1 | AN ACT concerning State government.
| ||||||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||||||
4 | Section 5. The Illinois Power Agency Act is amended by | ||||||||||||||||||||||||||||
5 | changing Sections 1-10, 1-56, and 1-75 as follows:
| ||||||||||||||||||||||||||||
6 | (20 ILCS 3855/1-10)
| ||||||||||||||||||||||||||||
7 | Sec. 1-10. Definitions. | ||||||||||||||||||||||||||||
8 | "Agency" means the Illinois Power Agency. | ||||||||||||||||||||||||||||
9 | "Agency loan agreement" means any agreement pursuant to | ||||||||||||||||||||||||||||
10 | which the Illinois Finance Authority agrees to loan the | ||||||||||||||||||||||||||||
11 | proceeds of revenue bonds issued with respect to a project to | ||||||||||||||||||||||||||||
12 | the Agency upon terms providing for loan repayment installments | ||||||||||||||||||||||||||||
13 | at least sufficient to pay when due all principal of, interest | ||||||||||||||||||||||||||||
14 | and premium, if any, on those revenue bonds, and providing for | ||||||||||||||||||||||||||||
15 | maintenance, insurance, and other matters in respect of the | ||||||||||||||||||||||||||||
16 | project. | ||||||||||||||||||||||||||||
17 | "Authority" means the Illinois Finance Authority. | ||||||||||||||||||||||||||||
18 | "Clean coal facility" means an electric generating | ||||||||||||||||||||||||||||
19 | facility that uses primarily coal as a feedstock and that | ||||||||||||||||||||||||||||
20 | captures and sequesters carbon emissions at the following | ||||||||||||||||||||||||||||
21 | levels: at least 50% of the total carbon emissions that the | ||||||||||||||||||||||||||||
22 | facility would otherwise emit if, at the time construction | ||||||||||||||||||||||||||||
23 | commences, the facility is scheduled to commence operation |
| |||||||
| |||||||
1 | before 2016, at least 70% of the total carbon emissions that | ||||||
2 | the facility would otherwise emit if, at the time construction | ||||||
3 | commences, the facility is scheduled to commence operation | ||||||
4 | during 2016 or 2017, and at least 90% of the total carbon | ||||||
5 | emissions that the facility would otherwise emit if, at the | ||||||
6 | time construction commences, the facility is scheduled to | ||||||
7 | commence operation after 2017. The power block of the clean | ||||||
8 | coal facility shall not exceed allowable emission rates for | ||||||
9 | sulfur dioxide, nitrogen oxides, carbon monoxide, particulates | ||||||
10 | and mercury for a natural gas-fired combined-cycle facility the | ||||||
11 | same size as and in the same location as the clean coal | ||||||
12 | facility at the time the clean coal facility obtains an | ||||||
13 | approved air permit. All coal used by a clean coal facility | ||||||
14 | shall have high volatile bituminous rank and greater than 1.7 | ||||||
15 | pounds of sulfur per million btu content, unless the clean coal | ||||||
16 | facility does not use gasification technology and was operating | ||||||
17 | as a conventional coal-fired electric generating facility on | ||||||
18 | June 1, 2009 (the effective date of Public Act 95-1027). | ||||||
19 | "Clean coal SNG facility" means a facility that uses a | ||||||
20 | gasification process to produce substitute natural gas, that | ||||||
21 | sequesters at least 90% of the total carbon emissions that the | ||||||
22 | facility would otherwise emit and that uses petroleum coke or | ||||||
23 | coal as a feedstock, with all such coal having a high | ||||||
24 | bituminous rank and greater than 1.7 pounds of sulfur per | ||||||
25 | million btu content. | ||||||
26 | "Commission" means the Illinois Commerce Commission. |
| |||||||
| |||||||
1 | "Costs incurred in connection with the development and | ||||||
2 | construction of a facility" means: | ||||||
3 | (1) the cost of acquisition of all real property and | ||||||
4 | improvements in connection therewith and equipment and | ||||||
5 | other property, rights, and easements acquired that are | ||||||
6 | deemed necessary for the operation and maintenance of the | ||||||
7 | facility; | ||||||
8 | (2) financing costs with respect to bonds, notes, and | ||||||
9 | other evidences of indebtedness of the Agency; | ||||||
10 | (3) all origination, commitment, utilization, | ||||||
11 | facility, placement, underwriting, syndication, credit | ||||||
12 | enhancement, and rating agency fees; | ||||||
13 | (4) engineering, design, procurement, consulting, | ||||||
14 | legal, accounting, title insurance, survey, appraisal, | ||||||
15 | escrow, trustee, collateral agency, interest rate hedging, | ||||||
16 | interest rate swap, capitalized interest and other | ||||||
17 | financing costs, and other expenses for professional | ||||||
18 | services; and | ||||||
19 | (5) the costs of plans, specifications, site study and | ||||||
20 | investigation, installation, surveys, other Agency costs | ||||||
21 | and estimates of costs, and other expenses necessary or | ||||||
22 | incidental to determining the feasibility of any project, | ||||||
23 | together with such other expenses as may be necessary or | ||||||
24 | incidental to the financing, insuring, acquisition, and | ||||||
25 | construction of a specific project and placing that project | ||||||
26 | in operation. |
| |||||||
| |||||||
1 | "Department" means the Department of Commerce and Economic | ||||||
2 | Opportunity. | ||||||
3 | "Director" means the Director of the Illinois Power Agency. | ||||||
4 | "Demand-response" means measures that decrease peak | ||||||
5 | electricity demand or shift demand from peak to off-peak | ||||||
6 | periods. | ||||||
7 | "Energy efficiency" means measures that reduce the amount | ||||||
8 | of electricity or natural gas required to achieve a given end | ||||||
9 | use. | ||||||
10 | "Electric utility" has the same definition as found in | ||||||
11 | Section 16-102 of the Public Utilities Act. | ||||||
12 | "Facility" means an electric generating unit or a | ||||||
13 | co-generating unit that produces electricity along with | ||||||
14 | related equipment necessary to connect the facility to an | ||||||
15 | electric transmission or distribution system. | ||||||
16 | "Governmental aggregator" means one or more units of local | ||||||
17 | government that individually or collectively procure | ||||||
18 | electricity to serve residential retail electrical loads | ||||||
19 | located within its or their jurisdiction. | ||||||
20 | "Large-scale distributed solar" means a photovoltaic cell | ||||||
21 | or panel that (i) has a generation capacity greater than 25 | ||||||
22 | kilowatts and (ii) is located on the customer's side of the | ||||||
23 | customer's electric meter. | ||||||
24 | "Local government" means a unit of local government as | ||||||
25 | defined in Article VII of Section 1 of the Illinois | ||||||
26 | Constitution. |
| |||||||
| |||||||
1 | "Municipality" means a city, village, or incorporated | ||||||
2 | town. | ||||||
3 | "Person" means any natural person, firm, partnership, | ||||||
4 | corporation, either domestic or foreign, company, association, | ||||||
5 | limited liability company, joint stock company, or association | ||||||
6 | and includes any trustee, receiver, assignee, or personal | ||||||
7 | representative thereof. | ||||||
8 | "Project" means the planning, bidding, and construction of | ||||||
9 | a facility. | ||||||
10 | "Public utility" has the same definition as found in | ||||||
11 | Section 3-105 of the Public Utilities Act. | ||||||
12 | "Real property" means any interest in land together with | ||||||
13 | all structures, fixtures, and improvements thereon, including | ||||||
14 | lands under water and riparian rights, any easements, | ||||||
15 | covenants, licenses, leases, rights-of-way, uses, and other | ||||||
16 | interests, together with any liens, judgments, mortgages, or | ||||||
17 | other claims or security interests related to real property. | ||||||
18 | "Renewable energy credit" means a tradable credit that | ||||||
19 | represents the environmental attributes of a certain amount of | ||||||
20 | energy produced from a renewable energy resource. | ||||||
21 | "Renewable energy resources" includes energy and its | ||||||
22 | associated renewable energy credit or renewable energy credits | ||||||
23 | from wind, solar thermal energy, photovoltaic cells and panels, | ||||||
24 | biodiesel, crops and untreated and unadulterated organic waste | ||||||
25 | biomass, tree waste, hydropower that does not involve new | ||||||
26 | construction or significant expansion of hydropower dams, and |
| |||||||
| |||||||
1 | other alternative sources of environmentally preferable | ||||||
2 | energy. For purposes of this Act, landfill gas produced in the | ||||||
3 | State is considered a renewable energy resource. "Renewable | ||||||
4 | energy resources" does not include the incineration or burning | ||||||
5 | of tires, garbage, general household, institutional, and | ||||||
6 | commercial waste, industrial lunchroom or office waste, | ||||||
7 | landscape waste other than tree waste, railroad crossties, | ||||||
8 | utility poles, or construction or demolition debris, other than | ||||||
9 | untreated and unadulterated waste wood. | ||||||
10 | "Revenue bond" means any bond, note, or other evidence of | ||||||
11 | indebtedness issued by the Authority, the principal and | ||||||
12 | interest of which is payable solely from revenues or income | ||||||
13 | derived from any project or activity of the Agency. | ||||||
14 | "Sequester" means permanent storage of carbon dioxide by | ||||||
15 | injecting it into a saline aquifer, a depleted gas reservoir, | ||||||
16 | or an oil reservoir, directly or through an enhanced oil | ||||||
17 | recovery process that may involve intermediate storage in a | ||||||
18 | salt dome. | ||||||
19 | "Servicing agreement" means (i) in the case of an electric | ||||||
20 | utility, an agreement between the owner of a clean coal | ||||||
21 | facility and such electric utility, which agreement shall have | ||||||
22 | terms and conditions meeting the requirements of paragraph (3) | ||||||
23 | of subsection (d) of Section 1-75, and (ii) in the case of an | ||||||
24 | alternative retail electric supplier, an agreement between the | ||||||
25 | owner of a clean coal facility and such alternative retail | ||||||
26 | electric supplier, which agreement shall have terms and |
| |||||||
| |||||||
1 | conditions meeting the requirements of Section 16-115(d)(5) of | ||||||
2 | the Public Utilities Act. | ||||||
3 | "Small-scale distributed solar" means a photovoltaic cell | ||||||
4 | or panel that (i) has a generation capacity of 25 kilowatts or | ||||||
5 | less and (ii) is located on the customer's side of the | ||||||
6 | customer's electric meter. | ||||||
7 | "Substitute natural gas" or "SNG" means a gas manufactured | ||||||
8 | by gasification of hydrocarbon feedstock, which is | ||||||
9 | substantially interchangeable in use and distribution with | ||||||
10 | conventional natural gas. | ||||||
11 | "Total resource cost test" or "TRC test" means a standard | ||||||
12 | that is met if, for an investment in energy efficiency or | ||||||
13 | demand-response measures, the benefit-cost ratio is greater | ||||||
14 | than one. The benefit-cost ratio is the ratio of the net | ||||||
15 | present value of the total benefits of the program to the net | ||||||
16 | present value of the total costs as calculated over the | ||||||
17 | lifetime of the measures. A total resource cost test compares | ||||||
18 | the sum of avoided electric utility costs, representing the | ||||||
19 | benefits that accrue to the system and the participant in the | ||||||
20 | delivery of those efficiency measures, as well as other | ||||||
21 | quantifiable societal benefits, including avoided natural gas | ||||||
22 | utility costs, to the sum of all incremental costs of end-use | ||||||
23 | measures that are implemented due to the program (including | ||||||
24 | both utility and participant contributions), plus costs to | ||||||
25 | administer, deliver, and evaluate each demand-side program, to | ||||||
26 | quantify the net savings obtained by substituting the |
| |||||||
| |||||||
1 | demand-side program for supply resources. In calculating | ||||||
2 | avoided costs of power and energy that an electric utility | ||||||
3 | would otherwise have had to acquire, reasonable estimates shall | ||||||
4 | be included of financial costs likely to be imposed by future | ||||||
5 | regulations and legislation on emissions of greenhouse gases.
| ||||||
6 | (Source: P.A. 95-481, eff. 8-28-07; 95-913, eff. 1-1-09; | ||||||
7 | 95-1027, eff. 6-1-09; 96-33, eff. 7-10-09; 96-159, eff. | ||||||
8 | 8-10-09; 96-784, eff. 8-28-09; revised 9-15-09.)
| ||||||
9 | (20 ILCS 3855/1-56) | ||||||
10 | Sec. 1-56. Illinois Power Agency Renewable Energy | ||||||
11 | Resources Fund. | ||||||
12 | (a) The Illinois Power Agency Renewable Energy Resources | ||||||
13 | Fund is created as a special fund in the State treasury. | ||||||
14 | (b) The Illinois Power Agency Renewable Energy Resources | ||||||
15 | Fund shall be administered by the Agency to procure renewable | ||||||
16 | energy resources. Prior to June 1, 2011, resources procured | ||||||
17 | pursuant to this Section shall be procured from facilities | ||||||
18 | located in Illinois, provided the resources are available from | ||||||
19 | those facilities. If resources are not available in Illinois, | ||||||
20 | then they shall be procured in states that adjoin Illinois. If | ||||||
21 | resources are not available in Illinois or in states that | ||||||
22 | adjoin Illinois, then they may be purchased elsewhere. | ||||||
23 | Beginning June 1, 2011, resources procured pursuant to this | ||||||
24 | Section shall be procured from facilities located in Illinois | ||||||
25 | or states that adjoin Illinois. If resources are not available |
| |||||||
| |||||||
1 | in Illinois or in states that adjoin Illinois, then they may be | ||||||
2 | procured elsewhere. To the extent available, at least 75% of | ||||||
3 | these renewable energy resources shall come from wind | ||||||
4 | generation and , starting June 1, 2015, at least the following | ||||||
5 | percentages 6% of the renewable energy resources used to meet | ||||||
6 | these standards shall come from solar photovoltaics : 0.38% by | ||||||
7 | June 1, 2011, 0.75% by June 1, 2012, 1.5% by June 1, 2013, 3% by | ||||||
8 | June 1, 2014, and 6% by June 1, 2015 and thereafter. Of the | ||||||
9 | renewable energy resources that must be derived from | ||||||
10 | photovoltaics under this subsection (b), at least 10% must come | ||||||
11 | from small-scale distributed solar, and at least 50% must come | ||||||
12 | from large-scale distributed solar . | ||||||
13 | (c) The Agency shall procure renewable energy resources at | ||||||
14 | least once each year in conjunction with a procurement event | ||||||
15 | for electric utilities required to comply with Section 1-75 of | ||||||
16 | the Act and shall , whenever possible, enter into long-term | ||||||
17 | contracts with a length of 5 years or more for at least 75% of | ||||||
18 | the renewable energy resources procured during each | ||||||
19 | procurement event . | ||||||
20 | (d) The price paid to procure renewable energy credits | ||||||
21 | using monies from the Illinois Power Agency Renewable Energy | ||||||
22 | Resources Fund shall not exceed the winning bid prices paid for | ||||||
23 | like resources procured for electric utilities required to | ||||||
24 | comply with Section 1-75 of this Act. | ||||||
25 | (e) All renewable energy credits procured using monies from | ||||||
26 | the Illinois Power Agency Renewable Energy Resources Fund shall |
| |||||||
| |||||||
1 | be permanently retired. | ||||||
2 | (f) The procurement process described in this Section is | ||||||
3 | exempt from the requirements of the Illinois Procurement Code, | ||||||
4 | pursuant to Section 20-10 of that Code. | ||||||
5 | (g) All disbursements from the Illinois Power Agency | ||||||
6 | Renewable Energy Resources Fund shall be made only upon | ||||||
7 | warrants of the Comptroller drawn upon the Treasurer as | ||||||
8 | custodian of the Fund upon vouchers signed by the Director or | ||||||
9 | by the person or persons designated by the Director for that | ||||||
10 | purpose. The Comptroller is authorized to draw the warrant upon | ||||||
11 | vouchers so signed. The Treasurer shall accept all warrants so | ||||||
12 | signed and shall be released from liability for all payments | ||||||
13 | made on those warrants. | ||||||
14 | (h) The Illinois Power Agency Renewable Energy Resources | ||||||
15 | Fund shall not be subject to sweeps, administrative charges, or | ||||||
16 | chargebacks, including, but not limited to, those authorized | ||||||
17 | under Section 8h of the State Finance Act, that would in any | ||||||
18 | way result in the transfer of any funds from this Fund to any | ||||||
19 | other fund of this State or in having any such funds utilized | ||||||
20 | for any purpose other than the express purposes set forth in | ||||||
21 | this Section.
| ||||||
22 | (Source: P.A. 96-159, eff. 8-10-09.) | ||||||
23 | (20 ILCS 3855/1-75) | ||||||
24 | Sec. 1-75. Planning and Procurement Bureau. The Planning | ||||||
25 | and Procurement Bureau has the following duties and |
| |||||||
| |||||||
1 | responsibilities: | ||||||
2 | (a) The Planning and Procurement Bureau shall each | ||||||
3 | year, beginning in 2008, develop procurement plans and | ||||||
4 | conduct competitive procurement processes in accordance | ||||||
5 | with the requirements of Section 16-111.5 of the Public | ||||||
6 | Utilities Act for the eligible retail customers of electric | ||||||
7 | utilities that on December 31, 2005 provided electric | ||||||
8 | service to at least 100,000 customers in Illinois. For the | ||||||
9 | purposes of this Section, the term "eligible retail | ||||||
10 | customers" has the same definition as found in Section | ||||||
11 | 16-111.5(a) of the Public Utilities Act. | ||||||
12 | (1) The Agency shall each year, beginning in 2008, | ||||||
13 | as needed, issue a request for qualifications for | ||||||
14 | experts or expert consulting firms to develop the | ||||||
15 | procurement plans in accordance with Section 16-111.5 | ||||||
16 | of the Public Utilities Act. In order to qualify an | ||||||
17 | expert or expert consulting firm must have: | ||||||
18 | (A) direct previous experience assembling | ||||||
19 | large-scale power supply plans or portfolios for | ||||||
20 | end-use customers; | ||||||
21 | (B) an advanced degree in economics, | ||||||
22 | mathematics, engineering, risk management, or a | ||||||
23 | related area of study; | ||||||
24 | (C) 10 years of experience in the electricity | ||||||
25 | sector, including managing supply risk; | ||||||
26 | (D) expertise in wholesale electricity market |
| |||||||
| |||||||
1 | rules, including those established by the Federal | ||||||
2 | Energy Regulatory Commission and regional | ||||||
3 | transmission organizations; | ||||||
4 | (E) expertise in credit protocols and | ||||||
5 | familiarity with contract protocols; | ||||||
6 | (F) adequate resources to perform and fulfill | ||||||
7 | the required functions and responsibilities; and | ||||||
8 | (G) the absence of a conflict of interest and | ||||||
9 | inappropriate bias for or against potential | ||||||
10 | bidders or the affected electric utilities. | ||||||
11 | (2) The Agency shall each year, as needed, issue a | ||||||
12 | request for qualifications for a procurement | ||||||
13 | administrator to conduct the competitive procurement | ||||||
14 | processes in accordance with Section 16-111.5 of the | ||||||
15 | Public Utilities Act. In order to qualify an expert or | ||||||
16 | expert consulting firm must have: | ||||||
17 | (A) direct previous experience administering a | ||||||
18 | large-scale competitive procurement process; | ||||||
19 | (B) an advanced degree in economics, | ||||||
20 | mathematics, engineering, or a related area of | ||||||
21 | study; | ||||||
22 | (C) 10 years of experience in the electricity | ||||||
23 | sector, including risk management experience; | ||||||
24 | (D) expertise in wholesale electricity market | ||||||
25 | rules, including those established by the Federal | ||||||
26 | Energy Regulatory Commission and regional |
| |||||||
| |||||||
1 | transmission organizations; | ||||||
2 | (E) expertise in credit and contract | ||||||
3 | protocols; | ||||||
4 | (F) adequate resources to perform and fulfill | ||||||
5 | the required functions and responsibilities; and | ||||||
6 | (G) the absence of a conflict of interest and | ||||||
7 | inappropriate bias for or against potential | ||||||
8 | bidders or the affected electric utilities. | ||||||
9 | (3) The Agency shall provide affected utilities | ||||||
10 | and other interested parties with the lists of | ||||||
11 | qualified experts or expert consulting firms | ||||||
12 | identified through the request for qualifications | ||||||
13 | processes that are under consideration to develop the | ||||||
14 | procurement plans and to serve as the procurement | ||||||
15 | administrator. The Agency shall also provide each | ||||||
16 | qualified expert's or expert consulting firm's | ||||||
17 | response to the request for qualifications. All | ||||||
18 | information provided under this subparagraph shall | ||||||
19 | also be provided to the Commission. The Agency may | ||||||
20 | provide by rule for fees associated with supplying the | ||||||
21 | information to utilities and other interested parties. | ||||||
22 | These parties shall, within 5 business days, notify the | ||||||
23 | Agency in writing if they object to any experts or | ||||||
24 | expert consulting firms on the lists. Objections shall | ||||||
25 | be based on: | ||||||
26 | (A) failure to satisfy qualification criteria; |
| |||||||
| |||||||
1 | (B) identification of a conflict of interest; | ||||||
2 | or | ||||||
3 | (C) evidence of inappropriate bias for or | ||||||
4 | against potential bidders or the affected | ||||||
5 | utilities. | ||||||
6 | The Agency shall remove experts or expert | ||||||
7 | consulting firms from the lists within 10 days if there | ||||||
8 | is a reasonable basis for an objection and provide the | ||||||
9 | updated lists to the affected utilities and other | ||||||
10 | interested parties. If the Agency fails to remove an | ||||||
11 | expert or expert consulting firm from a list, an | ||||||
12 | objecting party may seek review by the Commission | ||||||
13 | within 5 days thereafter by filing a petition, and the | ||||||
14 | Commission shall render a ruling on the petition within | ||||||
15 | 10 days. There is no right of appeal of the | ||||||
16 | Commission's ruling. | ||||||
17 | (4) The Agency shall issue requests for proposals | ||||||
18 | to the qualified experts or expert consulting firms to | ||||||
19 | develop a procurement plan for the affected utilities | ||||||
20 | and to serve as procurement administrator. | ||||||
21 | (5) The Agency shall select an expert or expert | ||||||
22 | consulting firm to develop procurement plans based on | ||||||
23 | the proposals submitted and shall award one-year | ||||||
24 | contracts to those selected with an option for the | ||||||
25 | Agency for a one-year renewal. | ||||||
26 | (6) The Agency shall select an expert or expert |
| |||||||
| |||||||
1 | consulting firm, with approval of the Commission, to | ||||||
2 | serve as procurement administrator based on the | ||||||
3 | proposals submitted. If the Commission rejects, within | ||||||
4 | 5 days, the Agency's selection, the Agency shall submit | ||||||
5 | another recommendation within 3 days based on the | ||||||
6 | proposals submitted. The Agency shall award a one-year | ||||||
7 | contract to the expert or expert consulting firm so | ||||||
8 | selected with Commission approval with an option for | ||||||
9 | the Agency for a one-year renewal. | ||||||
10 | (b) The experts or expert consulting firms retained by | ||||||
11 | the Agency shall, as appropriate, prepare procurement | ||||||
12 | plans, and conduct a competitive procurement process as | ||||||
13 | prescribed in Section 16-111.5 of the Public Utilities Act, | ||||||
14 | to ensure adequate, reliable, affordable, efficient, and | ||||||
15 | environmentally sustainable electric service at the lowest | ||||||
16 | total cost over time, taking into account any benefits of | ||||||
17 | price stability, for eligible retail customers of electric | ||||||
18 | utilities that on December 31, 2005 provided electric | ||||||
19 | service to at least 100,000 customers in the State of | ||||||
20 | Illinois. | ||||||
21 | (c) Renewable portfolio standard. | ||||||
22 | (1) The procurement plans shall include | ||||||
23 | cost-effective renewable energy resources. A minimum | ||||||
24 | percentage of each utility's total supply to serve the | ||||||
25 | load of eligible retail customers, as defined in | ||||||
26 | Section 16-111.5(a) of the Public Utilities Act, |
| |||||||
| |||||||
1 | procured for each of the following years shall be | ||||||
2 | generated from cost-effective renewable energy | ||||||
3 | resources: at least 2% by June 1, 2008; at least 4% by | ||||||
4 | June 1, 2009; at least 5% by June 1, 2010; at least 6% | ||||||
5 | by June 1, 2011; at least 7% by June 1, 2012; at least | ||||||
6 | 8% by June 1, 2013; at least 9% by June 1, 2014; at | ||||||
7 | least 10% by June 1, 2015; and increasing by at least | ||||||
8 | 1.5% each year thereafter to at least 25% by June 1, | ||||||
9 | 2025. To the extent that it is available, at least 75% | ||||||
10 | of the renewable energy resources used to meet these | ||||||
11 | standards shall come from wind generation and, | ||||||
12 | beginning on June 1, 2011 2015 , at least 6% of the | ||||||
13 | renewable energy resources used to meet these | ||||||
14 | standards shall come from photovoltaics. Of the | ||||||
15 | renewable energy resources that must be derived from | ||||||
16 | photovoltaics under this paragraph (1) of subsection | ||||||
17 | (c), at least 10% shall come from small-scale | ||||||
18 | distributed solar and at least 50% shall come from | ||||||
19 | large-scale distributed solar. For purposes of this | ||||||
20 | subsection (c), "cost-effective" means that the costs | ||||||
21 | of procuring renewable energy resources do not cause | ||||||
22 | the limit stated in paragraph (2) of this subsection | ||||||
23 | (c) to be exceeded and do not exceed benchmarks based | ||||||
24 | on market prices for renewable energy resources in the | ||||||
25 | region, which shall be developed by the procurement | ||||||
26 | administrator, in consultation with the Commission |
| |||||||
| |||||||
1 | staff, Agency staff, and the procurement monitor and | ||||||
2 | shall be subject to Commission review and approval. | ||||||
3 | (2) For purposes of this subsection (c), the | ||||||
4 | required procurement of cost-effective renewable | ||||||
5 | energy resources for a particular year shall be | ||||||
6 | measured as a percentage of the actual amount of | ||||||
7 | electricity (megawatt-hours) supplied by the electric | ||||||
8 | utility to eligible retail customers in the planning | ||||||
9 | year ending immediately prior to the procurement. For | ||||||
10 | purposes of this subsection (c), the amount paid per | ||||||
11 | kilowatthour means the total amount paid for electric | ||||||
12 | service expressed on a per kilowatthour basis. For | ||||||
13 | purposes of this subsection (c), the total amount paid | ||||||
14 | for electric service includes without limitation | ||||||
15 | amounts paid for supply, transmission, distribution, | ||||||
16 | surcharges, and add-on taxes. | ||||||
17 | Notwithstanding the requirements of this | ||||||
18 | subsection (c), the total of renewable energy | ||||||
19 | resources procured pursuant to the procurement plan | ||||||
20 | for any single year shall be reduced by an amount | ||||||
21 | necessary to limit the annual estimated average net | ||||||
22 | increase due to the costs of these resources included | ||||||
23 | in the amounts paid by eligible retail customers in | ||||||
24 | connection with electric service to: | ||||||
25 | (A) in 2008, no more than 0.5% of the amount | ||||||
26 | paid per kilowatthour by those customers during |
| |||||||
| |||||||
1 | the year ending May 31, 2007; | ||||||
2 | (B) in 2009, the greater of an additional 0.5% | ||||||
3 | of the amount paid per kilowatthour by those | ||||||
4 | customers during the year ending May 31, 2008 or 1% | ||||||
5 | of the amount paid per kilowatthour by those | ||||||
6 | customers during the year ending May 31, 2007; | ||||||
7 | (C) in 2010, the greater of an additional 0.5% | ||||||
8 | of the amount paid per kilowatthour by those | ||||||
9 | customers during the year ending May 31, 2009 or | ||||||
10 | 1.5% of the amount paid per kilowatthour by those | ||||||
11 | customers during the year ending May 31, 2007; | ||||||
12 | (D) in 2011, the greater of an additional 0.5% | ||||||
13 | of the amount paid per kilowatthour by those | ||||||
14 | customers during the year ending May 31, 2010 or 2% | ||||||
15 | of the amount paid per kilowatthour by those | ||||||
16 | customers during the year ending May 31, 2007; and | ||||||
17 | (E) thereafter, the amount of renewable energy | ||||||
18 | resources procured pursuant to the procurement | ||||||
19 | plan for any single year shall be reduced by an | ||||||
20 | amount necessary to limit the estimated average | ||||||
21 | net increase due to the cost of these resources | ||||||
22 | included in the amounts paid by eligible retail | ||||||
23 | customers in connection with electric service to | ||||||
24 | no more than the greater of 2.015% of the amount | ||||||
25 | paid per kilowatthour by those customers during | ||||||
26 | the year ending May 31, 2007 or the incremental |
| |||||||
| |||||||
1 | amount per kilowatthour paid for these resources | ||||||
2 | in 2011. | ||||||
3 | No later than June 30, 2011, the Commission shall | ||||||
4 | review the limitation on the amount of renewable energy | ||||||
5 | resources procured pursuant to this subsection (c) and | ||||||
6 | report to the General Assembly its findings as to | ||||||
7 | whether that limitation unduly constrains the | ||||||
8 | procurement of cost-effective renewable energy | ||||||
9 | resources. | ||||||
10 | (3) Through June 1, 2011, renewable energy | ||||||
11 | resources shall be counted for the purpose of meeting | ||||||
12 | the renewable energy standards set forth in paragraph | ||||||
13 | (1) of this subsection (c) only if they are generated | ||||||
14 | from facilities located in the State, provided that | ||||||
15 | cost-effective renewable energy resources are | ||||||
16 | available from those facilities. If those | ||||||
17 | cost-effective resources are not available in | ||||||
18 | Illinois, they shall be procured in states that adjoin | ||||||
19 | Illinois and may be counted towards compliance. If | ||||||
20 | those cost-effective resources are not available in | ||||||
21 | Illinois or in states that adjoin Illinois, they shall | ||||||
22 | be purchased elsewhere and shall be counted towards | ||||||
23 | compliance. After June 1, 2011, cost-effective | ||||||
24 | renewable energy resources located in Illinois and in | ||||||
25 | states that adjoin Illinois may be counted towards | ||||||
26 | compliance with the standards set forth in paragraph |
| |||||||
| |||||||
1 | (1) of this subsection (c). If those cost-effective | ||||||
2 | resources are not available in Illinois or in states | ||||||
3 | that adjoin Illinois, they shall be purchased | ||||||
4 | elsewhere and shall be counted towards compliance. | ||||||
5 | (4) The electric utility shall retire all | ||||||
6 | renewable energy credits used to comply with the | ||||||
7 | standard. | ||||||
8 | (5) Beginning with the year commencing June 1, | ||||||
9 | 2010, an electric utility subject to this subsection | ||||||
10 | (c) shall apply the lesser of the maximum alternative | ||||||
11 | compliance payment rate or the most recent estimated | ||||||
12 | alternative compliance payment rate for its service | ||||||
13 | territory for the corresponding compliance period, | ||||||
14 | established pursuant to subsection (d) of Section | ||||||
15 | 16-115D of the Public Utilities Act to its retail | ||||||
16 | customers that take service pursuant to the electric | ||||||
17 | utility's hourly pricing tariff or tariffs. The | ||||||
18 | electric utility shall retain all amounts collected as | ||||||
19 | a result of the application of the alternative | ||||||
20 | compliance payment rate or rates to such customers, | ||||||
21 | and, beginning in 2011, the utility shall include in | ||||||
22 | the information provided under item (1) of subsection | ||||||
23 | (d) of Section 16-111.5 of the Public Utilities Act the | ||||||
24 | amounts collected under the alternative compliance | ||||||
25 | payment rate or rates for the prior year ending May 31. | ||||||
26 | Notwithstanding any limitation on the procurement of |
| |||||||
| |||||||
1 | renewable energy resources imposed by item (2) of this | ||||||
2 | subsection (c), the Agency shall increase its spending | ||||||
3 | on the purchase of renewable energy resources to be | ||||||
4 | procured by the electric utility for the next plan year | ||||||
5 | by an amount equal to the amounts collected by the | ||||||
6 | utility under the alternative compliance payment rate | ||||||
7 | or rates in the prior year ending May 31. | ||||||
8 | (d) Clean coal portfolio standard. | ||||||
9 | (1) The procurement plans shall include electricity | ||||||
10 | generated using clean coal. Each utility shall enter into | ||||||
11 | one or more sourcing agreements with the initial clean coal | ||||||
12 | facility, as provided in paragraph (3) of this subsection | ||||||
13 | (d), covering electricity generated by the initial clean | ||||||
14 | coal facility representing at least 5% of each utility's | ||||||
15 | total supply to serve the load of eligible retail customers | ||||||
16 | in 2015 and each year thereafter, as described in paragraph | ||||||
17 | (3) of this subsection (d), subject to the limits specified | ||||||
18 | in paragraph (2) of this subsection (d). It is the goal of | ||||||
19 | the State that by January 1, 2025, 25% of the electricity | ||||||
20 | used in the State shall be generated by cost-effective | ||||||
21 | clean coal facilities. For purposes of this subsection (d), | ||||||
22 | "cost-effective" means that the expenditures pursuant to | ||||||
23 | such sourcing agreements do not cause the limit stated in | ||||||
24 | paragraph (2) of this subsection (d) to be exceeded and do | ||||||
25 | not exceed cost-based benchmarks, which shall be developed | ||||||
26 | to assess all expenditures pursuant to such sourcing |
| |||||||
| |||||||
1 | agreements covering electricity generated by clean coal | ||||||
2 | facilities, other than the initial clean coal facility, by | ||||||
3 | the procurement administrator, in consultation with the | ||||||
4 | Commission staff, Agency staff, and the procurement | ||||||
5 | monitor and shall be subject to Commission review and | ||||||
6 | approval. | ||||||
7 | (A) A utility party to a sourcing agreement shall | ||||||
8 | immediately retire any emission credits that it | ||||||
9 | receives in connection with the electricity covered by | ||||||
10 | such agreement. | ||||||
11 | (B) Utilities shall maintain adequate records | ||||||
12 | documenting the purchases under the sourcing agreement | ||||||
13 | to comply with this subsection (d) and shall file an | ||||||
14 | accounting with the load forecast that must be filed | ||||||
15 | with the Agency by July 15 of each year, in accordance | ||||||
16 | with subsection (d) of Section 16-111.5 of the Public | ||||||
17 | Utilities Act. | ||||||
18 | (C) A utility shall be deemed to have complied with | ||||||
19 | the clean coal portfolio standard specified in this | ||||||
20 | subsection (d) if the utility enters into a sourcing | ||||||
21 | agreement as required by this subsection (d). | ||||||
22 | (2) For purposes of this subsection (d), the required | ||||||
23 | execution of sourcing agreements with the initial clean | ||||||
24 | coal facility for a particular year shall be measured as a | ||||||
25 | percentage of the actual amount of electricity | ||||||
26 | (megawatt-hours) supplied by the electric utility to |
| |||||||
| |||||||
1 | eligible retail customers in the planning year ending | ||||||
2 | immediately prior to the agreement's execution. For | ||||||
3 | purposes of this subsection (d), the amount paid per | ||||||
4 | kilowatthour means the total amount paid for electric | ||||||
5 | service expressed on a per kilowatthour basis. For purposes | ||||||
6 | of this subsection (d), the total amount paid for electric | ||||||
7 | service includes without limitation amounts paid for | ||||||
8 | supply, transmission, distribution, surcharges and add-on | ||||||
9 | taxes. | ||||||
10 | Notwithstanding the requirements of this subsection | ||||||
11 | (d), the total amount paid under sourcing agreements with | ||||||
12 | clean coal facilities pursuant to the procurement plan for | ||||||
13 | any given year shall be reduced by an amount necessary to | ||||||
14 | limit the annual estimated average net increase due to the | ||||||
15 | costs of these resources included in the amounts paid by | ||||||
16 | eligible retail customers in connection with electric | ||||||
17 | service to: | ||||||
18 | (A) in 2010, no more than 0.5% of the amount | ||||||
19 | paid per kilowatthour by those customers during | ||||||
20 | the year ending May 31, 2009; | ||||||
21 | (B) in 2011, the greater of an additional 0.5% | ||||||
22 | of the amount paid per kilowatthour by those | ||||||
23 | customers during the year ending May 31, 2010 or 1% | ||||||
24 | of the amount paid per kilowatthour by those | ||||||
25 | customers during the year ending May 31, 2009; | ||||||
26 | (C) in 2012, the greater of an additional 0.5% |
| |||||||
| |||||||
1 | of the amount paid per kilowatthour by those | ||||||
2 | customers during the year ending May 31, 2011 or | ||||||
3 | 1.5% of the amount paid per kilowatthour by those | ||||||
4 | customers during the year ending May 31, 2009; | ||||||
5 | (D) in 2013, the greater of an additional 0.5% | ||||||
6 | of the amount paid per kilowatthour by those | ||||||
7 | customers during the year ending May 31, 2012 or 2% | ||||||
8 | of the amount paid per kilowatthour by those | ||||||
9 | customers during the year ending May 31, 2009; and | ||||||
10 | (E) thereafter, the total amount paid under | ||||||
11 | sourcing agreements with clean coal facilities | ||||||
12 | pursuant to the procurement plan for any single | ||||||
13 | year shall be reduced by an amount necessary to | ||||||
14 | limit the estimated average net increase due to the | ||||||
15 | cost of these resources included in the amounts | ||||||
16 | paid by eligible retail customers in connection | ||||||
17 | with electric service to no more than the greater | ||||||
18 | of (i) 2.015% of the amount paid per kilowatthour | ||||||
19 | by those customers during the year ending May 31, | ||||||
20 | 2009 or (ii) the incremental amount per | ||||||
21 | kilowatthour paid for these resources in 2013. | ||||||
22 | These requirements may be altered only as provided | ||||||
23 | by statute.
No later than June 30, 2015, the | ||||||
24 | Commission shall review the limitation on the | ||||||
25 | total amount paid under sourcing agreements, if | ||||||
26 | any, with clean coal facilities pursuant to this |
| |||||||
| |||||||
1 | subsection (d) and report to the General Assembly | ||||||
2 | its findings as to whether that limitation unduly | ||||||
3 | constrains the amount of electricity generated by | ||||||
4 | cost-effective clean coal facilities that is | ||||||
5 | covered by sourcing agreements. | ||||||
6 | (3) Initial clean coal facility. In order to promote | ||||||
7 | development of clean coal facilities in Illinois, each | ||||||
8 | electric utility subject to this Section shall execute a | ||||||
9 | sourcing agreement to source electricity from a proposed | ||||||
10 | clean coal facility in Illinois (the "initial clean coal | ||||||
11 | facility") that will have a nameplate capacity of at least | ||||||
12 | 500 MW when commercial operation commences, that has a | ||||||
13 | final Clean Air Act permit on the effective date of this | ||||||
14 | amendatory Act of the 95th General Assembly, and that will | ||||||
15 | meet the definition of clean coal facility in Section 1-10 | ||||||
16 | of this Act when commercial operation commences. The | ||||||
17 | sourcing agreements with this initial clean coal facility | ||||||
18 | shall be subject to both approval of the initial clean coal | ||||||
19 | facility by the General Assembly and satisfaction of the | ||||||
20 | requirements of paragraph (4) of this subsection (d) and | ||||||
21 | shall be executed within 90 days after any such approval by | ||||||
22 | the General Assembly. The Agency and the Commission shall | ||||||
23 | have authority to inspect all books and records associated | ||||||
24 | with the initial clean coal facility during the term of | ||||||
25 | such a sourcing agreement. A utility's sourcing agreement | ||||||
26 | for electricity produced by the initial clean coal facility |
| |||||||
| |||||||
1 | shall include: | ||||||
2 | (A) a formula contractual price (the "contract | ||||||
3 | price") approved pursuant to paragraph (4) of this | ||||||
4 | subsection (d), which shall: | ||||||
5 | (i) be determined using a cost of service | ||||||
6 | methodology employing either a level or deferred | ||||||
7 | capital recovery component, based on a capital | ||||||
8 | structure consisting of 45% equity and 55% debt, | ||||||
9 | and a return on equity as may be approved by the | ||||||
10 | Federal Energy Regulatory Commission, which in any | ||||||
11 | case may not exceed the lower of 11.5% or the rate | ||||||
12 | of return approved by the General Assembly | ||||||
13 | pursuant to paragraph (4) of this subsection (d); | ||||||
14 | and | ||||||
15 | (ii) provide that all miscellaneous net | ||||||
16 | revenue, including but not limited to net revenue | ||||||
17 | from the sale of emission allowances, if any, | ||||||
18 | substitute natural gas, if any, grants or other | ||||||
19 | support provided by the State of Illinois or the | ||||||
20 | United States Government, firm transmission | ||||||
21 | rights, if any, by-products produced by the | ||||||
22 | facility, energy or capacity derived from the | ||||||
23 | facility and not covered by a sourcing agreement | ||||||
24 | pursuant to paragraph (3) of this subsection (d) or | ||||||
25 | item (5) of subsection (d) of Section 16-115 of the | ||||||
26 | Public Utilities Act, whether generated from the |
| |||||||
| |||||||
1 | synthesis gas derived from coal, from SNG, or from | ||||||
2 | natural gas, shall be credited against the revenue | ||||||
3 | requirement for this initial clean coal facility; | ||||||
4 | (B) power purchase provisions, which shall: | ||||||
5 | (i) provide that the utility party to such | ||||||
6 | sourcing agreement shall pay the contract price | ||||||
7 | for electricity delivered under such sourcing | ||||||
8 | agreement; | ||||||
9 | (ii) require delivery of electricity to the | ||||||
10 | regional transmission organization market of the | ||||||
11 | utility that is party to such sourcing agreement; | ||||||
12 | (iii) require the utility party to such | ||||||
13 | sourcing agreement to buy from the initial clean | ||||||
14 | coal facility in each hour an amount of energy | ||||||
15 | equal to all clean coal energy made available from | ||||||
16 | the initial clean coal facility during such hour | ||||||
17 | times a fraction, the numerator of which is such | ||||||
18 | utility's retail market sales of electricity | ||||||
19 | (expressed in kilowatthours sold) in the State | ||||||
20 | during the prior calendar month and the | ||||||
21 | denominator of which is the total retail market | ||||||
22 | sales of electricity (expressed in kilowatthours | ||||||
23 | sold) in the State by utilities during such prior | ||||||
24 | month and the sales of electricity (expressed in | ||||||
25 | kilowatthours sold) in the State by alternative | ||||||
26 | retail electric suppliers during such prior month |
| |||||||
| |||||||
1 | that are subject to the requirements of this | ||||||
2 | subsection (d) and paragraph (5) of subsection (d) | ||||||
3 | of Section 16-115 of the Public Utilities Act, | ||||||
4 | provided that the amount purchased by the utility | ||||||
5 | in any year will be limited by paragraph (2) of | ||||||
6 | this subsection (d); and | ||||||
7 | (iv) be considered pre-existing contracts in | ||||||
8 | such utility's procurement plans for eligible | ||||||
9 | retail customers; | ||||||
10 | (C) contract for differences provisions, which | ||||||
11 | shall: | ||||||
12 | (i) require the utility party to such sourcing | ||||||
13 | agreement to contract with the initial clean coal | ||||||
14 | facility in each hour with respect to an amount of | ||||||
15 | energy equal to all clean coal energy made | ||||||
16 | available from the initial clean coal facility | ||||||
17 | during such hour times a fraction, the numerator of | ||||||
18 | which is such utility's retail market sales of | ||||||
19 | electricity (expressed in kilowatthours sold) in | ||||||
20 | the utility's service territory in the State | ||||||
21 | during the prior calendar month and the | ||||||
22 | denominator of which is the total retail market | ||||||
23 | sales of electricity (expressed in kilowatthours | ||||||
24 | sold) in the State by utilities during such prior | ||||||
25 | month and the sales of electricity (expressed in | ||||||
26 | kilowatthours sold) in the State by alternative |
| |||||||
| |||||||
1 | retail electric suppliers during such prior month | ||||||
2 | that are subject to the requirements of this | ||||||
3 | subsection (d) and paragraph (5) of subsection (d) | ||||||
4 | of Section 16-115 of the Public Utilities Act, | ||||||
5 | provided that the amount paid by the utility in any | ||||||
6 | year will be limited by paragraph (2) of this | ||||||
7 | subsection (d); | ||||||
8 | (ii) provide that the utility's payment | ||||||
9 | obligation in respect of the quantity of | ||||||
10 | electricity determined pursuant to the preceding | ||||||
11 | clause (i) shall be limited to an amount equal to | ||||||
12 | (1) the difference between the contract price | ||||||
13 | determined pursuant to subparagraph (A) of | ||||||
14 | paragraph (3) of this subsection (d) and the | ||||||
15 | day-ahead price for electricity delivered to the | ||||||
16 | regional transmission organization market of the | ||||||
17 | utility that is party to such sourcing agreement | ||||||
18 | (or any successor delivery point at which such | ||||||
19 | utility's supply obligations are financially | ||||||
20 | settled on an hourly basis) (the "reference | ||||||
21 | price") on the day preceding the day on which the | ||||||
22 | electricity is delivered to the initial clean coal | ||||||
23 | facility busbar, multiplied by (2) the quantity of | ||||||
24 | electricity determined pursuant to the preceding | ||||||
25 | clause (i); and | ||||||
26 | (iii) not require the utility to take physical |
| |||||||
| |||||||
1 | delivery of the electricity produced by the | ||||||
2 | facility; | ||||||
3 | (D) general provisions, which shall: | ||||||
4 | (i) specify a term of no more than 30 years, | ||||||
5 | commencing on the commercial operation date of the | ||||||
6 | facility; | ||||||
7 | (ii) provide that utilities shall maintain | ||||||
8 | adequate records documenting purchases under the | ||||||
9 | sourcing agreements entered into to comply with | ||||||
10 | this subsection (d) and shall file an accounting | ||||||
11 | with the load forecast that must be filed with the | ||||||
12 | Agency by July 15 of each year, in accordance with | ||||||
13 | subsection (d) of Section 16-111.5 of the Public | ||||||
14 | Utilities Act. | ||||||
15 | (iii) provide that all costs associated with | ||||||
16 | the initial clean coal facility will be | ||||||
17 | periodically reported to the Federal Energy | ||||||
18 | Regulatory Commission and to purchasers in | ||||||
19 | accordance with applicable laws governing | ||||||
20 | cost-based wholesale power contracts; | ||||||
21 | (iv) permit the Illinois Power Agency to | ||||||
22 | assume ownership of the initial clean coal | ||||||
23 | facility, without monetary consideration and | ||||||
24 | otherwise on reasonable terms acceptable to the | ||||||
25 | Agency, if the Agency so requests no less than 3 | ||||||
26 | years prior to the end of the stated contract term; |
| |||||||
| |||||||
1 | (v) require the owner of the initial clean coal | ||||||
2 | facility to provide documentation to the | ||||||
3 | Commission each year, starting in the facility's | ||||||
4 | first year of commercial operation, accurately | ||||||
5 | reporting the quantity of carbon emissions from | ||||||
6 | the facility that have been captured and | ||||||
7 | sequestered and report any quantities of carbon | ||||||
8 | released from the site or sites at which carbon | ||||||
9 | emissions were sequestered in prior years, based | ||||||
10 | on continuous monitoring of such sites. If, in any | ||||||
11 | year after the first year of commercial operation, | ||||||
12 | the owner of the facility fails to demonstrate that | ||||||
13 | the initial clean coal facility captured and | ||||||
14 | sequestered at least 50% of the total carbon | ||||||
15 | emissions that the facility would otherwise emit | ||||||
16 | or that sequestration of emissions from prior | ||||||
17 | years has failed, resulting in the release of | ||||||
18 | carbon dioxide into the atmosphere, the owner of | ||||||
19 | the facility must offset excess emissions. Any | ||||||
20 | such carbon offsets must be permanent, additional, | ||||||
21 | verifiable, real, located within the State of | ||||||
22 | Illinois, and legally and practicably enforceable. | ||||||
23 | The cost of such offsets for the facility that are | ||||||
24 | not recoverable shall not exceed $15 million in any | ||||||
25 | given year. No costs of any such purchases of | ||||||
26 | carbon offsets may be recovered from a utility or |
| |||||||
| |||||||
1 | its customers. All carbon offsets purchased for | ||||||
2 | this purpose and any carbon emission credits | ||||||
3 | associated with sequestration of carbon from the | ||||||
4 | facility must be permanently retired. The initial | ||||||
5 | clean coal facility shall not forfeit its | ||||||
6 | designation as a clean coal facility if the | ||||||
7 | facility fails to fully comply with the applicable | ||||||
8 | carbon sequestration requirements in any given | ||||||
9 | year, provided the requisite offsets are | ||||||
10 | purchased. However, the Attorney General, on | ||||||
11 | behalf of the People of the State of Illinois, may | ||||||
12 | specifically enforce the facility's sequestration | ||||||
13 | requirement and the other terms of this contract | ||||||
14 | provision. Compliance with the sequestration | ||||||
15 | requirements and offset purchase requirements | ||||||
16 | specified in paragraph (3) of this subsection (d) | ||||||
17 | shall be reviewed annually by an independent | ||||||
18 | expert retained by the owner of the initial clean | ||||||
19 | coal facility, with the advance written approval | ||||||
20 | of the Attorney General. The Commission may, in the | ||||||
21 | course of the review specified in item (vii), | ||||||
22 | reduce the allowable return on equity for the | ||||||
23 | facility if the facility wilfully fails to comply | ||||||
24 | with the carbon capture and sequestration | ||||||
25 | requirements set forth in this item (v); | ||||||
26 | (vi) include limits on, and accordingly |
| |||||||
| |||||||
1 | provide for modification of, the amount the | ||||||
2 | utility is required to source under the sourcing | ||||||
3 | agreement consistent with paragraph (2) of this | ||||||
4 | subsection (d); | ||||||
5 | (vii) require Commission review: (1) to | ||||||
6 | determine the justness, reasonableness, and | ||||||
7 | prudence of the inputs to the formula referenced in | ||||||
8 | subparagraphs (A)(i) through (A)(iii) of paragraph | ||||||
9 | (3) of this subsection (d), prior to an adjustment | ||||||
10 | in those inputs including, without limitation, the | ||||||
11 | capital structure and return on equity, fuel | ||||||
12 | costs, and other operations and maintenance costs | ||||||
13 | and (2) to approve the costs to be passed through | ||||||
14 | to customers under the sourcing agreement by which | ||||||
15 | the utility satisfies its statutory obligations. | ||||||
16 | Commission review shall occur no less than every 3 | ||||||
17 | years, regardless of whether any adjustments have | ||||||
18 | been proposed, and shall be completed within 9 | ||||||
19 | months; | ||||||
20 | (viii) limit the utility's obligation to such | ||||||
21 | amount as the utility is allowed to recover through | ||||||
22 | tariffs filed with the Commission, provided that | ||||||
23 | neither the clean coal facility nor the utility | ||||||
24 | waives any right to assert federal pre-emption or | ||||||
25 | any other argument in response to a purported | ||||||
26 | disallowance of recovery costs; |
| |||||||
| |||||||
1 | (ix) limit the utility's or alternative retail | ||||||
2 | electric supplier's obligation to incur any | ||||||
3 | liability until such time as the facility is in | ||||||
4 | commercial operation and generating power and | ||||||
5 | energy and such power and energy is being delivered | ||||||
6 | to the facility busbar; | ||||||
7 | (x) provide that the owner or owners of the | ||||||
8 | initial clean coal facility, which is the | ||||||
9 | counterparty to such sourcing agreement, shall | ||||||
10 | have the right from time to time to elect whether | ||||||
11 | the obligations of the utility party thereto shall | ||||||
12 | be governed by the power purchase provisions or the | ||||||
13 | contract for differences provisions; | ||||||
14 | (xi) append documentation showing that the | ||||||
15 | formula rate and contract, insofar as they relate | ||||||
16 | to the power purchase provisions, have been | ||||||
17 | approved by the Federal Energy Regulatory | ||||||
18 | Commission pursuant to Section 205 of the Federal | ||||||
19 | Power Act; | ||||||
20 | (xii) provide that any changes to the terms of | ||||||
21 | the contract, insofar as such changes relate to the | ||||||
22 | power purchase provisions, are subject to review | ||||||
23 | under the public interest standard applied by the | ||||||
24 | Federal Energy Regulatory Commission pursuant to | ||||||
25 | Sections 205 and 206 of the Federal Power Act; and | ||||||
26 | (xiii) conform with customary lender |
| |||||||
| |||||||
1 | requirements in power purchase agreements used as | ||||||
2 | the basis for financing non-utility generators. | ||||||
3 | (4) Effective date of sourcing agreements with the | ||||||
4 | initial clean coal facility. Any proposed sourcing | ||||||
5 | agreement with the initial clean coal facility shall not | ||||||
6 | become effective unless the following reports are prepared | ||||||
7 | and submitted and authorizations and approvals obtained: | ||||||
8 | (i) Facility cost report. The owner of the | ||||||
9 | initial clean coal facility shall submit to the | ||||||
10 | Commission, the Agency, and the General Assembly a | ||||||
11 | front-end engineering and design study, a facility | ||||||
12 | cost report, method of financing (including but | ||||||
13 | not limited to structure and associated costs), | ||||||
14 | and an operating and maintenance cost quote for the | ||||||
15 | facility (collectively "facility cost report"), | ||||||
16 | which shall be prepared in accordance with the | ||||||
17 | requirements of this paragraph (4) of subsection | ||||||
18 | (d) of this Section, and shall provide the | ||||||
19 | Commission and the Agency access to the work | ||||||
20 | papers, relied upon documents, and any other | ||||||
21 | backup documentation related to the facility cost | ||||||
22 | report. | ||||||
23 | (ii) Commission report. Within 6 months | ||||||
24 | following receipt of the facility cost report, the | ||||||
25 | Commission, in consultation with the Agency, shall | ||||||
26 | submit a report to the General Assembly setting |
| |||||||
| |||||||
1 | forth its analysis of the facility cost report. | ||||||
2 | Such report shall include, but not be limited to, a | ||||||
3 | comparison of the costs associated with | ||||||
4 | electricity generated by the initial clean coal | ||||||
5 | facility to the costs associated with electricity | ||||||
6 | generated by other types of generation facilities, | ||||||
7 | an analysis of the rate impacts on residential and | ||||||
8 | small business customers over the life of the | ||||||
9 | sourcing agreements, and an analysis of the | ||||||
10 | likelihood that the initial clean coal facility | ||||||
11 | will commence commercial operation by and be | ||||||
12 | delivering power to the facility's busbar by 2016. | ||||||
13 | To assist in the preparation of its report, the | ||||||
14 | Commission, in consultation with the Agency, may | ||||||
15 | hire one or more experts or consultants, the costs | ||||||
16 | of which shall be paid for by the owner of the | ||||||
17 | initial clean coal facility. The Commission and | ||||||
18 | Agency may begin the process of selecting such | ||||||
19 | experts or consultants prior to receipt of the | ||||||
20 | facility cost report. | ||||||
21 | (iii) General Assembly approval. The proposed | ||||||
22 | sourcing agreements shall not take effect unless, | ||||||
23 | based on the facility cost report and the | ||||||
24 | Commission's report, the General Assembly enacts | ||||||
25 | authorizing legislation approving (A) the | ||||||
26 | projected price, stated in cents per kilowatthour, |
| |||||||
| |||||||
1 | to be charged for electricity generated by the | ||||||
2 | initial clean coal facility, (B) the projected | ||||||
3 | impact on residential and small business | ||||||
4 | customers' bills over the life of the sourcing | ||||||
5 | agreements, and (C) the maximum allowable return | ||||||
6 | on equity for the project; and | ||||||
7 | (iv) Commission review. If the General | ||||||
8 | Assembly enacts authorizing legislation pursuant | ||||||
9 | to subparagraph (iii) approving a sourcing | ||||||
10 | agreement, the Commission shall, within 90 days of | ||||||
11 | such enactment, complete a review of such sourcing | ||||||
12 | agreement. During such time period, the Commission | ||||||
13 | shall implement any directive of the General | ||||||
14 | Assembly, resolve any disputes between the parties | ||||||
15 | to the sourcing agreement concerning the terms of | ||||||
16 | such agreement, approve the form of such | ||||||
17 | agreement, and issue an order finding that the | ||||||
18 | sourcing agreement is prudent and reasonable. | ||||||
19 | The facility cost report shall be prepared as follows: | ||||||
20 | (A) The facility cost report shall be prepared by | ||||||
21 | duly licensed engineering and construction firms | ||||||
22 | detailing the estimated capital costs payable to one or | ||||||
23 | more contractors or suppliers for the engineering, | ||||||
24 | procurement and construction of the components | ||||||
25 | comprising the initial clean coal facility and the | ||||||
26 | estimated costs of operation and maintenance of the |
| |||||||
| |||||||
1 | facility. The facility cost report shall include: | ||||||
2 | (i) an estimate of the capital cost of the core | ||||||
3 | plant based on one or more front end engineering | ||||||
4 | and design studies for the gasification island and | ||||||
5 | related facilities. The core plant shall include | ||||||
6 | all civil, structural, mechanical, electrical, | ||||||
7 | control, and safety systems. | ||||||
8 | (ii) an estimate of the capital cost of the | ||||||
9 | balance of the plant, including any capital costs | ||||||
10 | associated with sequestration of carbon dioxide | ||||||
11 | emissions and all interconnects and interfaces | ||||||
12 | required to operate the facility, such as | ||||||
13 | transmission of electricity, construction or | ||||||
14 | backfeed power supply, pipelines to transport | ||||||
15 | substitute natural gas or carbon dioxide, potable | ||||||
16 | water supply, natural gas supply, water supply, | ||||||
17 | water discharge, landfill, access roads, and coal | ||||||
18 | delivery. | ||||||
19 | The quoted construction costs shall be expressed | ||||||
20 | in nominal dollars as of the date that the quote is | ||||||
21 | prepared and shall include (1) capitalized financing | ||||||
22 | costs during construction,
(2) taxes, insurance, and | ||||||
23 | other owner's costs, and (3) an assumed escalation in | ||||||
24 | materials and labor beyond the date as of which the | ||||||
25 | construction cost quote is expressed. | ||||||
26 | (B) The front end engineering and design study for |
| |||||||
| |||||||
1 | the gasification island and the cost study for the | ||||||
2 | balance of plant shall include sufficient design work | ||||||
3 | to permit quantification of major categories of | ||||||
4 | materials, commodities and labor hours, and receipt of | ||||||
5 | quotes from vendors of major equipment required to | ||||||
6 | construct and operate the clean coal facility. | ||||||
7 | (C) The facility cost report shall also include an | ||||||
8 | operating and maintenance cost quote that will provide | ||||||
9 | the estimated cost of delivered fuel, personnel, | ||||||
10 | maintenance contracts, chemicals, catalysts, | ||||||
11 | consumables, spares, and other fixed and variable | ||||||
12 | operations and maintenance costs. | ||||||
13 | (a) The delivered fuel cost estimate will be | ||||||
14 | provided by a recognized third party expert or | ||||||
15 | experts in the fuel and transportation industries. | ||||||
16 | (b) The balance of the operating and | ||||||
17 | maintenance cost quote, excluding delivered fuel | ||||||
18 | costs will be developed based on the inputs | ||||||
19 | provided by duly licensed engineering and | ||||||
20 | construction firms performing the construction | ||||||
21 | cost quote, potential vendors under long-term | ||||||
22 | service agreements and plant operating agreements, | ||||||
23 | or recognized third party plant operator or | ||||||
24 | operators. | ||||||
25 | The operating and maintenance cost quote | ||||||
26 | (including the cost of the front end engineering |
| |||||||
| |||||||
1 | and design study) shall be expressed in nominal | ||||||
2 | dollars as of the date that the quote is prepared | ||||||
3 | and shall include (1) taxes, insurance, and other | ||||||
4 | owner's costs, and (2) an assumed escalation in | ||||||
5 | materials and labor beyond the date as of which the | ||||||
6 | operating and maintenance cost quote is expressed. | ||||||
7 | (D) The facility cost report shall also include (i) | ||||||
8 | an analysis of the initial clean coal facility's | ||||||
9 | ability to deliver power and energy into the applicable | ||||||
10 | regional transmission organization markets and (ii) an | ||||||
11 | analysis of the expected capacity factor for the | ||||||
12 | initial clean coal facility. | ||||||
13 | (E) Amounts paid to third parties unrelated to the | ||||||
14 | owner or owners of the initial clean coal facility to | ||||||
15 | prepare the core plant construction cost quote, | ||||||
16 | including the front end engineering and design study, | ||||||
17 | and the operating and maintenance cost quote will be | ||||||
18 | reimbursed through Coal Development Bonds. | ||||||
19 | (5) Re-powering and retrofitting coal-fired power | ||||||
20 | plants previously owned by Illinois utilities to qualify as | ||||||
21 | clean coal facilities. During the 2009 procurement | ||||||
22 | planning process and thereafter, the Agency and the | ||||||
23 | Commission shall consider sourcing agreements covering | ||||||
24 | electricity generated by power plants that were previously | ||||||
25 | owned by Illinois utilities and that have been or will be | ||||||
26 | converted into clean coal facilities, as defined by Section |
| |||||||
| |||||||
1 | 1-10 of this Act. Pursuant to such procurement planning | ||||||
2 | process, the owners of such facilities may propose to the | ||||||
3 | Agency sourcing agreements with utilities and alternative | ||||||
4 | retail electric suppliers required to comply with | ||||||
5 | subsection (d) of this Section and item (5) of subsection | ||||||
6 | (d) of Section 16-115 of the Public Utilities Act, covering | ||||||
7 | electricity generated by such facilities. In the case of | ||||||
8 | sourcing agreements that are power purchase agreements, | ||||||
9 | the contract price for electricity sales shall be | ||||||
10 | established on a cost of service basis. In the case of | ||||||
11 | sourcing agreements that are contracts for differences, | ||||||
12 | the contract price from which the reference price is | ||||||
13 | subtracted shall be established on a cost of service basis. | ||||||
14 | The Agency and the Commission may approve any such utility | ||||||
15 | sourcing agreements that do not exceed cost-based | ||||||
16 | benchmarks developed by the procurement administrator, in | ||||||
17 | consultation with the Commission staff, Agency staff and | ||||||
18 | the procurement monitor, subject to Commission review and | ||||||
19 | approval. The Commission shall have authority to inspect | ||||||
20 | all books and records associated with these clean coal | ||||||
21 | facilities during the term of any such contract. | ||||||
22 | (6) Costs incurred under this subsection (d) or | ||||||
23 | pursuant to a contract entered into under this subsection | ||||||
24 | (d) shall be deemed prudently incurred and reasonable in | ||||||
25 | amount and the electric utility shall be entitled to full | ||||||
26 | cost recovery pursuant to the tariffs filed with the |
| |||||||
| |||||||
1 | Commission. | ||||||
2 | (e) The draft procurement plans are subject to public | ||||||
3 | comment, as required by Section 16-111.5 of the Public | ||||||
4 | Utilities Act. | ||||||
5 | (f) The Agency shall submit the final procurement plan | ||||||
6 | to the Commission. The Agency shall revise a procurement | ||||||
7 | plan if the Commission determines that it does not meet the | ||||||
8 | standards set forth in Section 16-111.5 of the Public | ||||||
9 | Utilities Act. | ||||||
10 | (g) The Agency shall assess fees to each affected | ||||||
11 | utility to recover the costs incurred in preparation of the | ||||||
12 | annual procurement plan for the utility. | ||||||
13 | (h) The Agency shall assess fees to each bidder to | ||||||
14 | recover the costs incurred in connection with a competitive | ||||||
15 | procurement process.
| ||||||
16 | (Source: P.A. 95-481, eff. 8-28-07; 95-1027, eff. 6-1-09; | ||||||
17 | 96-159, eff. 8-10-09.)
|