1 | AN ACT concerning education.
| ||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||
3 | represented in the General Assembly:
| ||||||
4 | Section 5. The Public University Energy Conservation Act is | ||||||
5 | amended by changing Section 5-10 as follows:
| ||||||
6 | (110 ILCS 62/5-10)
| ||||||
7 | Sec. 5-10. Energy conservation measure. | ||||||
8 | (a) "Energy conservation
measure" means any improvement, | ||||||
9 | repair, alteration, or betterment of any
building or facility, | ||||||
10 | subject to all applicable building codes, owned or operated by | ||||||
11 | a public university or any
equipment, fixture, or furnishing to | ||||||
12 | be added to or used in any
such building or facility
that is | ||||||
13 | designed to reduce
energy consumption or operating costs, and | ||||||
14 | may include, without limitation,
one or more of the following:
| ||||||
15 | (1) Insulation of the building structure or systems | ||||||
16 | within the building.
| ||||||
17 | (2) Storm windows or doors, caulking or | ||||||
18 | weatherstripping, multiglazed
windows or doors, heat | ||||||
19 | absorbing or heat reflective glazed and coated
window or | ||||||
20 | door systems, additional glazing, reductions in glass | ||||||
21 | area, or
other window and door system modifications that | ||||||
22 | reduce energy consumption.
| ||||||
23 | (3) Automated or computerized energy control systems.
|
| |||||||
| |||||||
1 | (4) Heating, ventilating, or air conditioning system | ||||||
2 | modifications or
replacements.
| ||||||
3 | (5) Replacement or modification of lighting fixtures | ||||||
4 | to increase the
energy efficiency of the lighting system | ||||||
5 | without increasing the overall
illumination of a facility, | ||||||
6 | unless an increase in illumination is necessary
to conform | ||||||
7 | to the applicable State or local building code for the | ||||||
8 | lighting
system after the proposed modifications are made.
| ||||||
9 | (6) Energy recovery systems.
| ||||||
10 | (7) Energy conservation measures that provide | ||||||
11 | long-term operating cost
reductions.
| ||||||
12 | (b) From the effective date of this amendatory Act of the | ||||||
13 | 96th General Assembly until January 1, 2015, "energy | ||||||
14 | conservation measure" includes a renewable energy center pilot | ||||||
15 | project at Eastern Illinois University, provided that: | ||||||
16 | (1) the University signs a partnership contract with a | ||||||
17 | qualified energy conservation measure provider as provided | ||||||
18 | in this Act; | ||||||
19 | (2) the University has responsibility for the | ||||||
20 | qualified provider's actions with regard to applicable | ||||||
21 | laws; | ||||||
22 | (3) the University obtains a performance bond in
| ||||||
23 | accordance with this Act; | ||||||
24 | (4) the University and the qualified provider follow | ||||||
25 | all aspects of the Prevailing Wage Act as provided by this | ||||||
26 | Act; |
| |||||||
| |||||||
1 | (5) the University and the qualified provider use an | ||||||
2 | approved list of firms from the Capital Development Board | ||||||
3 | (CDB), unless the University requires services that are not | ||||||
4 | typically performed by the firms on CDB's list; | ||||||
5 | (6) the University provides monthly progress reports | ||||||
6 | to the Procurement Policy Board, and the University allows | ||||||
7 | a representative from CDB to monitor the project, provided | ||||||
8 | that such involvement is at no cost to the University; | ||||||
9 | (7) the University requires the qualified provider to | ||||||
10 | follow the provisions of the Business Enterprise for | ||||||
11 | Minorities, Females, and Persons with Disabilities Act and | ||||||
12 | the Public Works Employment Discrimination Act as provided | ||||||
13 | in this Act; | ||||||
14 | (8) the University agrees to award new building | ||||||
15 | construction work to a responsible bidder, as defined in | ||||||
16 | Section 30-22 of the Illinois Procurement Code; | ||||||
17 | (9) the University includes in its contract with the | ||||||
18 | qualified provider a requirement that the qualified | ||||||
19 | provider name the sub-contractors that it will use, and the | ||||||
20 | qualified provider may not change these without the | ||||||
21 | University's written approval; | ||||||
22 | (10) the University follows, to the extent possible, | ||||||
23 | the Design-Build Procurement Act for construction of the | ||||||
24 | project, taking into consideration the current status of | ||||||
25 | the project; for purposes of this Act, the definition of | ||||||
26 | "State construction agency" in the Design-Build |
| |||||||
| |||||||
1 | Procurement Act means Eastern Illinois University for the | ||||||
2 | purpose of this project; | ||||||
3 | (11) the University follows, to the extent possible, | ||||||
4 | the Architectural, Engineering, and Land Surveying | ||||||
5 | Qualifications Based Selection Act; | ||||||
6 | (12) the University requires all engineering, | ||||||
7 | architecture, and design work related to the installation | ||||||
8 | or modification of facilities be performed by design | ||||||
9 | professionals licensed by the State of Illinois and | ||||||
10 | professional design firms registered in the State of | ||||||
11 | Illinois; and | ||||||
12 | (13) the University produces annual reports and a final | ||||||
13 | report describing the project upon completion and files the | ||||||
14 | reports with the Procurement Policy Board, CDB, and the | ||||||
15 | General Assembly. | ||||||
16 | The provisions of this subsection (b), other than this | ||||||
17 | sentence, are inoperative after January 1, 2015. | ||||||
18 | (Source: P.A. 94-1062, eff. 7-31-06.)
| ||||||
19 | Section 99. Effective date. This Act takes effect upon | ||||||
20 | becoming law. |