|
|
|
09600SB0658ham003 |
- 2 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| and premium, if any, on those revenue bonds, and providing for |
2 |
| maintenance, insurance, and other matters in respect of the |
3 |
| project. |
4 |
| "Authority" means the Illinois Finance Authority. |
5 |
| "Clean coal SNG facility" means a facility that uses a |
6 |
| gasification process to produce substitute natural gas, that |
7 |
| sequesters at least 90% of the total carbon emissions that the |
8 |
| facility would otherwise emit and that uses petroleum coke or |
9 |
| coal as a feedstock, with all such coal having a high |
10 |
| bituminous rank and greater than 1.7 pounds of sulfur per |
11 |
| million btu content. |
12 |
| "Commission" means the Illinois Commerce Commission. |
13 |
| "Costs incurred in connection with the development and |
14 |
| construction of a facility" means: |
15 |
| (1) the cost of acquisition of all real property and |
16 |
| improvements in connection therewith and equipment and |
17 |
| other property, rights, and easements acquired that are |
18 |
| deemed necessary for the operation and maintenance of the |
19 |
| facility; |
20 |
| (2) financing costs with respect to bonds, notes, and |
21 |
| other evidences of indebtedness of the Agency; |
22 |
| (3) all origination, commitment, utilization, |
23 |
| facility, placement, underwriting, syndication, credit |
24 |
| enhancement, and rating agency fees; |
25 |
| (4) engineering, design, procurement, consulting, |
26 |
| legal, accounting, title insurance, survey, appraisal, |
|
|
|
09600SB0658ham003 |
- 3 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| escrow, trustee, collateral agency, interest rate hedging, |
2 |
| interest rate swap, capitalized interest and other |
3 |
| financing costs, and other expenses for professional |
4 |
| services; and |
5 |
| (5) the costs of plans, specifications, site study and |
6 |
| investigation, installation, surveys, other Agency costs |
7 |
| and estimates of costs, and other expenses necessary or |
8 |
| incidental to determining the feasibility of any project, |
9 |
| together with such other expenses as may be necessary or |
10 |
| incidental to the financing, insuring, acquisition, and |
11 |
| construction of a specific project and placing that project |
12 |
| in operation. |
13 |
| "Department" means the Department of Commerce and Economic |
14 |
| Opportunity. |
15 |
| "Director" means the Director of the Illinois Power Agency. |
16 |
| "Demand-response" means measures that decrease peak |
17 |
| electricity demand or shift demand from peak to off-peak |
18 |
| periods. |
19 |
| "Energy efficiency" means measures that reduce the amount |
20 |
| of electricity required to achieve a given end use. |
21 |
| "Electric utility" has the same definition as found in |
22 |
| Section 16-102 of the Public Utilities Act. |
23 |
| "Facility" means an electric generating unit or a |
24 |
| co-generating unit that produces electricity along with |
25 |
| related equipment necessary to connect the facility to an |
26 |
| electric transmission or distribution system. |
|
|
|
09600SB0658ham003 |
- 4 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| "Governmental aggregator" means one or more units of local |
2 |
| government that individually or collectively procure |
3 |
| electricity to serve residential retail electrical loads |
4 |
| located within its or their jurisdiction. |
5 |
| "Local government" means a unit of local government as |
6 |
| defined in Article VII of Section 1 of the Illinois |
7 |
| Constitution. |
8 |
| "Municipality" means a city, village, or incorporated |
9 |
| town. |
10 |
| "Person" means any natural person, firm, partnership, |
11 |
| corporation, either domestic or foreign, company, association, |
12 |
| limited liability company, joint stock company, or association |
13 |
| and includes any trustee, receiver, assignee, or personal |
14 |
| representative thereof. |
15 |
| "Project" means the planning, bidding, and construction of |
16 |
| a facility. |
17 |
| "Public utility" has the same definition as found in |
18 |
| Section 3-105 of the Public Utilities Act. |
19 |
| "Real property" means any interest in land together with |
20 |
| all structures, fixtures, and improvements thereon, including |
21 |
| lands under water and riparian rights, any easements, |
22 |
| covenants, licenses, leases, rights-of-way, uses, and other |
23 |
| interests, together with any liens, judgments, mortgages, or |
24 |
| other claims or security interests related to real property. |
25 |
| "Renewable energy credit" means a tradable credit that |
26 |
| represents the environmental attributes of a certain amount of |
|
|
|
09600SB0658ham003 |
- 5 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| energy produced from a renewable energy resource. |
2 |
| "Renewable energy resources" includes energy and its |
3 |
| associated renewable energy credit or renewable energy credits |
4 |
| from wind, solar thermal energy, photovoltaic cells and panels, |
5 |
| biodiesel, crops and untreated and unadulterated organic waste |
6 |
| biomass, trees and tree trimmings, hydropower that does not |
7 |
| involve new construction or significant expansion of |
8 |
| hydropower dams, and other alternative sources of |
9 |
| environmentally preferable energy. For purposes of this Act, |
10 |
| landfill gas produced in the State is considered a renewable |
11 |
| energy resource. "Renewable energy resources" does not include |
12 |
| the incineration or burning of tires, garbage, general |
13 |
| household, institutional, and commercial waste, industrial |
14 |
| lunchroom or office waste, landscape waste other than trees and |
15 |
| tree trimmings, railroad crossties, utility poles, or |
16 |
| construction or demolition debris, other than untreated and |
17 |
| unadulterated waste wood. |
18 |
| "Revenue bond" means any bond, note, or other evidence of |
19 |
| indebtedness issued by the Authority, the principal and |
20 |
| interest of which is payable solely from revenues or income |
21 |
| derived from any project or activity of the Agency. |
22 |
| "Total resource cost test" or "TRC test" means a standard |
23 |
| that is met if, for an investment in energy efficiency or |
24 |
| demand-response measures, the benefit-cost ratio is greater |
25 |
| than one. The benefit-cost ratio is the ratio of the net |
26 |
| present value of the total benefits of the program to the net |
|
|
|
09600SB0658ham003 |
- 6 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| present value of the total costs as calculated over the |
2 |
| lifetime of the measures. A total resource cost test compares |
3 |
| the sum of avoided electric utility costs, representing the |
4 |
| benefits that accrue to the system and the participant in the |
5 |
| delivery of those efficiency measures, to the sum of all |
6 |
| incremental costs of end-use measures that are implemented due |
7 |
| to the program (including both utility and participant |
8 |
| contributions), plus costs to administer, deliver, and |
9 |
| evaluate each demand-side program, to quantify the net savings |
10 |
| obtained by substituting the demand-side program for supply |
11 |
| resources. In calculating avoided costs of power and energy |
12 |
| that an electric utility would otherwise have had to acquire, |
13 |
| reasonable estimates shall be included of financial costs |
14 |
| likely to be imposed by future regulations and legislation on |
15 |
| emissions of greenhouse gases.
|
16 |
| (Source: P.A. 95-481, eff. 8-28-07; 95-913, eff. 1-1-09.) |
17 |
| (Text of Section after amendment by P.A. 95-1027 ) |
18 |
| Sec. 1-10. Definitions. |
19 |
| "Agency" means the Illinois Power Agency. |
20 |
| "Agency loan agreement" means any agreement pursuant to |
21 |
| which the Illinois Finance Authority agrees to loan the |
22 |
| proceeds of revenue bonds issued with respect to a project to |
23 |
| the Agency upon terms providing for loan repayment installments |
24 |
| at least sufficient to pay when due all principal of, interest |
25 |
| and premium, if any, on those revenue bonds, and providing for |
|
|
|
09600SB0658ham003 |
- 7 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| maintenance, insurance, and other matters in respect of the |
2 |
| project. |
3 |
| "Authority" means the Illinois Finance Authority. |
4 |
| "Clean coal facility" means an electric generating |
5 |
| facility that uses primarily coal as a feedstock and that |
6 |
| captures and sequesters carbon emissions at the following |
7 |
| levels: at least 50% of the total carbon emissions that the |
8 |
| facility would otherwise emit if, at the time construction |
9 |
| commences, the facility is scheduled to commence operation |
10 |
| before 2016, at least 70% of the total carbon emissions that |
11 |
| the facility would otherwise emit if, at the time construction |
12 |
| commences, the facility is scheduled to commence operation |
13 |
| during 2016 or 2017, and at least 90% of the total carbon |
14 |
| emissions that the facility would otherwise emit if, at the |
15 |
| time construction commences, the facility is scheduled to |
16 |
| commence operation after 2017. The power block of the clean |
17 |
| coal facility shall not exceed allowable emission rates for |
18 |
| sulfur dioxide, nitrogen oxides, carbon monoxide, particulates |
19 |
| and mercury for a natural gas-fired combined-cycle facility the |
20 |
| same size as and in the same location as the clean coal |
21 |
| facility at the time the clean coal facility obtains an |
22 |
| approved air permit. All coal used by a clean coal facility |
23 |
| shall have high volatile bituminous rank and greater than 1.7 |
24 |
| pounds of sulfur per million btu content, unless the clean coal |
25 |
| facility does not use gasification technology and was operating |
26 |
| as a conventional coal-fired electric generating facility on |
|
|
|
09600SB0658ham003 |
- 8 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| June 1, 2009 ( the effective date of Public Act 95-1027)
this |
2 |
| amendatory Act of the 95th General Assembly . |
3 |
| "Clean coal SNG facility" means a facility that uses a |
4 |
| gasification process to produce substitute natural gas, that |
5 |
| sequesters at least 90% of the total carbon emissions that the |
6 |
| facility would otherwise emit and that uses petroleum coke or |
7 |
| coal as a feedstock, with all such coal having a high |
8 |
| bituminous rank and greater than 1.7 pounds of sulfur per |
9 |
| million btu content. |
10 |
| "Commission" means the Illinois Commerce Commission. |
11 |
| "Costs incurred in connection with the development and |
12 |
| construction of a facility" means: |
13 |
| (1) the cost of acquisition of all real property and |
14 |
| improvements in connection therewith and equipment and |
15 |
| other property, rights, and easements acquired that are |
16 |
| deemed necessary for the operation and maintenance of the |
17 |
| facility; |
18 |
| (2) financing costs with respect to bonds, notes, and |
19 |
| other evidences of indebtedness of the Agency; |
20 |
| (3) all origination, commitment, utilization, |
21 |
| facility, placement, underwriting, syndication, credit |
22 |
| enhancement, and rating agency fees; |
23 |
| (4) engineering, design, procurement, consulting, |
24 |
| legal, accounting, title insurance, survey, appraisal, |
25 |
| escrow, trustee, collateral agency, interest rate hedging, |
26 |
| interest rate swap, capitalized interest and other |
|
|
|
09600SB0658ham003 |
- 9 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| financing costs, and other expenses for professional |
2 |
| services; and |
3 |
| (5) the costs of plans, specifications, site study and |
4 |
| investigation, installation, surveys, other Agency costs |
5 |
| and estimates of costs, and other expenses necessary or |
6 |
| incidental to determining the feasibility of any project, |
7 |
| together with such other expenses as may be necessary or |
8 |
| incidental to the financing, insuring, acquisition, and |
9 |
| construction of a specific project and placing that project |
10 |
| in operation. |
11 |
| "Department" means the Department of Commerce and Economic |
12 |
| Opportunity. |
13 |
| "Director" means the Director of the Illinois Power Agency. |
14 |
| "Demand-response" means measures that decrease peak |
15 |
| electricity demand or shift demand from peak to off-peak |
16 |
| periods. |
17 |
| "Energy efficiency" means measures that reduce the amount |
18 |
| of electricity required to achieve a given end use. |
19 |
| "Electric utility" has the same definition as found in |
20 |
| Section 16-102 of the Public Utilities Act. |
21 |
| "Facility" means an electric generating unit or a |
22 |
| co-generating unit that produces electricity along with |
23 |
| related equipment necessary to connect the facility to an |
24 |
| electric transmission or distribution system. |
25 |
| "Governmental aggregator" means one or more units of local |
26 |
| government that individually or collectively procure |
|
|
|
09600SB0658ham003 |
- 10 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| electricity to serve residential retail electrical loads |
2 |
| located within its or their jurisdiction. |
3 |
| "Local government" means a unit of local government as |
4 |
| defined in Article VII of Section 1 of the Illinois |
5 |
| Constitution. |
6 |
| "Municipality" means a city, village, or incorporated |
7 |
| town. |
8 |
| "Person" means any natural person, firm, partnership, |
9 |
| corporation, either domestic or foreign, company, association, |
10 |
| limited liability company, joint stock company, or association |
11 |
| and includes any trustee, receiver, assignee, or personal |
12 |
| representative thereof. |
13 |
| "Project" means the planning, bidding, and construction of |
14 |
| a facility. |
15 |
| "Public utility" has the same definition as found in |
16 |
| Section 3-105 of the Public Utilities Act. |
17 |
| "Real property" means any interest in land together with |
18 |
| all structures, fixtures, and improvements thereon, including |
19 |
| lands under water and riparian rights, any easements, |
20 |
| covenants, licenses, leases, rights-of-way, uses, and other |
21 |
| interests, together with any liens, judgments, mortgages, or |
22 |
| other claims or security interests related to real property. |
23 |
| "Renewable energy credit" means a tradable credit that |
24 |
| represents the environmental attributes of a certain amount of |
25 |
| energy produced from a renewable energy resource. |
26 |
| "Renewable energy resources" includes energy and its |
|
|
|
09600SB0658ham003 |
- 11 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| associated renewable energy credit or renewable energy credits |
2 |
| from wind, solar thermal energy, photovoltaic cells and panels, |
3 |
| biodiesel, crops and untreated and unadulterated organic waste |
4 |
| biomass, trees and tree trimmings, hydropower that does not |
5 |
| involve new construction or significant expansion of |
6 |
| hydropower dams, and other alternative sources of |
7 |
| environmentally preferable energy. For purposes of this Act, |
8 |
| landfill gas produced in the State is considered a renewable |
9 |
| energy resource. "Renewable energy resources" does not include |
10 |
| the incineration or burning of tires, garbage, general |
11 |
| household, institutional, and commercial waste, industrial |
12 |
| lunchroom or office waste, landscape waste other than trees and |
13 |
| tree trimmings, railroad crossties, utility poles, or |
14 |
| construction or demolition debris, other than untreated and |
15 |
| unadulterated waste wood. |
16 |
| "Revenue bond" means any bond, note, or other evidence of |
17 |
| indebtedness issued by the Authority, the principal and |
18 |
| interest of which is payable solely from revenues or income |
19 |
| derived from any project or activity of the Agency. |
20 |
| "Sequester" means permanent storage of carbon dioxide by |
21 |
| injecting it into a saline aquifer, a depleted gas reservoir, |
22 |
| or an oil reservoir, directly or through an enhanced oil |
23 |
| recovery process that may involve intermediate storage in a |
24 |
| salt dome. |
25 |
| "Servicing agreement" means (i) in the case of an electric |
26 |
| utility, an agreement between the owner of a clean coal |
|
|
|
09600SB0658ham003 |
- 12 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| facility and such electric utility, which agreement shall have |
2 |
| terms and conditions meeting the requirements of paragraph (3) |
3 |
| of subsection (d) of Section 1-75, and (ii) in the case of an |
4 |
| alternative retail electric supplier, an agreement between the |
5 |
| owner of a clean coal facility and such alternative retail |
6 |
| electric supplier, which agreement shall have terms and |
7 |
| conditions meeting the requirements of Section 16-115(d)(5) of |
8 |
| the Public Utilities Act. |
9 |
| "Substitute natural gas" or "SNG" means a gas manufactured |
10 |
| by gasification of hydrocarbon feedstock, which is |
11 |
| substantially interchangeable in use and distribution with |
12 |
| conventional natural gas. |
13 |
| "Total resource cost test" or "TRC test" means a standard |
14 |
| that is met if, for an investment in energy efficiency or |
15 |
| demand-response measures, the benefit-cost ratio is greater |
16 |
| than one. The benefit-cost ratio is the ratio of the net |
17 |
| present value of the total benefits of the program to the net |
18 |
| present value of the total costs as calculated over the |
19 |
| lifetime of the measures. A total resource cost test compares |
20 |
| the sum of avoided electric utility costs, representing the |
21 |
| benefits that accrue to the system and the participant in the |
22 |
| delivery of those efficiency measures, to the sum of all |
23 |
| incremental costs of end-use measures that are implemented due |
24 |
| to the program (including both utility and participant |
25 |
| contributions), plus costs to administer, deliver, and |
26 |
| evaluate each demand-side program, to quantify the net savings |
|
|
|
09600SB0658ham003 |
- 13 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| obtained by substituting the demand-side program for supply |
2 |
| resources. In calculating avoided costs of power and energy |
3 |
| that an electric utility would otherwise have had to acquire, |
4 |
| reasonable estimates shall be included of financial costs |
5 |
| likely to be imposed by future regulations and legislation on |
6 |
| emissions of greenhouse gases.
|
7 |
| (Source: P.A. 95-481, eff. 8-28-07; 95-913, eff. 1-1-09; |
8 |
| 95-1027, eff. 6-1-09; revised 1-14-09.) |
9 |
| (20 ILCS 3855/1-20)
|
10 |
| Sec. 1-20. General powers of the Agency. |
11 |
| (a) The Agency is authorized to do each of the following: |
12 |
| (1) Develop electricity procurement plans to ensure |
13 |
| adequate, reliable, affordable, efficient, and |
14 |
| environmentally sustainable electric service at the lowest |
15 |
| total cost over time, taking into account any benefits of |
16 |
| price stability, for electric utilities that on December |
17 |
| 31, 2005 provided electric service to at least 100,000 |
18 |
| customers in Illinois. The procurement plans shall be |
19 |
| updated on an annual basis and shall include electricity |
20 |
| generated from renewable resources sufficient to achieve |
21 |
| the standards specified in this Act. |
22 |
| (2) Conduct competitive procurement processes to |
23 |
| procure the supply resources identified in the procurement |
24 |
| plan, pursuant to Section 16-111.5 of the Public Utilities |
25 |
| Act. |
|
|
|
09600SB0658ham003 |
- 14 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| (3) Develop electric generation and co-generation |
2 |
| facilities that use indigenous coal or renewable |
3 |
| resources, or both, financed with bonds issued by the |
4 |
| Illinois Finance Authority. |
5 |
| (4) Supply electricity from the Agency's facilities at |
6 |
| cost to one or more of the following: municipal electric |
7 |
| systems, governmental aggregators, or rural electric |
8 |
| cooperatives in Illinois. |
9 |
| (b) Except as otherwise limited by this Act, the Agency has |
10 |
| all of the powers necessary or convenient to carry out the |
11 |
| purposes and provisions of this Act, including without |
12 |
| limitation, each of the following: |
13 |
| (1) To have a corporate seal, and to alter that seal at |
14 |
| pleasure, and to use it by causing it or a facsimile to be |
15 |
| affixed or impressed or reproduced in any other manner. |
16 |
| (2) To use the services of the Illinois Finance |
17 |
| Authority necessary to carry out the Agency's purposes. |
18 |
| (3) To negotiate and enter into loan agreements and |
19 |
| other agreements with the Illinois Finance Authority. |
20 |
| (4) To obtain and employ personnel and hire consultants |
21 |
| that are necessary to fulfill the Agency's purposes, and to |
22 |
| make expenditures for that purpose within the |
23 |
| appropriations for that purpose. |
24 |
| (5) To purchase, receive, take by grant, gift, devise, |
25 |
| bequest, or otherwise, lease, or otherwise acquire, own, |
26 |
| hold, improve, employ, use, and otherwise deal in and with, |
|
|
|
09600SB0658ham003 |
- 15 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| real or personal property whether tangible or intangible, |
2 |
| or any interest therein, within the State. |
3 |
| (6) To acquire real or personal property, whether |
4 |
| tangible or intangible, including without limitation |
5 |
| property rights, interests in property, franchises, |
6 |
| obligations, contracts, and debt and equity securities, |
7 |
| and to do so by the exercise of the power of eminent domain |
8 |
| in accordance with Section 1-21; except that any real |
9 |
| property acquired by the exercise of the power of eminent |
10 |
| domain must be located within the State. |
11 |
| (7) To sell, convey, lease, exchange, transfer, |
12 |
| abandon, or otherwise dispose of, or mortgage, pledge, or |
13 |
| create a security interest in, any of its assets, |
14 |
| properties, or any interest therein, wherever situated. |
15 |
| (8) To purchase, take, receive, subscribe for, or |
16 |
| otherwise acquire, hold, make a tender offer for, vote, |
17 |
| employ, sell, lend, lease, exchange, transfer, or |
18 |
| otherwise dispose of, mortgage, pledge, or grant a security |
19 |
| interest in, use, and otherwise deal in and with, bonds and |
20 |
| other obligations, shares, or other securities (or |
21 |
| interests therein) issued by others, whether engaged in a |
22 |
| similar or different business or activity. |
23 |
| (9) To make and execute agreements, contracts, and |
24 |
| other instruments necessary or convenient in the exercise |
25 |
| of the powers and functions of the Agency under this Act, |
26 |
| including contracts with any person, local government, |
|
|
|
09600SB0658ham003 |
- 16 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| State agency, or other entity; and all State agencies and |
2 |
| all local governments are authorized to enter into and do |
3 |
| all things necessary to perform any such agreement, |
4 |
| contract, or other instrument with the Agency. No such |
5 |
| agreement, contract, or other instrument shall exceed 40 |
6 |
| years. |
7 |
| (10) To lend money, invest and reinvest its funds in |
8 |
| accordance with the Public Funds Investment Act, and take |
9 |
| and hold real and personal property as security for the |
10 |
| payment of funds loaned or invested. |
11 |
| (11) To borrow money at such rate or rates of interest |
12 |
| as the Agency may determine, issue its notes, bonds, or |
13 |
| other obligations to evidence that indebtedness, and |
14 |
| secure any of its obligations by mortgage or pledge of its |
15 |
| real or personal property, machinery, equipment, |
16 |
| structures, fixtures, inventories, revenues, grants, and |
17 |
| other funds as provided or any interest therein, wherever |
18 |
| situated. |
19 |
| (12) To enter into agreements with the Illinois Finance |
20 |
| Authority to issue bonds whether or not the income |
21 |
| therefrom is exempt from federal taxation. |
22 |
| (13) To procure insurance against any loss in |
23 |
| connection with its properties or operations in such amount |
24 |
| or amounts and from such insurers, including the federal |
25 |
| government, as it may deem necessary or desirable, and to |
26 |
| pay any premiums therefor. |
|
|
|
09600SB0658ham003 |
- 17 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| (14) To negotiate and enter into agreements with |
2 |
| trustees or receivers appointed by United States |
3 |
| bankruptcy courts or federal district courts or in other |
4 |
| proceedings involving adjustment of debts and authorize |
5 |
| proceedings involving adjustment of debts and authorize |
6 |
| legal counsel for the Agency to appear in any such |
7 |
| proceedings. |
8 |
| (15) To file a petition under Chapter 9 of Title 11 of |
9 |
| the United States Bankruptcy Code or take other similar |
10 |
| action for the adjustment of its debts. |
11 |
| (16) To enter into management agreements for the |
12 |
| operation of any of the property or facilities owned by the |
13 |
| Agency. |
14 |
| (17) To enter into an agreement to transfer and to |
15 |
| transfer any land, facilities, fixtures, or equipment of |
16 |
| the Agency to one or more municipal electric systems, |
17 |
| governmental aggregators, or rural electric agencies or |
18 |
| cooperatives, for such consideration and upon such terms as |
19 |
| the Agency may determine to be in the best interest of the |
20 |
| citizens of Illinois. |
21 |
| (18) To enter upon any lands and within any building |
22 |
| whenever in its judgment it may be necessary for the |
23 |
| purpose of making surveys and examinations to accomplish |
24 |
| any purpose authorized by this Act. |
25 |
| (19) To maintain an office or offices at such place or |
26 |
| places in the State as it may determine. |
|
|
|
09600SB0658ham003 |
- 18 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| (20) To request information, and to make any inquiry, |
2 |
| investigation, survey, or study that the Agency may deem |
3 |
| necessary to enable it effectively to carry out the |
4 |
| provisions of this Act. |
5 |
| (21) To accept and expend appropriations. |
6 |
| (22) To engage in any activity or operation that is |
7 |
| incidental to and in furtherance of efficient operation to |
8 |
| accomplish the Agency's purposes. |
9 |
| (23) To adopt, revise, amend, and repeal rules with |
10 |
| respect to its operations, properties, and facilities as |
11 |
| may be necessary or convenient to carry out the purposes of |
12 |
| this Act, subject to the provisions of the Illinois |
13 |
| Administrative Procedure Act and Sections 1-22 and 1-35 of |
14 |
| this Act. |
15 |
| (24) To establish and collect charges and fees as |
16 |
| described in this Act.
|
17 |
| (25) To manage procurement of substitute natural gas |
18 |
| from a facility that meets the criteria specified in |
19 |
| subsection (a) of Section 1-56 of this Act, on terms and |
20 |
| conditions that may be approved by the Agency pursuant to |
21 |
| subsection (d) of Section 1-56 of this Act, to support the |
22 |
| operations of State agencies and local governments that |
23 |
| agree to such terms and conditions. This procurement |
24 |
| process is not subject to the Procurement Code. |
25 |
| (Source: P.A. 95-481, eff. 8-28-07.) |
|
|
|
09600SB0658ham003 |
- 19 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| (20 ILCS 3855/1-56 new)
|
2 |
| Sec. 1-56. Clean coal SNG facility construction. |
3 |
| (a) It is the intention of the General Assembly to provide |
4 |
| additional long-term natural gas price stability to the State |
5 |
| and consumers by promoting the development of a clean coal SNG |
6 |
| facility that would produce a minimum annual output of 30 Bcf |
7 |
| of SNG and commence construction no later than June 1, 2013 on |
8 |
| a brownfield site in a municipality with at least one million |
9 |
| residents. The costs associated with preparing a facility cost |
10 |
| report for such a facility, which contains all of the |
11 |
| information required by subsection (b) of this Section, may be |
12 |
| paid or reimbursed pursuant to subsection (c) of this Section. |
13 |
| (b) The facility cost report for a facility that meets the |
14 |
| criteria set forth in subsection (a) of this Section shall be |
15 |
| prepared by a duly licensed engineering firm that details the |
16 |
| estimated capital costs payable to one or more contractors or |
17 |
| suppliers for the engineering, procurement, and construction |
18 |
| of the components comprising the facility and the estimated |
19 |
| costs of operation and maintenance of the facility. The report |
20 |
| must be provided to the General Assembly and the Agency on or |
21 |
| before April 30, 2010. The facility cost report shall include |
22 |
| all off the following: |
23 |
| (1) An estimate of the capital cost of the core plant |
24 |
| based on a front-end engineering and design study. The core |
25 |
| plant shall include all civil, structural, mechanical, |
26 |
| electrical, control, and safety systems. The quoted |
|
|
|
09600SB0658ham003 |
- 20 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| construction costs shall be expressed in nominal dollars as |
2 |
| of the date that the quote is prepared and shall include: |
3 |
| (A) capitalized financing costs during |
4 |
| construction; |
5 |
| (B) taxes, insurance, and other owner's costs; and |
6 |
| (C) any assumed escalation in materials and labor |
7 |
| beyond the date as of which the construction cost quote |
8 |
| is expressed; |
9 |
| (2) An estimate of the capital cost of the balance of |
10 |
| the plant, including any capital costs associated with site |
11 |
| preparation and remediation, sequestration of carbon |
12 |
| dioxide emissions, and all interconnects and interfaces |
13 |
| required to operate the facility, such as construction or |
14 |
| backfeed power supply, pipelines to transport substitute |
15 |
| natural gas or carbon dioxide, potable water supply, |
16 |
| natural gas supply, water supply, water discharge, |
17 |
| landfill, access roads, and coal delivery. The front-end |
18 |
| engineering and design study and the cost study for the |
19 |
| balance of the plant shall include sufficient design work |
20 |
| to permit quantification of major categories of materials, |
21 |
| commodities and labor hours, and receipt of quotes from |
22 |
| vendors of major equipment required to construct and |
23 |
| operate the facility. |
24 |
| (3) An operating and maintenance cost quote that will |
25 |
| provide the estimated cost of delivered fuel, personnel, |
26 |
| maintenance contracts, chemicals, catalysts, consumables, |
|
|
|
09600SB0658ham003 |
- 21 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| spares, and other fixed and variable operating and |
2 |
| maintenance costs. This quote is subject to the following |
3 |
| requirements: |
4 |
| (A) The delivered fuel cost estimate shall be |
5 |
| provided by a recognized third party expert or experts |
6 |
| in the fuel and transportation industries. |
7 |
| (B) The balance of the operating and maintenance |
8 |
| cost quote, excluding delivered fuel costs shall be |
9 |
| developed based on the inputs provided by a duly |
10 |
| licensed engineering firm performing the construction |
11 |
| cost quote, potential vendors under long-term service |
12 |
| agreements and plant operating agreements, or |
13 |
| recognized third-party plant operator or operators. |
14 |
| The operating and maintenance cost quote shall be |
15 |
| expressed in nominal dollars as of the date that the quote |
16 |
| is prepared and shall include (i) taxes, insurance, and |
17 |
| other owner's costs and (ii) any assumed escalation in |
18 |
| materials and labor beyond the date as of which the |
19 |
| operating and maintenance cost quote is expressed. |
20 |
| (c) Reasonable amounts paid or due to be paid by the owner |
21 |
| or owners of the clean coal SNG facility to third parties |
22 |
| unrelated to the owner or owners to prepare the facility cost |
23 |
| report may be reimbursed or paid up to $10 million, through |
24 |
| funding authorized pursuant to 20 ILCS 3501/825-65. |
25 |
| (d) The Agency shall review the facility report and based |
26 |
| on that report, consider whether to enter into long term |
|
|
|
09600SB0658ham003 |
- 22 - |
LRB096 06724 AMC 27695 a |
|
|
1 |
| contracts to purchase SNG from the facility pursuant to Section |
2 |
| 1-20 of this Act. To assist with its evaluation of the report, |
3 |
| the Agency may hire one or more experts or consultants, the |
4 |
| reasonable costs of which, not to exceed $250,000, shall be |
5 |
| paid for by the owner or owners of the clean coal SNG facility |
6 |
| submitting the facility cost report. The Agency may begin the |
7 |
| process of selecting such experts or consultants prior to |
8 |
| receipt of the facility cost report.
|
9 |
| Section 95. No acceleration or delay. Where this Act makes |
10 |
| changes in a statute that is represented in this Act by text |
11 |
| that is not yet or no longer in effect (for example, a Section |
12 |
| represented by multiple versions), the use of that text does |
13 |
| not accelerate or delay the taking effect of (i) the changes |
14 |
| made by this Act or (ii) provisions derived from any other |
15 |
| Public Act.
|
16 |
| Section 99. Effective date. This Act takes effect upon |
17 |
| becoming law.".
|