|
|||||||
| |||||||
| |||||||
1 | HOUSE RESOLUTION
| ||||||
2 | WHEREAS, The members of the Illinois House of | ||||||
3 | Representatives are pleased to congratulate the citizens of the | ||||||
4 | Village of Buffalo Grove for winning the 2010 Environmental | ||||||
5 | Project of the Year by the American Public Works Association | ||||||
6 | for the stabilization and naturalization of the White Pine | ||||||
7 | Drainage Channel; and
| ||||||
8 | WHEREAS, The Village of Buffalo Grove has actively worked | ||||||
9 | on the implementation of a project that would address erosion | ||||||
10 | and non-point source pollution along the White Pine, an urban | ||||||
11 | drainage channel that discharges directly into Buffalo Creek | ||||||
12 | and the Des Plaines River System, since early 2005; and
| ||||||
13 | WHEREAS, The White Pine Drainage Channel project has | ||||||
14 | incorporated numerous innovative restoration methods, such as | ||||||
15 | the use of both native plant bio-engineering, along with | ||||||
16 | traditional armoring techniques, to create a system that could | ||||||
17 | withstand the volatile nature of the urban waterway; the | ||||||
18 | addition of a pedestrian pathway along the channel and the | ||||||
19 | installation of educational signage seeks to help to improve | ||||||
20 | the public's awareness and understanding as to the importance | ||||||
21 | of such restoration projects; embedded boulders were placed at | ||||||
22 | the toe of the bank to reduce the shear stresses caused during | ||||||
23 | high flow periods, while native plantings and turf reinforcing |
| |||||||
| |||||||
1 | mats were designed and installed to further prevent erosion and | ||||||
2 | to lock-in the boulder toe, providing for a cohesive and | ||||||
3 | naturalized system; and
| ||||||
4 | WHEREAS, In addition to the stream naturalization portion | ||||||
5 | of the improvement, the project also constructed a bike path, | ||||||
6 | which extended from the bike path system located on the | ||||||
7 | northern side of Lions Park on the south and extending north | ||||||
8 | along the White Pine Corridor to the Buffalo Grove Park | ||||||
9 | District's Alcott facilities on the north side of Bernard Drive | ||||||
10 | in Buffalo Grove; and
| ||||||
11 | WHEREAS, The government and citizens of the Village of | ||||||
12 | Buffalo Grove should take pride in this wonderful project and | ||||||
13 | the example this project sets for other municipalities; | ||||||
14 | therefore, be it
| ||||||
15 | RESOLVED, BY THE HOUSE OF REPRESENTATIVES OF THE | ||||||
16 | NINETY-SIXTH GENERAL ASSEMBLY OF THE STATE OF ILLINOIS, that we | ||||||
17 | congratulate the citizens of the Village of Buffalo Grove for | ||||||
18 | winning the 2010 Environmental Project of the Year by the | ||||||
19 | American Public Works Association for the stabilization and | ||||||
20 | naturalization of the White Pine Drainage Channel; and be it | ||||||
21 | further
| ||||||
22 | RESOLVED, That a suitable copy of this resolution be |
| |||||||
| |||||||
1 | presented to the Buffalo Grove Village Board as a symbol of our | ||||||
2 | esteem and respect.
|