|
Sen. Don Harmon
Filed: 11/16/2010
| | 09600SB0852sam001 | | LRB096 06926 JDS 43637 a |
|
|
| 1 | | AMENDMENT TO SENATE BILL 852
|
| 2 | | AMENDMENT NO. ______. Amend Senate Bill 852 by replacing |
| 3 | | everything after the enacting clause with the following:
|
| 4 | | "Section 5. The Environmental Protection Act is amended by |
| 5 | | changing Section 22.38 as follows:
|
| 6 | | (415 ILCS 5/22.38)
|
| 7 | | Sec. 22.38. Facilities accepting exclusively general |
| 8 | | construction or
demolition debris
for transfer, storage, or |
| 9 | | treatment.
|
| 10 | | (a) Facilities accepting exclusively general construction |
| 11 | | or demolition
debris for
transfer, storage, or treatment shall |
| 12 | | be subject to local zoning, ordinance,
and
land use |
| 13 | | requirements.
Those facilities shall be located in accordance |
| 14 | | with local zoning requirements
or, in the absence of local |
| 15 | | zoning requirements, shall be located so that no
part of the |
| 16 | | facility boundary is closer than 1,320 feet from the nearest
|
|
| | 09600SB0852sam001 | - 2 - | LRB096 06926 JDS 43637 a |
|
|
| 1 | | property zoned for primarily residential use.
|
| 2 | | (b) An owner or operator of a facility accepting |
| 3 | | exclusively general
construction or demolition debris for |
| 4 | | transfer, storage, or treatment shall:
|
| 5 | | (1) Within 48 hours after of receipt of the general |
| 6 | | construction or demolition
debris at the facility, sort the |
| 7 | | general construction or demolition debris to
separate the
|
| 8 | | recyclable general construction or demolition debris, and |
| 9 | | recovered wood that is processed for use as fuel, and |
| 10 | | general construction or demolition debris that is |
| 11 | | processed for use at a landfill from the non-recyclable
|
| 12 | | general construction or demolition debris that is to be |
| 13 | | disposed of or discarded.
|
| 14 | | (2) Transport off site for disposal, in accordance with |
| 15 | | all applicable federal, State, and local requirements |
| 16 | | within 72 hours after its receipt at the facility, all |
| 17 | | non-recyclable general
construction or demolition debris |
| 18 | | that is not neither recyclable general construction or |
| 19 | | demolition debris, nor recovered wood that is processed for |
| 20 | | use as fuel, or general construction or demolition debris |
| 21 | | that is processed for use at a landfill in
accordance with |
| 22 | | all applicable federal, State, and local requirements |
| 23 | | within 72
hours of its receipt at the facility.
|
| 24 | | (3) Limit the percentage of incoming non-recyclable |
| 25 | | general construction
or demolition debris to 25% or
less of |
| 26 | | the total incoming general construction or demolition |
|
| | 09600SB0852sam001 | - 3 - | LRB096 06926 JDS 43637 a |
|
|
| 1 | | debris,
as calculated on a quarterly daily basis, so that |
| 2 | | 75% or more of the general construction or demolition |
| 3 | | debris accepted on a quarterly daily basis consists of |
| 4 | | recyclable general construction or demolition debris, |
| 5 | | recovered wood that is processed for use as fuel, or |
| 6 | | general construction or demolition debris that is |
| 7 | | processed for use at a landfill both.
|
| 8 | | (4) Within 6 months after its receipt at the facility, |
| 9 | | transport: |
| 10 | | (A) Transport all non-putrescible recyclable |
| 11 | | general construction or
demolition debris
for |
| 12 | | recycling or disposal; and |
| 13 | | (B) all non-putrescible general construction or |
| 14 | | demolition debris that is processed for use at a |
| 15 | | landfill to a MSWLF unit for use or disposal within 6 |
| 16 | | months of its receipt at the facility.
|
| 17 | | (5) Within 45 days after of its receipt at the |
| 18 | | facility, transport: |
| 19 | | (A) (i) all putrescible or combustible recyclable |
| 20 | | general
construction or demolition debris
(excluding |
| 21 | | recovered wood that is processed for use as fuel) for |
| 22 | | recycling or disposal; and |
| 23 | | (B) (ii) all recovered wood that is processed for |
| 24 | | use as fuel to an intermediate processing facility for |
| 25 | | sizing, to a combustion facility for use as fuel, or to |
| 26 | | a disposal facility; and |
|
| | 09600SB0852sam001 | - 4 - | LRB096 06926 JDS 43637 a |
|
|
| 1 | | (C) all putrescible general construction or |
| 2 | | demolition debris that is processed for use at a |
| 3 | | landfill to a MSWLF unit for use or disposal.
|
| 4 | | (6) Employ tagging and recordkeeping procedures to (i) |
| 5 | | demonstrate
compliance
with this Section and (ii) identify |
| 6 | | the source and transporter of material
accepted by the |
| 7 | | facility.
|
| 8 | | (7) Control odor, noise, combustion of materials, |
| 9 | | disease vectors, dust,
and litter.
|
| 10 | | (8) Control, manage, and dispose of any storm water |
| 11 | | runoff and leachate
generated at the facility in accordance |
| 12 | | with applicable federal, State, and
local requirements.
|
| 13 | | (9) Control access to the facility.
|
| 14 | | (10) Comply with all applicable federal, State, or |
| 15 | | local requirements for
the handling, storage, |
| 16 | | transportation, or disposal of asbestos-containing
|
| 17 | | material or other material accepted at the
facility that is |
| 18 | | not general construction or demolition debris.
|
| 19 | | (11) Prior to August 24, 2009 (the effective date of |
| 20 | | Public Act 96-611), submit to the Agency at least 30 days |
| 21 | | prior to the initial acceptance
of general construction or |
| 22 | | demolition debris at the facility, on forms provided
by the |
| 23 | | Agency, the following information:
|
| 24 | | (A) the name, address, and telephone number of both |
| 25 | | the facility owner
and operator;
|
| 26 | | (B) the street address and location of the |
|
| | 09600SB0852sam001 | - 5 - | LRB096 06926 JDS 43637 a |
|
|
| 1 | | facility;
|
| 2 | | (C) a description of facility operations;
|
| 3 | | (D) a description of the tagging and recordkeeping |
| 4 | | procedures the
facility will employ to (i) demonstrate |
| 5 | | compliance with this Section and (ii)
identify the |
| 6 | | source and transporter of any material accepted by the |
| 7 | | facility;
|
| 8 | | (E) the name and location of the disposal sites to |
| 9 | | be used for the
disposal of any general construction or |
| 10 | | demolition debris received at the facility that must be |
| 11 | | disposed of;
|
| 12 | | (F) the name and location of an individual, |
| 13 | | facility, or business to
which recyclable materials |
| 14 | | will be transported;
|
| 15 | | (G) the name and location of intermediate |
| 16 | | processing facilities or combustion facilities to |
| 17 | | which recovered wood that is processed for use as fuel |
| 18 | | will be transported; and
|
| 19 | | (H) other information as specified on the form |
| 20 | | provided by the Agency.
|
| 21 | | (12) On or after August 24, 2009 (the effective date of |
| 22 | | Public Act 96-611), obtain a permit issued by the Agency |
| 23 | | prior to the initial acceptance of general construction or |
| 24 | | demolition debris at the facility.
|
| 25 | | When any of the information contained or processes |
| 26 | | described in the initial
notification form submitted to the |
|
| | 09600SB0852sam001 | - 6 - | LRB096 06926 JDS 43637 a |
|
|
| 1 | | Agency under paragraph (11) of subsection (b) of this |
| 2 | | Section changes, the owner and operator shall
submit an |
| 3 | | updated form within 14 days of the change.
|
| 4 | | (c) For purposes of this Section, the term "recyclable |
| 5 | | general
construction or demolition debris" means general |
| 6 | | construction or demolition
debris that has been rendered |
| 7 | | reusable and is reused or that would otherwise
be disposed of |
| 8 | | or discarded but is collected, separated, or processed and
|
| 9 | | returned to the economic mainstream in the form of raw |
| 10 | | materials or products.
"Recyclable general construction or |
| 11 | | demolition debris" does not include general
construction or |
| 12 | | demolition debris processed for use as fuel, incinerated,
|
| 13 | | burned, buried, or otherwise used as fill material.
|
| 14 | | (d) For purposes of this Section, "treatment" means |
| 15 | | processing
designed to alter the physical nature of the general |
| 16 | | construction or
demolition debris, including but not limited to |
| 17 | | size reduction, crushing,
grinding, or
homogenization, but |
| 18 | | does not include processing designed to change the chemical
|
| 19 | | nature of the general construction or demolition debris.
|
| 20 | | (e) For purposes of this Section, "recovered wood that is |
| 21 | | processed for use as fuel" means wood that has been salvaged |
| 22 | | from general construction or demolition debris and processed |
| 23 | | for use as fuel, as authorized by the applicable state or |
| 24 | | federal environmental regulatory authority, and supplied only |
| 25 | | to intermediate processing facilities for sizing, or to |
| 26 | | combustion facilities for use as fuel, that have obtained all |
|
| | 09600SB0852sam001 | - 7 - | LRB096 06926 JDS 43637 a |
|
|
| 1 | | necessary waste management and air permits for handling and |
| 2 | | combustion of the fuel. |
| 3 | | (f) For purposes of this Section, "non-recyclable general |
| 4 | | construction or demolition debris" does not include "recovered |
| 5 | | wood that is processed for use as fuel" or general construction |
| 6 | | or demolition debris that is processed for use at a landfill. |
| 7 | | (g) Recyclable general construction or demolition debris, |
| 8 | | or recovered wood that is processed for use as fuel, and |
| 9 | | general construction and demolition debris that is processed |
| 10 | | for use at a landfill that is sent for disposal at the end of |
| 11 | | the applicable retention period shall not be considered as |
| 12 | | meeting the 75% diversion requirement for purposes of |
| 13 | | subdivision (b)(3) of this Section if sent for disposal at the |
| 14 | | end of the applicable retention period. |
| 15 | | (h) For the purposes of this Section, "general construction |
| 16 | | or demolition debris that is processed for use at a landfill" |
| 17 | | means general construction or demolition debris that is |
| 18 | | processed for use at a MSWLF unit as alternative daily cover, |
| 19 | | road building material, or drainage structure building |
| 20 | | material in accordance with the MSWLF unit's waste disposal |
| 21 | | permit issued by the Agency under this Act. |
| 22 | | (Source: P.A. 96-235, eff. 8-11-09; 96-611, eff. 8-24-09; |
| 23 | | 96-1000, eff. 7-2-10.)
|
| 24 | | Section 99. Effective date. This Act takes effect upon |
| 25 | | becoming law.".
|