1 | AN ACT concerning State government.
| ||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||
4 | Section 1. Short title. This Act may be cited as the | ||||||||||||||||||||||||
5 | Critical Facility Flood Protection Act. | ||||||||||||||||||||||||
6 | Section 5. Legislative findings. | ||||||||||||||||||||||||
7 | (a) The State of Illinois has programs for the construction | ||||||||||||||||||||||||
8 | of buildings, facilities, and other development projects, and | ||||||||||||||||||||||||
9 | it annually acquires and disposes of lands in floodplains.
| ||||||||||||||||||||||||
10 | (b) Federal financial assistance for the acquisition or | ||||||||||||||||||||||||
11 | construction of insurable structures in Special Flood Hazard | ||||||||||||||||||||||||
12 | Areas requires State participation in the National Flood | ||||||||||||||||||||||||
13 | Insurance Program.
| ||||||||||||||||||||||||
14 | (c) The Federal Emergency Management Agency has | ||||||||||||||||||||||||
15 | promulgated and adopted regulations at 44 CFR 59-79, as | ||||||||||||||||||||||||
16 | presently enacted or hereafter amended, that govern | ||||||||||||||||||||||||
17 | eligibility of State governments to participate in the National | ||||||||||||||||||||||||
18 | Flood Insurance Program and that require State development | ||||||||||||||||||||||||
19 | activities to comply with specified minimum floodplain | ||||||||||||||||||||||||
20 | regulation criteria.
| ||||||||||||||||||||||||
21 | (d) The Presidential Interagency Floodplain Management | ||||||||||||||||||||||||
22 | Review Committee has published recommendations to strengthen | ||||||||||||||||||||||||
23 | State floodplain management activities.
|
| |||||||
| |||||||
1 | Section 10. Definitions. For the purposes of this Act: | ||||||
2 | "Critical facility" means a facility for which even a | ||||||
3 | slight chance of flooding is too great a threat, including | ||||||
4 | hospitals, fire stations, police stations, facilities where | ||||||
5 | critical records are stored, and other similar facilities. | ||||||
6 | "Development" or "developed" means the placement or | ||||||
7 | erection of earthworks or structures, including manufactured | ||||||
8 | homes; land filling, excavation, or other alteration of the | ||||||
9 | ground surface; installation of public utilities; channel | ||||||
10 | modification; storage of materials; or any other activity | ||||||
11 | undertaken to modify the existing physical features of a | ||||||
12 | floodplain. | ||||||
13 | "Flood protection elevation" means one foot above the | ||||||
14 | applicable base flood or 100-year frequency flood elevation. | ||||||
15 | "Office of Water Resources" means the Illinois Department | ||||||
16 | of Natural Resources, Office of Water Resources. | ||||||
17 | "Special Flood Hazard Area" or "floodplain" means an area | ||||||
18 | that is subject to inundation by the base or 100-year frequency | ||||||
19 | flood and that is shown as such on the most current Flood | ||||||
20 | Insurance Rate Map published by the Federal Emergency | ||||||
21 | Management Agency. | ||||||
22 | "State agency" means any department, commission, board, or | ||||||
23 | agency under the jurisdiction of the Governor; any board, | ||||||
24 | commission, agency, or authority that has a majority of its | ||||||
25 | members appointed by the Governor; and the Governor's Office. |
| |||||||
| |||||||
1 | Section 15. State agency responsibilities. | ||||||
2 | (a) Each State agency engaged in development within a | ||||||
3 | Special Flood Hazard Area shall undertake the development in | ||||||
4 | accordance with the requirements of this subsection (a): | ||||||
5 | (1) All development shall comply with the requirements | ||||||
6 | of 92 Ill. Adm. Code 700 or 92 Ill. Adm. Code 708, | ||||||
7 | whichever is applicable, as well as with the requirements | ||||||
8 | of the National Flood Insurance Program at 44 CFR 59-79, as | ||||||
9 | presently enacted or hereafter amended. | ||||||
10 | (2) In addition to the requirements set forth under | ||||||
11 | paragraph (1) of subsection (a), the following additional | ||||||
12 | requirements shall apply if applicable: | ||||||
13 | (A) All new critical facilities shall be located | ||||||
14 | outside of the floodplain. If this is not practical, | ||||||
15 | critical facilities shall be developed with the lowest | ||||||
16 | floor elevation equal to or greater than the 500-year | ||||||
17 | frequency flood elevation or structurally dry | ||||||
18 | floodproofed to at least the 500-year frequency flood | ||||||
19 | elevation.
| ||||||
20 | (B) All new buildings shall be developed with the | ||||||
21 | lowest floor elevation equal to or greater than the | ||||||
22 | flood protection elevation or structurally dry | ||||||
23 | floodproofed to at least the flood protection | ||||||
24 | elevation.
| ||||||
25 | (C) Modifications, additions, repairs or |
| |||||||
| |||||||
1 | replacement of existing structures may be allowed so | ||||||
2 | long as the new development does not obstruct flood | ||||||
3 | flows and does not increase the floor area of the | ||||||
4 | existing structure by more than 20% or increase the | ||||||
5 | market value of the structure by more than 50%. | ||||||
6 | Floodproofing activities are permitted and encouraged, | ||||||
7 | but they must comply with the requirements of this | ||||||
8 | subsection.
| ||||||
9 | (b) Each State agency that administers grants or loans for | ||||||
10 | financing development within Special Flood Hazard Areas shall | ||||||
11 | take all steps within its authority to ensure that the | ||||||
12 | development meets the requirements of this Act. | ||||||
13 | (c) Each State agency that is responsible for regulating or | ||||||
14 | permitting development within Special Flood Hazard Areas shall | ||||||
15 | take all steps within its authority to ensure that the | ||||||
16 | development meets the requirements of this Act.
| ||||||
17 | (d) Each State agency engaged in planning programs or | ||||||
18 | programs for the promotion of development shall inform | ||||||
19 | participants in its programs of the existence and location of | ||||||
20 | Special Flood Hazard Areas and of any State or local floodplain | ||||||
21 | requirements in effect in those areas, and shall ensure that | ||||||
22 | proposed developments within Special Flood Hazard Areas meet | ||||||
23 | the requirements of this Act.
| ||||||
24 | (e) The Office of Water Resources shall provide available | ||||||
25 | flood hazard information to assist each State agency in | ||||||
26 | carrying out the responsibilities established by this Act. Each |
| |||||||
| |||||||
1 | State agency that obtains new flood elevation, floodway, or | ||||||
2 | encroachment data developed in conjunction with development or | ||||||
3 | other activities covered by this Act shall submit that data to | ||||||
4 | the Office of Water Resources for review. If that data is used | ||||||
5 | in determining design features or location of any State | ||||||
6 | development, it must be approved first by the Office of Water | ||||||
7 | Resources.
| ||||||
8 | (f) Each State agency shall work with the Office of Water | ||||||
9 | Resources to establish procedures to effectively carry out this | ||||||
10 | Act.
| ||||||
11 | Section 20. Supersedes prior executive order. This Act | ||||||
12 | supersedes Executive Order 2006-5, which is no longer of any | ||||||
13 | force or effect.
| ||||||
14 | Section 99. Effective date. This Act takes effect upon | ||||||
15 | becoming law.
|