|
| | 10000SB0060ham001 | - 2 - | LRB100 06032 AMC 26209 a |
|
|
1 | | combined waterworks
and sewerage system, or improvement or |
2 | | extension at a rate that will be
sufficient to pay the |
3 | | principal and interest of any bonds issued to pay
the cost of |
4 | | the system, improvement, or extension and the maintenance and
|
5 | | operation of the system, improvement, or extension and may |
6 | | provide an adequate
depreciation fund for the bonds. Charges or |
7 | | rates shall be established,
revised, and maintained by |
8 | | ordinance and become payable as the township board
determines |
9 | | by ordinance.
|
10 | | (c) The charges or rates are liens upon the real estate |
11 | | upon or for which
sewerage service is supplied whenever the |
12 | | charges or rates become delinquent as
provided by the ordinance |
13 | | of the board fixing a delinquency date.
|
14 | | (d) Notwithstanding any provision of law to the contrary, |
15 | | the township shall conduct a cost study regarding the |
16 | | connection charge of the township: |
17 | | (1) before the township increases or creates a |
18 | | connection charge; |
19 | | (2) upon the request of the supervisor or a majority of |
20 | | the township board of the township; |
21 | | (3) upon the request of a majority of the mayors or |
22 | | village presidents of the municipalities located within or |
23 | | substantially within the township or township's facility |
24 | | planning area; or |
25 | | (4) upon the filing with the township board of a |
26 | | petition signed by 10% or more of the customers who have |
|
| | 10000SB0060ham001 | - 3 - | LRB100 06032 AMC 26209 a |
|
|
1 | | paid connection charges to the township in the previous 5 |
2 | | calendar years. |
3 | | The cost study shall be conducted by an independent entity |
4 | | within 6 months of action taken under paragraphs (1), (2), (3), |
5 | | or (4) of this subsection (d). For purposes of subsections (d) |
6 | | and (e), the term "independent entity" shall mean an |
7 | | engineering firm that has not entered into a contract with any |
8 | | State agency, unit of local government, or non-governmental |
9 | | entity for goods or services within the township or township |
10 | | service area in the 24 months prior to being contracted to |
11 | | perform the cost study. After performing a cost study under |
12 | | this subsection (d), an independent entity may not contract |
13 | | with any State agency, unit of local government, or |
14 | | non-governmental entity for goods or services within the |
15 | | township or township service area in the 24 months after |
16 | | completion of the cost study other than to perform further cost |
17 | | studies under this subsection (d). A township shall not be |
18 | | required to conduct more than one cost study in a 60 month |
19 | | period under paragraphs (3) or (4) of this subsection (d). The |
20 | | cost study must include, at a minimum, an examination of |
21 | | similar water main and sewer connection charges in neighboring |
22 | | units of local government or units of local government similar |
23 | | in size or population. Following the completion of the cost |
24 | | study, no increase or new connection charge may be imposed |
25 | | unless the increase or new charge is justified by the cost |
26 | | study. If the connection charge the township charged prior to |
|
| | 10000SB0060ham001 | - 4 - | LRB100 06032 AMC 26209 a |
|
|
1 | | completion of the cost study is higher than is justified by the |
2 | | cost study, the township shall reduce its connection charge to |
3 | | the amount justified by the cost study. For purposes of this |
4 | | subsection (d), "connection charge" means any charge or fee, by |
5 | | whatever name, assessed to recover the cost of connecting the |
6 | | customer's water main, sewer, or water main and sewer service |
7 | | line to the township's facilities, and includes only the direct |
8 | | and indirect costs of physically tying the service line into |
9 | | the township's main. |
10 | | (e) If a cost study has been conducted pursuant to |
11 | | subsection (d) of this Section and a new cost study is |
12 | | requested under paragraph (3) or (4) of subsection (d), the |
13 | | township shall obtain a written quote from an independent |
14 | | entity detailing the cost of the requested cost study and one |
15 | | of the following shall occur prior to a new cost study |
16 | | beginning: |
17 | | (1) each township, village, and municipality whose |
18 | | mayor or president requested the cost study under paragraph |
19 | | (3) of subsection (d) shall pay a proportionate share of |
20 | | the entire cost of the cost study as detailed in the |
21 | | written quote required under this subsection (e); or |
22 | | (2) the customers who signed the petition under |
23 | | paragraph (4) of subsection (d) shall pay a pro rata share |
24 | | of the entire cost of the cost study as detailed in written |
25 | | quote required under this subsection (e). |
26 | | Payments required under either paragraph (1) or (2) of this |
|
| | 10000SB0060ham001 | - 5 - | LRB100 06032 AMC 26209 a |
|
|
1 | | subsection (e) shall be made to the township clerk, who shall |
2 | | forward the same to the independent entity upon receipt of |
3 | | entire amount of the written quote for the cost study. If the |
4 | | entire amount of the written quote for the cost study has not |
5 | | been received within 90 days from the township clerk providing |
6 | | public note of the amount of the written quote, then those |
7 | | amounts received by the township clerk shall be refunded to the |
8 | | persons or entities which paid them. |
9 | | (Source: P.A. 99-481, eff. 9-22-15; 99-498, eff. 1-29-16.)
|
10 | | (60 ILCS 1/205-141 new) |
11 | | Sec. 205-141. Initiating proceedings for particular |
12 | | locality; rates
and charges; lien; certain townships. |
13 | | (a) This Section applies to any township that (i) has a |
14 | | population between 31,500 and 32,000 according to the 2010 |
15 | | federal decennial census; and (ii) is located within a county |
16 | | that has a population between 260,000 and 265,000 according to |
17 | | the 2010 federal decennial census. |
18 | | (a-1) A township board may initiate proceedings under |
19 | | Sections 205-130 through
205-150 in the manner provided by |
20 | | Section 205-20. |
21 | | (b) The township board may establish a fair and reasonable |
22 | | rate for each
user of the waterworks system or sewerage system, |
23 | | or combined waterworks
and sewerage system, or improvement or |
24 | | extension at a rate that will be
sufficient to pay the |
25 | | principal and interest of any bonds issued to pay
the cost of |
|
| | 10000SB0060ham001 | - 6 - | LRB100 06032 AMC 26209 a |
|
|
1 | | the system, improvement, or extension and the maintenance and
|
2 | | operation of the system, improvement, or extension and may |
3 | | provide an adequate
depreciation fund for the bonds. Rates |
4 | | shall be established,
revised, and maintained by ordinance and |
5 | | become payable as the township board
determines by ordinance. |
6 | | (b-5) The township board may establish a fair and |
7 | | reasonable connection charge for each new user added to the |
8 | | township's waterworks system or sewerage system. |
9 | | (c) The charges or rates are liens upon the real estate |
10 | | upon or for which
sewerage service is supplied whenever the |
11 | | charges or rates become delinquent as
provided by the ordinance |
12 | | of the board fixing a delinquency date. |
13 | | (d) Notwithstanding any provision of law to the contrary, a |
14 | | cost study shall be conducted regarding the connection charge |
15 | | of the township: |
16 | | (1) before the township increases or creates a |
17 | | connection charge; |
18 | | (2) upon the request of the supervisor or a majority of |
19 | | the township board of the township; |
20 | | (3) upon the request of a majority of the mayors or |
21 | | village presidents of the municipalities located within or |
22 | | substantially within the township or township's facility |
23 | | planning area; or |
24 | | (4) upon the filing with the township board of a |
25 | | petition signed by 10% or more of the customers who have |
26 | | paid connection charges to the township in the previous 5 |
|
| | 10000SB0060ham001 | - 7 - | LRB100 06032 AMC 26209 a |
|
|
1 | | calendar years. |
2 | | The cost study shall be conducted by an independent entity |
3 | | within 6 months of action taken under paragraphs (1), (2), (3), |
4 | | or (4) of this subsection (d). If a cost study is requested |
5 | | under paragraphs (1) or (2) of this subsection, then the |
6 | | township shall order and pay for the cost study. If a cost |
7 | | study is requested under paragraphs (3) or (4) of this |
8 | | subsection, then the municipalities whose mayors or presidents |
9 | | requested the cost study under paragraph (3), or the customers |
10 | | who filed a petition under paragraph (4), shall choose the |
11 | | independent entity to conduct the cost study, order the cost |
12 | | study, and pay for the cost study. After performing a cost |
13 | | study under this subsection (d), an independent entity may not |
14 | | contract with any State agency, unit of local government, or |
15 | | non-governmental entity for goods or services within the |
16 | | township or township service area in the 24 months after |
17 | | completion of the cost study other than to perform further cost |
18 | | studies under this subsection (d). A township shall not be |
19 | | required to conduct more than one cost study in a 60 month |
20 | | period under paragraphs (3) or (4) of this subsection (d). The |
21 | | cost study must include, at a minimum, an examination of |
22 | | residential and commercial connection charges for the |
23 | | waterworks system or sewerage system, whichever applies, in at |
24 | | least 30 units of local government in Illinois with a similar |
25 | | number of customers as are connected to the township's |
26 | | waterworks system and sewerage system. Following the |
|
| | 10000SB0060ham001 | - 8 - | LRB100 06032 AMC 26209 a |
|
|
1 | | completion of the cost study, no increase or new connection |
2 | | charge may be imposed unless the increase or new charge is |
3 | | justified by the cost study. If the connection charge the |
4 | | township charged prior to completion of the cost study is |
5 | | higher than is justified by the cost study, the township shall |
6 | | reduce its connection charge to the amount justified by the |
7 | | cost study. |
8 | | (e) For purposes of this Section: |
9 | | "Connection charge" means any nominal charge or fee, by |
10 | | whatever name, assessed to recover the cost of connecting the |
11 | | customer's water main, sewer, or water main and sewer service |
12 | | line to the township's facilities, and includes only the direct |
13 | | and indirect costs of physically tying the service line into |
14 | | the township's main line in the adjoining utility easement. |
15 | | "Independent entity" means an engineering firm that has not |
16 | | entered into a contract with any State agency, unit of local |
17 | | government, or non-governmental entity for goods or services |
18 | | within the township or township service area in the 24 months |
19 | | prior to being contracted to perform the cost study.
|
20 | | (60 ILCS 1/205-145)
|
21 | | Sec. 205-145. Special fund. All revenue derived from the |
22 | | operation of a
waterworks system or sewerage system, or |
23 | | combined waterworks and sewerage
system, constructed, |
24 | | acquired, extended, or improved to serve a particular
locality |
25 | | shall be set aside as collected and shall be deposited in a |
|
| | 10000SB0060ham001 | - 9 - | LRB100 06032 AMC 26209 a |
|
|
1 | | special
fund of the township. That fund shall be used only (i) |
2 | | to pay the cost of
operating and maintaining the waterworks |
3 | | system or sewerage system, or combined
waterworks and sewerage |
4 | | system, constructed, acquired, extended, or improved to
serve a |
5 | | particular locality, (ii) to provide an adequate depreciation |
6 | | fund, and
(iii) to pay the principal and interest on the bonds |
7 | | issued by the township
under Sections 205-130 through 205-141 |
8 | | 205-140 for the purpose of constructing,
acquiring, extending, |
9 | | or improving the system.
|
10 | | (Source: P.A. 76-1360; 88-62.)
|
11 | | Section 99. Effective date. This Act takes effect upon |
12 | | becoming law.".
|