|
| | 09900HB0264sam001 | - 2 - | LRB099 03912 AWJ 35050 a |
|
|
| 1 | | improvements of the system, the principal and interest of any |
| 2 | | bonds issued to pay
the cost of any necessary upgrades or |
| 3 | | improvements to the system, and improvement, or extension and |
| 4 | | the maintenance and
operation of the system, improvement, or |
| 5 | | extension and may provide an adequate
depreciation fund for the |
| 6 | | bonds. Monthly Charges or rates shall be established,
revised, |
| 7 | | and maintained by ordinance and become payable as the township |
| 8 | | board
determines by ordinance. |
| 9 | | For any user outside of the township's geographical |
| 10 | | boundaries and outside the township's facility planning area, |
| 11 | | the township may impose a 25% surcharge above the monthly user |
| 12 | | rates charged to all users within the township or the |
| 13 | | township's facility planning area. For purposes of this |
| 14 | | Section, "facility planning area" has the same meaning as that |
| 15 | | term is defined under subsection (c) of Section 2.08 of the |
| 16 | | Wastewater Land Treatment Site Regulation Act.
|
| 17 | | (b-5) The township board of a township that operates a |
| 18 | | water or sewerage system may by ordinance collect a fair and |
| 19 | | reasonable fee, which shall not include the cost of labor and |
| 20 | | materials, for connection to any such system for the connection |
| 21 | | of a new service line from the new user's building or |
| 22 | | development to the township's main water or sewer line located |
| 23 | | in the adjoining utility easement. The standard used in order |
| 24 | | to determine a fair and reasonable connection fee shall be |
| 25 | | based solely on the size of the water meter to be installed for |
| 26 | | the service of the building or development. The fee shall not |
|
| | 09900HB0264sam001 | - 3 - | LRB099 03912 AWJ 35050 a |
|
|
| 1 | | exceed, but may be less than, the connection fee for the |
| 2 | | applicable connection type, as described below. The |
| 3 | | restriction on fees imposed by this subsection shall not limit |
| 4 | | the right of the township to recover the actual cost of field |
| 5 | | labor and materials incurred by the township to connect the new |
| 6 | | user's building or development to the township's main water or |
| 7 | | sewer line in the adjoining utility easement. The actual cost |
| 8 | | of field labor shall not include wages that exceed one and |
| 9 | | one-half times the employees' normal hourly pay rate. The |
| 10 | | actual cost of materials shall not exceed one and one-quarter |
| 11 | | times the township's acquisition cost of materials actually |
| 12 | | used and provided by the township to make the connection. The |
| 13 | | connection fee shall not change the terms of any existing |
| 14 | | recapture agreement between a developer and a township. |
| 15 | | Sewer Connection Fees |
| 16 | | Size of water meter Amount of fee |
| 17 | | Single family residential..............................$1,000 |
| 18 | | Multifamily residential..................$1,000 per residence |
| 19 | | Planned unit multifamily.......Applicable commercial size fee |
| 20 | | 3/4 inch & smaller commercial..........................$1,000 |
| 21 | | 1 inch commercial......................................$1,669 |
| 22 | | 1 1/2 inch commercial..................................$3,031 |
| 23 | | 2 inch commercial......................................$4,736 |
| 24 | | 3 inch commercial......................................$8,744 |
| 25 | | 4 inch commercial.....................................$14,711 |
|
| | 09900HB0264sam001 | - 4 - | LRB099 03912 AWJ 35050 a |
|
|
| 1 | | 6 inch commercial.....................................$28,351 |
| 2 | | 8 inch commercial.....................................$51,368 |
| 3 | | 10 inch commercial....................................$82,655 |
| 4 | | 12 inch & larger commercial..........Set by resolution of the |
| 5 | | township board |
| 6 | | Water Main Connection Fees |
| 7 | | Size of water meter............................Amount of fee |
| 8 | | 3/4 inch & smaller....................................$1,000 |
| 9 | | 1 inch.................................................$1,600 |
| 10 | | 1 1/2 inch.............................................$2,300 |
| 11 | | 2 inch.................................................$3,900 |
| 12 | | 3 inch.................................................$8,600 |
| 13 | | 4 inch................................................$15,400 |
| 14 | | 6 inch................................................$34,300 |
| 15 | | 8 inch................................................$41,100 |
| 16 | | 10 inch & larger meters..............................$154,000 |
| 17 | | Unmetered & Main Extension.............................$2,000 |
| 18 | | Landscaping sprinkler meter............................$1,000 |
| 19 | | The plan review fee charged by the township to review the |
| 20 | | building or development plans for the new connection, |
| 21 | | regardless of type, may not exceed $100. |
| 22 | | The inspection fee charged by the township to inspect the |
| 23 | | new service line connection to the township's main line in the |
| 24 | | adjoining utility easement may not exceed $100. |
|
| | 09900HB0264sam001 | - 5 - | LRB099 03912 AWJ 35050 a |
|
|
| 1 | | The township may not charge a new user an acreage fee as |
| 2 | | part of or in addition to the connection fee. |
| 3 | | The township may charge a new user outside of the |
| 4 | | township's geographical boundaries or the township's facility |
| 5 | | planning area up to an additional 25% surcharge above the |
| 6 | | connection fees indicated above. |
| 7 | | As used in this Section, "multifamily residential" means |
| 8 | | the connection fee for a residential building to be constructed |
| 9 | | on an individual platted lot, which has at least 2 and not more |
| 10 | | than 4 separate residential units, and which is not part of a |
| 11 | | multifamily planned unit development. |
| 12 | | As used in this Section, "multifamily planned unit |
| 13 | | development" means the connection fee for a development using |
| 14 | | one main water meter to service one or more buildings within a |
| 15 | | planned unit development. A multifamily planned unit |
| 16 | | development shall be charged a single connection fee according |
| 17 | | to the above schedules, without regard to the number of |
| 18 | | residential units within the development. |
| 19 | | (c) The charges or rates are liens upon the real estate |
| 20 | | upon or for which
sewerage service is supplied whenever the |
| 21 | | charges or rates become delinquent as
provided by the ordinance |
| 22 | | of the board fixing a delinquency date.
|
| 23 | | (Source: P.A. 82-783; 88-62.)
|
| 24 | | Section 10. The Illinois Municipal Code is amended by |
| 25 | | adding Section 1-2-1.3 as follows: |
|
| | 09900HB0264sam001 | - 6 - | LRB099 03912 AWJ 35050 a |
|
|
| 1 | | (65 ILCS 5/1-2-1.3 new) |
| 2 | | Sec. 1-2-1.3. Pet grooming vending machines. |
| 3 | | Notwithstanding any zoning ordinance adopted by the |
| 4 | | municipality, the corporate authorities of a municipality may |
| 5 | | pass an ordinance to prohibit or regulate the location of |
| 6 | | vending machines that provide an enclosed space or designated |
| 7 | | area for the use of a customer for pet grooming using goods or |
| 8 | | services dispensed by the machine. |
| 9 | | Section 99. Effective date. This Act takes effect upon |
| 10 | | becoming law.".
|