1 | AN ACT concerning finance.
| ||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||
4 | Section 5. The Illinois Procurement Code is amended by | ||||||||||||||||||||||||
5 | changing Section 20-30 as follows:
| ||||||||||||||||||||||||
6 | (30 ILCS 500/20-30)
| ||||||||||||||||||||||||
7 | Sec. 20-30. Emergency purchases.
| ||||||||||||||||||||||||
8 | (a) Conditions for use. In accordance with standards set by
| ||||||||||||||||||||||||
9 | rule, a purchasing
agency may make emergency procurements | ||||||||||||||||||||||||
10 | without competitive sealed
bidding or prior notice
when there | ||||||||||||||||||||||||
11 | exists a threat to public health or public safety, or
when | ||||||||||||||||||||||||
12 | immediate expenditure is
necessary for repairs to State | ||||||||||||||||||||||||
13 | property in order to protect
against further loss of or damage | ||||||||||||||||||||||||
14 | to
State property, to prevent or minimize serious disruption in | ||||||||||||||||||||||||
15 | critical State
services that affect health, safety, or | ||||||||||||||||||||||||
16 | collection of substantial State revenues, or to ensure the
| ||||||||||||||||||||||||
17 | integrity of State records; provided, however, that the term of | ||||||||||||||||||||||||
18 | the emergency purchase shall be limited to the time reasonably | ||||||||||||||||||||||||
19 | needed for a competitive procurement, not to exceed 90 calendar | ||||||||||||||||||||||||
20 | days. A contract may be extended beyond 90 calendar days if the | ||||||||||||||||||||||||
21 | chief procurement officer determines additional time is | ||||||||||||||||||||||||
22 | necessary and that the contract scope and duration are limited | ||||||||||||||||||||||||
23 | to the emergency. Prior to execution of the extension, the |
| |||||||
| |||||||
1 | chief procurement officer must hold a public hearing and | ||||||
2 | provide written justification for all emergency contracts. | ||||||
3 | Members of the public may present testimony. Emergency | ||||||
4 | procurements shall be made
with as much competition
as is | ||||||
5 | practicable under the circumstances.
A written
description of | ||||||
6 | the basis for the emergency and reasons for the
selection of | ||||||
7 | the particular
contractor shall be included in the contract | ||||||
8 | file.
| ||||||
9 | (b) Notice. Notice of all emergency procurements shall be | ||||||
10 | provided to the Procurement Policy Board and published in the | ||||||
11 | online electronic Bulletin no later than 5 calendar days after | ||||||
12 | the contract is awarded. Notice of intent to extend an | ||||||
13 | emergency contract shall be provided to the Procurement Policy | ||||||
14 | Board and published in the online electronic Bulletin at least | ||||||
15 | 14 calendar days before the public hearing. Notice shall | ||||||
16 | include at least a description of the need for the emergency | ||||||
17 | purchase, the contractor, and if applicable, the date, time, | ||||||
18 | and location of the public hearing. A copy of this notice and | ||||||
19 | all documents provided at the hearing shall be included in the | ||||||
20 | online electronic subsequent Procurement Bulletin. The State | ||||||
21 | purchasing officer Before the next appropriate volume of the | ||||||
22 | Illinois Procurement
Bulletin, the purchasing agency shall | ||||||
23 | publish in the
Illinois Procurement Bulletin a copy of each | ||||||
24 | written description
and reasons and the total cost
of each | ||||||
25 | emergency procurement made during the previous month.
When only | ||||||
26 | an estimate of the
total cost is known at the time of |
| |||||||
| |||||||
1 | publication, the estimate shall
be identified as an estimate | ||||||
2 | and
published. When the actual total cost is determined, it | ||||||
3 | shall
also be published in like manner no later than 5 calendar | ||||||
4 | days after it is determined
before the 10th day of the next | ||||||
5 | succeeding month .
| ||||||
6 | (c) Affidavits. A chief procurement officer making a | ||||||
7 | procurement
under this Section shall file
affidavits with the | ||||||
8 | Procurement Policy Board and the Auditor General within
10 | ||||||
9 | calendar days
after the procurement setting
forth the amount | ||||||
10 | expended, the name of the contractor involved,
and the | ||||||
11 | conditions and
circumstances requiring the emergency | ||||||
12 | procurement. When only an
estimate of the cost is
available | ||||||
13 | within 10 calendar days after the procurement, the actual cost
| ||||||
14 | shall be reported immediately
after it is determined. At the | ||||||
15 | end of each fiscal quarter, the
Auditor General shall file with | ||||||
16 | the
Legislative Audit Commission and the Governor a complete | ||||||
17 | listing
of all emergency
procurements reported during that | ||||||
18 | fiscal quarter. The Legislative
Audit Commission shall
review | ||||||
19 | the emergency procurements so reported and, in its annual
| ||||||
20 | reports, advise the General
Assembly of procurements that | ||||||
21 | appear to constitute an abuse of
this Section.
| ||||||
22 | (d) Quick purchases. The chief procurement officer may | ||||||
23 | promulgate rules
extending the circumstances by which a | ||||||
24 | purchasing agency may make purchases
under this Section, | ||||||
25 | including but not limited to the procurement of items
available | ||||||
26 | at a discount for a limited period of time.
|
| |||||||
| |||||||
1 | (e) The changes to this Section made by this amendatory Act | ||||||
2 | of the 96th General Assembly apply to procurements executed on | ||||||
3 | or after its effective date.
| ||||||
4 | (Source: P.A. 98-1076, eff. 1-1-15 .)
| ||||||
5 | Section 99. Effective date. This Act takes effect July 1, | ||||||
6 | 2015.
|