|
|
|
HR1129 |
|
LRB096 21899 AJT 39910 r |
|
|
1 |
| HOUSE RESOLUTION
|
2 |
| WHEREAS, The erosion of jobs in the United States due to |
3 |
| outsourcing is at a critical all time high; and
|
4 |
| WHEREAS, The loss of high-technology aerospace jobs is |
5 |
| destroying the nation's ability to design, fabricate, and |
6 |
| assemble the products needed to defend itself; and
|
7 |
| WHEREAS, The current administration in Washington, D.C. |
8 |
| has elected to continue war in foreign lands; and
|
9 |
| WHEREAS, The global war on terrorism has changed the needs |
10 |
| of our military and stretched our resources thin; and
|
11 |
| WHEREAS, The continued production of the C-17 Globemaster |
12 |
| III, a transport aircraft capable of meeting the needs of our |
13 |
| nation's uniformed men and women, is being slowed down; and
|
14 |
| WHEREAS, The United States needs additional modern |
15 |
| aircraft capable of meeting the needs of future combat systems, |
16 |
| current strategic and tactical missions, humanitarian |
17 |
| missions, and other requirements placed on our military; and
|
18 |
| WHEREAS, The current plan to upgrade older, less reliable |
19 |
| C-5's will not fully meet our nation's needs; therefore, be it
|