|
| | 99TH GENERAL ASSEMBLY
State of Illinois
2015 and 2016 HB3309 Introduced , by Rep. Dwight Kay SYNOPSIS AS INTRODUCED: |
| |
Amends the Township Code. Provides that a township board may by ordinance establish and collect a charge for connection to a waterworks system or sewerage system, or combined waterworks and sewerage system, to new users. Prohibits the charge from exceeding 1/6 of the user's estimated annual charges for that class of service.
|
| |
| | A BILL FOR |
|
|
| | HB3309 | | LRB099 11105 AWJ 31521 b |
|
|
| 1 | | AN ACT concerning local government.
|
| 2 | | Be it enacted by the People of the State of Illinois,
|
| 3 | | represented in the General Assembly:
|
| 4 | | Section 5. The Township Code is amended by changing Section |
| 5 | | 205-140 as follows:
|
| 6 | | (60 ILCS 1/205-140)
|
| 7 | | Sec. 205-140.
Initiating proceedings for particular |
| 8 | | locality; rates
and charges; lien.
|
| 9 | | (a) A township board may initiate proceedings under |
| 10 | | Sections 205-130 through
205-150 in the manner provided by |
| 11 | | Section 205-20.
|
| 12 | | (b) The township board may establish the rate or charge to |
| 13 | | each
user of the waterworks system or sewerage system, or |
| 14 | | combined waterworks
and sewerage system, or improvement or |
| 15 | | extension at a rate that will be
sufficient to pay the |
| 16 | | principal and interest of any bonds issued to pay
the cost of |
| 17 | | the system, improvement, or extension and the maintenance and
|
| 18 | | operation of the system, improvement, or extension and may |
| 19 | | provide an adequate
depreciation fund for the bonds. Charges or |
| 20 | | rates shall be established,
revised, and maintained by |
| 21 | | ordinance and become payable as the township board
determines |
| 22 | | by ordinance.
|
| 23 | | (b-5) The township board of a township that operates a |