|
Sen. Kyle McCarter
Filed: 5/7/2015
| | 09900HB0264sam002 | | LRB099 03912 AWJ 35051 a |
|
|
1 | | AMENDMENT TO HOUSE BILL 264
|
2 | | AMENDMENT NO. ______. Amend House Bill 264 on page 1, |
3 | | immediately before line 4, by inserting the following:
|
4 | | "Section 3. The Township Code is amended by changing |
5 | | Section 205-140 as follows:
|
6 | | (60 ILCS 1/205-140)
|
7 | | Sec. 205-140.
Initiating proceedings for particular |
8 | | locality; rates
and charges; lien.
|
9 | | (a) A township board may initiate proceedings under |
10 | | Sections 205-130 through
205-150 in the manner provided by |
11 | | Section 205-20.
|
12 | | (b) The township board may establish the monthly rate or |
13 | | charge to all users each
user of the waterworks system or |
14 | | sewerage system, or combined waterworks
and sewerage system, or |
15 | | improvement or extension at a rate that will be
sufficient to |
16 | | pay for the operation, maintenance, and necessary upgrades or |
|
| | 09900HB0264sam002 | - 2 - | LRB099 03912 AWJ 35051 a |
|
|
1 | | improvements of the system, the principal and interest of any |
2 | | bonds issued to pay
the cost of any necessary upgrades or |
3 | | improvements to the system, and improvement, or extension and |
4 | | the maintenance and
operation of the system, improvement, or |
5 | | extension and may provide an adequate
depreciation fund for the |
6 | | bonds. Monthly Charges or rates shall be established,
revised, |
7 | | and maintained by ordinance and become payable as the township |
8 | | board
determines by ordinance. |
9 | | For any user outside of the township's geographical |
10 | | boundaries and outside the township's facility planning area, |
11 | | the township may impose a 25% surcharge above the monthly user |
12 | | rates charged to all users within the township or the |
13 | | township's facility planning area. For purposes of this |
14 | | Section, "facility planning area" has the same meaning as that |
15 | | term is defined under subsection (c) of Section 2.08 of the |
16 | | Wastewater Land Treatment Site Regulation Act.
|
17 | | (b-5) The township board of a township that operates a |
18 | | water or sewerage system may by ordinance collect a fair and |
19 | | reasonable fee, which shall not include the cost of labor and |
20 | | materials, for connection to any such system for the connection |
21 | | of a new service line from the new user's building or |
22 | | development to the township's main water or sewer line located |
23 | | in the adjoining utility easement. The standard used in order |
24 | | to determine a fair and reasonable connection fee shall be |
25 | | based solely on the size of the water meter to be installed for |
26 | | the service of the building or development. The fee shall not |
|
| | 09900HB0264sam002 | - 3 - | LRB099 03912 AWJ 35051 a |
|
|
1 | | exceed, but may be less than, the connection fee for the |
2 | | applicable connection type, as described below. The |
3 | | restriction on fees imposed by this subsection shall not limit |
4 | | the right of the township to recover the actual cost of field |
5 | | labor and materials incurred by the township to connect the new |
6 | | user's building or development to the township's main water or |
7 | | sewer line in the adjoining utility easement. The actual cost |
8 | | of field labor shall not include wages that exceed one and |
9 | | one-half times the employees' normal hourly pay rate. The |
10 | | actual cost of materials shall not exceed one and one-quarter |
11 | | times the township's acquisition cost of materials actually |
12 | | used and provided by the township to make the connection. The |
13 | | connection fee shall not change the terms of any existing |
14 | | recapture agreement between a developer and a township. |
15 | | Sewer Connection Fees |
16 | | Size of water meter Amount of fee |
17 | | Single family residential ..............................$1,000 |
18 | | Multifamily residential ..................$1,000 per residence |
19 | | Planned unit multifamily .......Applicable commercial size fee |
20 | | 3/4 inch & smaller commercial ..........................$1,000 |
21 | | 1 inch commercial ......................................$1,669 |
22 | | 1 1/2 inch commercial ..................................$3,031 |
23 | | 2 inch commercial ......................................$4,736 |
24 | | 3 inch commercial ......................................$8,744 |
25 | | 4 inch commercial .....................................$14,711 |
|
| | 09900HB0264sam002 | - 4 - | LRB099 03912 AWJ 35051 a |
|
|
1 | | 6 inch commercial .....................................$28,351 |
2 | | 8 inch commercial .....................................$51,368 |
3 | | 10 inch commercial ....................................$82,655 |
4 | | 12 inch & larger commercial ..........Set by resolution of the |
5 | | township board |
6 | | Water Main Connection Fees |
7 | | Size of water meter ............................Amount of fee |
8 | | 3/4 inch & smaller ....................................$1,000 |
9 | | 1 inch .................................................$1,600 |
10 | | 1 1/2 inch .............................................$2,300 |
11 | | 2 inch .................................................$3,900 |
12 | | 3 inch .................................................$8,600 |
13 | | 4 inch ................................................$15,400 |
14 | | 6 inch ................................................$34,300 |
15 | | 8 inch ................................................$41,100 |
16 | | 10 inch & larger meters ..............................$154,000 |
17 | | Unmetered & Main Extension .............................$2,000 |
18 | | Landscaping sprinkler meter ............................$1,000 |
19 | | The plan review fee charged by the township to review the |
20 | | building or development plans for the new connection, |
21 | | regardless of type, may not exceed $100. |
22 | | The inspection fee charged by the township to inspect the |
23 | | new service line connection to the township's main line in the |
24 | | adjoining utility easement may not exceed $100. |
|
| | 09900HB0264sam002 | - 5 - | LRB099 03912 AWJ 35051 a |
|
|
1 | | The township may not charge a new user an acreage fee as |
2 | | part of or in addition to the connection fee. |
3 | | The township may charge a new user outside of the |
4 | | township's geographical boundaries or the township's facility |
5 | | planning area up to an additional 25% surcharge above the |
6 | | connection fees indicated above. |
7 | | As used in this Section, "multifamily residential" means |
8 | | the connection fee for a residential building to be constructed |
9 | | on an individual platted lot, which has at least 2 and not more |
10 | | than 4 separate residential units, and which is not part of a |
11 | | multifamily planned unit development. |
12 | | As used in this Section, "multifamily planned unit |
13 | | development" means the connection fee for a development using |
14 | | one main water meter to service one or more buildings within a |
15 | | planned unit development. A multifamily planned unit |
16 | | development shall be charged a single connection fee according |
17 | | to the above schedules, without regard to the number of |
18 | | residential units within the development. |
19 | | (c) The charges or rates are liens upon the real estate |
20 | | upon or for which
sewerage service is supplied whenever the |
21 | | charges or rates become delinquent as
provided by the ordinance |
22 | | of the board fixing a delinquency date.
|
23 | | (Source: P.A. 82-783; 88-62.)".
|