes (B)........................ 13,150,000

    Total                                       $49,937,700

 

HIGHWAY CONSTRUCTION AND LAND ACQUISITION

GRANTS AND AWARDS

    Section 15.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Road Fund to the Department of Transportation for the objects and purposes hereinafter named:

  For apportionment to counties for

   construction of township bridges 20

   feet or more in length as provided

   in Section 6-901 through 6-906 of the

   "Illinois Highway Code"...................... 15,000,000

  For apportionment to needy Townships and

   Road Districts, as determined by the

   Department in consultation with the County

   Superintendents of Highways, Township

   Highway Commissioners, or Road District

   Highway Commissioners........................ 10,014,300

  For apportionment to high-growth cities over

   5,000 in population, as determined by the

   Department in consultation with the Illinois

   Municipal League.............................. 4,000,000

  For apportionment to counties

   under 1,000,000 in population,

   $8,000,000 of the total apportioned

   in equal amounts to each eligible

   county, and $13,800,000 apportioned

   to each eligible county in proportion

   to the amount of motor vehicle license

   fees received from the residents of

   eligible counties............................ 21,800,000

    Total                                       $50,814,300

 

HIGHWAY CONSTRUCTION AND LAND ACQUISITION

CONSTRUCTION

    Section 20.  The sum of $930,000,000, or so much thereof as may be necessary, is appropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of State highways, arterial highways, roads, access areas, roadside shelters, rest areas fringe parking facilities and sanitary facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the Road Improvement Program as approximated below:

 

 District 1, Schaumburg........................ 243,993,600

 District 2, Dixon.............................. 53,956,700

 District 3, Ottawa............................. 55,904,000

 District 4, Peoria............................. 36,214,500

 District 5, Paris.............................. 30,155,000

 District 6, Springfield........................ 38,265,500

 District 7, Effingham.......................... 30,056,500

 District 8, Collinsville...................... 122,668,100

 District 9, Carbondale......................... 31,670,100

 Statewide (including refunds)................. 110,290,000

 Engineering................................... 176,826,000

    Total                                         930,000,000         

Section 25.  The sum of $310,000,000, or so much thereof as may be necessary, is appropriated from the Transportation Bond Series A Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program as approximated below:

 

 District 1, Schaumburg........................ 112,518,000

 District 2, Dixon.............................. 23,962,000

 District 3, Ottawa............................. 25,550,000

 District 4, Peoria............................. 23,045,000

 District 5, Paris.............................. 14,282,000

 District 6, Springfield........................ 19,230,000

 District 7, Effingham.......................... 22,302,000

 District 8, Collinsville....................... 26,675,000

 District 9, Carbondale......................... 17,300,000

 Statewide (including refunds).................. 25,136,000

 Engineering........................................      0

    Total                                       310,000,000

 

    Section 27.  The sum of $2,801,433,698, or so much thereof as may be necessary, is appropriated from the Transportation Bond Series D Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program as approximated below:

 

 District 1, Schaumburg...................... 1,307,767,925

 District 2, Dixon............................. 321,800,800

 District 3, Ottawa............................ 190,512,450

 District 4, Peoria............................ 200,107,500

 District 5, Paris............................. 135,118,550

 District 6, Springfield....................... 159,863,500

 District 7, Effingham......................... 116,729,223

 District 8, Collinsville...................... 229,600,000

 District 9, Carbondale........................ 139,933,750

 Statewide (including refunds)........................... 0

 Engineering........................................      0

    Total                                     2,801,433,698

 

HIGHWAY CONSTRUCTION AND LAND ACQUISITION

LUMP SUMS

    Section 30.  The sum of $95,000,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program as approximated below:

 

 District 1, Schaumburg......................... 36,055,400

 District 2, Dixon............................... 7,973,300

 District 3, Ottawa.............................. 8,261,000

 District 4, Peoria.............................. 5,351,500

 District 5, Paris............................... 4,456,000

 District 6, Springfield......................... 5,654,500

 District 7, Effingham........................... 4,441,500

 District 8, Collinsville....................... 18,126,900

 District 9, Carbondale.......................... 4,679,900

 Statewide (including refunds)........................... 0

 Engineering........................................      0

    Total                                        95,000,000

 

    Section 35.  The sum of $499,185,700, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program as approximated below:

 

 District 1, Schaumburg........................ 289,000,000

 District 2, Dixon.............................. 20,000,000

 District 3, Ottawa............................. 15,000,000

 District 4, Peoria............................. 13,000,000

 District 5, Paris.............................. 13,000,000

 District 6, Springfield........................ 15,000,000

 District 7, Effingham.......................... 14,000,000

 District 8, Collinsville....................... 28,000,000

 District 9, Carbondale......................... 10,000,000

 Statewide (including refunds).................. 82,185,700

    Total...................................... 499,185,700

 

    Section 36.  The sum of $500,000,000, or so much thereof as may be necessary, is appropriated from the Transportation Bond Series D Fund to the Department of Transportation for grants to counties, municipalities, and road districts for planning, engineering, acquisition, construction, reconstruction, development, improvement, extension, and all construction related expenses of the public infrastructure and other transportation improvement projects which are related to economic development in the State of Illinois allocated as follows:

    For the municipalities of the State..... $245,500,000

    For the counties of the State having

     1,000,000 or more inhabitants............ 83,700,000

    For the counties of the State having less

     than 1,000,000 inhabitants............... 91,350,000

    For the road districts of the State....... 79,450,000

       Total                                    $500,000,000

 

GRADE CROSSING PROTECTION

CONSTRUCTION

    Section 40.  The sum of $39,000,000 or so much thereof as may be necessary, is appropriated from the Grade Crossing Protection Fund to the Department of Transportation for the installation of grade crossing protection or grade separations at places where a public highway crosses a railroad at grade, as ordered by the Illinois Commerce Commission, as provided by law.

 

DIVISION OF AERONAUTICS

AWARDS AND GRANTS

    Section 45.  The sum of $137,000,000 or so much thereof as may be necessary, is appropriated from the Federal/Local Airport Fund to the Department of Transportation for funding the local or federal share of airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws, provided such amounts shall not exceed funds available from federal and/or local sources.

 

    Section 50.  The sum of $20,000,000, or so much thereof as may be necessary, is appropriated from the Transportation Bond Series B Fund to the Department of Transportation for financial assistance to airports pursuant to Section 34 of the Illinois Aeronautics Act, as amended, for such purposes as are described in that Section and for airport acquisition and development pursuant to Section 72 of the Illinois Aeronautics Act, as amended, for such purposes as are described in that Section.

 

DIVISION OF PUBLIC AND INTERMODAL TRANSPORTATION

AWARDS AND GRANTS

    Section 55.  The sum of $16,000,000, or so much thereof as may be necessary, is appropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.

 

DIVISION OF PUBLIC AND INTERMODAL TRANSPORTATION

CONSTRUCTION

    Section 60.  The sum of $300,000,000, or so much thereof as may be necessary, is appropriated from the Transportation Bond Series B Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program, provided such amounts not exceed funds made available by the federal government for this program.

 

    Section 61.  The sum of $20,000,000, or so much thereof as may be necessary, is appropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program, provided such amounts not exceed funds made available by the federal government for this program.

 

    Section 65.  The sum of $1,800,000,000, or so much thereof as may be necessary, is appropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to the Regional Transportation Authority (RTA) as approximated below:

  To the Suburban Bus Division of the

    Regional Transportation Authority

    (PACE) for construction costs and

    for the acquisition, construction,

    extension, reconstruction, and improvement

    of mass transportation facilities,

    including rapid transit, intercity

    transit, bus and other equipment............ 90,000,000

  To the Chicago Transit Authority (CTA)

    for construction costs and for the

    acquisition, construction, extension,

    reconstruction, and improvement of

    mass transportation facilities,

    including rapid transit, intercity

    transit, bus and other equipment........... 900,000,000

  To the Commuter Rail Division of the

    Regional Transportation Authority (Metra)

    for construction costs and for the

    acquisition, construction, extension,

    reconstruction, and improvement of

    mass transportation facilities,

    including rapid transit, intercity

    transit, bus and other equipment........... 810,000,000

    Total                                       1,800,000,000

 

    Section 70.  The sum of $200,000,000, or so much thereof as may be necessary, is appropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants, and providing project assistance to municipalities, special transportation districts, private Non-profit carriers, mass transportation carriers and Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law for the purpose of downstate public transit systems.

 

RAIL PASSENGER AND RAIL FREIGHT

AWARDS AND GRANTS

    Section 75.  The sum of $2,700,000, or so much thereof as may be necessary, is appropriated from the State Rail Freight Loan Repayment Fund for funding the State Rail Freight Loan Repayment Program created by Section 49.25g-1 of the Civil Administrative Code of Illinois.

 

    Section 80.  The sum of $1,045,000, or so much thereof as may be necessary, is appropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the Rail Freight Service Assistance Program, created by Section 49.25a through 49.25g-1 of the Civil Administrative Code of Illinois.

 

    Section 83.  The sum of $150,000,000, or so much thereof as may be necessary, is appropriated from the Transportation Bond Series B Fund to the Department of Transportation for track and signal improvements, AMTRAK station improvements, rail passenger equipment, and rail freight facility improvements.

 

    Section 85.  No contract shall be entered into or obligation incurred or any expenditure made from an appropriation herein made in

Section 5  Permanent Improvements

Section 30 Road Program

Section 50 Aeronautics

Section 65 Transit

Section 70 Transit

Section 75 State Rail Freight Loan Repayment

Section 80 Federal Rail Freight Loan Repayment

of this Article until after the purpose and the amount of such expenditure has been approved in writing by the Governor.

 

    Total, Article 50                        $7,927,516,400

 

ARTICLE 55

DEPARTMENT OF TRANSPORTATION

PERMANENT IMPROVEMENTS

    Section 5.  The sum of $27,520,862, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation and reappropriation concerning Permanent Improvements heretofore made in Article 35, Section 5 and Article 36, Section 5 of Public Act 95-0734, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

CONSULTANT AND PRELIMINARY ENGINEERING

 

    Section 10.  The sum of $22,678,442, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriations heretofore made in Article 36, Section 10 and Section 15 of Public Act 95-0734, as amended, for Engineering and Consultant Contracts only, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 15.  The sum of $17,755,985, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriations heretofore made in Article 36, Section 35 and Section 40 of Public Act 95-0734, as amended, for Engineering and Consultant Contracts only, is reappropriated from the State Construction Fund to the Department of Transportation for the same purposes.

 

OTHER LUMP SUMS

 

    Section 20.  The sum of $7,678,411, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation and reappropriation concerning hazardous materials made in Article 35, Section 10 and Article 36, Section 20 of Public Act 95-0734, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 25.  The sum of $34,698,338, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation and reappropriation made for Formal Contracts in the line item, “For Maintenance, Traffic and Physical Research Purposes (A)” for the Central Offices, Division of Highways, in Article 35, Section 10 and Article 36, Section 25 of Public Act 95-0734, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 30.  The sum of $7,633,493, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation and reappropriation concerning Highway Damage Claims heretofore made in Article 35, Section 10 and Article 36, Section 30 of Public Act 95-0734, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

HIGHWAY CONSTRUCTION AND LAND ACQUISITION

AWARDS AND GRANTS

 

    Section 35.  The sum of $19,133,342, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation and reappropriation heretofore made for township bridges in Article 35, Section 15 and Article 36, Section 45 of Public Act 95-0734, as amended, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

HIGHWAY CONSTRUCTION AND LAND ACQUISITION

 

    Section 40.  The sum of $700,458, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 50 of Public Act 95-0734, is reappropriated from the Road Fund to the Department of Transportation for the same purposes.

 

    Section 45.  The sum of $211,133,362, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriations heretofore made in Article 36, Section 55, Section 60, and Section 65 of Public Act 95-0734, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations.

 

    Section 50.  The sum of $92,078,416, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 70 of Public Act 95-0734, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program; such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations.

 

    Section 55.  The following named sums or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009 from the reappropriations heretofore made in Article 36, Section 75 of Public Act 95-0734, as amended, are reappropriated to the Department of Transportation from the Road Fund for the FY04 federal earmarks provided in Conference Report 108-401 which accompanies Public Law 108-199.  Expenditures shall not exceed funds to be made available by the federal government.

 

Bridge Discretionary

 

North Avenue Bridge, Chicago..................... 1,188,885

 

National Corridor Planning & Development

City of Forsyth Frontage Road....................... 11,917

 

Ferry Boats/Terminal Facilities

Canal Corridor Association-Port of

LaSalle Project.................................... 400,000

 

Transportation & Community & System Preservation

Homewood, Illinois railroad station/

platform acquisition and improvement............... 191,311

 

Village of Glencoe, Green Bay

Trail – North Branch Trail Connection.............. 110,262

 

Section 115 Member Initiatives

 

168th and State Streets Intersection

Improvements........................................ 32,834

 

Annie Glidden Road, DeKalb......................... 178,291

 

Convocation Center Roadway......................... 151,655

 

Great River Road in Mercer County................... 14,882

 

Illinois Route 38 at Union Pacific

Railroad Grade Separation.......................... 250,000

 

ITS – I-74 in Peoria............................... 750,000

 

Kaskaskia Regional Port District, access roads....... 9,586

 

Long Meadow Parkway Fox River Bridge

  Crossing, Bolz Road............................ 2,820,000

 

Milwaukee Avenue Rehabilitation.................... 200,000

 

Rock Island County, Illinois Milan

  Beltway Construction............................. 500,000

 

Sauk Trail Reconstruction

  Improvements, Park Forest........................ 330,000

 

Sauk Village Industrial Park Access Road........... 472,494

 

Sheridan Road, Evanston............................ 800,000

 

St. Charles, Illinois, Fox River

  Crossing at Red Gate Corridor.................... 662,586

 

US 51, Christian/Shelby Counties................. 1,235,962

 

West Grand Avenue. (from North

  Western to N. California Ave.)................... 800,000

 

    Total                                       $11,110,665

 

    Section 60.  The following named sums or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from the reappropriations heretofore made in Article 36, Section 80 of Public Act 95-0734, as amended, are reappropriated to the Department of Transportation from the Road Fund for the FY05 federal earmarks provided in Conference Report 108-792 which accompanies Public Law 108-447.  Expenditures shall not exceed funds to be made available by the federal government.

 

Bridge Discretionary

 

North-South Wacker Drive Reconstruction

in Chicago....................................... 1,916,666

 

Interstate Maintenance Discretionary

 

I-55 South Barrier, Darien Illinois.............. 1,400,000

 

Section 117 Member Initiatives

 

171st Street reconstruction, East Hazel Crest........ 6,429

 

67th Street Pedestrian Underpass, Chicago

Lakefront.......................................... 400,000

 

Camp Street upgrades, East Peoria................ 1,820,370

 

Cermak and Kenton Avenues.......................... 835,058

 

Cicero Avenue lighting in University Park.......... 200,000

 

Des Plaines, Illinois alley, sidewalk

improvements........................................ 16,073

 

Fulton County Highway 6............................ 729,300

 

I-290 Cap, Oak Park.............................. 1,000,000

 

KBS Railroad Hazard Elimination, Kankakee

County............................................. 300,000

 

MacArthur Boulevard Extension, Springfield......... 381,805

 

McHenry County / Crystal Lake Road............... 1,000,000

 

Milwaukee Avenue, Grand to Gale, Chicago........... 972,872

 

Route 178 relocation, Phase II Engineering......... 827,373

 

Sheridan Road Improvements, Evanston............... 500,000

 

Sidewalks near Ford Heights........................ 200,000

 

Street improvements and streetlights, Lynnwood ...... 2,792

 

Street improvements, Bartonville................... 143,835

 

Street improvements, Village of Armington........... 42,567

 

Streetlights and salt dome for Markham............. 300,000

 

U.S. 41/I-176 Interchange improvements

Phase I study...................................... 800,000

 

Winfield Pedestrian Tunnel....................... 1,000,000

    Total                                       $14,795,140

 

    Section 65.  The sum of $81,321,817, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 85 of Public Act 95-0734, as amended, are reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations.

 

    Section 70.  The sum of $746,777, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 95 of Public Act 95-0734, is reappropriated from the Road Fund to the Department of Transportation for Pavement Preservation Programs.

 

    Section 75.  The sum of $257,186,953, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 100 of Public Act 95-0734, is reappropriated from the Road Fund to the Department of Transportation for High Priority Projects (HPP) and Transportation Improvement Projects (TI) pertaining to local governments as designated in Public Law 109-59, Title I, Subtitle G, Section 1702 and Subtitle I, Section 1934 of the federal reauthorization act entitled SAFETEA-LU; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations.  Specific project approximations appear in Article 101, Section 25 of Public Act 94-0798.

 

    Section 80.  The sum of $15,207,100, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation heretofore made in Article 35, Section 20 of Public Act 95-0734, is reappropriated from the Road Fund to the Department of Transportation for Transportation, Community and System Preservation (TCSP), Discretionary Interstate Maintenance and Surface Transportation Priorities earmarks pertaining to state and local governments as designated in the Consolidated Appropriation Act, 2008, Division K, Public Law 110-161; provided such amounts do not exceed funds made available by the federal government through Congressional designations, annual allocations, obligation limitations, or any other federal limitations, as approximated in Article 35, Section 20 of Public Act 95-0734.

 

    Section 85.  The sum of $76,944,001, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriations heretofore made in Article 36, Section 130 and Section 135 of Public Act 95-0734, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.

 

    Section 90.  The sum of $57,879,296, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 140 of Public Act 95-0734, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.

 

    Section 95.  The sum of $40,392,607, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 145 of Public Act 95-0734, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.

 

    Section 100.  The sum of $304,010,982, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 150 of Public Act 95-0734, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.

 

    Section 105.  The sum of $14,027,206, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 155 of Public Act 95-0734, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for all expenses related to Phase II of the I-57/294 interchange in the County of Cook.

 

    Section 110.  The sum of $638,890,295, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation heretofore made in Article 35, Section 30 of Public Act 95-0734, as amended, are reappropriated from the State Construction Account Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-0850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations, and scale houses, in accordance with applicable laws and regulations.

 

HIGHWAY CONSTRUCTION AND LAND ACQUISITION

LUMP SUMS

 

    Section 115.  The sum of $16,542,586, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 90 of Public Act 95-0734, as amended, are reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations, including refunds.

 

    Section 120.  The sum of $157,852,612, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 105 of Public Act 95-0734, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.

 

    Section 125.  The sum of $203,803,237, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 110 of Public Act 95-0734, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.

 

    Section 130.  The sum of $67,063,715, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 115 of Public Act 95-0734, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the High Priority Projects (HPP) and Transportation Improvement Projects (TI) specifically identified in Article 101, Section 25 of Public Act 94-0798, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.

 

    Section 135.  The sum of $236,155,772, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 120 of Public Act 95-0734, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.

 

    Section 140.  The sum of $356,432,186, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 125 of Public Act 95-0734, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.

 

    Section 145.  The sum of $599,153,832, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation heretofore made in Article 35, Section 25 of Public Act 95-0734, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the state portion of the Road Improvement Program, including refunds.

 

    Section 150.  The sum of $542,236,818, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation heretofore made in Article 35, Section 27 of Public Act 95-0734, as amended, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the local portion of the Road Improvement Program, including refunds.

 

    Section 155.  The sum of $1,517,100, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation heretofore made in Article 35, Section 20a of Public Act 95-0734, is reappropriated from the Road Fund to the Department of Transportation for the local match of all other non-federally reimbursed expenses associated with the Transportation, Community and System Preservation (TCSP) and Discretionary Interstate Maintenance earmarks specifically identified in Article 35, Section 20a of Public Act 95-0734, provided that such amounts do not exceed funds made available and paid into the Road Fund by local governments.

 

BOND FUND

CONSTRUCTION

 

    Section 160.  The sum of $9,702,759, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 160 of Public Act 95-0734, for statewide purposes, is reappropriated from the Transportation Bond Series A Fund to the Department of Transportation for the same purposes.

 

    Section 165.  The sum of $100,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 165 of Public Act 95-0734, as amended, for statewide purposes, is reappropriated from the Transportation Bond Series A Fund to the Department of Transportation for the same purposes.

 

GRADE CROSSING PROTECTION

CONSTRUCTION

 

    Section 170.  The sum of $73,345,214, or so much thereof as may be necessary, and remains unexpended, at the close of business on June 30, 2009, from the appropriation and reappropriation heretofore made for grade crossing protection or grade separation in Article 35, Section 34 and Article 36, Section 170 of Public Act 95-0734, as amended, is reappropriated from the Grade Crossing Protection Fund to the Department of Transportation for the same purpose.

 

DIVISION OF AERONAUTICS

AWARDS AND GRANTS

 

    Section 175.  The sum of $460,035,190, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation and reappropriation heretofore made in Article 35, Section 35 and Article 36, Section 175 of Public Act 95-0734, as amended, is reappropriated from the Federal/Local Airport Fund to the Department of Transportation for funding the local or federal share of airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state or federal laws, provided such amounts shall not exceed funds available from federal and/or local sources.

 

    Section 180.  The sum of $19,025,378, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriations concerning airport improvements heretofore made in Article 36, Section 180 and Section 185 of Public Act 95-0734, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes.

 

DIVISION OF AERONAUTICS

CONSTRUCTION

 

    Section 190.  The sum of $14,800,686, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 190 of Public Act 95-0734, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes.

 

DIVISION OF PUBLIC AND INTERMODAL TRANSPORTATION

AWARDS AND GRANTS

 

    Section 195.  The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriations heretofore made in Article 36, Section 195 of Public Act 95-0734, as amended, are reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes as follows:

 

  Pursuant to Section 4(b)(1) of the

    General Obligation Bond Act, as amended......... 18,025

  For the counties of Cook, DuPage,

    Kane, Lake, McHenry and Will,

    pursuant to Section 4(b)(2) of

    the General Obligation Bond Act,

    as amended..................................... 553,724

  For the counties of the State

    outside the counties of Cook,

    DuPage, Kane, Lake, McHenry and

    Will, pursuant to Section

    4(b)(3) of the General Obligation

    Bond Act, as amended............................ 28,014

    Total                                          $599,763

 

    Section 200.  The following named sums, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriations heretofore made in Article 36, Section 200 of Public Act 95-0734, as amended, are reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes as follows:

 

  Pursuant to Section 4(b)(1) of

    the General Obligation Bond Act,

    as amended.................................. 40,680,044

  For the counties of the State

    outside the counties of Cook,

    DuPage, Kane, McHenry, and Will,

    pursuant to Section 4(b)(1)

    of the General Obligation Bond

    Act, as amended.............................. 3,195,300

  For the Department of Transportation's

    Greenlight Program pursuant to

    Section 4(b)(1) of the General

    Obligation Bond Act, as amended............. 12,496,695

  To extend the metrolink rail line

    to Mid-America Airport....................... 5,000,002

    Total                                       $61,372,041

 

    Section 205. The sum of $73,603,178, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 205 of Public Act 95-0734, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for construction costs, making grants and providing project assistance to municipalities, special transportation districts, private non-profit carriers, mass transportation carriers and the Intercity rail program for the acquisition, construction, extension, reconstruction, and improvement of mass transportation facilities, including rapid transit, intercity rail, bus and other equipment used in connection therewith, as provided by law, pursuant to Section 4(b)(1) of the General Obligation Bond Act, as amended.

 

    Section 210. The sum of $46,450,773, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation and reappropriation heretofore made in Article 35, Section 55 and Article 36, Section 210 of Public Act 95-0734, as amended, is reappropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for the federal share of capital, operating, consultant services, and technical assistance grants, as well as state administration and interagency agreements, provided such amounts shall not exceed funds to be made available from the Federal Government.

 

DIVISION OF PUBLIC AND INTERMODAL TRANSPORTATION

LUMP SUMS

 

    Section 215.  The sum of $75,904,023, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 215 of Public Act 95-0734, as amended, is reappropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program, provided such amounts not exceed funds made available by the federal government for this program.

 

RAIL PASSENGER AND RAIL FREIGHT

AWARDS AND GRANTS

 

    Section 220.  The sum of $15,480,074, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation and reappropriation heretofore made in Article 35, Section 60 and Article 36, Section 220 of Public Act 95-0734, as amended, is reappropriated from the State Rail Freight Loan Repayment Fund to the Department of Transportation for the same purposes.

 

    Section 225.  The sum of $10,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 225 of Public Act 95-0734, as amended, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for the federal share of the High Speed Rail Project.

 

    Section 230.  The sum of $28,737,923, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the reappropriation heretofore made in Article 36, Section 230 of Public Act 95-0734, as amended, is reappropriated from the Transportation Bond Series B Fund to the Department of Transportation for the same purposes.

 

    Section 235.  The sum of $5,472,573, or so much thereof as may be necessary, less $1,000,000 to be lapsed from the unexpended balance, and remains unexpended at the close of business on June 30, 2009, from the appropriation and reappropriation concerning the federal share of the Rail Freight Loan Repayment Program heretofore made in Article 35, Section 65 and Article 36, Section 235 of Public Act 95-0734, as amended, is reappropriated from the Rail Freight Loan Repayment Fund to the Department of Transportation for the same purposes.

 

STIMULUS

HIGHWAY CONSTRUCTION AND LAND ACQUISITION

LUMP SUMS

 

    Section 240.  The sum of $900,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation heretofore made in Article 10, Section 320 of Public Act 95-732 as amended by Public Act 96-004, is reappropriated from the Road Fund to the Department of Transportation for  preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state highways, arterial highways, roads, access areas, roadside shelters, rest areas, fringe parking facilities and sanitary facilities, and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control, junkyard removal and control and preservation of natural beauty; and for capital improvements which directly facilitate an effective vehicle weight enforcement program, such as scales (fixed and portable), scale pits and scale installations and scale houses, in accordance with applicable laws and regulations for the State portion, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.

 

    Section 245.  The sum of $325,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation heretofore made in Article 10, Section 325 of Public Act 95-732 as amended by Public Act 96-004, is reappropriated from the Road Fund to the Department of Transportation for preliminary engineering and construction engineering and contract costs of construction, including reconstruction, extension and improvement of state and local roads and bridges, fringe parking facilities and such other purposes as provided by the “Illinois Highway Code”; for purposes allowed or required by Title 23 of the U.S. Code; for bikeways as provided by Public Act 78-850; for land acquisition and signboard removal and control and preservation of natural beauty, in accordance with applicable laws and regulations for the State and Local portion, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.

 

  Section 250.  The sum of $50,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation heretofore made in Article 10, Section 330 of Public Act 95-732 as amended by Public Act 96-004, is reappropriated from the Road Fund to the Department of Transportation to provide local funding for project expenses in excess of the Local portion of federal funds made available from the American Recovery and Reinvestment Act of 2009, provided such amounts do not exceed funds made available and paid into the Road Fund by the local governments.

 

DIVISION OF AERONAUTICS

LUMP SUMS

    Section 255.  The sum of $150,000,000 or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation heretofore made in Article 10, Section 335 of Public Act 95-732 as amended by Public Act 96-004, is reappropriated from the Federal/Local Airport Fund to the Department of Transportation for funding the local or federal share of airport improvement projects, including reimbursements and/or refunds, undertaken pursuant to pertinent state and federal laws, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009 and/or local sources.

 

DIVISION OF PUBLIC AND INTERMODAL TRANSPORTATION

LUMP SUMS

    Section 260.  The sum of $40,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation heretofore made in Article 10, Section 340 of Public Act 95-732 as amended by Public Act 96-004, is reappropriated from the Federal Mass Transit Trust Fund to the Department of Transportation for capital, operating, consultant services, and technical assistance grants, state administration, and intergovernmental and interagency agreements, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.

 

    Section 265.  The sum of $300,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation heretofore made in Article 10, Section 345 of Public Act 95-732 as amended by Public Act 96-004, is reappropriated from the Road Fund to the Department of Transportation for grants, road construction and all other costs relating to the Chicago Region Environmental and Transportation Efficiency (CREATE) program, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.

 

RAIL PASSENGER AND RAIL FREIGHT

LUMP SUMS

 

    Section 270.  The sum of $285,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation heretofore made in Article 10, Section 350 of Public Act 95-732 as amended by Public Act 96-004, is reappropriated from the Road Fund to the Department of Transportation for track and signal improvements, AMTRAK station improvements, passenger rail equipment, and facility improvements, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.

 

    Section 275.  The sum of $6,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation heretofore made in Article 10, Section 355 of Public Act 95-732 as amended by Public Act 96-004, is reappropriated from the Road Fund to the Department of Transportation for track and signal improvements, rail freight equipment, and rail freight facility improvements, provided such amounts not exceed federal funds made available by the American Recovery and Reinvestment Act of 2009.

 

    Section 280.   The sum of $500,000,000 or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from the appropriation heretofore made in Article 10, Section 360 of Public Act 95-732 as amended by Public Act 96-004, is reappropriated from the Federal High Speed Rail Trust Fund to the Department of Transportation for grants, construction, and all other costs relating to high speed rail projects in compliance with the American Recovery and Reinvestment Act of 2009, provided such amounts not exceed funds made available by the federal government for this purpose.

 

    Section 285. No contract shall be entered into or obligation incurred or any expenditure made from a reappropriation herein made in:

 

Section 5   Permanent Improvements

Section 160 Series A - Road Program

Section 165  Series A - Road Program

Section 180  Series B - Aeronautics

Section 190  Series B - Land Acquisition 3rd Airport

Section 195  Series B - Transit

Section 200  Series B - Transit

Section 205  Series B - Transit

Section 220  State Rail Freight Loan Repayment

Section 225  FHSRTF High Speed Rail-Federal

Section 230  Series B - Rail

Section 235  Federal Rail Freight Loan Repayment

 

of this Article until after the purpose and the amount of such expenditure has been approved in writing by the Governor.

 

    Total, Article 55                        $7,683,811,381

 

ARTICLE 60

CAPITAL DEVELOPMENT BOARD

 

    Section 5.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Agriculture for the projects hereinafter enumerated:

ILLINOIS STATE FAIRGROUNDS- SPRINGFIELD

  For replacing the HVAC in

   the administration building.................. $3,212,000

  For replacing roofing systems –

   Administration Building and

   Lower Roof.................................... 2,220,472

  Plan and begin electrical

   system replacement.............................. 600,000

CENTRALIA ANIMAL DIAGNOSTICS LAB

For replacing the roof............................ $615,000

    Total                                        $6,647,472

 

    Section 10.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:

SPRINGFIELD- SUPREME COURT BUILDING

  Plan and begin renovation of

   Supreme Court Building....................... 14,400,000

    Total                                       $14,400,000

 

    Section 15.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Office of the Architect of the Capitol for the projects hereinafter enumerated:

CAPITOL BUILDING- SPRINGFIELD

  For upgrading the HVAC systems

   and for renovations to meet

   compliance with ADA, in addition

   to funds previously appropriated............. 43,761,500

  For upgrades to life safety

   protection systems in addition

   to funds previously appropriated.............. 6,000,000

    Total                                       $49,761,500

 

    Section 20.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Office of the Secretary of State for the projects hereinafter enumerated:

HOWLETT BUILDING- SPRINGFIELD

  For upgrading the North Patio for

   public safety................................... 461,000

  For installing an emergency generator............ 791,000

  For replacing roofing systems.................... 662,000

ILLINOIS STATE LIBRARY- SPRINGFIELD

  For replacing the roofing system................. 528,000

CAPITOL COMPLEX- SPRINGFIELD

  For upgrading fire alarm panels.................. 771,000

  Plan/begin upgrade of high voltage

   distribution system........................... 1,500,000

  For capital upgrades......................... 250,000,000

CHICAGO DRIVER FACILITIES – WEST, NORTH AND SOUTH

  For HVAC upgrades.............................. 2,074,000

    Total                                      $256,787,000

 

    Section 25.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Central Management Services for the projects hereinafter enumerated:

JAMES R. THOMPSON CENTER- CHICAGO

  For planning and beginning electrical

   system and life safety system upgrades........ 1,000,000

  For upgrading the HVAC system.................. 4,150,000

ELGIN REGIONAL OFFICE BUILDING

  For upgrading the HVAC system.................. 2,461,000

COLLINSVILLE REGIONAL OFFICE BUILDING

  For replacing the roof......................... 1,980,000

CHICAGO MEDICAL CENTER – OFFICE AND LABORATORY

For installing an emergency generator

and upgrading the electrical system.............. 2,000,000

STATEWIDE (JRTC, EPA, CHAMPAIGN ROB)

For the renovation of state-owned property....... 2,000,000

    Total                                       $13,591,000

 

    Section 30.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Natural Resources for the projects hereinafter enumerated:

BIG RIVER STATE FOREST

  For ADA improvements............................. 322,611

GIANT CITY STATE PARK - JACKSON COUNTY

  For replacing the sewer treatment system......... 491,040

I&M CANAL - CHANNAHON - GRUNDY COUNTY

  For repair of the spillway, in addition

   to funds previously appropriated................ 364,320

ILLINOIS BEACH STATE PARK - LAKE COUNTY

  For stabilizing shoreline...................... 1,000,000

JAKE WOLF MEMORIAL FISH HATCHERY

  For replacing or upgrading

   electrical system............................... 348,000

NAUVOO STATE PARK

  For ADA improvements............................. 328,385

PYRAMID STATE PARK

  For renovating the Galum building for a

   mine rescue station............................. 848,000

ROCK CUT STATE PARK

  For rehabilitating water and sewer

   system.......................................... 350,000

STARVED ROCK STATE PARK AND LODGE

  For replacing roofing systems.................... 500,000

WAYNE FITZGERRELL STATE RECREATION AREA

  For replacing roofs.............................. 262,004

WORLD SHOOTING COMPLEX – SPARTA - RANDOLPH COUNTY

  For infrastructure improvements.................. 450,000

LINCOLN’S TOMB - SPRINGFIELD

  For renovating the interior...................... 700,000

LINCOLN-HERNDON LAW OFFICE - SPRINGFIELD

  For purchase and restoration

   of the Tinsley Shop........................... 1,000,000

    Total                                        $6,964,360

 

    Section 35.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:

DIXON CORRECTIONAL CENTER

  For replacing the fire alarm system............ 3,300,000

LINCOLN CORRECTIONAL CENTER

  For upgrading the building

   automation system............................. 2,147,000

LOGAN CORRECTIONAL CENTER

  For replacing housing unit roofs................. 829,000

JACKSONVILLE CORRECTIONAL CENTER

  For upgrading the fire alarm system............ 1,596,000

CENTRALIA CORRECTIONAL CENTER

  For replacing roofing systems.................. 3,333,000

SOUTHWESTERN CORRECTIONAL CENTER

  For replacing the roofing system................. 825,000

STATEVILLE CORRECTIONAL CENTER

  For replacing the X house locks................ 1,597,000

VANDALIA CORRECTIONAL CENTER

  For an emergency generator....................... 815,000

  For replacing roofing systems.................. 2,343,000

VIENNA CORRECTIONAL CENTER

  For replacing windows.......................... 2,118,000

  For replacing roofing systems.................... 940,000

    Total                                       $19,843,000

 

    Section 40.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Juvenile Justice for the projects hereinafter enumerated:

ILLINOIS YOUTH CENTER - JOLIET

  For replacing roofs, in addition

   to funds previously appropriated................ 425,874

ILLINOIS YOUTH CENTER – KEWANEE

  For replacing the sprinkler system............. 6,500,000

ILLINOIS YOUTH CENTER - PERE MARQUETTE

  For replacing roofs.............................. 221,000

ILLINOIS YOUTH CENTER - ST. CHARLES

  For upgrading HVAC system........................ 606,000

    Total                                        $7,752,874

 

    Section 45.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the projects hereinafter enumerated:

ALTON MENTAL HEALTH CENTER - MADISON COUNTY

  For life/safety improvements..................... 932,000

CHICAGO-READ MENTAL HEALTH CENTER - CHICAGO

  For replacing the emergency

   generator..................................... 1,391,000

CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA

  For upgrading the fire alarm system............ 2,085,000

  For life/safety improvements................... 7,296,000

FOX DEVELOPMENTAL CENTER - DWIGHT

  For upgrading fire/life safety systems........... 353,000

ILLINOIS SCHOOL FOR THE DEAF

  For installing sprinkler systems

   in the dormitories and elementary

   buildings..................................... 3,841,000

ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE

  For replacing roofs.............................. 392,832

JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY

  For upgrading fire/life safety systems........... 581,000

KILEY DEVELOPMENTAL CENTER

  For upgrading Building C ceiling................. 444,000

MCFARLAND MENTAL HEALTH CENTER - SPRINGFIELD

  For upgrading fire alarm system................ 2,800,000

  For replacing roofs – Kennedy and

   Administration Building....................... 2,226,000

    Total                                       $22,341,832

 

    Section 50.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Revenue for the projects hereinafter enumerated:

WILLARD ICE BUILDING - SPRINGFIELD

  For repairing emergency generator................ 120,000

  For renovation of the parking ramp............. 2,791,000

    Total                                        $2,911,000

 

    Section 55.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of State Police for the projects hereinafter enumerated:

AMERICAN GENERAL BUILDING - SPRINGFIELD

  For installing an emergency generator

   and various improvements...................... 3,000,000

METRO-EAST FORENSIC LAB - BELLEVILLE

  For constructing new forensic lab, in

   addition to funds previously appropriated..... 2,500,000

    Total                                        $5,500,000

 

    Section 60.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Veterans Affairs for the projects hereinafter enumerated:

 

ANNA VETERAN’S HOME

To plan and begin the construction

   of a 40-50 bed addition......................... 700,000

LASALLE VETERAN’S HOME – LASALLE COUNTY

  For the replacement of the galvanized water

   piping.......................................... 210,000

QUINCY VETERAN’S HOME - ADAMS COUNTY

  For constructing a central chiller plant....... 5,400,000

  For planning and beginning

   renovation of Kent, Shapers

   and Elmore, in addition

   to funds previously appropriated.............. 1,056,000

STATEWIDE

  For the construction of a 200-bed

   veterans’ home facility, in addition

   to funds previously appropriated............. 15,000,000

    Total                                       $22,366,000

 

    Section 65.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Office of the Attorney General for the projects hereinafter enumerated:

ATTORNEY GENERAL BUILDING - SPRINGFIELD

  For renovating and waterproofing terrace......... 190,000

  For replacing electronic ballasts................ 959,000

  For replacing the roof........................... 378,000

    Total                                        $1,527,000

 

    Section 66.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the projects hereinafter enumerated:

 

STATEWIDE

  For emergencies and abatement of

   hazardous materials, in

   addition to funds previously appropriated.... 10,000,000

  For escalation costs for state

   facility projects, in addition

   to funds previously appropriated............. 17,000,000

  For escalation and emergencies for

   higher education projects, in

   addition to funds previously appropriated.... 25,000,000

    Total                                       $52,000,000

 

    Section 70.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Department of Military Affairs for the project hereinafter enumerated:

 

STATEWIDE

  To complete construction and

   purchase equipment for the Shiloh,

   Mt. Vernon, and Carbondale Readiness

   Centers......................................... 400,000

 

    Section 75. The sum of $1,351,481,696, or so much thereof as may be necessary, is appropriated from the School Construction Fund to the Capital Development Board for grants to school districts for school construction projects authorized by the School Construction Law.

 

   Section 77.  The amount of $148,518,304, or so much of that amount as may be necessary, is appropriated from the School Construction Fund to the Illinois State Board of Education for Fiscal Year 2002 School Construction Program grant recipients as follows:

  Rochester Community Unit School District 3A.. 10,183,033

  Fairfield Public School District 112........... 3,898,926

  Stewardson-Strasburg Community Unit

    District 5A.................................. 2,046,533

  Johnston City Community Unit School District 1... 528,822

  Winfield School District 34.................... 2,312,480

  East St. Louis School District 189............ 29,025,628

  Silvis School District 34..................... 11,900,936

  Joliet Public School District 86.............. 26,774,854

  Community Consolidated School Dist. 93

    Carol Stream................................. 1,554,822

  Hinckley-Big Rock Community Unit

    School District 429.......................... 1,939,944

  West Northfield School District 31............. 1,780,688

  DuQuoin Community Unit School District 300.... 10,263,396

  Benton Community Consolidated School

    District 47.................................. 2,464,790

  Villa Park School District 45.................... 980,545

  Westchester School District 92 1/2................ 26,237

  Big Hollow School District 38.................... 251,812

  Matteson Elementary School District 162........ 1,145,241

  Central School District 104...................... 415,622

  Northbrook School District 27.................. 1,543,711

  Manteno Community Unit School District 5....... 2,184,621

  Bradley School District 61..................... 2,096,220

  Bethalto Community School District 8........... 4,278,782

  Westmont Community Unit School District 201.... 1,217,000

  Chicago Public School (CPS) District 299...... 29,703,661

 

    Section 85. The sum of $100,000,000, or so much thereof as may be necessary, is appropriated from the School Infrastructure Fund to the Capital Development Board for grants to the Illinois State Board of Education for school districts for maintenance projects authorized by the School Construction Law.

 

    Section 90.  The sum of $27,322,800, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete work at the various higher education institutions.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for such purposes.

 

    Section 95.  In addition to any amounts previously appropriated for these purposes, the following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for the projects hereinafter enumerated:

 

LAKE LAND COLLEGE

  For renovating and expanding

   Student Services Building Addition........... 2,361,100

TRITON COLLEGE

  For renovating and expanding

   the Technology Building..................... $10,666,100

JOLIET JUNIOR COLLEGE

  For renovation of Utilities.................... 4,522,900

ROCL VALLEY COLLEGE

  For Construction of an

   Arts Instructional Center.................... 26,711,900

ELGIN COMMUNITY COLLEGE

  For Spartan Drive Extension.................... 2,244,800

PARKLAND COLLEGE

  For renovating and expanding

   the Student Services Center Addition......... 15,442,100

WILLIAM RAINEY HARPER COLLEGE

  For Engineering and Technology

   Center Renovations........................... 20,336,800

REND LAKE COLLEGE

  For Art Program Addition

   and minor remodeling............................ 451,300

LAKE LAND COLLEGE

  For Construction of a Rural

   Development Technology Center................. 7,524,100

COLLEGE OF DUPAGE

  For Installation of the

   Instructional Center Noise Abatement.......... 1,544,600

WILLIAM RAINEY HARPER COLLEGE

  For Construction of a One

   Stop/Admissions and Campus/

   Student Life Center.......................... 40,653,900

ILLINOIS VALLEY COMMUNITY COLLEGE

  Construction of a Community

   Technology Center ........................... 16,323,100

COLLEGE OF LAKE COUNTY

  For Construction of a Student

    Service Building............................ 35,927,000

RICHLAND COMMUNITY COLLEGE

  For Renovation of the Student

    Success Center and Construction

    of an Addition to the Student

    Success Center............................... 3,524,000

IECC – LINCOLN TRAIL COLLEGE

  For Construction of a Center

    For Technology............................... 7,569,800

    Total                                      $195,803,500

 

    Section 97.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for the Temporary Facility Replacement Program for the projects hereinafter enumerated:

OLIVE HARVEY COLLEGE

For Construction of a New Building.............. 30,671,600

WAUBONSEE COMMUNITY COLLEGE

To Replace Building “A”

  Temporary Building............................. 2,615,200

IECC – OLNEY CENTRAL

For Construction of the Collision

  Repair Technology Center....................... 1,122,800

COLLEGE OF DUPAGE

For Temporary Facilities Replacement............ 25,000,000

JOLIET JUNIOR COLLEGE

For Temporary Facilities Replacement............. 8,815,900

ILLINOIS VALLEY COMMUNITY COLLEGE

For Construction of a Community

. Technology Center.............................. 6,521,700

LINCOLN LAND COMMUNITY COLLEGE

For Renovations to Logan Hall and

  Mason Hall..................................... 2,991,200

IECC – WABASH VALLEY

For Construction of a Student Center............. 4,029,400

LEWIS & CLARK COMMUNITY COLLEGE

For Construction of a Daycare

  and Montessori................................. 1,663,000

For Construction of an Engineering

  Annex.......................................... 1,536,600

PARKLAND COLLEGE

For Construction of an Applied

  Technology Addition............................ 9,180,600

COLLEGE OF LAKE COUNTY

For Construction of a Classroom Building

  at the Grayslake Campus....................... 17,569,200

IECC – LINCOLN TRAIL COLLEGE

For Construction of an AC/Refrigeration

  and Sheet Metal Technology Building............ 1,495,500

ILLINOIS CENTRAL COLLEGE

For Renovation and Additions to

  Dirksen Hall................................... 2,633,700

MCHENRY COUNTY COLLEGE

For Construction of a Greenhouse................... 671,600

For Construction of a Pumphouse.................... 115,900

SPOON RIVER COLLEGE

For Construction of a Multi-Purpose

  Building....................................... 4,027,100

WILLIAM RAINEY HARPER COLLEGE

To Replace the Hospitality Facility.............. 3,944,800

LAKE LAND COLLEGE

For Construction of a Workforce

  Relocation Center.............................. 9,881,700

    Total                                        $134,487,500

 

    Section 100. In addition to any amount previously appropriated, the following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Board of Higher Education for the projects hereinafter enumerated:

CHICAGO STATE UNIVERSITY

  For renovating Douglas Hall, in

   addition to funds previously appropriated.... 19,500,000

  For Construction of an Early

    Childhood Development Center................. 3,000,000

  For Remediation of the Convocation

    Building, in addition to funds

    previously appropriated...................... 5,000,000

EASTERN ILLINOIS UNIVERSITY

  For remodeling of the HVAC in the

   Life Science Building and Coleman Hall........ 4,757,100

GOVERNORS STATE UNIVERSITY

  For renovation of a Teaching/Learning

   Complex, in addition to funds

   previously appropriated....................... 8,000,000

  For replacing roadways and sidewalks........... 2,028,000

ILLINOIS STATE UNIVERSITY

  For renovations of the Fine Arts

   Complex...................................... 54,250,100

NORTHEASTERN ILLINOIS UNIVERSITY

  For constructing an education

   building..................................... 72,977,200

NORTHERN ILLINOIS UNIVERSITY

  For renovating and expanding

   Stevens Building............................. 22,517,600

  For planning Computer Sciences

   Technology Center............................. 2,787,400

SOUTHERN ILLINOIS UNIVERSITY - EDWARDSVILLE

  For renovating and constructing

   a Science Laboratory, in addition

   to funds previously appropriated............. 78,867,300

SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE

  For constructing a Transportation

   Education Center, in addition

   to funds previously appropriated............. 56,718,792

  For planning and beginning

   Communications Building....................... 4,255,400

UNIVERSITY OF ILLINOIS - CHICAGO

  For upgrading the campus infrastructure and

   renovating campus buildings.................. 20,800,000

UNIVERSITY OF ILLINOIS - URBANA/CHAMPAIGN

  For renovating Lincoln Hall, in

   addition to funds previously appropriated.... 57,304,000

  For constructing a Post Harvest

   Crop Processing and Research

   Laboratory, in addition to

   funds previously appropriated................ 20,034,000

  For constructing an Electrical

   and Computer Engineering Building,

   in addition to funds previously

   appropriated................................. 44,520,000

UNIVERSITY OF ILLINOIS - ROCKFORD

  For constructing a National

   Rural Health Center.......................... 14,820,000

WESTERN ILLINOIS UNIVERSITY - MACOMB

  For constructing a performing arts

   center, in addition to funds

   previously appropriated...................... 67,835,768

WESTERN ILLINOIS UNIVERSITY - QUAD CITIES

  For the renovation and construction

   of a Riverfront Campus,

   in addition to funds

   previously appropriated...................... 15,863,120

ILLINOIS MATH AND SCIENCE ADADEMY

  For residence hall rehabilitation

   and main building addition.................... 6,260,000

  For “A” wing laboratories remodeling........... 3,600,000

    Total                                      $585,695,780

 

    Section 105.  The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete work at the various higher education institutions. These appropriated amounts shall be in addition to any other appropriated amounts which can be expended for such purposes  $62,677,200

Chicago State University........ 1,449,300

Eastern Illinois University..... 2,319,900

Governors State University........ 853,800

Illinois State University....... 4,596,000

Northeastern Illinois University 1,726,500

Northern Illinois University.... 5,215,500

Western Illinois University..... 3,564,900

Southern Illinois University-

   Carbondale................... 7,312,500

Southern Illinois University-

   Edwardsville................. 3,433,800

University of Illinois-

   Chicago..................... 12,497,700

University of Illinois-

   Springfield.................. 1,031,100

University of Illinois-

   Urbana/Champaign............ 18,676,200

 

    Section 110.  The sum of $1,650,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Board of Trustees of Eastern Illinois University to purchase equipment to complete the renovation and expansion of the Doudna Fine Arts Center. This appropriation is in addition to funds previously appropriated.

 

    Section 115.  The sum of $17,564,400, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Board of Trustees of Southern Illinois University for construction and equipment expenses to complete the renovation and expansion of the Morris Library. This appropriation is in addition to funds previously appropriated.

 

    Section 120.  The sum of $300,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Board of Higher Education for grants to various private colleges and universities.

 

    Section 125.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 60                         3,028,206,600

 

ARTICLE 61

ILLINOIS EMERGENCY MANAGEMENT AGENCY

 

    Section 5.  The sum of $25,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Illinois Emergency Management Agency for safety and security improvements at various public universities, private colleges or universities and community colleges.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 61                           $25,000,000

 

ARTICLE 65

CAPITAL DEVELOPMENT BOARD

 

    Section 5.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from appropriations and reappropriations heretofore made for such purposes in Article 37, Section 5 of Public Act 95-734, and Sections 5, 10 and 200 of Public Act 95-746, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Agriculture for the projects hereinafter enumerated:

ILLINOIS STATE FAIRGROUNDS - DUQUOIN

(From Article 37, Section 5 of Public Act 95-734)

For completing the upgrade of the

  electrical distribution system, in

  addition to funds previously

  appropriated..................................... 100,759

For constructing a multi-purpose

  building.......................................... 61,710

(From Section 200 of Public Act 95-746)

For Emergency Roof Replacement...................... 19,061

ILLINOIS STATE FAIRGROUNDS - SPRINGFIELD

(From Article 37, Section 5 of Public Act 95-734)

For renovating comfort stations, in addition

  to funds previously appropriated.................. 47,650

For renovating the Emmerson Building................ 57,578

(From Section 5 of Public Act 95-746)

For replacement of water and sewer

  service to various buildings..................... 205,475

(From Section 10 of Public Act 95-746)

For an airlock addition to Metrology

  (Weights and Measures) Lab....................... 127,508

(From Section 200 of Public Act 95-746)

For Asbestos Abatement.............................. 85,000

    Total                                          $704,741

 

    Section 20.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made for such purposes in Article 37, Section 20 of Public Act 95-734, as amended, are reappropriated from the Capital Development Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:

SPRINGFIELD - SUPREME COURT BUILDING

(From Article 37, Section 20 of Public Act 95-734)

For renovating the HVAC system on

  the 3rd Floor.................................... 140,000

For installing humidifier and water

  filtration systems............................. 1,373,755

APPELLATE COURT SECOND DISTRICT - ELGIN

For miscellaneous improvements...................... 60,520

    Total                                        $1,574,275

 

    Section 30.  The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 37, Section 30 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Courts of Illinois for the projects hereinafter enumerated:

SUPREME COURT BUILDING - SPRINGFIELD

(From Article 37, Section 30 of Public Act 95-734)

For renovating the Library and

  completing HVAC, in addition to funds

  previously appropriated.......................... 235,000

 

    Section 35.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made for such purposes in Article 37, Section 35 of Public Act 95-734, as amended, are reappropriated from the Capital Development Fund to the Capital Development Board for the Office of the Architect of the Capitol for the projects hereinafter enumerated:

CAPITOL BUILDING - SPRINGFIELD

(From Article 37, Section 35 of Public Act 95-734)

For equipment, remodeling and all other

  costs related to the maintenance, renovation

  or restoration of areas located in the

  Capitol Building................................. 978,984

For all costs related to asbestos and

  environmental abatement in the

  Capitol Building............................... 1,801,429

    Total                                        $2,780,413

 

    Section 40.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from appropriations and reappropriations heretofore made in Article 37, Section 40, of Public Act 95-734, and Sections 70, 75 and 80 of Public Act 95-746, are reappropriated from the Capital Development Fund to the Capital Development Board for the Office of the Secretary of State for the projects hereinafter enumerated:

CAPITOL BUILDING - SPRINGFIELD

(From Article 37, Section 40 of Public Act 95-734)

For planning and design, providing a study,

  historical analysis, asbestos abatement

  and all other costs associated with the

  upgrade of the HVAC system in the Capitol

  building......................................... 180,516

For all costs related to the planning

  and design of life safety and fire

  protection system improvements, hazardous

  material abatement, historical restoration

  and construction in the Capitol Building......... 351,680

CAPITOL COMPLEX - SPRINGFIELD

For completing the stone restoration, in

  addition to funds previously appropriated........ 323,373

For demolition of 222 S. College,

  and landscaping of Capitol Complex

  in addition to funds previously

  appropriated..................................... 964,131

For demolition of 222 South College

  Building and landscaping of

  Capitol Complex.................................. 586,444

(From Section 70 of Public Act 95-746)

To upgrade a high voltage monitoring

  system........................................... 275,496

DRIVER'S FACILITY WEST - CHICAGO

(From Article 37, Section 40 of Public Act 95-734)

For renovating the building........................ 391,180

(From Section 80 of Public Act 95-746)

For renovation and improvement of

  pedestrian traffic flow.......................... 206,761

DRIVER SERVICES FACILITIES, NORTH, SOUTH AND

WEST - CHICAGO

(From Section 75 of Public Act 95-746)

To upgrade electrical systems...................... 418,681

MOTOR VEHICLE SERVICES FACILITY - SPRINGFIELD

(From Article 37, Section 40 of Public Act 95-734)

For upgrading the fire alarm and

  security systems.................................. 16,809

WILLIAM G. STRATTON BUILDING - SPRINGFIELD

For the planning, design, reconstruction,

  and construction to renovate or replace

  the Stratton Office Building, in addition

  to funds previously appropriated............... 7,379,119

    Total                                       $11,094,190

 

    Section 45.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made in Article 37, Section 45 of Public Act 95-734, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Office of the Secretary of State for the projects hereinafter enumerated:

CAPITOL COMPLEX – SPRINGFIELD

(From Article 37, Section 45 of Public Act 95-734)

For upgrading fire alarm systems in

  two buildings.................................... 17,992

    Total                                           $17,992

 

    Section 50.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from appropriations and reappropriations heretofore made for such purposes in Article 37, Section 50 of Public Act 95-734, and Sections 20, 25, 30, 150, 155, 185 and 200 of Public Act 95-746, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Central Management Services for the projects hereinafter enumerated:

STATEWIDE

(From Article 37, Section 50 of Public Act 95-734)

For renovating state owned

  property....................................... 2,000,000

For upgrading the building security

  system at the James R. Thompson Center

  and the State of Illinois building

  in addition to funds previously

  appropriated..................................... 655,000

(From Section 200, Public Act 95-746)

For renovation of State-owned

  property at the following

  locations:  Kenneth Hall Regional

  Office Building, AIG (Franklin Complex)

  Building, James R. Thompson Center,

  Sangamo Complex (IEPA), Champaign Regional

  Office Building (IEPA), Springfield

  Regional Office Building, Natural

  Resource Center (DNR) and Read -

  Building (Elgin Mental Health Center).......... 1,847,310

OFFICE AND LAB BUILDING, CHICAGO MEDICAL CENTER

(From Article 37, Section 50 of Public Act 95-734)

For planning and beginning the renovation

  of the facility.................................. 474,164

JAMES R. THOMPSON CENTER - CHICAGO

For installing an emergency generator............ 3,545,000

For rehabilitating exterior columns, in

  addition to funds previously appropriated...... 1,000,000

For upgrading mechanical systems, in

  addition to funds previously appropriated......... 27,341

MEDICAL CENTER (DCFS DISTRICT OFFICE) - CHICAGO

For replacing roof and upgrading

  mechanical and electrical systems................ 321,956

ROCKFORD REGIONAL OFFICE BUILDING

For replacing Halon and upgrading

  the air conditioning............................. 162,614

ILLINOIS CENTER FOR REHABILITATION AND

EDUCATION (WOOD) - CHICAGO

For upgrading fire and safety systems............... 27,113

SPRINGFIELD - RESEARCH AND COLLECTION CENTER

For expanding surplus warehouse..................... 73,584

SPRINGFIELD - COMPUTER FACILITY

For upgrading the computer room and the

  electrical system................................. 23,421

MICHAEL A. BILANDIC BUILDING, CHICAGO

(From Section 20 of Public Act 95-746)

For upgrading HVAC and domestic water

  system......................................... 1,540,474

SPRINGFIELD REGIONAL OFFICE BUILDING

(From Section 25 of Public Act 95-746)

For emergency cooling tower replacement

  at 4500 S. Sixth Street Road...................... 56,864

SUBURBAN NORTH REGIONAL OFFICE FACILITY, DES PLAINES

(From Section 30 of Public Act 95-746)

For renovating office space........................ 382,716

KENNETH HALL REGIONAL OFFICE BUILDING – EAST ST. LOUIS

(From Section 150 of Public Act 95-746)

For design services for emergency parapet

  wall repairs...................................... 47,456

MEDICAL CENTER ( EDWARDS CENTER) - CHICAGO

(From Section 155 of Public Act 95-746)

For medical center (Edwards Center).............. 3,150,000

COLLINSVILLE REGIONAL OFFICE COMPLEX

(From Section 185 of Public Act 95-746)

To replace an emergency generator.................. 372,000

    Total                                       $15,707,013

 

    Section 60.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made in Article 37, Section 60, of Public Act 95-734, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Central Management Services for the projects hereinafter enumerated:

ILLINOIS CENTER FOR REHABILITATION AND EDUCATION

(ROOSEVELT) – CHICAGO

(From Article 37, Section 60 of Public Act 95-734)

For upgrading the kitchen and plumbing............. 185,838

JAMES R. THOMPSON CENTER - CHICAGO

For rehabilitating exterior columns, in

  addition to funds previously appropriated........ 48,157

    Total                                          $233,995

 

    Section 65.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from appropriations and reappropriations heretofore made for such purposes in Article 37, Section 65 Public Act 95-734, and Sections 90, 95, 100, 105, 110, 115 and 200 of Public Act 95-746, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Natural Resources for the projects hereinafter enumerated:

BABE WOODYARD STATE NATURAL AREA -

VERMILION COUNTY

(From Article 37, Section 65 of Public Act 95-734)

For developing the site and associated

  land acquisition................................. 244,604

BUFFALO ROCK STATE PARK – LASALLE COUNTY

(From Section 90 of Public Act 95-746)

For design services to replace a septic system....... 4,125

CARLYLE LAKE STATE PARKS

(From Article 37, Section 65 of Public Act 95-734)

For road and site improvements at

  Carlyle Lake................................... 1,477,424

For infrastructure and site

  improvements at Carlyle Lake..................... 765,485

CARLYLE STATE FISH AND WILDLIFE AREA – FAYETTE COUNTY

(From Section 110 of Public Act 95-746)

To replace Cox Bridge at Carlyle State

  Fish and Wildlife Area........................... 550,000

EAGLE CREEK STATE PARK - SHELBY COUNTY

(From Article 37, Section 65 of Public Act 95-734)

For constructing lake access boat

  docks at resort.................................. 248,793

FERNE CLYFFE STATE PARK - JOHNSON COUNTY

For replacing the campground

  sewage treatment system.......................... 365,054

GOOSE LAKE PRAIRIE NATURAL AREA - GRUNDY COUNTY

For replacing floating boardwalk.................... 24,604

HENNEPIN CANAL PARKWAY STATE PARK AND ACCESS AREA

For rehabilitating/repairing railroad

  bridges, in addition to funds

  previously appropriated.......................... 851,685

HORSESHOE LAKE CONSERVATION AREA - ALEXANDER COUNTY

For dam rehabilitation and the State's share

  to implement the ecological restoration

  plan in cooperation with the U.S.

  Army Corps of Engineers, and

  land acquisition................................. 842,605

I & M Canal - CHANNAHON STATE PARK - WILL COUNTY

For improving DuPage River Spillway................. 35,035

(From Section 200 of Public Act 95-746)

For replacing Lock 14 Bridge....................... 425,000

For improving the DuPage River Spillway............ 930,000

ILLINOIS BEACH STATE PARK - LAKE COUNTY

(From Article 37, Section 65 of Public Act 95-734)

For replacing sanitary sewer line................... 79,748

For replacing sanitary sewer lines................. 311,922

MORAINE HILLS STATE PARK – MCHENRY COUNTY

(From Section 95 of Public Act 95-746)

For replacing yellow-head marshy dam culverts...... 400,000

PERE MARQUETTE STATE PARK – JERSEY COUNTY

(From Section 100 of Public Act 95-746)

For design services to replace a lodge

  pool dehumidifier................................. 63,279

(From Section 105 of Public Act 95-746)

For emergency replacement of a sewage

  treatment plant.................................. 621,000

RED HILLS STATE PARK – LAWRENCE COUNTY

(From Article 37, Section 65 of Public Act 95-734)

For miscellaneous improvements...................... 44,740

RESEARCH & COLLECTIONS CENTER - SPRINGFIELD

For renovating the interior......................... 17,915

ROCK CUT STATE PARK - WINNEBAGO COUNTY

For upgrading the sewage system.................... 675,104

SILOAM SPRINGS STATE PARK – ADAMS COUNTY

For rehabilitating office/service area........... 1,119,114

STEPHEN A. FORBES STATE PARK, MARION COUNTY

(From Section 115 of Public Act 95-746)

For design services to replace dump and

  fish cleaning stations............................ 44,584

WORLD SHOOTING COMPLEX – SPARTA

(From Article 37, Section 65 of Public Act 95-734)

For construction of the World Shooting

  Complex in Sparta................................. 57,580

SPRINGFIELD

For constructing an office building and

  interpretive center.............................. 166,153

WHITE PINES FOREST STATE PARK - OGLE COUNTY

For completing the replacement of the

  sewer system, in addition to funds

  previously appropriated........................... 11,557

WILDLIFE PRAIRIE PARK

For rehabilitating the sewage

  treatment plant.................................. 767,500

(From Section 200 of Public Act 95-746)

For upgrading sewage treatment plant............. 1,032,000

STATEWIDE

(From Article 37, Section 65 of Public Act 95-734)

For replacing/repairing the roofing systems

  at the following locations at the approximate

  cost set forth below............................ 245,000

  Clinton Lake Recreational

   Area - DeWitt County................. 65,000

  Ferne Clyffe State Park-

   Johnson County....................... 20,000

  Hennepin Canal Parkway

   State Park........................... 26,000

  Lake Le-Aqua-Na State Park-

   Stephenson County.................... 39,000

  Mermet Lake Conservation Area-

   Massac County........................ 95,000

For replacing/repairing the roofing systems

  at the following locations at the approximate

  costs set forth below............................ 115,267

  Starved Rock State Park &

   Lodge-LaSalle County.................. 4,726

  Kaskaskia River Fish & Wildlife

   Area-Randolph County................. 19,500

  Pyramid State Park-

   Perry County.......................... 4,109

  Region V Office (Benton)

   Franklin County...................... 86,932

For rehabilitating dams and bridges................ 120,754

For constructing, replacing and

  renovating lodges and concession

  buildings...................................... 1,488,014

For replacing roofs at the following locations,

  at the approximate cost set forth below.......... 134,931

  Shabbona Lake State

   Park................................. 40,850

  Hennepin Canal Parkway

   State Park........................... 15,750

  Randolph Fish &

   Wildlife Area........................ 32,271

  Dixon Springs State

   Park................................. 46,060

For replacing and constructing vault

  toilets at the following locations,

  at the approximate cost set forth

  below............................................ 167,772

   Hennepin Canal Parkway

   State Trail......................... 167,772

For rehabilitating dams at the

  following locations, at the

  approximate cost set forth below................. 450,002

   Rock Cut State Park................. 450,002

For replacing roofs at the following

  locations, at the approximate

  cost set forth below............................. 206,925

   Southern IL Arts &

    Crafts Center.......................... 412

   Frank Holten State Park................. 412

   DNR Geological Survey-

    Champaign.............................. 413

   Sangchris Lake State

    Park................................. 5,291

   Illini State Park..................... 1,692

   Shelbyville Fish &

    Wildlife Area....................... 79,480

   Trail of Tears State

    Forest............................... 3,685

   Sanganois Conservation Area............. 413

   Rice Lake State Park................. 28,090

   Hidden Spring State Park............. 53,740

   Siloam Springs State Park............. 2,417

   Mississippi Palisades

    State Park.......................... 30,880

For replacing vault toilets at the following

  locations, at the approximate cost set forth

  below............................................ 285,813

    Anderson Lake Conservation Area -

     Fulton/Schuyler Counties........... 71,453

    Giant City State Park -

     Jackson/Union Counties............. 71,453

    Randolph County Conservation Area... 71,453

    Silver Springs State Park -

      Kendall County.................... 71,454

For constructing hazardous material storage

  buildings.......................................... 9,935

For constructing vault toilets at the

  following locations at the approximate

  cost set forth below:............................ 137,897

   Apple River Canyon State Park........ 19,699

   Des Plaines Conservation Area........ 19,700

   Kankakee River State Park............ 19,700

   Lake Le-Aqua-Na State Park........... 19,699

   Marshall County Conservation Area.... 19,700

   Morrison-Rockwood State Park......... 19,699

   Rice Lake Conservation Area.......... 19,700

For planning, construction, reconstruction,

  land acquisition and related costs,

  utilities, site improvements, and all other

  expenses necessary for various capital

  improvements at parks, conservation areas,

  and other facilities under the jurisdiction

  of the Department of Natural Resources........... 581,794

    Total                                       $16,120,714

 

    Section 75.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made in Article 37, Section 75 of Public Act 95-734, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Natural Resources for the project hereinafter enumerated:

GOOSE LAKE PRAIRIE NATURAL AREA - GRUNDY COUNTY

(From Article 37, Section 75 of Public Act 95-734)

For rehabilitating visitor's center

  exterior.......................................... 23,345

    Total                                           $23,345

 

    Section 80.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from appropriations and reappropriations heretofore made for such purposes in Article 37, Section 80 of Public Act 95-734, and Sections 35, 40, 45, 50, 135, 140, 145, 175, 180 and 200 of Public Act 95-746, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:

CENTRALIA CORRECTIONAL CENTER

(From Article 37, Section 80 of Public Act 95-734)

For replacing the cooling tower.................... 201,948

(From Section 180 of Public Act 95-746)

To upgrade a sewage treatment plant................ 453,000

DIXON CORRECTIONAL CENTER

(From Article 37, Section 80 of Public Act 95-734)

For planning the upgrade and expansion

  of the medical care facility...................... 24,127

DWIGHT CORRECTIONAL CENTER

For renovating Housing Unit C8, in

  addition to funds previously

  appropriated..................................... 270,000

For renovating buildings, in addition

  to funds previously appropriated................. 274,847

For renovation of buildings......................... 30,261

(From Section 35 of Public Act 95-746)

For repair and replacement of roofing

  system............................................ 52,463

EAST MOLINE CORRECTIONAL CENTER

(From Article 37, Section 80 of Public Act 95-734)

For upgrading the roofing system................... 675,879

For replacing windows, in addition

  to funds previously appropriated.................. 42,450

GRAHAM CORRECTIONAL CENTER

For upgrading the cooling tower..................... 10,015

For upgrading the mechanical system................. 35,990

For planning the upgrade of building automation

   system and fire alarm system..................... 21,170

HARDIN COUNTY WORK CAMP

(From Section 145, Public Act 95-746)

To upgrade a sewage treatment plant................ 342,929

(From Section 200, Public Act 95-746)

For emergency kitchen repairs...................... 177,000

HOPKINS PARK

(From Article 37, Section 80 of Public Act 95-734)

For infrastructure improvements

  in connection with the Hopkins Park

  Correctional Center............................ 5,858,444

ILLINOIS RIVER CORRECTIONAL CENTER – CANTON

(From Section 135, Public Act 95-746)

For design services to replace a domestic

  hot water heater.................................. 41,606

ILLINOIS YOUTH CENTER - HARRISBURG

(From Article 37, Section 80 of Public Act 95-734)

For constructing a multi-purpose medical,

  vocational and confinement building.............. 375,000

For utility upgrade, including gas

  and sewer...................................... 4,695,721

ILLINOIS YOUTH CENTER - RUSHVILLE

For planning, design, construction, equipment

  and all other necessary costs to add

  a cellhouse.................................... 2,282,202

ILLINOIS YOUTH CENTER - ST. CHARLES

For constructing an R & C building

  and other improvements......................... 1,957,557

LAWRENCE COUNTY CORRECTIONAL CENTER - LAWRENCEVILLE

For constructing two cellhouses, in

  addition to funds previously appropriated.......... 9,915

LINCOLN CORRECTIONAL CENTER

For replacing doors and locks....................... 31,592

LOGAN CORRECTIONAL CENTER

For planning and beginning the upgrade

  of the power plant............................... 321,186

For renovating the electrical

  distribution system.............................. 159,995

For constructing a medical building

  and dietary building........................... 2,019,174

(From Section 175, Public Act 95-746)

To upgrade a power plant at Logan

  Correctional Center............................ 5,737,445

MENARD CORRECTIONAL CENTER - CHESTER

(From Article 37, Section 80 of Public Act 95-734)

For replacing the administration building,

  in addition to funds previously

  appropriated.................................. 11,626,369

For replacing the Administration

  Building......................................... 310,244

For replacing toilets and waste lines

  at E/W Cellhouse and upgrade

  North Cellhouse plumbing......................... 364,351

For renovation or replacement of the

  Old Hospital Building, in addition to

  funds previously appropriated..................... 48,064

For planning and construction of the

  Administration Building.......................... 513,777

PONTIAC CORRECTIONAL CENTER

For replacing doors and frames................... 1,620,000

SHAWNEE CORRECTIONAL CENTER

For replacing the emergency generator............... 44,867

SHERIDAN CORRECTIONAL CENTER

(From Section 40 of Public Act 95-746)

For replacement of roofing system.................. 100,939

STATEVILLE CORRECTIONAL CENTER - JOLIET

(From Article 37, Section 80 of Public Act 95-734)

For replacing doors and locks...................... 580,000

For replacing windows in B House................... 126,480

For replacing power plant and

  utility distribution system....................... 17,454

For upgrading electrical system and elevator

  and installing HVAC system....................... 393,750

TAYLORVILLE CORRECTIONAL CENTER

(From Section 140 of Public Act 95-746)

For design services to replace operators

  and main gates.................................... 27,195

VANDALIA CORRECTIONAL CENTER

(From Article 37, Section 80 of Public Act 95-734)

For constructing a multi-purpose program

  building.......................................... 90,656

For converting Administration Building and

  planning construction of an Administration/

  Health Care Unit................................. 308,406

(From Section 45 of Public Act 95-746)

For replacement of roofing system.................. 267,256

(From Article 37, Section 80 of Public Act 95-734)

VIENNA CORRECTIONAL CENTER

For replacing the cooler and freezer............... 356,663

For upgrading the power plant...................... 707,109

For upgrading the HVAC system and replacing

  water lines in six housing units................. 423,601

(From Section 50 of Public Act 95-746)

For emergency roof replacement on

  various buildings................................ 330,679

(From Article 37, Section 80 of Public Act 95-734)

STATEWIDE

For all costs associated with

  a timekeeping and payroll system.............. 10,000,000

For upgrading roofing systems at the

 following locations at the approximate

 costs set forth below.............................. 94,315

  Hardin County Work Camp................ 8,808

  Illinois Youth Center Joliet.......... 44,151

  Pontiac Correctional Center........... 41,356

For replacing doors and locks

  at the following locations at the

  approximate costs set forth below.............. 1,113,137

   Dixon Correctional Center......... 1,081,626

   Vienna Correctional Center........... 35,511

For upgrading showers at the following

  locations at the approximate

  cost set forth below............................. 258,708

   Hill Correctional

    Center............................. 258,708

For upgrading water towers at the following

  locations at the approximate

  cost set forth below........................... 1,651,849

   Dixon Correctional

    Center............................. 413,466

   Illinois Youth Center -

    St. Charles...................... 1,228,853

   Illinois Youth Center -

    Valley View.......................... 9,530

For planning, design, construction, equipment

  and all other necessary costs for a

  maximum security facility..................... 77,469,151

For planning a medium security facility

  and land acquisition........................... 2,629,428

For replacing roofing systems at

  the following locations at the

  approximate cost set forth below................. 154,609

   Menard Correctional Center............ 6,194

   Vienna Correctional Center........... 81,100

   Illinois Youth Center -

    Harrisburg........................... 4,138

   Pontiac Correctional Center.............. 10

   Illinois Youth Center - Joliet....... 63,167

For replacing or upgrading security and

  monitoring systems at the following

  locations at the approximate cost set

  forth below...................................... 278,707

   Vienna Correctional

    Center............................. 250,000

   Pontiac Correctional

    Center................................... 0

   Joliet Correctional

    Center.............................. 28,707

For planning and replacing windows at the

  following locations at the approximate cost

  set forth below................................ 2,226,942

   Vienna Correctional

    Center........................... 1,780,000

   Sheridan Correctional

    Center............................. 314,454

   Illinois Youth Center -

    Valley View.......................... 8,310

   Illinois Youth Center -

    Joliet.............................. 74,875

   Dixon Correctional

    Center.............................. 46,073

   Shawnee Correctional

    Center............................... 3,230

For replacing security fencing at the

  following locations at the approximate

  cost set forth below............................. 306,251

   Hill Correctional

    Center............................... 3,547

   Western IL Correctional

    Center.............................. 31,427

   Joliet Correctional

    Center.............................. 49,119

   Logan Correctional

    Center............................. 172,369

   Dixon Correctional

    Center............................... 8,752

   Shawnee Correctional

    Center............................... 5,269

   Graham Correctional

    Center.............................. 24,369

   Danville Correctional

    Center.............................. 11,399

For planning, design, construction, equipment

  and all other necessary costs for a

  female multi-security level

  correctional center........................... 55,938,782

For replacing roofing systems at the

  following locations at the approximate

  cost set forth below............................. 189,284

    Vienna Correctional Center......... 150,261

    Sheridan Correctional Center........ 17,785

    Western Illinois Correctional

     Center - Mt. Sterling.............. 21,238

For upgrading fire and safety systems at

  the following locations at the approximate

  costs set forth below, in addition to

  funds previously appropriated.................. 2,018,041

    Menard Correctional Center -

     Chester......................... 1,835,344

    Sheridan Correctional Center....... 110,620

    Vienna Correctional Center.......... 72,077

    Total                                      $198,688,980

 

    Section 85.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made for such purpose in Article 37, Section 85, of Public Act 95-734, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Corrections for the projects hereinafter enumerated:

BIG MUDDY CORRECTIONAL FACILITY

(From Article 37, Section 85 of Public Act 95-734)

For replacing door locking controls

  and intercom systems........................... 2,312,558

STATEVILLE CORRECTIONAL CENTER

For installing fire alarm systems................ 1,600,000

    Total                                        $3,912,558

 

    Section 90.  The sum of $336,056, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 37, Section 90 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Emergency Management Agency for costs associated with a new State Emergency Operations Center.

 

    Section 95.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from appropriations and reappropriations heretofore made for such purposes in Article 37, Section 95 of Public Act 95-734, and Sections 60, 65, 120, 125, 130 and 170 of Public Act 95-746, are reappropriated from the Capital Development Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:

BISHOP HILL HISTORIC SITE - HENRY COUNTY

(From Article 37, Section 95 of Public Act 95-734)

For restoring interior and exterior.................. 6,555

BLACK HAWS STATE HISTORIC SITE – ROCK ISLAND

(From Section 60 of Public Act 95-746)

For renovating a retaining wall and two

  shelters ........................................ 250,292

CAHOKIA MOUNDS HISTORIC SITE - COLLINSVILLE

(From Article 37, Section 95 of Public Act 95-734)

For replacement of Monk's Mounds stairs............ 211,080

For restoration of Monk's Mound.................... 631,531

For purchasing private land within historic

  site boundary.................................... 189,979

(From Section 65, Public Act 95-746)

To create a new entrance around existing

  bronze artwork doors............................. 166,782

DANA THOMAS HOUSE STATE HISTORIC SITE

(From Section 120, Public Act 95-746)

To rehabilitate the interior and exterior

  at Dana Thomas House State Historic Site....... 3,100,000

DAVID DAVIS HOME

(From Article 37, Section 95 of Public Act 95-734)

To acquire a residence to be

  converted to a Visitors Center..................... 7,962

(From Article 125, Public Act 95-746)

For design services for emergency

  roof repairs....................................... 4,450

JARROT MANSION STATE HISTORICAL SITE

(From Article 37, Section 95 of Public Act 95-734)

For restoring the mansion, site improvements

  and land acquisition, in addition

  to funds previously appropriated............... 1,447,021

LINCOLN-HERNDON LAW OFFICES STATE HISTORIC SITE

(From Article 170, Public Act 95-746)

For emergency roof repairs at law offices........... 25,200

LINCOLN LOG CABIN STATE HISTORIC SITE, COLES COUNTY

(From Article 130, Public Act 95-746)

To replace a sewer system at Historic Site......... 280,000

(From Article 37, Section 95 of Public Act 95-734)

LINCOLN'S TOMB/VIETNAM MEMORIAL - SPRINGFIELD

For rehabilitating site and providing

  irrigation system................................ 121,100

LINCOLN'S NEW SALEM HISTORIC SITE - MENARD COUNTY

For providing electrical at

  campgrounds...................................... 110,444

LINCOLN PRESIDENTIAL CENTER - SPRINGFIELD

For constructing library and museum complex, in

  addition to funds previously appropriated...... 2,645,514

For constructing a Lincoln Presidential

  Library............................................ 4,337

OLD STATE CAPITOL - SPRINGFIELD

For repairing elevators............................ 387,464

UNION STATION - SPRINGFIELD

For purchasing and rehabilitating................... 21,721

STATEWIDE

For statewide ISTEA 21 Match....................... 593,070

For matching ISTEA federal grant funds............. 143,310

    Total                                       $10,347,812

 

    Section 105.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made in Article 37, Section 105, of Public Act 95-734, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Historic Preservation Agency for the projects hereinafter enumerated:

MT. PULASKI COURTHOUSE HISTORIC SITE - LOGAN COUNTY

(From Article 37, Section 105 of Public Act 95-734)

For rehabilitating interior & exterior.............. 24,118

PULLMAN HISTORIC SITE

For all costs associated with the

  stabilization and restoration of the

  Pullman Historic Site.......................... 1,273,991

    Total                                        $1,298,109

 

    Section 110.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from appropriations and reappropriations heretofore made for such purposes in Article 37, Section 110 of Public Act 95-734, and Sections 160, 165 and 200 of Public Act 95-746, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the projects hereinafter enumerated:

ALTON MENTAL HEALTH CENTER - MADISON COUNTY

(From Article 37, Section 110 of Public Act 95-734)

For renovating the Forensic Complex and

  constructing two building additions, in

  addition to funds previously appropriated...... 3,900,000

For constructing two building additions

  at the Forensic Complex........................ 6,780,876

For rehabilitation of the central dietary............ 9,179

CHESTER MENTAL HEALTH CENTER

For completing the replacement of

  smoke and heat detectors, in addition

  to funds previously appropriated................. 440,000

For upgrading HVAC systems......................... 144,664

For replacing smoke/heat detectors.................. 65,032

CHICAGO-READ MENTAL HEALTH CENTER - CHICAGO

For rehabbing absorbers, controls

  and valves........................................ 86,160

(From Section 160 of Public Act 95-746)

For design services to renovate Unit

  J-East for forensic use........................... 47,560

CHOATE MENTAL HEALTH AND DEVELOPMENTAL CENTER - ANNA

(From Article 37, Section 110 of Public Act 95-734)

For renovating Sycamore Hall........................ 94,930

(From Section 200 of Public Act 95-746)

For renovating Sycamore.......................... 4,385,000

For emergency boiler control replacement............ 20,569

ELGIN MENTAL HEALTH CENTER - KANE COUNTY

(From Article 37, Section 110 of Public Act 95-734)

For replacing power plant and engineering

  building....................................... 7,742,663

For renovating the central dietary

  and kitchen.................................... 3,704,073

For construction of roads, parking lots

  and street lights................................ 133,664

(From Section 165 of Public Act 95-746)

For design services to convert Reed Building

  for office space................................. 148,524

FOX DEVELOPMENTAL CENTER - DWIGHT

(From Article 37, Section 110 of Public Act 95-734)

For replacing and repairing interior doors,

  flooring and walls, in addition to funds

  previously appropriated.......................... 249,122

For planning and beginning replacement

  of interior doors and flooring

  and repairing walls in the Main and

  Administration Buildings.......................... 35,888

HOWE DEVELOPMENTAL CENTER - TINLEY PARK

For completing upgrade of tunnels,

  Phase II, in addition to funds previously

  appropriated..................................... 366,920

For renovating residences, in addition to

  funds previously appropriated..................... 99,182

ILLINOIS SCHOOL FOR THE DEAF - JACKSONVILLE

For renovating the High School Building

  Phase II......................................... 169,442

For renovating High School Building................. 96,859

ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE

For renovating auditorium, classroom

  and administration buildings................... 2,103,306

For renovating classrooms in Building 17......... 1,250,724

For renovations to the powerhouse,

  boilers and associated coal and ash

  equipment........................................ 400,000

(From Section 200 of Public Act 95-746)

For renovating the power house................... 2,088,000

JACKSONVILLE DEVELOPMENTAL CENTER - MORGAN COUNTY

(From Article 37, Section 110 of Public Act 95-734)

For planning and beginning the renovation

  of the power house................................ 37,892

KILEY DEVELOPMENTAL CENTER - WAUKEGAN

For converting the facility to natural

  gas, in addition to funds previously

  appropriated..................................... 112,391

For renovating homes, Phase II, in

  addition to funds previously

  appropriated...................................... 77,343

LINCOLN DEVELOPMENTAL CENTER - LOGAN

For various capital improvements,

  including planning and construction

  of four ten-bed transitional or

  residential homes................................ 582,596

LUDEMAN DEVELOPMENTAL CENTER - PARK FOREST

For upgrading the electrical panel................. 338,114

For repairing and replacing furnaces and

  duct work, in addition to funds previously

  appropriated..................................... 141,615

For renovating residential and neighborhood

  homes, in addition to funds previously

  appropriated...................................... 46,810

For replacing plumbing, HVAC and

  boiler systems................................... 629,184

For renovation of residential buildings,

  in addition to funds previously

  appropriated...................................... 74,252

MABLEY DEVELOPMENTAL CENTER - DIXON

For replacing mechanicals and upgrading

  the fire alarm systems............................ 71,348

MADDEN MENTAL HEALTH CENTER - HINES

For renovating pavilions and

  administration building for safety/

  security, in addition to

  funds previously appropriated.................... 621,882

For renovating dietary............................. 729,885

For renovation of pavilions, in addition

  to funds previously appropriated.................. 60,833

MURRAY DEVELOPMENTAL CENTER - CENTRALIA

For completing the renovation of

  the boiler house, in addition to

  funds previously appropriated.................. 2,991,120

SHAPIRO DEVELOPMENTAL CENTER - KANKAKEE

For replacing the sewer system in

  south campus................................... 2,056,004

For planning and beginning renovation

  of dietary....................................... 203,263

For work necessary to remedy fire

  damper deficiencies.............................. 118,922

For replacing water mains and valves,

  in addition to funds previously

  appropriated..................................... 210,015

SINGER MENTAL HEALTH CENTER - ROCKFORD

For upgrading fire alarm systems.................... 47,651

For renovating dietary and stores................... 55,334

For renovating mechanicals and

  residential areas................................ 691,943

TINLEY PARK MENTAL HEALTH CENTER – COOK COUNTY

For completing the upgrade of fire

  and life/safety issues in Oak Hall,

  in addition to funds previously

  appropriated..................................... 600,000

STATEWIDE

For replacing roofing systems at

  the following locations, at the

  approximate costs set forth below................ 244,866

   Chicago-Read Mental

    Health Center - Cook

    County............................. 148,645

   Fox Developmental

    Center - Dwight..................... 11,932

   Kiley Developmental Center -

    Waukegan............................ 84,289

For replacing and repairing roofing systems

 at the following locations, at the

 approximate cost set forth below.................. 398,899

Alton Mental Health Center -

  Madison............................... 66,483

Shapiro Developmental Center -

  Kankakee.............................. 66,483

Ludeman Developmental Center -

  Park Forest........................... 66,483

Madden Mental Health Center -

  Hines................................. 66,483

Murray Developmental Center -

  Centralia............................. 66,483

Kiley Developmental Center -

  Waukegan.............................. 66,484

For replacing and repairing roofing

  systems at the following locations, at

  the approximate cost set forth below............. 782,838

   Chicago-Read Mental Health

    Center............................. 166,314

   Howe Developmental Center -

    Tinley Park........................ 562,126

   Shapiro Developmental Center -

    Kankakee............................ 39,730

   Illinois School for the

    Deaf - Jacksonville................. 12,087

   Kiley Developmental

    Center - Waukegan.................... 2,581

For repairing or replacing roofs

  at the following locations, at

  the approximate cost set forth below............. 303,219

   Illinois School for the

    Visually Impaired -

    Jacksonville........................ 38,368

   Jacksonville Developmental

    Center - Morgan County.............. 60,000

   Lincoln Developmental Center -

    Logan County......................... 2,039

   Murray Developmental Center -

    Centralia........................... 86,136

   Shapiro Developmental Center -

    Kankakee........................... 116,676

For replacing and repairing roofing systems

  at the following locations at the approximate

  cost set forth below............................. 241,386

    Chicago-Read Mental Health Center.... 3,763

    Tinley Park Mental Health Center.... 12,974

    Illinois School for the Visually

     Impaired - Jacksonville............ 19,414

    Shapiro Developmental Center -

     Kankakee........................... 25,955

    Kiley Developmental Center -

     Waukegan................................ 3

    Ludeman Developmental Center -

     Park Forest....................... 179,277

For replacement of roofing systems at the

  following locations at the approximate costs

  set forth below:................................. 118,670

    Lincoln Development Center.......... 29,667

    Murray Developmental Center......... 29,668

    Elgin Developmental Center.......... 29,667

    Shapiro Developmental Center........ 29,667

    Total                                       $47,150,612

 

    Section 115.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made for such purposes in Article 37, Section 115 of Public Act 95-734, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Human Services for the projects hereinafter enumerated:

ILLINOIS SCHOOL FOR THE VISUALLY IMPAIRED - JACKSONVILLE

(From Article 37, Section 115 of Public Act 95-734)

For renovations to the powerhouse,

  boilers and associated coal and ash

  equipment........................................ 157,269

    Total                                          $157,269

 

    Section 125.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made for such purposes in Article 37, Section 125 of Public Act 95-734, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Human Services for the project hereinafter enumerated:

ILLINOIS SCHOOL FOR THE DEAF – JACKSONVILLE

(From Article 37, Section 125 of Public Act 95-734)

For replacing dorm doors......................... 1,945,671

JACKSONVILLE DEVELOPMENTAL CENTER – MORGAN

For upgrading the mechanicals in the

  power plant, in addition to funds

  previously appropriated........................... 45,582

SINGER MENTAL HEALTH CENTER

For repair and/or replacement of roofs.............. 61,150

FOX DEVELOPMENTAL CENTER - DWIGHT

For renovating the water treatment plant........... 678,331

    Total                                        $2,730,734

 

    Section 130.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriation and reappropriations heretofore made in Article 37, Section 130 of Public Act 95-734, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Medical District Commission for the projects hereinafter enumerated:

ILLINOIS MEDICAL DISTRICT COMMISSION - CHICAGO

(From Article 37, Section 130 of Public Act 95-734)

For upgrading utility and infrastructure,

  in addition to funds previously

  appropriated..................................... 412,685

For upgrading core utilities....................... 126,364

For upgrading research center...................... 346,714

For constructing a Lab and Research

  Biotech Grad Facility............................. 29,494

    Total                                          $915,257

 

    Section 140.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made for such purposes in Article 37, Section 140 of Public Act 95-734, as amended, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Military Affairs for the projects hereinafter enumerated:

BLOOMINGTON ARMORY - McLEAN COUNTY

(From Article 37, Section 140 of Public Act 95-734)

For rehabilitating the mechanical/electrical

  systems and renovating the interior............ 2,720,825

CAMP LINCOLN - SPRINGFIELD

For construction of a military academy

  facility......................................... 153,719

ELGIN ARMORY - KANE COUNTY

For upgrading the interior and exterior............ 757,368

MACOMB ARMORY - McDONOUGH

For completing the mechanical/electrical

  systems upgrade, renovating the interior,

  and installing a kitchen, in addition to

  funds previously appropriated.................. 2,484,125

For replacing the mechanical and electrical

  systems and installing a kitchen................. 678,666

NORTH RIVERSIDE ARMORY

For rehabilitating the interior and

  exterior.......................................... 14,648

NORTHWEST ARMORY - CHICAGO

For upgrading the electrical system.............. 2,815,000

For replacing the mechanical systems................ 46,187

SYCAMORE ARMORY

For replacing the electrical system,

  renovating the interior and installing

  air conditioning.................................. 22,310

    Total                                        $9,692,848

 

    Section 145.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made in Article 37, Section 145, of Public Act 95-734, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Military Affairs for the projects hereinafter enumerated:

LAWRENCEVILLE ARMORY

(From Article 37, Section 145 of Public Act 95-734)

For rehabilitating the exterior and

  replacing roofing systems....................... 176,837

    Total                                          $176,837

 

    Section 150.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made for such purposes in Article 37, Section 150 of Public Act 95-734, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Revenue for the projects hereinafter enumerated:

WILLARD ICE BUILDING - SPRINGFIELD

(From Article 37, Section 150 of Public Act 95-734)

For completing the upgrade of

  building management controls,

  in addition to funds

  previously appropriated.......................... 400,000

For replacing the dock exhaust system.............. 172,722

For upgrading building management

  controls....................................... 3,495,466

For upgrading the plumbing system.................. 908,359

For renovating the interior and

  upgrading HVAC................................. 2,847,517

    Total                                        $7,824,064

 

    Section 160.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made for such purposes in Article 37, Section 160 of Public Act 95-734, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Revenue for the project hereinafter enumerated:

WILLARD ICE BUILDING – SPRINGFIELD

(From Article 37, Section 160 of Public Act 95-734)

For completing the upgrade of the

  Plumbing System.................................. 600,000

    Total                                          $600,000

 

    Section 165.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from appropriations and reappropriations heretofore made for such purposes in Article 37, Section 165 of Public Act 95-734, and Sections 55, 190 and 195 of Public Act 95-746, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of State Police for the projects hereinafter enumerated:

EFFINGHAM DISTRICT 12

(From Section 55 of Public Act 95-746)

For Effingham District 12 Firing Range............. 433,535

CHICAGO FORENSIC LABORATORY

(From Article 37, Section 165 of Public Act 95-734)

For planning and beginning the

  construction of an addition

  to the Chicago Forensic

  Laboratory..................................... 1,129,393

DISTRICT 13 HEADQUARTERS - DuQUOIN

For constructing a district 13

  headquarters....................................... 6,951

(From Section 195 of Public Act 95-746)

To upgrade a firing range.......................... 563,636

SPRINGFIELD ARMORY

(From Article 37, Section 165 of Public Act 95-734)

For planning and design of the rehabilitation

  and site improvements of the Springfield

  Armory, in addition to funds previously

  appropriated..................................... 352,523

STATE POLICE TRAINING ACADEMY - SPRINGFIELD

For planning and beginning the

  construction of an addition to the

  CODIS Laboratory................................. 277,750

ULLIN DISTRICT 22

(From Section 190 of Public Act 95-746)

For emergency roof and interior and

  exterior repairs.................................. 78,268

STATEWIDE

(From Article 37, Section 165 of Public Act 95-734)

For replacing communications towers

  equipment and tower buildings.................... 539,398

For replacing radio communication towers,

  equipment buildings and installing emergency

  power generators at the following

  locations at the approximate costs

  set forth below.................................. 250,000

  Harlem & Irving – Cook County......... 62,500

  Savanna – Carroll County.............. 62,500

  Fairfield – Wayne County.............. 62,500

  Niota – Hancock County................ 62,500

    Total                                        $3,631,454

 

    Section 175.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from appropriations and reappropriations heretofore made for such purposes in Article 37, Section 175 of Public Act 95-734, and Section 85 of Public Act 95-746, are reappropriated from the Capital Development Fund to the Capital Development Board for the Department of Veterans' Affairs for the projects hereinafter enumerated:

MANTENO VETERANS' HOME - KANKAKEE COUNTY

(From Article 37, Section 175 of Public Act 95-734)

For replacing air conditioner chillers........... 1,094,873

For replacing condensing units..................... 122,241

For upgrading or construction of roads

  and parking lots.................................. 28,785

For planning and constructing additional

  storage and support areas......................... 73,248

For upgrading storm sewer........................... 97,768

QUINCY VETERANS' HOME - ADAMS COUNTY

For constructing a bus and

  ambulance garage................................. 849,073

For improvements to various buildings

  and replacement of Fletcher Building

  to meet licensure standards.................... 2,286,031

(From Section 85 of Public Act 95-746)

To replace a chimney stack and ash handling

  system......................................... 2,300,000

    Total                                        $6,852,019

 

    Section 185.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made for such purposes in Article 37, Section 185 of Public Act 95-734, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Department of Veterans' Affairs for the project hereinafter enumerated:

MANTENO VETERANS HOME

(From Article 37, Section 185 of Public Act 95-734)

For completing the upgrade of emergency

  generators......................................... 8,555

    Total                                            $8,555

 

    Section 190.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from appropriations and reappropriations heretofore made for such purposes in Article 37, Section 190 of Public Act 95-734, and Sections 15 and 200 of Public Act 95-746, are reappropriated from the Capital Development Fund to the Capital Development Board for the projects hereinafter enumerated:

CHICAGO

(From Article 37, Section 190 of Public Act 95-734)

  For expanding and renovating the

   Bio-Safety 3 Laboratory for the

   Department of Public Health..................... 832,114

ATTORNEY GENERAL BUILDING - SPRINGFIELD

(From Section 15 of Public Act 95-746)

For upgrading the snow melt system at

  the Attorney General Building.................... 104,000

(From Article 37, Section 190 of Public Act 95-734)

For upgrading environmental equipment

  and HVAC, in addition to funds previously

  appropriated - Archives Building.................. 35,833

STATEWIDE

For improving energy efficiency..................... 82,228

(From Section 200 of Public Act 95-746)

For Emergency Repairs and Hazardous

  Material Abatement at State-Owned

  Facilities, State Universities, and

  Community Colleges............................ 14,351,747

(From Article 37, Section 190 of Public Act 95-734)

For the purposes of capital planning

  and condition assessment and analysis

  of State capital facilities, to be

  expended only upon the direction of

  the Director of the Bureau of

  the Budget....................................... 189,167

For abating hazardous materials..................... 67,658

For retrofitting or upgrading mechanized

  refrigeration equipment (CFCs)................... 650,000

For surveys and modifications to buildings

  to meet requirements of the federal

  Americans with Disabilities Act (ADA)............. 44,004

For surveys and modifications to buildings

  to meet requirements of the federal

  Americans with Disabilities Act (ADA)............ 200,755

For abating hazardous materials...................... 7,284

For retrofitting or upgrading mechanized

  refrigeration equipment (CFCs)................. 3,866,523

For surveys and modifications to buildings

  to meet requirements of the federal

  Americans with Disabilities Act.................. 986,432

For abating hazardous materials..................... 36,455

For retrofitting or upgrading mechanized

  refrigeration equipment (CFCs)................. 2,207,568

For upgrading and remediating

  aboveground and underground storage tanks...... 1,540,497

For retrofitting or upgrading mechanized

  refrigeration equipment (CFCs)................... 423,603

For surveys and modifications to

  buildings to meet requirements of the

  federal Americans with Disabilities Act.......... 115,979

For abatement of hazardous materials................. 2,015

For upgrading/retrofitting mechanized

  refrigeration equipment (CFCs).................... 47,547

For surveys and modifications to buildings

  to meet requirements of the federal

  Americans with Disabilities Act.................. 136,536

For demolition of buildings......................... 74,066

For retrofitting/upgrading mechanical

  refrigeration equipment........................... 30,551

For the planning, upgrade

  and replacement of potentially

  hazardous underground storage tanks................ 8,979

    Total                                       $26,041,541

 

    Section 195.  The amount of $478,102, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 37, Section 195 of Public Act 95-734, is reappropriated from the Asbestos Abatement Fund to the Capital Development Board for surveying and abating asbestos-containing materials statewide.

 

    Section 200.  The amount of $807,093, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 37, Section 200 of Public Act 95-734, is reappropriated from the Asbestos Abatement Fund to the Capital Development Board for asbestos surveys and emergency abatement in relation to asbestos abatement in state governmental buildings or higher education residential and auxiliary enterprise buildings.

 

    Section 210.  The following named amount or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 37, Section 210 of Public Act 95-734, is reappropriated from the School Construction Fund to the Capital Development Board for the State Board of Education for the projects hereinafter enumerated:

STATEWIDE

(From Article 37, Section 210 of Public Act 95-734)

Grants for facility construction................. 2,724,785

 

    Section 215.  The sum of $7,404,907, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 37, Section 215 of Public Act 95-734, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.

 

    Section 220.  The sum of $3,535,520, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 37, Section 220 of Public Act 95-734, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.

 

    Section 225.  The sum of $1,872,926, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 37, Section 225 of Public Act 95-734, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.

 

    Section 230.  The sum of $145,888, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 37, Section 230 of Public Act 95-734, is reappropriated from the School Construction Fund to the Capital Development Board for school construction grants pursuant to the School Construction Law, in addition to amounts previously appropriated for such purposes.

 

    Section 245.  The sum of $18,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 37, Section 245 of Public Act 95-734, is reappropriated from the School Construction Fund to the Capital Development Board for grants to school districts for school improvement projects authorized by the School Construction Law.

 

    Section 270.  The sum of $475,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 37, Section 270 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for water resource management projects as authorized by subsection (g) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 275.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made for such purposes in Article 37, Section 275 of Public Act 95-734, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for the projects hereinafter enumerated:

CITY COLLEGES OF CHICAGO

(From Article 37, Section 275 of Public Act 95-734)

For various bondable capital improvements.......... 570,171

CITY COLLEGES OF CHICAGO/KENNEDY KING

For remodeling for Workforce Preparation

  Centers........................................ 3,575,930

For remodeling for a culinary arts

  educational facility.......................... 10,875,000

CITY COLLEGES OF CHICAGO - MALCOLM X COLLEGE

For remodeling the Allied Health

  program facilities............................. 4,304,223

COLLEGE OF DUPAGE

For upgrading the Instructional Center

  heating, ventilating and air

  conditioning systems.............................. 90,937

COLLEGE OF LAKE COUNTY

For planning and beginning construction

  of a technology building -

  Phase 1............................................ 7,364

KANKAKEE COMMUNITY COLLEGE

For constructing a laboratory/classroom

  facility......................................... 244,893

LAKELAND COLLEGE

Student Services Building addition............... 6,498,007

MCHENRY COUNTY COLLEGE

For constructing classrooms and a

  student services building and remodeling

  space, in addition to funds previously

  appropriated..................................... 473,076

MORAINE VALLEY COMMUNITY COLLEGE - PALOS HILLS

For constructing a classroom/administration

  building, providing site improvements and

  purchasing equipment, in addition to

  funds previously appropriated..................... 41,635

PRAIRIE STATE COLLEGE - CHICAGO HEIGHTS

For constructing an addition to the Adult

  Training/Outreach Center, in addition to

  funds previously appropriated.................... 811,858

SOUTH SUBURBAN COLLEGE

For improving flood retention...................... 437,000

TRITON COMMUNITY COLLEGE - RIVER GROVE

For rehabilitating the Liberal Arts

  Building....................................... 1,536,546

For rehabilitating the potable water

  distribution system............................... 70,146

STATEWIDE

For the Illinois Community College Board

  miscellaneous capital improvements including

  construction, capital facilities, cost of

  planning, supplies, equipment, materials,

  services and all other expenses required to

  complete the work at the various community

  Colleges.  This appropriated amount shall be

  in addition to any other appropriated amounts

  which can be expended for this purpose......... 1,483,480

STATEWIDE

For miscellaneous capital improvements

  including construction, capital facilities,

  cost of planning, supplies, equipment,

  materials, services and all other expenses

  required to complete the work at the

  various community colleges.  This appropriated

  amount shall be in addition to any other

  appropriated amounts which can be

  expended for these purposes.................... 4,948,041

For miscellaneous capital improvements

  including construction, capital facilities,

  cost of planning, supplies, equipment,

  materials, services and all other expenses

  required to complete the work at the

  various community colleges.  This appropriated

  amount shall be in addition to any other

  appropriated amounts which can be

  expended for these purposes.................... 3,683,848

STATEWIDE - CONSTRUCTION DEFECTS

For planning, construction and renovation

  to correct defectively designed or

  constructed community college facilities,

  provided that monies recovered based upon

  claims arising out of such defective design

  or construction shall be paid to the state

  as required by Section 105.12 of the Public

  Community College Act as reimbursement for

  monies expended pursuant to this

  appropriation..................................... 36,622

    Total                                       $39,688,777

 

    Section 280.  The amount of $400,281, or so much thereof as may be necessary, and remains unexpended on June 30, 2009, from a reappropriation heretofore made for such purposes in Article 37, Section 280 of Public Act 95-734, as amended, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for grants to community colleges repair, renovation, and miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, costs of planning, supplies, equipment, materials, services, and all other expenses required to complete the work.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 285.  The sum of $1,328,332, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 37, Section 285 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 290.  The sum of $1,665,864, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purposes in Article 37, Section 290 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 295.  The sum of $2,556,705, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purposes in Article 37, Section 295 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 300.  The sum of $668,166, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purposes in Article 37, Section 300 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Community College Board for grants to community colleges for miscellaneous capital improvements including construction, reconstruction, remodeling, improvements, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services, and all other expenses required to complete the work. This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 305.  The sum of $13,568, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 37, Section 305 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for miscellaneous capital improvements at various educational facilities statewide, in addition to funds previously appropriated.

 

    Section 310.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made for such purposes in Article 37, Section 310 of Public Act 95-734, are reappropriated from the Capital Development Fund to the Capital Development Board for the Board of Higher Education for the projects hereinafter enumerated:

ILLINOIS MATHEMATICS AND SCIENCE ACADEMY - AURORA

(From Article 37, Section 310 of Public Act 95-734)

To plan and begin construction of a

  space for the delivery of teacher

  training and development and student

  enrichment programs.............................. 108,843

 

    Section 315.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made in Article 37, Section 315 of Public Act 95-734, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:

STATEWIDE

(From Article 37, Section 315 of Public Act 95-734)

For miscellaneous capital improvements

  including construction, capital facilities,

  cost of planning, supplies, equipment,

  materials, services and all other expenses

  required to complete the work at the various

  universities.  This appropriated amount

  shall be in addition to any other appropriated

  amounts which can be expended for these

  purposes...................................... 17,586,358

   Chicago State University............ 322,100

   Eastern Illinois University......... 515,500

   Governors State University............ 2,533

   Illinois State University........... 984,871

   Northeastern Illinois University.... 383,700

   Northern Illinois University...... 1,159,000

   Western Illinois University......... 219,551

   Southern Illinois University -

    Carbondale......................... 801,859

   Southern Illinois University -

    Edwardsville....................... 763,100

   University of Illinois -

    Chicago.......................... 2,777,300

   University of Illinois -

    Springfield........................ 227,400

   University of Illinois -

    Urbana/Champaign................. 4,131,963

   Illinois Community

    College Board.................... 5,297,481

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required to complete

  the work at the various universities.

  This appropriated amount shall be in

  addition to any other appropriated amounts

  which can be expended for these purposes...... 15,675,018

   Chicago State University............ 260,819

   Eastern Illinois University......... 515,500

   Governors State University............ 1,001

   Illinois State University........... 111,197

   Northeastern Illinois

    University......................... 383,700

   Northern Illinois University...... 1,159,000

   Southern Illinois University -

    Carbondale.......................... 31,277

   Southern Illinois University -

    Edwardsville........................... 712

   University of Illinois -

    Chicago.......................... 2,777,300

   University of Illinois -

    Springfield........................ 212,512

   University of Illinois -

    Urbana/Champaign................. 4,150,300

   Illinois Community

    College Board.................... 6,071,700

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required to complete

  the work at the various universities

  This appropriated amount shall be in

  addition to any other appropriated amounts

  which can be expended for these purposes....... 4,197,338

   Chicago State University............. 30,849

   Eastern Illinois University......... 515,500

   Illinois State University............. 1,007

   Northern Illinois University........ 573,953

   Western Illinois University......... 138,442

   Southern Illinois University -

    Carbondale......................... 131,311

   University of Illinois -

    Chicago.......................... 2,049,066

   University of Illinois -

    Springfield........................ 209,126

   University of Illinois -

    Urbana/Champaign................... 548,084

For miscellaneous capital improvements,

  including construction, capital

  facilities, cost of planning,

  supplies, equipment, materials, services

  and all other expenses required to

  complete the work at the various universities.

  This appropriated amount shall be in

  addition to any other appropriated

  amounts which can be expended

  for these purposes............................. 2,824,140

   Eastern Illinois University......... 477,768

   Illinois State University........... 106,016

   Northern Illinois University...... 1,207,568

   Southern Illinois University -

    Carbondale.......................... 71,189

   University of Illinois -

    Chicago............................ 245,200

   University of Illinois -

    Urbana/Champaign................... 716,399

For miscellaneous capital improvements

  including construction, reconstruction

  remodeling, improvements, repair

  and installation of capital

  facilities, cost of planning, supplies,

  equipment, materials, services and all

  other expenses required to complete

  the work at the various universities set

  forth below.  This appropriated amount

  shall be in addition to any other

  appropriated amounts which can

  be expended for these purposes................. 1,758,682

  Chicago State University............. 124,987

  Eastern Illinois University........... 42,140

  Northeastern Illinois University...... 32,560

  Northern Illinois University......... 690,260

  Western Illinois University........... 12,865

  University of Illinois -

   Champaign/Urbana Campus............. 855,870

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

 all other expenses required to

  complete the work at the various

  universities set forth below.  This

  appropriation shall be in addition

  to any other appropriated amounts

  which can be expended for these purposes......... 788,859

For Eastern Illinois University........ 261,412

For Northeastern Illinois University .... 3,449

For Northern Illinois University........ 58,820

For University of Illinois -

  Urbana-Champaign..................... 465,178

For miscellaneous capital improvements,

  including construction, reconstruction,

  remodeling, improvement, repair and

  installation of capital facilities, cost of

  planning, supplies, equipment, materials,

  services and all other expenses

  required to complete the work at the various

  universities set forth below.  This

  appropriation shall be in addition to

  any other appropriated amounts which

  can be expended for these purposes............... 235,399

  For Northern Illinois University..... 151,292

  For Southern Illinois University -

   Carbondale........................... 22,188

  For Southern Illinois University -

   Edwardsville......................... 11,240

  For University of Illinois -

   Urbana-Champaign..................... 50,679

For miscellaneous capital improvements

  including construction, reconstruction,

  remodeling, improvement, repair and

  installation of capital facilities,

  cost of planning, supplies, equipment,

  materials, services and all other expenses

  required to complete the work at the

  various universities set forth below.

  This appropriation shall be in addition

  to any other appropriated amounts which

  can be expended for these purposes............... 763,341

  For Chicago State University.......... 17,768

  For Eastern Illinois University...... 150,380

  For Governors State University........ 71,798

  For Illinois State University......... 85,165

  For Northeastern Illinois University . 36,177

  For Northern Illinois University..... 207,446

  For University of Illinois........... 194,607

SOUTHERN ILLINOIS UNIVERSITY

For Southern Illinois University

  for miscellaneous capital improvements

  including construction, reconstruction,

  remodeling, improvements, repair and

  installation of capital facilities, cost

  of planning, supplies, equipment, materials

  services and all other expenses

  required to complete the work.  This

  appropriation shall be in addition to any

  other appropriated amounts which can

  be expended for these purposes................... 118,119

UNIVERSITY OF ILLINOIS

For the Board of Trustees of the University of

  Illinois for miscellaneous capital

  improvements including construction,

  reconstruction, remodeling, improvement,

  repair and installation of capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required for completing

  the work at the colleges and

  universities.  This appropriation shall

  be in addition to any other

  appropriated amounts which can be

  expended for these purposes....................... 89,723

For the Board of Higher Education for

  miscellaneous capital improvements,

  including construction, reconstruction,

  remodeling, improvements, repair and

  installation of capital facilities, cost

  of planning, supplies, equipment,

  materials, services, and all other

  expenses required to complete the

  work at the colleges and universities

  hereinafter enumerated.  This appropriation

  shall be in addition to any other

  appropriated amounts which can be

  expended for these purposes:

Northern Illinois University........................ 17,454

    Total                                       $44,054,431

 

    Section 320.  The sum of $130,565, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purposes in Article 37, Section 320 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for the Board of Higher Education for miscellaneous capital improvements, including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required for completing the work at the colleges and universities.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 325.  The following named amounts, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from reappropriations heretofore made for such purposes in Article 37, Section 325 of Public Act 95-734, are reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:

(From Article 37, Section 325 of Public Act 95-734)

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required to complete

  the work at the various universities.

  This appropriated amount shall be in

  addition to any other appropriated amounts

  which can be expended for these purposes.

Chicago State University........................... 140,767

Eastern Illinois University........................ 257,800

Governors State University.......................... 94,900

Illinois State University.......................... 510,700

Northeastern Illinois University................... 191,800

Northern Illinois University....................... 579,500

Western Illinois University......................... 96,101

Southern Illinois University - Carbondale.......... 560,973

Southern Illinois University - Edwardsville ....... 381,500

University of Illinois - Chicago................. 1,388,600

University of Illinois - Springfield............... 114,600

University of Illinois - Urbana/Champaign........ 2,075,100

Illinois Community College Board................. 2,888,562

    Total                                        $9,280,903

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required to complete

  the work at the various universities.

  This appropriated amount shall be in

  addition to any other appropriated amounts

  which can be expended for these purposes.

Chicago State University.......................... 161,000

Eastern Illinois University........................ 255,993

Governors State University.......................... 21,306

Northeastern Illinois University................... 191,800

Northern Illinois University....................... 579,500

Southern Illinois University - Carbondale........... 22,934

Southern Illinois University - Edwardsville......... 82,753

University of Illinois - Chicago................. 1,388,600

University of Illinois - Springfield............... 114,600

University of Illinois - Urbana/Champaign........ 1,891,423

Illinois Community College Board................. 2,805,684

    Total                                        $7,515,593

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required to complete

  the work at the various universities.

  This appropriated amount shall be in

  addition to any other appropriated amounts

  which can be expended for these purposes.

Chicago State University............................. 1,002

Eastern Illinois University........................ 185,800

Governors State University.......................... 45,618

Illinois State University........................... 27,182

Northern Illinois University....................... 579,500

Western Illinois University.......................... 9,341

Southern Illinois University - Carbondale........... 14,758

University of Illinois - Chicago................... 974,174

University of Illinois - Springfield................ 76,866

University of Illinois - Urbana/Champaign........ 1,539,425

    Total                                        $3,453,666

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required to complete

  the work at the various universities.

  This appropriated amount shall be in

  addition to any other appropriated amounts

  which can be expended for these purposes.

Eastern Illinois University......................... 21,618

Governors State University.......................... 26,826

Illinois State University.......................... 111,595

Northeastern Illinois University.................... 87,701

Northern Illinois University....................... 335,923

University of Illinois - Chicago................... 103,101

University of Illinois - Springfield................ 30,052

University of Illinois - Urbana/Champaign.......... 258,177

    Total                                          $974,993

For miscellaneous capital improvements

  including construction, capital

  facilities, cost of planning, supplies,

  equipment, materials, services and

  all other expenses required to complete

  the work at the various universities.

  This appropriated amount shall be in

  addition to any other appropriated amounts

  which can be expended for these purposes.

Chicago State University............................. 7,549

Eastern Illinois University........................ 134,474

Northeastern Illinois University.................... 32,547

Northern Illinois University....................... 340,000

University of Illinois- Champaign/Urbana............ 65,946

    Total                                          $580,516

 

    Section 330.  The sum of $1,598,774, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 37, Section 330 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 335.  The sum of $1,253,180, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 37, Section 335 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the various community colleges. This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 340.  The following named amounts, or so much thereof as may be necessary and remain unexpended at the close of business on June 30, 2009, from reappropriations heretofore made in Article 37, Section 340 of Public Act 95-734, are reappropriated from the Capital Development Fund to the Capital Development Board for the Illinois Board of Higher Education for the projects hereinafter enumerated:

CHICAGO STATE UNIVERSITY

(From Article 37, Section 340 of Public Act 95-734)

For replacing primary electrical

  feeder cable..................................... 115,049

For the construction of a conference

  Center, Daycare Facility and for

  renovating Building K (Robinson

  Center) in addition to funds

  previously appropriated........................ 4,860,186

For the construction of a day care

  facility....................................... 4,888,875

For the construction of a student

  financial outreach building.................... 4,719,982

For constructing a new library facility,

  site improvements, utilities, and

  purchasing equipment, in addition

  to funds previously appropriated............... 1,007,921

For technology improvements and

  deferred maintenance........................... 1,171,770

For remodeling Building K, in addition

  to funds previously appropriated............... 8,473,432

For planning and beginning to remodel

  Building K and improving site.................. 1,000,474

For a grant to Chicago State University for

  all costs associated with construction of

  a Convocation Center.............................. 14,687

For upgrading campus infrastructure,

  in addition to the funds

  previously appropriated.......................... 573,846

For renovating buildings and upgrading

  mechanical systems................................ 61,412

EASTERN ILLINOIS UNIVERSITY

For upgrading the electrical

  distribution system............................ 2,031,880

For renovating and expanding the

  Fine Arts Center, in addition to

  funds previously appropriated.................... 113,408

For planning and beginning to renovate

  and expand the Fine Arts Center -

  Phase 1, in addition to funds

  previously appropriated.......................... 133,604

For upgrading campus buildings for health,

  safety and environmental improvements............ 360,718

GOVERNORS STATE UNIVERSITY

For constructing addition and

  remodeling the teaching & learning

  complex, in addition to funds

  previously appropriated....................... 14,557,170

ILLINOIS STATE UNIVERSITY

For renovating Stevenson and Turner

  Halls for life/safety.......................... 8,786,380

For the upgrade and remodeling

  of Schroeder Hall.............................. 2,038,924

For remodeling Julian and Moulton Halls............ 376,727

NORTHEASTERN ILLINOIS UNIVERSITY

For renovating Building "C" and

  remodeling and expanding Building "E"

  and Building "F"............................... 6,233,200

For planning and beginning to remodel

  Buildings A, B and E............................. 212,743

For remodeling in the Science Building

  to upgrade heating, ventilating and air

  conditioning systems........................... 2,021,400

For replacing fire alarm systems, lighting

  and ceilings..................................... 120,812

NORTHERN ILLINOIS UNIVERSITY

For renovating the Founders Library

  basement, in addition to funds previously

  appropriated..................................... 626,578

For planning a classroom building and

  developing site in Hoffman Estates............. 1,314,500

For completing the construction of the

  Engineering Building, in addition to

  amounts previously appropriated for

  such purpose...................................... 37,233

For renovating Altgeld Hall and

  purchasing equipment............................. 219,777

For upgrading storm waterway controls in

  addition to funds previously appropriated........ 217,884

SOUTHERN ILLINOIS UNIVERSITY

For planning, construction and equipment

  for a cancer center............................... 68,143

SOUTHERN ILLINOIS UNIVERSITY - CARBONDALE

For renovating and constructing an

  addition to the Morris Library, in

  addition to funds previously

  appropriated..................................... 160,721

SIU SCHOOL OF MEDICINE - SPRINGFIELD

For constructing and for equipment for

  an addition to the combined laboratory,

  in addition to funds previously

  appropriated...................................... 65,248

UNIVERSITY OF ILLINOIS AT CHICAGO

Plan, construct, and equip the Chemical

  Sciences Building............................. 57,600,000

For planning, construction and equipment

  for a chemical sciences building............... 3,549,048

To plan and begin construction of

  a medical imaging research/clinical

  facility.......................................... 49,753

For remodeling the Clinical

  Sciences Building................................ 854,132

For the renovation of the court area and

  Lecture Center, in addition to funds

  previously appropriated........................... 54,793

UNIVERSITY OF IL LINOIS AT CHAMPAIGN-URBANA

For planning, analysis and design

  of Lincoln Hall.  Design cannot proceed

  beyond Program Analysis/Preliminary

  Design unless approved in writing by

  the Governor................................... 2,000,000

Expansion of Microelectronics Lab.................. 151,766

For planning, construction and equipment

  for a biotechnology genomic facility............. 959,838

For planning, construction and equipment

  for a supercomputing application facility........ 247,984

UNIVERSITY CENTER OF LAKE COUNTY

For constructing a university center and

  purchasing equipment, in addition to

  funds previously appropriated..................... 30,303

For land, planning, remodeling, construction

  and all costs necessary to construct a

  facility.......................................... 35,981

WESTERN ILLINOIS UNIVERSITY - MACOMB

Plan and construct performing arts center........ 2,688,234

For improvements to Memorial

  Hall........................................... 9,487,227

    Total                                      $144,293,743

 

    Section 360.  The amount of $73,780, or so much thereof as may be necessary, and remains unexpended on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 37, Section 360 of Public Act 95-734, as amended, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the University of Illinois for miscellaneous capital improvements including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, costs of planning, supplies, equipment, materials, services, and all other expenses required to complete the work.  This appropriation shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 370.  The following named amount, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 37, Section 370 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for the project hereinafter enumerated:

EAST ST. LOUIS COLLEGE CENTER

(From Article 37, Section 370 of Public Act 95-734)

For construction of facilities, remodeling,

  site improvements, utilities and other

  costs necessary for adapting the former

  campus of Metropolitan Community College

  for a Community College Center and Southern

  Illinois University, in addition to funds

  previously appropriated........................ 2,146,323

 

    Section 375.  The sum of $16,105,527, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 37, Section 375 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 380.  The sum of $21,965,216, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 37, Section 380 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 385.  The sum of $9,270,559, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 37, Section 385 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the Illinois Community College Board for miscellaneous capital improvements including construction, capital facilities, cost of planning, supplies, equipment, materials and all other expenses required to complete the work at the various community colleges.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 390.  The sum of $3,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 37, Section 390 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for a grant to Northwestern University for planning, construction, and equipment for a Nanofabrication and Molecular Center.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 400.  The sum of $16,741, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 37, Section 400 of Public Act 95-734, as amended, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for miscellaneous capital improvements to state facilities including construction, reconstruction, remodeling, improvement, repair and installation of capital facilities, cost of planning, supplies, equipment, materials, services and all other expenses required to complete the work at the facilities.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 405.  The sum of $69,083,113, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 37, Section 405 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Capital Development Board for the development and improvement of educational, scientific, technical and vocational programs and facilities and the expansion of health and human services, and for any other purposes authorized in subsection (c) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 410.  The sum of $118,682,832, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 37, Section 410 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for educational purposes by State universities and colleges, the Illinois Community College Board created by the Public Community College Act and for grants to public community colleges as authorized by Sections 5-11 and 5-12 of the Public Community College Act as authorized by subsection (a) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    No contract shall be entered into or obligation incurred for any expenditure made in this Article until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, Article 65                          $904,211,595

 

ARTICLE 75

EASTERN ILLINOIS UNIVERSITY

 

    Section 5.  The sum of $1,323,408, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 38, Section 5 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Board of Trustees of Eastern Illinois University to purchase equipment for the renovation and expansion of the Fine Arts Center.  No contract shall be entered into or obligation incurred for any expenditure from the appropriation made in this Section until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, Article 75                            $1,323,408

 

ARTICLE 80

NORTHEASTERN ILLINOIS UNIVERSITY

 

    Section 5.  The sum of $1,552,933, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 39, Section 5 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Board of Trustees of Northeastern Illinois University to purchase equipment and remodel buildings A, B and E.  This appropriation is in addition to any funds previously appropriated.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 80                            $1,552,933

 

ARTICLE 85

UNIVERSITY OF ILLINOIS

 

    Section 5.  The sum of $4,210,698, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 40, Section 5 of Public Act 95-734, as amended, is reappropriated from the Capital Development Fund to the Board of Trustees of the University of Illinois for all costs associated with the space needs of the Department of Natural Resources, Illinois Natural History Survey Division and State Water Survey Division on the campus of the University of Illinois in Champaign, including construction, capital facilities, planning, relocation, renovation and rehabilitation, mechanical systems, materials, services and all other costs required to complete the work.

 

    Section 10.  The sum of $106,727, or so much thereof as may be necessary and remains unexpended on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 40, Section 10 of Public Act 95-734, is reappropriated from the Capital Development Fund to the University of Illinois for digitalization infrastructure for WILL-TV (Urbana-Champaign).

 

    Section 20.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Sections 5 and 10 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 85                            $4,317,425

 

ARTICLE 90

ILLINOIS COMMERCE COMMISSION

 

    Section 5.  The sum of $57,423, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 41, Section 5 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Illinois Commerce Commission for train whistle abatement in counties with over 3,000,000 in population, where a public highway crosses a railroad at grade.

 

    Total, Article 90                               $57,423

 

ARTICLE 95

ENVIRONMENTAL PROTECTION AGENCY

 

    Section 5.  The sum of $110,400,000, or so much thereof as may be necessary, is appropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.

 

    Section 7  The sum of $110,400,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for the Water Revolving Loan Program.

 

    Section 10.  The sum of $5,300,000, or so much thereof as may be necessary, is appropriated from the Capital Development Fund to the Environmental Protection Agency for financial assistance to municipalities with designated River Edge Redevelopment Zones for brownfields redevelopment in accordance with Section 58.13 of the Environmental Protection Act, including costs in prior years.

 

    Section 15.  The sum of $75,000,000, or so much thereof as may be necessary, is appropriated from the Anti-Pollution Fund to the Environmental Protection Agency for reimbursements to eligible owners/operators of Leaking Underground Storage Tanks, including claims submitted in prior years and for costs associated with site remediation.

 

    Section 20.  The sum of $204,000,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to rules defining the Water Pollution Control Revolving Loan program and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.

 

    Section 25.  The sum of $152,000,000, or so much thereof as may be necessary, is appropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government and privately owned community water supplies for drinking water infrastructure projects pursuant to the Safe Drinking Water Act, as amended, and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged program.

 

    Section 35.  No contract shall be entered into or obligation incurred for any expenditure made in Sections 5, 10, 15 and 30 of this Article until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, Article 95                          $546,700,000

 

ARTICLE 100

ENVIRONMENTAL PROTECTION AGENCY

 

    Section 5.  The sum of $596,915,013, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 42, Section 20, and Article 43, Section 5 of Public Act 95-734, as amended, are reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to rules defining the Water Pollution Control Revolving Loan program and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.

 

    Section 10.  The sum of $236,430,498, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from appropriations heretofore made in Article 42, Section 25, and Article 43, Section 10 of Public Act 95-734, as amended, are reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government and privately owned community water supplies for drinking water infrastructure projects pursuant to the Safe Drinking Water Act, as amended, and for transfer of funds to establish reserve accounts, construction accounts or any other necessary funds or accounts in order to implement a leveraged loan program.

 

    Section 15.  The sum of $8,942,400, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 43, Section 15 of Public Act 95-734, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.

 

    Section 20.  The sum of $1,827,595, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 43, Section 20 of Public Act 95-734, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for deposit into the Water Revolving Fund.

 

    Section 25.  The sum of $4,402,121, or so much thereof as may be necessary and as remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 43, Section 25 of Public Act 95-734, as amended, is reappropriated from the Anti-Pollution Fund to the Environmental Protection Agency for grants to units of local government for wastewater facilities, pursuant to provisions of the "Anti-Pollution Bond Act."

 

    Section 30.  The amount of $46,234,397, or so much thereof as may be necessary and remains unexpended on June 30, 2009, from reappropriations heretofore made for such purposes in Article 43, Section 30 of Public Act 95-734, as amended, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for wastewater compliance grants to units of local government or sewer systems and wastewater treatment facilities pursuant to procedures and rules established under the Anti-Pollution Bond Act.  These grants are limited to projects for which the local government provides at least 30% of the project cost.  There is an approved project compliance plan, and there is an enforceable compliance schedule prior to the grant award.  The grant award will be based on eligible project cost contained in the approved compliance plan.

 

    Section 35.  The sum of $2,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 43, Section 35 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Brownfields Redevelopment Fund for use pursuant to Sections 58.13 and 58.15 of the Environmental Protection Act.

 

    Section 40.  The sum of $2,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 43, Section 40 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Brownfields Redevelopment Fund for use pursuant to Sections 58.13 and 58.15 of the Environmental Protection Act.

 

    Section 45.  The sum of $10,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 43, Section 45 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for deposit into the Hazardous Waste Fund for use pursuant to Section 22.2 of the Environmental Protection Act.

 

    Section 50.  The sum of $471,885, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 43, Section 50 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for grants and contracts for public drinking water infrastructure, including design and construction, where private drinking water wells have been contaminated by a hazardous substance.

 

    Section 55.  The sum of $4,995,121, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 43, Section 55 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for financial assistance to municipalities with designated River Edge Redevelopment Zones for brownfields redevelopment in accordance with Section 58.13 of the Environmental Protection Act, including costs in prior years.

 

    Section 60.  The sum of $8,462,700, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 43, Section 60 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for the protection, preservation, restoration and conservation of environmental and natural resources, for deposits into the Water Revolving Fund, and for any other purposes authorized in subsection (d) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 65.  The sum of $16,600,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 43, Section 65 of Public Act 95-734, is reappropriated from the Build Illinois Bond Fund to the Environmental Protection Agency for the protection, preservation, restoration and conservation of environmental and natural resources, for deposits into the Water Revolving Fund, and for any other purposes authorized in subsection (d) of Section 4 of the Build Illinois Bond Act and for grants to State Agencies for such purposes.

 

    Section 70.  The sum of $180,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 15, Section 260 of Public Act 95-731 as amended by Public Act 96-004, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to units of local government for sewer systems and wastewater treatment facilities pursuant to the American Recovery and Reinvestment Act of 2009.

 

    Section 75.  The sum of $80,200,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 15, Section 265 of Public Act 95-731 as amended by Public Act 96-004, is reappropriated from the Water Revolving Fund to the Environmental Protection Agency for financial assistance to local governments and privately owned community water supplies for drinking water infrastructure projects pursuant to the American Recovery and Reinvestment Act of 2009.

 

    Section 80.  No contract shall be entered into or obligation incurred for any expenditure made in Sections 15 through 65 of this Article until after the purpose and amounts have been approved in writing by the Governor.

 

    Total, Article 100                       $1,199,481,730

 

ARTICLE 105

HISTORIC PRESERVATION AGENCY

 

    Section 5.  The sum of $143,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 44, Section 5 of Public Act 95-734, as amended, is reappropriated from the Capital Development Fund to the Historic Preservation Agency for support facilities, acquisition or improvements for Sugar Loaf and/or Fox Mounds or other properties within the Cahokia Mounds National Historic Landmark Boundary.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 105                             $143,000

 

ARTICLE 110

ILLINOIS FINANCE AUTHORITY

 

    Section 5.  The sum of $6,000,000, or so much thereof as may be necessary, is appropriated from the Fire Truck Revolving Loan Fund to the Illinois Finance Authority for the purpose of making loans to fire departments, fire protection districts, and township fire departments as successor in interest to the Illinois Rural Bond Bank.

 

    Section 10.  The sum of $4,000,000, or so much thereof as may be necessary, is appropriated from the Ambulance Revolving Loan Fund to the Illinois Finance Authority for the purpose of making loans to fire departments, fire protection districts, township fire departments or non-profit ambulance services as successor in interest to the Illinois Rural Bond Bank.

 

    Total, Article 110                          $10,000,000

 

ARTICLE 115

ILLINOIS FINANCE AUTHORITY

 

    Section 5.  The sum of $10,630,807, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from appropriations and reappropriations heretofore made in Article 45, Section 5, and Article 46, Section 5 of Public Act 95-734, as amended, is reappropriated from the Fire Truck Revolving Loan Fund to the Illinois Finance Authority for the purpose of making loans to fire departments, fire protection districts, and township fire departments as successor in interest to the Illinois Rural Bond Bank, pursuant to Section 845-75 of Public Act 93-0205.

 

    Section 10.  The sum of $4,000,000, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 45, Section 10 of Public Act 95-734, is reappropriated from the Ambulance Revolving Loan Fund to the Illinois Finance Authority for the purpose of making loans to fire departments, fire protection districts, township fire departments or non-profit ambulance services as successor in interest to the Illinois Rural Bond Bank.

 

    Total, Article 115                          $14,630,807

 

ARTICLE 120

ILLINOIS COMMUNITY COLLEGE BOARD

 

    Section 5.  The sum of $1,606,823, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 47, Section 5 of Public Act 95-734, as amended, is reappropriated from the Build Illinois Bond Fund for the Illinois Community College Board for remodeling of facilities for compliance with the Americans with Disabilities Act.  This appropriated amount shall be in addition to any other appropriated amounts which can be expended for these purposes.

 

    Section 10.  No contract shall be entered into or obligation incurred for any expenditures from appropriations in Section 5 of this Article until after the purposes and amounts have been approved in writing by the Governor.

 

    Total, Article 120                           $1,606,823

 

ARTICLE 125

 

    Section 5.  No monies may be expended from any appropriation or reappropriation under any section of this Article unless a grant or contractual agreement for the expenditure was agreed to in writing prior to August 31, 2007.  The Comptroller shall not approve the expenditure until he or she receives a copy of that signed grant or contractual agreement.  The Comptroller shall keep a copy of any such grant or contractual agreement he or she receives.

 

    Section 10.  The sum of $4,580,704, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 48, Section 10 of Public Act 95-734, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.

 

    Section 15.  The sum of $3,130,040, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 48, Section 15 of Public Act 95-734, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8 or Article 10 of the Build Illinois Act.

 

    Section 20.  The sum of $2,600,251, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 48, Section 20 of Public Act 95-734, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.

 

    Section 25.  The sum of $5,567,122, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 48, Section 25 of Public Act 95-734, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.

 

    Section 30.  The sum of $4,524,172, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 48, Section 30 of Public Act 95-734, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants and loans pursuant but not limited to Article 8, Article 9 or Article 10 of the Build Illinois Act.

 

    Section 40.  The sum of $208,908,598, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 48, Section 40 of Public Act 95-734, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the purpose of making grants and loans to local governments for planning, engineering, acquisition, construction, reconstruction, development, improvement and extension of the public infrastructure, and for any other purposes authorized in subsection (a) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 45.  The sum of $47,500,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 48, Section 45 of Public Act 95-734, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the purpose of fostering economic development and increased employment and the well being of the citizens of Illinois, and for any other purposes authorized in subsection (b) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 50.  The sum of $30,646,616, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 48, Section 50 of Public Act 95-734, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for the development and improvement of educational, scientific, technical and vocational programs and facilities and the expansion of health and human services, and for any other purposes authorized in subsection (c) of Section 4 of the Build Illinois Bond Act and for grants to State agencies for such purposes.

 

    Section 55.  The sum of $30,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 48, Section 55 of Public Act 95-734, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for open spaces, recreational and conservation purposes and the protection of land and for deposits into the Conservation 2000 Projects Fund as authorized by subsection (c) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 60.  The sum of $36,743,496, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 48, Section 60 of Public Act 95-734, as amended, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for grants to local governments for the acquisition, financing, architectural planning, development, alteration, installation, and construction of capital facilities consisting of buildings, structures, durable equipment, and land as authorized by subsection (l) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 65.  The amount of $10,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 48, Section 65 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Department of Commerce and Economic Opportunity for grants to local governments for the acquisition, financing, architectural planning, development, alteration, installation, and construction of capital facilities consisting of buildings, structures, durable equipment, and land as authorized by subsection (l) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 70.  The amount of $25,000,000, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made in Article 48, Section 70 of Public Act 95-734, as amended, is reappropriated from the Build Illinois Bond Fund to the Department of Commerce and Economic Opportunity for grants pursuant but not limited to Article 8, Article 9, or Article 10 of the Build Illinois Act.

 

    Section 75.  The sum of $13,801,931, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from an appropriation heretofore made for such purpose in Article 48, Section 75 of Public Act 95-734, as amended, is reappropriated from the Fund for Illinois’ Future to the Department of Commerce and Economic Opportunity for grants to units of government, educational facilities and not-for-profit organizations for education and training, infrastructure improvements and other capital projects including but not limited to planning, construction, reconstruction, equipment, utilities and vehicles, and all costs associated with economic development programs, community service programs, public health programs, public safety programs, other programs and activities, and for grants to other State agencies for any capital or operating purposes.

 

    Section 80.  The amount of $2,476,501 or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made in Article 48, Section 80 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for grants to units of local government and other eligible entities for all costs associated with land acquisition, construction and rehabilitation projects.

 

    Section 85.  The sum of $2,585,800, or so much thereof as may be necessary, and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 48, Section 85 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for child care facilities, mental and public health facilities, and facilities for the care of disabled veterans and their spouses as authorized by subsection (d) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 90.  The sum of $77,778,276, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 48, Section 90 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for correctional purposes at State prison and correctional centers as authorized by subsection (b) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 95.  The sum of $24,224,289, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 48, Section 95 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for open spaces, recreational and conservation purposes and the protection of land and for deposits into the Conservation 2000 Projects Fund as authorized by subsection (c) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 100.  The sum of $6,790,503, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 48, Section 100 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for child care facilities, mental and public health facilities, and facilities for the care of disabled veterans and their spouses as authorized by subsection (d) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Section 105.  The sum of $97,297,389, or so much thereof as may be necessary and remains unexpended at the close of business on June 30, 2009, from a reappropriation heretofore made for such purpose in Article 48, Section 105 of Public Act 95-734, is reappropriated from the Capital Development Fund to the Capital Development Board for use by the State, its departments, authorities, public corporations, commissions and agencies as authorized by subsection (e) of Section 3 of the General Obligation Bond Act or for grants to State agencies for such purposes.

 

    Total, Article 125                         $634,155,688

 

ARTICLE 130

 

    Section 5. The following named amounts, or so much thereof as may be necessary, are appropriated from the Capital Development Fund to the Capital Development Board for the following purposes:

 

DEPARTMENT OF NATURAL RESOURCES

PERE MARQUETTE STATE PARK

  For replacing lodge pool

   dehumidifier, in addition to

   funds previously appropriated................... 700,000

STEPHEN FORBES STATE PARK

  For replacing dump and fish

   cleaning stations, in addition

   to funds previously appropriated................ 550,000

BUFFALO ROCK STATE PARK

  For replacing the septic

   system, in addition to funds

   previously appropriated......................... 650,000

 

DEPARTMENT OF CORRECTIONS

ILLINOIS RIVER CORRECTIONAL CENTER

  For replacing domestic hot water

   heater, in addition to

   funds previously appropriated................... 625,000

TAYLORVILLE CORRECTIONAL CENTER

  For replacing operators and

   main gates, in addition to

   funds previously appropriated................... 300,000

 

DEPARTMENT OF HUMAN SERVICES

CHICAGO-READ MENTAL HEALTH CENTER

  For renovating Unit J-East for

   forensic use, in addition to

   funds previously appropriated................. 3,500,000

ELGIN MENTAL HEALTH CENTER

  For converting the Read Building

   for office space, in addition

   to funds previously appropriated.............. 1,750,000

MADDEN MENTAL HEALTH CENTER

  For renovating residential

   pavilions, in addition to

   funds previously appropriated................... 550,000

KILEY DEVELOPMENTAL CENTER

  For improving power reliability

   and installing emergency lighting,

   in addition to funds

   previously appropriated......................... 940,000

 

ILLINOIS HISTORIC PRESERVATION AGENCY

LINCOLN’S TOMB

  For replacing the HVAC system,

   in addition to funds

   previously appropriated......................... 250,000

 

DEPARTMENT OF VETERANS AFFAIRS

  For planning and beginning the

   construction of a skilled care

   veterans home................................. 2,000,000

 

DEPARTMENT OF STATE POLICE

  For planning and beginning the

   construction of a Metro East

   forensic laboratory, in addition to

   funds previously appropriated................... 750,000

 

DEPARTMENT OF MILITARY AFFAIRS

  For constructing an army

   aviation support facility..................... 6,252,000

 

STATEWIDE

  For American with Disabilities Act

   (ADA) upgrades at the following

   locations at the approximate

   cost set forth below.......................... 3,500,000

  DNR – I & M Canal Corridor ... 1,800,000

  IBHE – Eastern Illinois

   University................... 1,848,000

  For providing construction contingency

   for the following projects at

   the approximate cost set forth below,

   in addition to funds

   previously appropriated......................... 773,500

LINCOLN’S TOMB HISTORIC SITE

  Rehab site/Provide

   irrigation system............... 85,600

MICHAEL BILANDIC BUILDING

  Upgrade HVAC and Domestic Water

   System......................... 184,700

SUBURBAN NORTH REGIONAL OFFICE FACILITY

  Renovate for Office Space....... 300,200

SECRETARY OF STATE

  Upgrade Electrical Systems at three

   Motor Vehicle Facilities........................ 203,000

 

ARTICLE 140

 

    Section 5.  The sum of $50,000,000, or so much thereof as may be necessary, is appropriated from the Build Illinois Bond Fund to the Secretary of State for capital grants to public libraries for permanent improvements.

 

Section 99. Effective date.  This Act takes effect July 1, 2009, but this Act does not take effect at all unless House Bill 255 of the 96th General Assembly, as amended, becomes law.