| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
1 | AN ACT concerning local government.
| ||||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||||||||||||||||||||||
3 | represented in the General Assembly:
| ||||||||||||||||||||||||||
4 | Section 5. The Counties Code is amended by changing | ||||||||||||||||||||||||||
5 | Sections 5-1062 and 5-1062.2 as follows:
| ||||||||||||||||||||||||||
6 | (55 ILCS 5/5-1062) (from Ch. 34, par. 5-1062)
| ||||||||||||||||||||||||||
7 | Sec. 5-1062. Stormwater management.
| ||||||||||||||||||||||||||
8 | (a) The purpose of this Section is to allow management and | ||||||||||||||||||||||||||
9 | mitigation of the
effects of urbanization on stormwater | ||||||||||||||||||||||||||
10 | drainage in metropolitan counties located
in the area served by | ||||||||||||||||||||||||||
11 | the Chicago Metropolitan Agency for Planning Northeastern | ||||||||||||||||||||||||||
12 | Illinois Planning Commission , and
references to "county" in | ||||||||||||||||||||||||||
13 | this Section shall apply only to those counties.
This Section | ||||||||||||||||||||||||||
14 | shall not apply to any county with a population in excess of
| ||||||||||||||||||||||||||
15 | 1,500,000, except as provided in subsection (c). The purpose of | ||||||||||||||||||||||||||
16 | this Section
shall be achieved by:
| ||||||||||||||||||||||||||
17 | (1) consolidating the existing stormwater management | ||||||||||||||||||||||||||
18 | framework into a
united, countywide structure;
| ||||||||||||||||||||||||||
19 | (2) setting minimum standards for floodplain and | ||||||||||||||||||||||||||
20 | stormwater management with an emphasis on the use of cost | ||||||||||||||||||||||||||
21 | effective, nature-based solutions to water quality and | ||||||||||||||||||||||||||
22 | flooding problems, including, but not limited to, those | ||||||||||||||||||||||||||
23 | solutions that restore or enhance the natural hydrologic |
| |||||||
| |||||||
1 | cycle by increasing infiltration, evapotranspiration, and | ||||||
2 | the collection of runoff for reuse as appropriate | ||||||
3 | considering the local conditions ;
and
| ||||||
4 | (3) preparing a countywide plan for the management of | ||||||
5 | stormwater runoff,
including the management of natural and | ||||||
6 | man-made drainageways. The countywide
plan may incorporate | ||||||
7 | watershed plans and shall evaluate and address the water | ||||||
8 | quality and flooding problems that exist in urban areas | ||||||
9 | that are a result of urban flooding .
| ||||||
10 | (b) A stormwater management planning committee shall be | ||||||
11 | established by
county board resolution, with its membership | ||||||
12 | consisting of equal numbers of
county board and municipal | ||||||
13 | representatives from each county board
district, and such other | ||||||
14 | members as may be determined by the county and
municipal | ||||||
15 | members. However, if the county has more than 6 county board
| ||||||
16 | districts, the county board may by ordinance divide the county | ||||||
17 | into not
less than 6 areas of approximately equal population, | ||||||
18 | to be used instead of
county board districts for the purpose of | ||||||
19 | determining representation on the
stormwater management | ||||||
20 | planning committee.
| ||||||
21 | The county board members shall be appointed by the chairman | ||||||
22 | of the county
board. Municipal members from each county board | ||||||
23 | district or other
represented area shall be appointed by a | ||||||
24 | majority vote of the mayors of
those municipalities which have | ||||||
25 | the greatest percentage of their respective
populations | ||||||
26 | residing in such county board district or other represented
|
| |||||||
| |||||||
1 | area. All municipal and county board representatives shall be | ||||||
2 | entitled
to a vote; the other members shall be nonvoting | ||||||
3 | members, unless authorized
to vote by the unanimous consent of | ||||||
4 | the municipal and county board
representatives. A municipality | ||||||
5 | that is located in more than one county may
choose, at the time | ||||||
6 | of formation of the stormwater management planning
committee | ||||||
7 | and based on watershed boundaries, to participate in the
| ||||||
8 | stormwater management planning program of either or both of the | ||||||
9 | counties.
Subcommittees of the stormwater management planning | ||||||
10 | committee may be
established to serve a portion of the county | ||||||
11 | or a particular drainage basin
that has similar stormwater | ||||||
12 | management needs. The stormwater management
planning committee | ||||||
13 | shall adopt by-laws, by a majority vote of the county and
| ||||||
14 | municipal members, to govern the functions of the committee and | ||||||
15 | its
subcommittees. Officers of the committee shall include a | ||||||
16 | chair and vice chair,
one of whom shall be a county | ||||||
17 | representative and one a municipal
representative.
| ||||||
18 | The principal duties of the committee shall be to develop a | ||||||
19 | stormwater
management plan for presentation to and approval by | ||||||
20 | the county board, and
to direct the plan's implementation and | ||||||
21 | revision. The committee may retain
engineering, legal and | ||||||
22 | financial advisors and inspection personnel. The
committee | ||||||
23 | shall meet at least quarterly and shall hold at least one | ||||||
24 | public
meeting during the preparation of the plan and prior to | ||||||
25 | its submittal to the
county board. The committee may make | ||||||
26 | grants: (1) to units of local government that are members in |
| |||||||
| |||||||
1 | the Federal Emergency Management Agency's National Flood | ||||||
2 | Insurance Program and have adopted an ordinance requiring | ||||||
3 | actions consistent with the stormwater management plan; and (2) | ||||||
4 | to landowners for the purposes of stormwater management, | ||||||
5 | including special projects. Use of the grant money must be | ||||||
6 | consistent with the stormwater management plan.
| ||||||
7 | (c) In the preparation of a stormwater management plan, a | ||||||
8 | county
stormwater management planning committee shall | ||||||
9 | coordinate the planning
process with each adjoining county to | ||||||
10 | ensure that recommended stormwater
projects will have no | ||||||
11 | significant impact on the levels or flows of
stormwaters in | ||||||
12 | inter-county watersheds or on the capacity of existing and
| ||||||
13 | planned stormwater retention facilities. An adopted stormwater | ||||||
14 | management
plan shall identify steps taken by the county to | ||||||
15 | coordinate the development
of plan recommendations with | ||||||
16 | adjoining counties.
| ||||||
17 | (d) (Blank).
| ||||||
18 | (e) Prior to recommending the plan to the county board, the | ||||||
19 | stormwater
management planning committee shall hold at least | ||||||
20 | one public hearing thereon
and shall afford interested persons | ||||||
21 | an opportunity to be heard. The hearing
shall be held in the | ||||||
22 | county seat. Notice of the hearing shall be published at
least | ||||||
23 | once no less than 15 days in advance thereof in a newspaper of | ||||||
24 | general
circulation published in the county. The notice shall | ||||||
25 | state the time and place
of the hearing and the place where | ||||||
26 | copies of the proposed plan will be
accessible for examination |
| |||||||
| |||||||
1 | by interested parties. If an affected municipality
having a | ||||||
2 | stormwater management plan adopted by ordinance wishes to | ||||||
3 | protest the
proposed county plan provisions, it shall appear at | ||||||
4 | the hearing and submit in
writing specific proposals to the | ||||||
5 | stormwater management planning committee.
After consideration | ||||||
6 | of the matters raised at the hearing, the committee may
amend | ||||||
7 | or approve the plan and recommend it to the county board for | ||||||
8 | adoption.
| ||||||
9 | The county board may enact the proposed plan by ordinance. | ||||||
10 | If the
proposals for modification of the plan made by an | ||||||
11 | affected municipality having
a stormwater management plan are | ||||||
12 | not included in the proposed county plan,
and the municipality | ||||||
13 | affected by the plan opposes adoption of the county
plan by | ||||||
14 | resolution of its corporate authorities, approval of
the county | ||||||
15 | plan shall require an affirmative vote of at least two-thirds | ||||||
16 | of the
county board members present and voting. If the county | ||||||
17 | board wishes to
amend the county plan, it shall submit in | ||||||
18 | writing specific proposals to the
stormwater management | ||||||
19 | planning committee. If the proposals are not
approved by the | ||||||
20 | committee, or are opposed by resolution of the corporate
| ||||||
21 | authorities of an affected municipality having a municipal | ||||||
22 | stormwater
management plan, amendment of the plan shall require | ||||||
23 | an affirmative vote of
at least two-thirds of the county board | ||||||
24 | members present and voting.
| ||||||
25 | (f) The county board may prescribe by ordinance reasonable | ||||||
26 | rules and
regulations for floodplain or stormwater management |
| |||||||
| |||||||
1 | and for governing the location,
width, course and release rate | ||||||
2 | of all stormwater runoff channels, streams
and basins in the | ||||||
3 | county, in accordance with the adopted stormwater
management | ||||||
4 | plan. These rules and regulations shall, at a minimum, meet
the | ||||||
5 | standards for floodplain management established by the Office | ||||||
6 | of Water Resources and
the requirements of the Federal | ||||||
7 | Emergency Management Agency for participation
in the National | ||||||
8 | Flood Insurance Program.
| ||||||
9 | (g) In accordance with, and if recommended in, the adopted | ||||||
10 | stormwater
management plan, the county board may adopt a | ||||||
11 | schedule of fees
as may be necessary to mitigate the effects of | ||||||
12 | increased stormwater runoff
resulting from new development. | ||||||
13 | The fees shall not exceed the cost of
satisfying the onsite | ||||||
14 | stormwater retention or detention requirements of the
adopted | ||||||
15 | stormwater management plan. The fees shall be used to finance
| ||||||
16 | activities undertaken by the county or its included | ||||||
17 | municipalities to
mitigate the effects of urban stormwater | ||||||
18 | runoff by providing regional
stormwater retention or detention | ||||||
19 | facilities, as identified in the county
plan. All such fees | ||||||
20 | collected by the county shall be held in a separate fund,
and | ||||||
21 | shall be expended only in the watershed within which they were | ||||||
22 | collected.
| ||||||
23 | (h) For the purpose of implementing this Section and for | ||||||
24 | the
development, design, planning, construction, operation and | ||||||
25 | maintenance of
stormwater facilities provided for in the | ||||||
26 | stormwater management plan, a
county board that has established |
| |||||||
| |||||||
1 | a stormwater management planning
committee pursuant to this | ||||||
2 | Section may cause an annual tax of not to exceed
0.20% of the | ||||||
3 | value, as equalized or assessed by the Department of Revenue,
| ||||||
4 | of all taxable property in the county to be levied upon all the | ||||||
5 | taxable
property in the county. The tax shall be in addition to | ||||||
6 | all other taxes
authorized by law to be levied and collected in | ||||||
7 | the county and shall be in
addition to the maximum tax rate | ||||||
8 | authorized by law for general county
purposes. The 0.20% | ||||||
9 | limitation provided in this Section may be increased
or | ||||||
10 | decreased by referendum in accordance with the provisions of | ||||||
11 | Sections
18-120, 18-125, and 18-130 of the Property Tax Code.
| ||||||
12 | Any revenues generated as a result of ownership or | ||||||
13 | operation of facilities
or land acquired with the tax funds | ||||||
14 | collected pursuant to this subsection
(h) shall be held in a | ||||||
15 | separate fund and be used either to abate such
property tax or | ||||||
16 | for implementing this Section.
| ||||||
17 | However, unless at least part of the county has been | ||||||
18 | declared after
July 1, 1986 by presidential proclamation to be | ||||||
19 | a disaster area as a result
of flooding, the tax authorized by | ||||||
20 | this subsection (h) shall not be levied
until the question of | ||||||
21 | its adoption, either for a specified period or
indefinitely, | ||||||
22 | has been submitted to the electors thereof and approved by a
| ||||||
23 | majority of those voting on the question. This question may be | ||||||
24 | submitted
at any election held in the county after the adoption | ||||||
25 | of a resolution by
the county board providing for the | ||||||
26 | submission of the question to the
electors of the county. The |
| |||||||
| |||||||
1 | county board shall certify the resolution and
proposition to | ||||||
2 | the proper election officials, who shall submit the
proposition | ||||||
3 | at an election in accordance with the general election law. If
| ||||||
4 | a majority of the votes cast on the question is in favor of the | ||||||
5 | levy of
the tax, it may thereafter be levied in the county for | ||||||
6 | the specified
period or indefinitely, as provided in the | ||||||
7 | proposition. The question shall
be put in substantially the | ||||||
8 | following form:
| ||||||
9 | -------------------------------------------------------------
| ||||||
10 | Shall an annual tax be levied
| ||||||
11 | for stormwater management purposes YES
| ||||||
12 | (for a period of not more than
| ||||||
13 | ...... years) at a rate not exceeding ------------------
| ||||||
14 | .....% of the equalized assessed
| ||||||
15 | value of the taxable property of NO
| ||||||
16 | ........ County?
| ||||||
17 | -------------------------------------------------------------
| ||||||
18 | (i) Upon the creation and implementation of a county | ||||||
19 | stormwater management
plan, the county may petition the circuit | ||||||
20 | court to dissolve any or all drainage
districts created | ||||||
21 | pursuant to the Illinois Drainage Code or predecessor Acts
| ||||||
22 | which are located entirely within the area of the county | ||||||
23 | covered by the plan.
| ||||||
24 | However, any active drainage district implementing a plan | ||||||
25 | that is
consistent with and at least as stringent as the county | ||||||
26 | stormwater
management plan may petition the stormwater |
| |||||||
| |||||||
1 | management planning committee
for exception from dissolution. | ||||||
2 | Upon filing of the petition, the committee
shall set a date for | ||||||
3 | hearing not less than 2 weeks, nor more than 4 weeks,
from the | ||||||
4 | filing thereof, and the committee shall give at least one | ||||||
5 | week's
notice of the hearing in one or more newspapers of | ||||||
6 | general circulation
within the district, and in addition shall | ||||||
7 | cause a copy of the notice to be
personally served upon each of | ||||||
8 | the trustees of the district. At the
hearing, the committee | ||||||
9 | shall hear the district's petition and allow the
district | ||||||
10 | trustees and any interested parties an opportunity to present | ||||||
11 | oral
and written evidence. The committee shall render its | ||||||
12 | decision upon the
petition for exception from dissolution based | ||||||
13 | upon the best interests of
the residents of the district. In | ||||||
14 | the event that the exception is not
allowed, the district may | ||||||
15 | file a petition within 30 days of the decision
with the circuit | ||||||
16 | court. In that case, the notice and hearing requirements
for | ||||||
17 | the court shall be the same as herein provided for the | ||||||
18 | committee.
The court shall likewise render its decision of | ||||||
19 | whether to dissolve the
district based upon the best interests | ||||||
20 | of residents of the district.
| ||||||
21 | The dissolution of any drainage district shall not affect | ||||||
22 | the obligation
of any bonds issued or contracts entered into by | ||||||
23 | the district nor
invalidate the levy, extension or collection | ||||||
24 | of any taxes or special
assessments upon the property in the | ||||||
25 | former drainage district. All property
and obligations of the | ||||||
26 | former drainage district shall be assumed and
managed by the |
| |||||||
| |||||||
1 | county, and the debts of the former drainage district shall
be | ||||||
2 | discharged as soon as practicable.
| ||||||
3 | If a drainage district lies only partly within a county | ||||||
4 | that adopts a
county stormwater management plan, the county may | ||||||
5 | petition the circuit
court to disconnect from the drainage | ||||||
6 | district that portion of the district
that lies within that | ||||||
7 | county. The property of the drainage district within the
| ||||||
8 | disconnected area shall be assumed and managed by the county. | ||||||
9 | The county shall
also assume a portion of the drainage | ||||||
10 | district's debt at the time of
disconnection, based on the | ||||||
11 | portion of the value of the taxable property of the
drainage | ||||||
12 | district which is located within the area being disconnected.
| ||||||
13 | The operations of any drainage district that continues to | ||||||
14 | exist in a
county that has adopted a stormwater management plan | ||||||
15 | in accordance with
this Section shall be in accordance with the | ||||||
16 | adopted plan.
| ||||||
17 | (j) Any county that has adopted a county stormwater | ||||||
18 | management plan
under this Section may, after 10 days written | ||||||
19 | notice to the owner or
occupant, enter upon any lands or waters | ||||||
20 | within the county for the purpose
of inspecting stormwater | ||||||
21 | facilities or causing the removal of any
obstruction to an | ||||||
22 | affected watercourse. The county shall be responsible
for any | ||||||
23 | damages occasioned thereby.
| ||||||
24 | (k) Upon petition of the municipality, and based on a | ||||||
25 | finding of the
stormwater management planning committee, the | ||||||
26 | county shall not enforce
rules and regulations adopted by the |
| |||||||
| |||||||
1 | county in any municipality located
wholly or partly within the | ||||||
2 | county that has a municipal stormwater
management ordinance | ||||||
3 | that is consistent with and at least as stringent as
the county | ||||||
4 | plan and ordinance, and is being enforced by the municipal
| ||||||
5 | authorities.
| ||||||
6 | (l) A county may issue general obligation bonds for | ||||||
7 | implementing any
stormwater plan adopted under this Section in | ||||||
8 | the manner prescribed in
Section 5-1012; except that the | ||||||
9 | referendum requirement of Section 5-1012 shall
not apply to | ||||||
10 | bonds issued pursuant to this Section on which the principal | ||||||
11 | and
interest are to be paid entirely out of funds generated by | ||||||
12 | the taxes and fees
authorized by this Section.
| ||||||
13 | (m) The powers authorized by this Section may be | ||||||
14 | implemented by the
county board for a portion of the county | ||||||
15 | subject to similar stormwater
management needs.
| ||||||
16 | (n) The powers and taxes authorized by this Section are in | ||||||
17 | addition to the
powers and taxes authorized by Division 5-15; | ||||||
18 | in exercising its powers
under this Section, a county shall not | ||||||
19 | be subject to the restrictions and
requirements of that | ||||||
20 | Division.
| ||||||
21 | (o) Pursuant to paragraphs (g) and (i) of Section 6 of | ||||||
22 | Article VII of
the Illinois Constitution, this Section | ||||||
23 | specifically denies and limits the
exercise of any power which | ||||||
24 | is inconsistent herewith by home rule units in
any county with | ||||||
25 | a population of less than 1,500,000 in the area served by
the | ||||||
26 | Chicago Metropolitan Agency for Planning Northeastern Illinois |
| |||||||
| |||||||
1 | Planning Commission . This Section does not
prohibit the | ||||||
2 | concurrent exercise of powers consistent herewith. | ||||||
3 | (p) As used in this Section: | ||||||
4 | "Urban flooding" means the flooding of public and private | ||||||
5 | land in urban communities that results from stormwater or | ||||||
6 | snowmelt runoff overwhelming the existing drainage | ||||||
7 | infrastructure, unrelated to the overflow of any river or lake, | ||||||
8 | whether or not that land is located in or near a floodplain. | ||||||
9 | "Urban area" means a census block with a population density | ||||||
10 | of 1,000 or more people per square mile and any group of | ||||||
11 | contiguous census blocks around the core having a density of | ||||||
12 | 500 or more people per square mile.
| ||||||
13 | (Source: P.A. 97-916, eff. 8-9-12.)
| ||||||
14 | (55 ILCS 5/5-1062.2) | ||||||
15 | Sec. 5-1062.2. Stormwater management. | ||||||
16 | (a) The purpose of this Section is to allow management and | ||||||
17 | mitigation of the effects of urbanization on stormwater | ||||||
18 | drainage in all counties not granted such authority under | ||||||
19 | Sections 5-1062 and Section 5-1062.3 of this Code the | ||||||
20 | metropolitan counties of Madison, St. Clair, Monroe, Kankakee, | ||||||
21 | Grundy, LaSalle, DeKalb, Kendall, and Boone and references to | ||||||
22 | "county" in this Section apply only to those counties . This | ||||||
23 | Section does not apply to counties in the Chicago Metropolitan | ||||||
24 | Agency for Planning Northeastern Illinois Planning Commission | ||||||
25 | that are granted authorities in Section 5-1062. The purpose of |
| |||||||
| |||||||
1 | this Section shall be achieved by: | ||||||
2 | (1) Consolidating the existing stormwater management
| ||||||
3 | framework into a united, countywide structure. | ||||||
4 | (2) Setting minimum standards for floodplain and
| ||||||
5 | stormwater management , with an emphasis on the use of cost | ||||||
6 | effective, nature-based solutions to water quality and | ||||||
7 | flooding problems, including, but not limited to, those | ||||||
8 | solutions that restore or enhance the natural hydrologic | ||||||
9 | cycle by increasing infiltration, evapotranspiration, and | ||||||
10 | the collection of runoff for reuse as appropriate | ||||||
11 | considering the local conditions . | ||||||
12 | (3) Preparing a countywide plan for the management
of | ||||||
13 | stormwater runoff, including the management of natural and | ||||||
14 | man-made drainageways. The countywide plan may incorporate | ||||||
15 | watershed plans and shall evaluate and address the water | ||||||
16 | quality and flooding problems that exist in urban areas | ||||||
17 | that are a result of urban flooding . | ||||||
18 | (b) A stormwater management planning committee may be | ||||||
19 | established by county board resolution, with its membership | ||||||
20 | consisting of equal numbers of county board and municipal | ||||||
21 | representatives from each county board district, and such other | ||||||
22 | members as may be determined by the county and municipal | ||||||
23 | members. If the county has more than 6 county board districts, | ||||||
24 | however, the county board may by ordinance divide the county | ||||||
25 | into not less than 6 areas of approximately equal population, | ||||||
26 | to be used instead of county board districts for the purpose of |
| |||||||
| |||||||
1 | determining representation on the stormwater management | ||||||
2 | planning committee. | ||||||
3 | The county board members shall be appointed by the chairman | ||||||
4 | of the county board. Municipal members from each county board | ||||||
5 | district or other represented area shall be appointed by a | ||||||
6 | majority vote of the mayors of those municipalities that have | ||||||
7 | the greatest percentage of their respective populations | ||||||
8 | residing in that county board district or other represented | ||||||
9 | area. All municipal and county board representatives shall be | ||||||
10 | entitled to a vote; the other members shall be nonvoting | ||||||
11 | members, unless authorized to vote by the unanimous consent of | ||||||
12 | the municipal and county board representatives. A municipality | ||||||
13 | that is located in more than one county may choose, at the time | ||||||
14 | of formation of the stormwater management planning committee | ||||||
15 | and based on watershed boundaries, to participate in the | ||||||
16 | stormwater management planning program of either or both of the | ||||||
17 | counties. Subcommittees of the stormwater management planning | ||||||
18 | committee may be established to serve a portion of the county | ||||||
19 | or a particular drainage basin that has similar stormwater | ||||||
20 | management needs. The stormwater management planning committee | ||||||
21 | shall adopt bylaws, by a majority vote of the county and | ||||||
22 | municipal members, to govern the functions of the committee and | ||||||
23 | its subcommittees. Officers of the committee shall include a | ||||||
24 | chair and vice chair, one of whom shall be a county | ||||||
25 | representative and one a municipal representative. | ||||||
26 | The principal duties of the committee shall be to develop a |
| |||||||
| |||||||
1 | stormwater management plan for presentation to and approval by | ||||||
2 | the county board, and to direct the plan's implementation and | ||||||
3 | revision. The committee may retain engineering, legal, and | ||||||
4 | financial advisors and inspection personnel. The committee | ||||||
5 | shall meet at least quarterly and shall hold at least one | ||||||
6 | public meeting during the preparation of the plan and prior to | ||||||
7 | its submittal to the county board. The committee may make | ||||||
8 | grants : (1) to units of local government that are members in | ||||||
9 | the Federal Emergency Management Agency's National Flood | ||||||
10 | Insurance Program and have adopted an ordinance requiring | ||||||
11 | actions consistent with the stormwater management plan ; and (2) | ||||||
12 | to landowners for the purposes of stormwater management, | ||||||
13 | including special projects . Use ; use of the grant money must | ||||||
14 | be consistent with the stormwater management plan. | ||||||
15 | The committee shall not have or exercise any power of | ||||||
16 | eminent domain.
| ||||||
17 | (c) In the preparation of a stormwater management plan, a | ||||||
18 | county stormwater management planning committee shall | ||||||
19 | coordinate the planning process with each adjoining county to | ||||||
20 | ensure that recommended stormwater projects will have no | ||||||
21 | significant impact on the levels or flows of stormwaters in | ||||||
22 | inter-county watersheds or on the capacity of existing and | ||||||
23 | planned stormwater retention facilities. An adopted stormwater | ||||||
24 | management plan shall identify steps taken by the county to | ||||||
25 | coordinate the development of plan recommendations with | ||||||
26 | adjoining counties. |
| |||||||
| |||||||
1 | (d) The stormwater management committee may not enforce any | ||||||
2 | rules or regulations that would interfere with (i) any power | ||||||
3 | granted by the Illinois Drainage Code (70 ILCS 605/) to | ||||||
4 | operate, construct, maintain, or improve drainage systems or | ||||||
5 | (ii) the ability to operate, maintain, or improve the drainage | ||||||
6 | systems used on or by land or a facility used for production | ||||||
7 | agriculture purposes, as defined in the Use Tax Act (35 ILCS | ||||||
8 | 105/), except newly constructed buildings and newly installed | ||||||
9 | impervious paved surfaces. Disputes regarding an exception | ||||||
10 | shall be determined by a mutually agreed upon arbitrator paid | ||||||
11 | by the disputing party or parties. | ||||||
12 | (e) Before the stormwater management planning committee | ||||||
13 | recommends to the county board a stormwater management plan for | ||||||
14 | the county or a portion thereof, it shall submit the plan to | ||||||
15 | the Office of Water Resources of the Department of Natural | ||||||
16 | Resources for review and recommendations. The Office, in | ||||||
17 | reviewing the plan, shall consider such factors as impacts on | ||||||
18 | the levels or flows in rivers and streams and the cumulative | ||||||
19 | effects of stormwater discharges on flood levels. The Office of | ||||||
20 | Water Resources shall determine whether the plan or ordinances | ||||||
21 | enacted to implement the plan complies with the requirements of | ||||||
22 | subsection (f). Within a period not to exceed 60 days, the | ||||||
23 | review comments and recommendations shall be submitted to the | ||||||
24 | stormwater management planning committee for consideration. | ||||||
25 | Any amendments to the plan shall be submitted to the Office for | ||||||
26 | review. |
| |||||||
| |||||||
1 | (f) Prior to recommending the plan to the county board, the | ||||||
2 | stormwater management planning committee shall hold at least | ||||||
3 | one public hearing thereon and shall afford interested persons | ||||||
4 | an opportunity to be heard. The hearing shall be held in the | ||||||
5 | county seat. Notice of the hearing shall be published at least | ||||||
6 | once no less than 15 days in advance of the hearing in a | ||||||
7 | newspaper of general circulation published in the county. The | ||||||
8 | notice shall state the time and place of the hearing and the | ||||||
9 | place where copies of the proposed plan will be accessible for | ||||||
10 | examination by interested parties. If an affected municipality | ||||||
11 | having a stormwater management plan adopted by ordinance wishes | ||||||
12 | to protest the proposed county plan provisions, it shall appear | ||||||
13 | at the hearing and submit in writing specific proposals to the | ||||||
14 | stormwater management planning committee. After consideration | ||||||
15 | of the matters raised at the hearing, the committee may amend | ||||||
16 | or approve the plan and recommend it to the county board for | ||||||
17 | adoption. | ||||||
18 | The county board may enact the proposed plan by ordinance. | ||||||
19 | If the proposals for modification of the plan made by an | ||||||
20 | affected municipality having a stormwater management plan are | ||||||
21 | not included in the proposed county plan, and the municipality | ||||||
22 | affected by the plan opposes adoption of the county plan by | ||||||
23 | resolution of its corporate authorities, approval of the county | ||||||
24 | plan shall require an affirmative vote of at least two-thirds | ||||||
25 | of the county board members present and voting. If the county | ||||||
26 | board wishes to amend the county plan, it shall submit in |
| |||||||
| |||||||
1 | writing specific proposals to the stormwater management | ||||||
2 | planning committee. If the proposals are not approved by the | ||||||
3 | committee, or are opposed by resolution of the corporate | ||||||
4 | authorities of an affected municipality having a municipal | ||||||
5 | stormwater management plan, amendment of the plan shall require | ||||||
6 | an affirmative vote of at least two-thirds of the county board | ||||||
7 | members present and voting. | ||||||
8 | (g) The county board may prescribe by ordinance reasonable | ||||||
9 | rules and regulations for floodplain or stormwater management | ||||||
10 | and for governing the location, width, course, and release rate | ||||||
11 | of all stormwater runoff channels, streams, and basins in the | ||||||
12 | county, in accordance with the adopted stormwater management | ||||||
13 | plan. Land, facilities, and drainage district facilities used | ||||||
14 | for production agriculture as defined in subsection (d) shall | ||||||
15 | not be subjected to regulation by the county board or | ||||||
16 | stormwater management committee under this Section for | ||||||
17 | floodplain management and for governing location, width, | ||||||
18 | course, maintenance, and release rate of stormwater runoff | ||||||
19 | channels, streams and basins, or water discharged from a | ||||||
20 | drainage district. These rules and regulations shall, at a | ||||||
21 | minimum, meet the standards for floodplain management | ||||||
22 | established by the Office of Water Resources and the | ||||||
23 | requirements of the Federal Emergency Management Agency for | ||||||
24 | participation in the National Flood Insurance Program. The | ||||||
25 | Commission may not impose more stringent regulations regarding | ||||||
26 | water quality on entities discharging in accordance with a |
| |||||||
| |||||||
1 | valid National Pollution Discharge Elimination System permit | ||||||
2 | issued under the Environmental Protection Act. | ||||||
3 | (h) In accordance with, and if recommended in, the adopted | ||||||
4 | stormwater management plan, the county board may adopt a | ||||||
5 | schedule of fees as may be necessary to mitigate the effects of | ||||||
6 | increased stormwater runoff resulting from new development | ||||||
7 | based on actual costs. The fees shall not exceed the cost of | ||||||
8 | satisfying the onsite stormwater retention or detention | ||||||
9 | requirements of the adopted stormwater management plan. The | ||||||
10 | fees shall be used to finance activities undertaken by the | ||||||
11 | county or its included municipalities to mitigate the effects | ||||||
12 | of urban stormwater runoff by providing regional stormwater | ||||||
13 | retention or detention facilities, as identified in the county | ||||||
14 | plan. The county board shall provide for a credit or reduction | ||||||
15 | in fees for any onsite retention, detention, drainage district | ||||||
16 | assessments, or other similar stormwater facility that the | ||||||
17 | developer is required to construct consistent with the | ||||||
18 | stormwater management ordinance. All these fees collected by | ||||||
19 | the county shall be held in a separate fund, and shall be | ||||||
20 | expended only in the watershed within which they were | ||||||
21 | collected. | ||||||
22 | (i) For the purpose of implementing this Section and for | ||||||
23 | the development, design, planning, construction, operation, | ||||||
24 | and maintenance of stormwater facilities provided for in the | ||||||
25 | stormwater management plan, a county board that has established | ||||||
26 | a stormwater management planning committee pursuant to this |
| |||||||
| |||||||
1 | Section may cause an annual tax of not to exceed 0.20% of the | ||||||
2 | value, as equalized or assessed by the Department of Revenue, | ||||||
3 | of all taxable property in the county to be levied upon all the | ||||||
4 | taxable property in the county or occupation and use taxes of | ||||||
5 | 1/10 of one cent. The property tax shall be in addition to all | ||||||
6 | other taxes authorized by law to be levied and collected in the | ||||||
7 | county and shall be in addition to the maximum tax rate | ||||||
8 | authorized by law for general county purposes. The 0.20% | ||||||
9 | limitation provided in this Section may be increased or | ||||||
10 | decreased by referendum in accordance with the provisions of | ||||||
11 | Sections 18-120, 18-125, and 18-130 of the Property Tax Code | ||||||
12 | (35 ILCS 200/). | ||||||
13 | Any revenues generated as a result of ownership or | ||||||
14 | operation of facilities or land acquired with the tax funds | ||||||
15 | collected pursuant to this subsection shall be held in a | ||||||
16 | separate fund and be used either to abate such property tax or | ||||||
17 | for implementing this Section. | ||||||
18 | However, the tax authorized by this subsection shall not be | ||||||
19 | levied until the question of its adoption, either for a | ||||||
20 | specified period or indefinitely, has been submitted to the | ||||||
21 | electors thereof and approved by a majority of those voting on | ||||||
22 | the question. This question may be submitted at any election | ||||||
23 | held in the county after the adoption of a resolution by the | ||||||
24 | county board providing for the submission of the question to | ||||||
25 | the electors of the county. The county board shall certify the | ||||||
26 | resolution and proposition to the proper election officials, |
| |||||||
| |||||||
1 | who shall submit the proposition at an election in accordance | ||||||
2 | with the general election law. If a majority of the votes cast | ||||||
3 | on the question is in favor of the levy of the tax, it may | ||||||
4 | thereafter be levied in the county for the specified period or | ||||||
5 | indefinitely, as provided in the proposition. The question | ||||||
6 | shall be put in substantially the following form: | ||||||
7 | Shall an annual tax be levied
for stormwater management | ||||||
8 | purposes (for a period of not more than ..... years) at a | ||||||
9 | rate not exceeding
.....% of the equalized assessed
value | ||||||
10 | of the taxable property of ..... County?
| ||||||
11 | Or this question may be submitted at any election held in the | ||||||
12 | county after the adoption of a resolution by the county board | ||||||
13 | providing for the submission of the question to the electors of | ||||||
14 | the county to authorize use and occupation taxes of 1/10 of one | ||||||
15 | cent: | ||||||
16 | Shall use and occupation taxes be raised for stormwater | ||||||
17 | management purposes (for a period of not more than ..... | ||||||
18 | years) at a rate of 1/10 of one cent for taxable goods in | ||||||
19 | ..... County? | ||||||
20 | Votes shall be recorded as Yes or No.
| ||||||
21 | (j) For those counties that adopt a property tax in | ||||||
22 | accordance with the provisions in this Section, the stormwater | ||||||
23 | management committee shall offer property tax abatements or | ||||||
24 | incentive payments to property owners who construct, maintain, | ||||||
25 | and use approved stormwater management devices. For those | ||||||
26 | counties that adopt use and occupation taxes in accordance with |
| |||||||
| |||||||
1 | the provisions of this Section, the stormwater management | ||||||
2 | committee may offer tax rebates or incentive payments to | ||||||
3 | property owners who construct, maintain, and use approved | ||||||
4 | stormwater management devices.
The stormwater management | ||||||
5 | committee is authorized to offer credits to the property tax, | ||||||
6 | if applicable, based on authorized practices consistent with | ||||||
7 | the stormwater management plan and approved by the committee. | ||||||
8 | Expenses of staff of a stormwater management committee that are | ||||||
9 | expended on regulatory project review may be no more than 20% | ||||||
10 | of the annual budget of the committee, including funds raised | ||||||
11 | under subsections (h) and (i). | ||||||
12 | (k) Any county that has adopted a county stormwater | ||||||
13 | management plan under this Section may, after 10 days written | ||||||
14 | notice receiving consent of the owner or occupant, enter upon | ||||||
15 | any lands or waters within the county for the purpose of | ||||||
16 | inspecting stormwater facilities or causing the removal of any | ||||||
17 | obstruction to an affected watercourse. If consent is denied or | ||||||
18 | cannot be reasonably obtained, the county ordinance shall | ||||||
19 | provide a process or procedure for an administrative warrant to | ||||||
20 | be obtained. The county shall be responsible for any damages | ||||||
21 | occasioned thereby. | ||||||
22 | (l) Upon petition of the municipality, and based on a | ||||||
23 | finding of the stormwater management planning committee, the | ||||||
24 | county shall not enforce rules and regulations adopted by the | ||||||
25 | county in any municipality located wholly or partly within the | ||||||
26 | county that has a municipal stormwater management ordinance |
| |||||||
| |||||||
1 | that is consistent with and at least as stringent as the county | ||||||
2 | plan and ordinance, and is being enforced by the municipal | ||||||
3 | authorities. On issues that the county ordinance is more | ||||||
4 | stringent as deemed by the committee, the county shall only | ||||||
5 | enforce rules and regulations adopted by the county on the more | ||||||
6 | stringent issues and accept municipal permits. The county shall | ||||||
7 | have no more than 60 days to review permits or the permits | ||||||
8 | shall be deemed approved. | ||||||
9 | (m) A county may issue general obligation bonds for | ||||||
10 | implementing any stormwater plan adopted under this Section in | ||||||
11 | the manner prescribed in Section 5-1012; except that the | ||||||
12 | referendum requirement of Section 5-1012 does not apply to | ||||||
13 | bonds issued pursuant to this Section on which the principal | ||||||
14 | and interest are to be paid entirely out of funds generated by | ||||||
15 | the taxes and fees authorized by this Section. | ||||||
16 | (n) The powers authorized by this Section may be | ||||||
17 | implemented by the county board for a portion of the county | ||||||
18 | subject to similar stormwater management needs. | ||||||
19 | (o) The powers and taxes authorized by this Section are in | ||||||
20 | addition to the powers and taxes authorized by Division 5-15; | ||||||
21 | in exercising its powers under this Section, a county shall not | ||||||
22 | be subject to the restrictions and requirements of that | ||||||
23 | Division.
| ||||||
24 | (p) As used in this Section: | ||||||
25 | "Urban flooding" means the flooding of public and private | ||||||
26 | land in urban communities that results from stormwater or |
| |||||||
| |||||||
1 | snowmelt runoff overwhelming the existing drainage | ||||||
2 | infrastructure, unrelated to the overflow of any river or lake, | ||||||
3 | whether or not that land is located in or near a floodplain. | ||||||
4 | "Urban areas" means a census block with a population | ||||||
5 | density of 1,000 or more people per square mile and any group | ||||||
6 | of contiguous census blocks around the core having a density of | ||||||
7 | 500 or more people per square mile. | ||||||
8 | (Source: P.A. 94-675, eff. 8-23-05.)
|