100TH GENERAL ASSEMBLY
State of Illinois
2017 and 2018
SB2213

 

Introduced 6/15/2017, by Sen. Daniel Biss

 

SYNOPSIS AS INTRODUCED:
 
See Index

    Creates the Illinois Workers' Rights and Worker Safety Act. Provides that except as authorized by State law enacted after January 1, 2017, a State agency may not amend or revise its rules relating to protection of workers' rights or worker safety in a manner less stringent than specified federal laws. Provides that a State agency may establish workers' rights and worker safety standards that are more stringent than those provided in federal law in existence as of January 1, 2017. Amends the Environmental Protection Act. Provides that in certain circumstances an action may be brought in a circuit court by a person in the public interest to enforce standards or requirements concerning air, water, drinking water, and endangered and threatened species adopted under specified provisions of the Act and the Illinois Endangered Species Protection Act. Provides that the provisions concerning public interest enforcement shall only become operative if specified events occur. Provides that the enforcement provisions of the Act are severable. Adds provisions concerning protection of the environment, natural resources, and public health. Requires various State agencies to adopt, maintain, and enforce rules concerning air, water, drinking water, and endangered and threatened species that are at least as stringent as various regulatory baselines under federal law, in addition to State law requirements. Provides that every State agency shall undertake all feasible efforts to implement and enforce these provisions. Contains reporting requirements. Deletes provisions providing that an air pollution construction or operating permit shall not be required due to emissions of greenhouse gases if certain events occur. Deletes certain language concerning exemptions from provisions concerning the Clean Air Act Permit Program.


LRB100 13060 MJP 27439 b

 

 

A BILL FOR

 

SB2213LRB100 13060 MJP 27439 b

1    AN ACT concerning safety.
 
2    Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
 
4    Section 5. Short title. This Act may be cited as the
5Illinois Workers' Rights and Worker Safety Act.
 
6    Section 10. Definitions. As used in this Act:
7    "Federal law" means the federal Fair Labor Standards Act of
81938, the federal Occupational Safety and Health Act of 1970,
9the Federal Mine Safety and Health Act of 1977, and other
10federal statutes relating to worker rights and protections and
11regulations, policies, guidance, standards, requirements, and
12specifications established under those federal statutes.
13    "State agency" means a State agency designated by law to
14implement the federal law or its State analog.
 
15    Section 15. Operative provisions. Except as authorized by
16State law enacted after January 1, 2017, a State agency may not
17amend or revise the State agency's rules in a manner that is
18less stringent in its protection of workers' rights or worker
19safety than standards established under federal law in
20existence as of January 1, 2017.
21    Except as otherwise provided in State law, a State agency
22may establish workers' rights and worker safety standards for

 

 

SB2213- 2 -LRB100 13060 MJP 27439 b

1Illinois that are more stringent than those provided in federal
2law in existence as of January 1, 2017.
 
3    Section 20. Reporting. Each State agency shall undertake
4all feasible efforts using the State agency's authority under
5State and federal law to implement and enforce this Act. Each
6State agency that takes steps to enforce this Act shall submit
7a report to the General Assembly at least once every 6 months
8describing the State agency's compliance with this Act.
 
9    Section 25. The Environmental Protection Act is amended by
10changing Sections 9.15 and 39.5 and by adding Sections 34.1 and
1134.9 and Title XVIII as follows:
 
12    (415 ILCS 5/9.15)
13    Sec. 9.15. Greenhouse gases.
14    (a) An air pollution construction permit shall not be
15required due to emissions of greenhouse gases if the equipment,
16site, or source is not subject to regulation, as defined by 40
17CFR 52.21, as now or hereafter amended, for greenhouse gases.
18This exemption does not relieve an owner or operator from the
19obligation to comply with other applicable rules or
20regulations.
21    (b) An air pollution operating permit shall not be required
22due to emissions of greenhouse gases if the equipment, site, or
23source is not subject to regulation, as defined by Section 39.5

 

 

SB2213- 3 -LRB100 13060 MJP 27439 b

1of this Act, for greenhouse gases. This exemption does not
2relieve an owner or operator from the obligation to comply with
3other applicable rules or regulations.
4    (c) (Blank). Notwithstanding any provision to the contrary
5in this Section, an air pollution construction or operating
6permit shall not be required due to emissions of greenhouse
7gases if any of the following events occur:
8        (1) enactment of federal legislation depriving the
9    Administrator of the USEPA of authority to regulate
10    greenhouse gases under the Clean Air Act;
11        (2) the issuance of any opinion, ruling, judgment,
12    order, or decree by a federal court depriving the
13    Administrator of the USEPA of authority to regulate
14    greenhouse gases under the Clean Air Act; or
15        (3) action by the President of the United States or the
16    President's authorized agent, including the Administrator
17    of the USEPA, to repeal or withdraw the Greenhouse Gas
18    Tailoring Rule (75 Fed. Reg. 31514, June 3, 2010).
19    This subsection (c) does not relieve an owner or operator
20from the obligation to comply with applicable rules or
21regulations other than those relating to greenhouse gases.
22    (d) (Blank). If any event listed in subsection (c) of this
23Section occurs, permits issued after such event shall not
24impose permit terms or conditions addressing greenhouse gases
25during the effectiveness of any event listed in subsection (c).
26    (e) (Blank). If an event listed in subsection (c) of this

 

 

SB2213- 4 -LRB100 13060 MJP 27439 b

1Section occurs, any owner or operator with a permit that
2includes terms or conditions addressing greenhouse gases may
3elect to submit an application to the Agency to address a
4revision or repeal of such terms or conditions. The Agency
5shall expeditiously process such permit application in
6accordance with applicable laws and regulations.
7(Source: P.A. 97-95, eff. 7-12-11.)
 
8    (415 ILCS 5/34.1 new)
9    Sec. 34.1. Public Interest Enforcement.
10    (a) In addition to the enforcement provisions under Section
1131 of this Act and any causes of action afforded by other
12statutes, the common law, or the Illinois Constitution, an
13action may be brought in the circuit court by a person in the
14public interest to enforce the standards or requirements
15adopted under paragraph (2) of subsection (b) of Section 60 of
16this Act or to impose civil penalties for a violation of those
17standards or requirements, if both of the following are
18satisfied:
19        (1) The private action is commenced more than 60 days
20    from the date that the person gave notice of an alleged
21    violation that is the subject of the private action to the
22    Attorney General and the State's Attorney in whose
23    jurisdiction the violation is alleged to have occurred, and
24    to the alleged violator.
25        (2) Neither the Attorney General nor State's Attorney

 

 

SB2213- 5 -LRB100 13060 MJP 27439 b

1    commenced and is diligently prosecuting an action against
2    the violation.
3    A person bringing an action in the public interest under
4this subsection and a person filing an action in which a
5violation of paragraph (2) of subsection (b) of Section 60 is
6alleged shall notify the Attorney General that the action has
7been filed.
8    (b) Subsection (a) is operative only if either of the
9following occurs:
10        (1) The United States Environmental Protection Agency
11    revises the standards or requirements described in
12    paragraph (2) of subsection (b) of Section 60 to be less
13    stringent than the applicable baseline federal law
14    standards.
15        (2) The federal Clean Air Act is amended to repeal or
16    substantially weaken the citizen suit provision under 42
17    U.S.C. 7604.
18    (c) In addition to the enforcement provisions under Section
1931 of this Act and any causes of action afforded by other
20statutes, the common law, or the Illinois Constitution, an
21action may be brought in the circuit court by a person in the
22public interest to enforce the standards or requirements
23adopted under paragraph (3) of subsection (b) of Section 61 or
24to impose civil penalties for a violation of those standards or
25requirements, if the requirements of paragraphs (1) and (2) of
26subsection (a) of this Section are met.

 

 

SB2213- 6 -LRB100 13060 MJP 27439 b

1    A person bringing an action in the public interest under
2this subsection and a person filing an action in which a
3violation of paragraph (3) of subsection (b) of Section 61 is
4alleged shall notify the Attorney General that the action has
5been filed.
6    (d) Subsection (c) is operative only if either of the
7following occurs:
8        (1) The United States Environmental Protection Agency
9    revised the standards or requirements described in
10    paragraph (3) of subsection (b) of Section 61 to be less
11    stringent than the applicable baseline federal law
12    standards.
13        (2) The federal Clean Water Act is amended to repeal or
14    substantially weaken the citizen suit provision under 33
15    U.S.C. 1365.
16    (e) In addition to the enforcement provisions under Section
1731 of this Act and any causes of action afforded by other
18statutes, the common law, or the Illinois Constitution, an
19action may be brought in the circuit court by a person in the
20public interest to enforce the standards or requirements
21adopted under paragraph (4) of subsection (b) of Section 61 or
22to impose civil penalties for a violation of those standards or
23requirements, if the requirements of paragraphs (1) and (2) of
24subsection (a) of this Section are met.
25    A person bringing an action in the public interest under
26this subsection and a person filing an action in which a

 

 

SB2213- 7 -LRB100 13060 MJP 27439 b

1violation of paragraph (4) of subsection (b) of Section 61 is
2alleged shall notify the Attorney General that the action has
3been filed.
4    (f) Subsection (e) is operative only if either of the
5following occurs:
6        (1) The United States Environmental Protection Agency
7    revised the standards or requirements described in
8    paragraph (4) of subsection (b) of Section 61 to be less
9    stringent than the applicable baseline federal law
10    standards.
11        (2) The federal Safe Drinking Water Act is amended to
12    repeal or substantially weaken the citizen suit provision
13    under 42 U.S.C. 300j-8.
14    (g) In addition to the enforcement provisions under the
15Illinois Endangered Species Protection Act, and any cases
16afforded by other statutes, the common law, or the Illinois
17Constitution, an action may be brought in the circuit court by
18a person in the public interest to enforce the standards or
19requirements of the Illinois Endangered Species Protection Act
20for a species listed under paragraph (1) of subsection (b) of
21Section 62 or to impose civil penalties for a violation of
22those requirements, if the requirements of paragraphs (1) and
23(2) of subsection (a) of this Section are met.
24    A person bringing an action in the public interest under
25this subsection and a person filing an action in which a
26violation of paragraph (1) of subsection (b) of Section 62 is

 

 

SB2213- 8 -LRB100 13060 MJP 27439 b

1alleged shall notify the Attorney General that the action has
2been filed.
3    (h) Subsection (g) is operative only if either of the
4following occurs:
5        (1) The relevant federal agency revised the standards
6    or requirements for the protection of species described in
7    paragraph (1) of subsection (b) of Section 62 to be less
8    protective than the applicable baseline federal law
9    standards.
10        (2) The federal Endangered Species Act is amended to
11    repeal or substantially weaken the citizen suit provision
12    under 16 U.S.C. 1540.
13    (i) An action or proceeding may be brought on the grounds
14that a State or local agency has violated the requirements of
15this Section.
16    (j) The court may award attorney's fees and expert fees and
17court costs, as appropriate, for an action brought under this
18Section.
 
19    (415 ILCS 5/34.9 new)
20    Sec. 34.9. Severability. The provisions of this Title VIII
21are severable. If any provision of this Title or its
22application is held invalid, that invalidity shall not affect
23other provisions or applications that can be given effect
24without the invalid provision or application.
 

 

 

SB2213- 9 -LRB100 13060 MJP 27439 b

1    (415 ILCS 5/39.5)  (from Ch. 111 1/2, par. 1039.5)
2    Sec. 39.5. Clean Air Act Permit Program.
3    1. Definitions. For purposes of this Section:
4    "Administrative permit amendment" means a permit revision
5subject to subsection 13 of this Section.
6    "Affected source for acid deposition" means a source that
7includes one or more affected units under Title IV of the Clean
8Air Act.
9    "Affected States" for purposes of formal distribution of a
10draft CAAPP permit to other States for comments prior to
11issuance, means all States:
12        (1) Whose air quality may be affected by the source
13    covered by the draft permit and that are contiguous to
14    Illinois; or
15        (2) That are within 50 miles of the source.
16    "Affected unit for acid deposition" shall have the meaning
17given to the term "affected unit" in the regulations
18promulgated under Title IV of the Clean Air Act.
19    "Applicable Clean Air Act requirement" means all of the
20following as they apply to emissions units in a source
21(including regulations that have been promulgated or approved
22by USEPA pursuant to the Clean Air Act which directly impose
23requirements upon a source and other such federal requirements
24which have been adopted by the Board. These may include
25requirements and regulations which have future effective
26compliance dates. Requirements and regulations will be exempt

 

 

SB2213- 10 -LRB100 13060 MJP 27439 b

1if USEPA determines that such requirements need not be
2contained in a Title V permit):
3        (1) Any standard or other requirement provided for in
4    the applicable state implementation plan approved or
5    promulgated by USEPA under Title I of the Clean Air Act
6    that implements the relevant requirements of the Clean Air
7    Act, including any revisions to the state Implementation
8    Plan promulgated in 40 CFR Part 52, Subparts A and O and
9    other subparts applicable to Illinois. For purposes of this
10    paragraph (1) of this definition, "any standard or other
11    requirement" means only such standards or requirements
12    directly enforceable against an individual source under
13    the Clean Air Act.
14        (2)(i) Any term or condition of any preconstruction
15        permits issued pursuant to regulations approved or
16        promulgated by USEPA under Title I of the Clean Air
17        Act, including Part C or D of the Clean Air Act.
18            (ii) Any term or condition as required pursuant to
19        Section 39.5 of any federally enforceable State
20        operating permit issued pursuant to regulations
21        approved or promulgated by USEPA under Title I of the
22        Clean Air Act, including Part C or D of the Clean Air
23        Act.
24        (3) Any standard or other requirement under Section 111
25    of the Clean Air Act, including Section 111(d).
26        (4) Any standard or other requirement under Section 112

 

 

SB2213- 11 -LRB100 13060 MJP 27439 b

1    of the Clean Air Act, including any requirement concerning
2    accident prevention under Section 112(r)(7) of the Clean
3    Air Act.
4        (5) Any standard or other requirement of the acid rain
5    program under Title IV of the Clean Air Act or the
6    regulations promulgated thereunder.
7        (6) Any requirements established pursuant to Section
8    504(b) or Section 114(a)(3) of the Clean Air Act.
9        (7) Any standard or other requirement governing solid
10    waste incineration, under Section 129 of the Clean Air Act.
11        (8) Any standard or other requirement for consumer and
12    commercial products, under Section 183(e) of the Clean Air
13    Act.
14        (9) Any standard or other requirement for tank vessels,
15    under Section 183(f) of the Clean Air Act.
16        (10) Any standard or other requirement of the program
17    to control air pollution from Outer Continental Shelf
18    sources, under Section 328 of the Clean Air Act.
19        (11) Any standard or other requirement of the
20    regulations promulgated to protect stratospheric ozone
21    under Title VI of the Clean Air Act, unless USEPA has
22    determined that such requirements need not be contained in
23    a Title V permit.
24        (12) Any national ambient air quality standard or
25    increment or visibility requirement under Part C of Title I
26    of the Clean Air Act, but only as it would apply to

 

 

SB2213- 12 -LRB100 13060 MJP 27439 b

1    temporary sources permitted pursuant to Section 504(e) of
2    the Clean Air Act.
3    "Applicable requirement" means all applicable Clean Air
4Act requirements and any other standard, limitation, or other
5requirement contained in this Act or regulations promulgated
6under this Act as applicable to sources of air contaminants
7(including requirements that have future effective compliance
8dates).
9    "CAAPP" means the Clean Air Act Permit Program, developed
10pursuant to Title V of the Clean Air Act.
11    "CAAPP application" means an application for a CAAPP
12permit.
13    "CAAPP Permit" or "permit" (unless the context suggests
14otherwise) means any permit issued, renewed, amended, modified
15or revised pursuant to Title V of the Clean Air Act.
16    "CAAPP source" means any source for which the owner or
17operator is required to obtain a CAAPP permit pursuant to
18subsection 2 of this Section.
19    "Clean Air Act" means the Clean Air Act, as now and
20hereafter amended, 42 U.S.C. 7401, et seq.
21    "Designated representative" has the meaning given to it in
22Section 402(26) of the Clean Air Act and the regulations
23promulgated thereunder, which state that the term "designated
24representative" means a responsible person or official
25authorized by the owner or operator of a unit to represent the
26owner or operator in all matters pertaining to the holding,

 

 

SB2213- 13 -LRB100 13060 MJP 27439 b

1transfer, or disposition of allowances allocated to a unit, and
2the submission of and compliance with permits, permit
3applications, and compliance plans for the unit.
4    "Draft CAAPP permit" means the version of a CAAPP permit
5for which public notice and an opportunity for public comment
6and hearing is offered by the Agency.
7    "Effective date of the CAAPP" means the date that USEPA
8approves Illinois' CAAPP.
9    "Emission unit" means any part or activity of a stationary
10source that emits or has the potential to emit any air
11pollutant. This term is not meant to alter or affect the
12definition of the term "unit" for purposes of Title IV of the
13Clean Air Act.
14    "Federally enforceable" means enforceable by USEPA.
15    "Final permit action" means the Agency's granting with
16conditions, refusal to grant, renewal of, or revision of a
17CAAPP permit, the Agency's determination of incompleteness of a
18submitted CAAPP application, or the Agency's failure to act on
19an application for a permit, permit renewal, or permit revision
20within the time specified in subsection 13, subsection 14, or
21paragraph (j) of subsection 5 of this Section.
22    "General permit" means a permit issued to cover numerous
23similar sources in accordance with subsection 11 of this
24Section.
25    "Major source" means a source for which emissions of one or
26more air pollutants meet the criteria for major status pursuant

 

 

SB2213- 14 -LRB100 13060 MJP 27439 b

1to paragraph (c) of subsection 2 of this Section.
2    "Maximum achievable control technology" or "MACT" means
3the maximum degree of reductions in emissions deemed achievable
4under Section 112 of the Clean Air Act.
5    "Owner or operator" means any person who owns, leases,
6operates, controls, or supervises a stationary source.
7    "Permit modification" means a revision to a CAAPP permit
8that cannot be accomplished under the provisions for
9administrative permit amendments under subsection 13 of this
10Section.
11    "Permit revision" means a permit modification or
12administrative permit amendment.
13    "Phase II" means the period of the national acid rain
14program, established under Title IV of the Clean Air Act,
15beginning January 1, 2000, and continuing thereafter.
16    "Phase II acid rain permit" means the portion of a CAAPP
17permit issued, renewed, modified, or revised by the Agency
18during Phase II for an affected source for acid deposition.
19    "Potential to emit" means the maximum capacity of a
20stationary source to emit any air pollutant under its physical
21and operational design. Any physical or operational limitation
22on the capacity of a source to emit an air pollutant, including
23air pollution control equipment and restrictions on hours of
24operation or on the type or amount of material combusted,
25stored, or processed, shall be treated as part of its design if
26the limitation is enforceable by USEPA. This definition does

 

 

SB2213- 15 -LRB100 13060 MJP 27439 b

1not alter or affect the use of this term for any other purposes
2under the Clean Air Act, or the term "capacity factor" as used
3in Title IV of the Clean Air Act or the regulations promulgated
4thereunder.
5    "Preconstruction Permit" or "Construction Permit" means a
6permit which is to be obtained prior to commencing or beginning
7actual construction or modification of a source or emissions
8unit.
9    "Proposed CAAPP permit" means the version of a CAAPP permit
10that the Agency proposes to issue and forwards to USEPA for
11review in compliance with applicable requirements of the Act
12and regulations promulgated thereunder.
13    "Regulated air pollutant" means the following:
14        (1) Nitrogen oxides (NOx) or any volatile organic
15    compound.
16        (2) Any pollutant for which a national ambient air
17    quality standard has been promulgated.
18        (3) Any pollutant that is subject to any standard
19    promulgated under Section 111 of the Clean Air Act.
20        (4) Any Class I or II substance subject to a standard
21    promulgated under or established by Title VI of the Clean
22    Air Act.
23        (5) Any pollutant subject to a standard promulgated
24    under Section 112 or other requirements established under
25    Section 112 of the Clean Air Act, including Sections
26    112(g), (j) and (r).

 

 

SB2213- 16 -LRB100 13060 MJP 27439 b

1            (i) Any pollutant subject to requirements under
2        Section 112(j) of the Clean Air Act. Any pollutant
3        listed under Section 112(b) for which the subject
4        source would be major shall be considered to be
5        regulated 18 months after the date on which USEPA was
6        required to promulgate an applicable standard pursuant
7        to Section 112(e) of the Clean Air Act, if USEPA fails
8        to promulgate such standard.
9            (ii) Any pollutant for which the requirements of
10        Section 112(g)(2) of the Clean Air Act have been met,
11        but only with respect to the individual source subject
12        to Section 112(g)(2) requirement.
13        (6) Greenhouse gases.
14    "Renewal" means the process by which a permit is reissued
15at the end of its term.
16    "Responsible official" means one of the following:
17        (1) For a corporation: a president, secretary,
18    treasurer, or vice-president of the corporation in charge
19    of a principal business function, or any other person who
20    performs similar policy or decision-making functions for
21    the corporation, or a duly authorized representative of
22    such person if the representative is responsible for the
23    overall operation of one or more manufacturing,
24    production, or operating facilities applying for or
25    subject to a permit and either (i) the facilities employ
26    more than 250 persons or have gross annual sales or

 

 

SB2213- 17 -LRB100 13060 MJP 27439 b

1    expenditures exceeding $25 million (in second quarter 1980
2    dollars), or (ii) the delegation of authority to such
3    representative is approved in advance by the Agency.
4        (2) For a partnership or sole proprietorship: a general
5    partner or the proprietor, respectively, or in the case of
6    a partnership in which all of the partners are
7    corporations, a duly authorized representative of the
8    partnership if the representative is responsible for the
9    overall operation of one or more manufacturing,
10    production, or operating facilities applying for or
11    subject to a permit and either (i) the facilities employ
12    more than 250 persons or have gross annual sales or
13    expenditures exceeding $25 million (in second quarter 1980
14    dollars), or (ii) the delegation of authority to such
15    representative is approved in advance by the Agency.
16        (3) For a municipality, State, Federal, or other public
17    agency: either a principal executive officer or ranking
18    elected official. For the purposes of this part, a
19    principal executive officer of a Federal agency includes
20    the chief executive officer having responsibility for the
21    overall operations of a principal geographic unit of the
22    agency (e.g., a Regional Administrator of USEPA).
23        (4) For affected sources for acid deposition:
24            (i) The designated representative shall be the
25        "responsible official" in so far as actions,
26        standards, requirements, or prohibitions under Title

 

 

SB2213- 18 -LRB100 13060 MJP 27439 b

1        IV of the Clean Air Act or the regulations promulgated
2        thereunder are concerned.
3            (ii) The designated representative may also be the
4        "responsible official" for any other purposes with
5        respect to air pollution control.
6    "Section 502(b)(10) changes" means changes that contravene
7express permit terms. "Section 502(b)(10) changes" do not
8include changes that would violate applicable requirements or
9contravene federally enforceable permit terms or conditions
10that are monitoring (including test methods), recordkeeping,
11reporting, or compliance certification requirements.
12    "Solid waste incineration unit" means a distinct operating
13unit of any facility which combusts any solid waste material
14from commercial or industrial establishments or the general
15public (including single and multiple residences, hotels, and
16motels). The term does not include incinerators or other units
17required to have a permit under Section 3005 of the Solid Waste
18Disposal Act. The term also does not include (A) materials
19recovery facilities (including primary or secondary smelters)
20which combust waste for the primary purpose of recovering
21metals, (B) qualifying small power production facilities, as
22defined in Section 3(17)(C) of the Federal Power Act (16 U.S.C.
23769(17)(C)), or qualifying cogeneration facilities, as defined
24in Section 3(18)(B) of the Federal Power Act (16 U.S.C.
25796(18)(B)), which burn homogeneous waste (such as units which
26burn tires or used oil, but not including refuse-derived fuel)

 

 

SB2213- 19 -LRB100 13060 MJP 27439 b

1for the production of electric energy or in the case of
2qualifying cogeneration facilities which burn homogeneous
3waste for the production of electric energy and steam or forms
4of useful energy (such as heat) which are used for industrial,
5commercial, heating or cooling purposes, or (C) air curtain
6incinerators provided that such incinerators only burn wood
7wastes, yard waste and clean lumber and that such air curtain
8incinerators comply with opacity limitations to be established
9by the USEPA by rule.
10    "Source" means any stationary source (or any group of
11stationary sources) that is located on one or more contiguous
12or adjacent properties that are under common control of the
13same person (or persons under common control) and that belongs
14to a single major industrial grouping. For the purposes of
15defining "source," a stationary source or group of stationary
16sources shall be considered part of a single major industrial
17grouping if all of the pollutant emitting activities at such
18source or group of sources located on contiguous or adjacent
19properties and under common control belong to the same Major
20Group (i.e., all have the same two-digit code) as described in
21the Standard Industrial Classification Manual, 1987, or such
22pollutant emitting activities at a stationary source (or group
23of stationary sources) located on contiguous or adjacent
24properties and under common control constitute a support
25facility. The determination as to whether any group of
26stationary sources is located on contiguous or adjacent

 

 

SB2213- 20 -LRB100 13060 MJP 27439 b

1properties, and/or is under common control, and/or whether the
2pollutant emitting activities at such group of stationary
3sources constitute a support facility shall be made on a case
4by case basis.
5    "Stationary source" means any building, structure,
6facility, or installation that emits or may emit any regulated
7air pollutant or any pollutant listed under Section 112(b) of
8the Clean Air Act, except those emissions resulting directly
9from an internal combustion engine for transportation purposes
10or from a nonroad engine or nonroad vehicle as defined in
11Section 216 of the Clean Air Act.
12    "Subject to regulation" has the meaning given to it in 40
13CFR 70.2, as now or hereafter amended.
14    "Support facility" means any stationary source (or group of
15stationary sources) that conveys, stores, or otherwise assists
16to a significant extent in the production of a principal
17product at another stationary source (or group of stationary
18sources). A support facility shall be considered to be part of
19the same source as the stationary source (or group of
20stationary sources) that it supports regardless of the 2-digit
21Standard Industrial Classification code for the support
22facility.
23    "USEPA" means the Administrator of the United States
24Environmental Protection Agency (USEPA) or a person designated
25by the Administrator.
 

 

 

SB2213- 21 -LRB100 13060 MJP 27439 b

1    1.1. Exclusion From the CAAPP.
2        a. An owner or operator of a source which determines
3    that the source could be excluded from the CAAPP may seek
4    such exclusion prior to the date that the CAAPP application
5    for the source is due but in no case later than 9 months
6    after the effective date of the CAAPP through the
7    imposition of federally enforceable conditions limiting
8    the "potential to emit" of the source to a level below the
9    major source threshold for that source as described in
10    paragraph (c) of subsection 2 of this Section, within a
11    State operating permit issued pursuant to subsection (a) of
12    Section 39 of this Act. After such date, an exclusion from
13    the CAAPP may be sought under paragraph (c) of subsection 3
14    of this Section.
15        b. An owner or operator of a source seeking exclusion
16    from the CAAPP pursuant to paragraph (a) of this subsection
17    must submit a permit application consistent with the
18    existing State permit program which specifically requests
19    such exclusion through the imposition of such federally
20    enforceable conditions.
21        c. Upon such request, if the Agency determines that the
22    owner or operator of a source has met the requirements for
23    exclusion pursuant to paragraph (a) of this subsection and
24    other applicable requirements for permit issuance under
25    subsection (a) of Section 39 of this Act, the Agency shall
26    issue a State operating permit for such source under

 

 

SB2213- 22 -LRB100 13060 MJP 27439 b

1    subsection (a) of Section 39 of this Act, as amended, and
2    regulations promulgated thereunder with federally
3    enforceable conditions limiting the "potential to emit" of
4    the source to a level below the major source threshold for
5    that source as described in paragraph (c) of subsection 2
6    of this Section.
7        d. The Agency shall provide an owner or operator of a
8    source which may be excluded from the CAAPP pursuant to
9    this subsection with reasonable notice that the owner or
10    operator may seek such exclusion.
11        e. The Agency shall provide such sources with the
12    necessary permit application forms.
 
13    2. Applicability.
14        a. Sources subject to this Section shall include:
15            i. Any major source as defined in paragraph (c) of
16        this subsection.
17            ii. Any source subject to a standard or other
18        requirements promulgated under Section 111 (New Source
19        Performance Standards) or Section 112 (Hazardous Air
20        Pollutants) of the Clean Air Act, except that a source
21        is not required to obtain a permit solely because it is
22        subject to regulations or requirements under Section
23        112(r) of the Clean Air Act.
24            iii. Any affected source for acid deposition, as
25        defined in subsection 1 of this Section.

 

 

SB2213- 23 -LRB100 13060 MJP 27439 b

1            iv. Any other source subject to this Section under
2        the Clean Air Act or regulations promulgated
3        thereunder, or applicable Board regulations.
4        b. Sources exempted from this Section shall include:
5            i. All sources listed in paragraph (a) of this
6        subsection that are not major sources, affected
7        sources for acid deposition or solid waste
8        incineration units required to obtain a permit
9        pursuant to Section 129(e) of the Clean Air Act, until
10        the source is required to obtain a CAAPP permit
11        pursuant to the Clean Air Act or regulations
12        promulgated thereunder.
13            ii. Nonmajor sources subject to a standard or other
14        requirements subsequently promulgated by USEPA under
15        Section 111 or 112 of the Clean Air Act that are
16        determined by USEPA to be exempt at the time a new
17        standard is promulgated.
18            iii. All sources and source categories that would
19        be required to obtain a permit solely because they are
20        subject to Part 60, Subpart AAA - Standards of
21        Performance for New Residential Wood Heaters (40 CFR
22        Part 60).
23            iv. All sources and source categories that would be
24        required to obtain a permit solely because they are
25        subject to Part 61, Subpart M - National Emission
26        Standard for Hazardous Air Pollutants for Asbestos,

 

 

SB2213- 24 -LRB100 13060 MJP 27439 b

1        Section 61.145 (40 CFR Part 61).
2            v. Any other source categories exempted by USEPA
3        regulations pursuant to Section 502(a) of the Clean Air
4        Act.
5            vi. (Blank). Major sources of greenhouse gas
6        emissions required to obtain a CAAPP permit under this
7        Section if any of the following occurs:
8                (A) enactment of federal legislation depriving
9            the Administrator of the USEPA of authority to
10            regulate greenhouse gases under the Clean Air Act;
11                (B) the issuance of any opinion, ruling,
12            judgment, order, or decree by a federal court
13            depriving the Administrator of the USEPA of
14            authority to regulate greenhouse gases under the
15            Clean Air Act; or
16                (C) action by the President of the United
17            States or the President's authorized agent,
18            including the Administrator of the USEPA, to
19            repeal or withdraw the Greenhouse Gas Tailoring
20            Rule (75 Fed. Reg. 31514, June 3, 2010).
21            If any event listed in this subparagraph (vi)
22        occurs, CAAPP permits issued after such event shall not
23        impose permit terms or conditions addressing
24        greenhouse gases during the effectiveness of any event
25        listed in subparagraph (vi). If any event listed in
26        this subparagraph (vi) occurs, any owner or operator

 

 

SB2213- 25 -LRB100 13060 MJP 27439 b

1        with a CAAPP permit that includes terms or conditions
2        addressing greenhouse gases may elect to submit an
3        application to the Agency to address a revision or
4        repeal of such terms or conditions. If any owner or
5        operator submits such an application, the Agency shall
6        expeditiously process the permit application in
7        accordance with applicable laws and regulations.
8        Nothing in this subparagraph (vi) shall relieve an
9        owner or operator of a source from the requirement to
10        obtain a CAAPP permit for its emissions of regulated
11        air pollutants other than greenhouse gases, as
12        required by this Section.
13        c. For purposes of this Section the term "major source"
14    means any source that is:
15            i. A major source under Section 112 of the Clean
16        Air Act, which is defined as:
17                A. For pollutants other than radionuclides,
18            any stationary source or group of stationary
19            sources located within a contiguous area and under
20            common control that emits or has the potential to
21            emit, in the aggregate, 10 tons per year (tpy) or
22            more of any hazardous air pollutant which has been
23            listed pursuant to Section 112(b) of the Clean Air
24            Act, 25 tpy or more of any combination of such
25            hazardous air pollutants, or such lesser quantity
26            as USEPA may establish by rule. Notwithstanding

 

 

SB2213- 26 -LRB100 13060 MJP 27439 b

1            the preceding sentence, emissions from any oil or
2            gas exploration or production well (with its
3            associated equipment) and emissions from any
4            pipeline compressor or pump station shall not be
5            aggregated with emissions from other similar
6            units, whether or not such units are in a
7            contiguous area or under common control, to
8            determine whether such stations are major sources.
9                B. For radionuclides, "major source" shall
10            have the meaning specified by the USEPA by rule.
11            ii. A major stationary source of air pollutants, as
12        defined in Section 302 of the Clean Air Act, that
13        directly emits or has the potential to emit, 100 tpy or
14        more of any air pollutant subject to regulation
15        (including any major source of fugitive emissions of
16        any such pollutant, as determined by rule by USEPA).
17        For purposes of this subsection, "fugitive emissions"
18        means those emissions which could not reasonably pass
19        through a stack, chimney, vent, or other
20        functionally-equivalent opening. The fugitive
21        emissions of a stationary source shall not be
22        considered in determining whether it is a major
23        stationary source for the purposes of Section 302(j) of
24        the Clean Air Act, unless the source belongs to one of
25        the following categories of stationary source:
26                A. Coal cleaning plants (with thermal dryers).

 

 

SB2213- 27 -LRB100 13060 MJP 27439 b

1                B. Kraft pulp mills.
2                C. Portland cement plants.
3                D. Primary zinc smelters.
4                E. Iron and steel mills.
5                F. Primary aluminum ore reduction plants.
6                G. Primary copper smelters.
7                H. Municipal incinerators capable of charging
8            more than 250 tons of refuse per day.
9                I. Hydrofluoric, sulfuric, or nitric acid
10            plants.
11                J. Petroleum refineries.
12                K. Lime plants.
13                L. Phosphate rock processing plants.
14                M. Coke oven batteries.
15                N. Sulfur recovery plants.
16                O. Carbon black plants (furnace process).
17                P. Primary lead smelters.
18                Q. Fuel conversion plants.
19                R. Sintering plants.
20                S. Secondary metal production plants.
21                T. Chemical process plants.
22                U. Fossil-fuel boilers (or combination
23            thereof) totaling more than 250 million British
24            thermal units per hour heat input.
25                V. Petroleum storage and transfer units with a
26            total storage capacity exceeding 300,000 barrels.

 

 

SB2213- 28 -LRB100 13060 MJP 27439 b

1                W. Taconite ore processing plants.
2                X. Glass fiber processing plants.
3                Y. Charcoal production plants.
4                Z. Fossil fuel-fired steam electric plants of
5            more than 250 million British thermal units per
6            hour heat input.
7                AA. All other stationary source categories,
8            which as of August 7, 1980 are being regulated by a
9            standard promulgated under Section 111 or 112 of
10            the Clean Air Act.
11                BB. Any other stationary source category
12            designated by USEPA by rule.
13            iii. A major stationary source as defined in part D
14        of Title I of the Clean Air Act including:
15                A. For ozone nonattainment areas, sources with
16            the potential to emit 100 tons or more per year of
17            volatile organic compounds or oxides of nitrogen
18            in areas classified as "marginal" or "moderate",
19            50 tons or more per year in areas classified as
20            "serious", 25 tons or more per year in areas
21            classified as "severe", and 10 tons or more per
22            year in areas classified as "extreme"; except that
23            the references in this clause to 100, 50, 25, and
24            10 tons per year of nitrogen oxides shall not apply
25            with respect to any source for which USEPA has made
26            a finding, under Section 182(f)(1) or (2) of the

 

 

SB2213- 29 -LRB100 13060 MJP 27439 b

1            Clean Air Act, that requirements otherwise
2            applicable to such source under Section 182(f) of
3            the Clean Air Act do not apply. Such sources shall
4            remain subject to the major source criteria of
5            subparagraph (ii) of paragraph (c) of this
6            subsection.
7                B. For ozone transport regions established
8            pursuant to Section 184 of the Clean Air Act,
9            sources with the potential to emit 50 tons or more
10            per year of volatile organic compounds (VOCs).
11                C. For carbon monoxide nonattainment areas (1)
12            that are classified as "serious", and (2) in which
13            stationary sources contribute significantly to
14            carbon monoxide levels as determined under rules
15            issued by USEPA, sources with the potential to emit
16            50 tons or more per year of carbon monoxide.
17                D. For particulate matter (PM-10)
18            nonattainment areas classified as "serious",
19            sources with the potential to emit 70 tons or more
20            per year of PM-10.
 
21    3. Agency Authority To Issue CAAPP Permits and Federally
22Enforceable State Operating Permits.
23        a. The Agency shall issue CAAPP permits under this
24    Section consistent with the Clean Air Act and regulations
25    promulgated thereunder and this Act and regulations

 

 

SB2213- 30 -LRB100 13060 MJP 27439 b

1    promulgated thereunder.
2        b. The Agency shall issue CAAPP permits for fixed terms
3    of 5 years, except CAAPP permits issued for solid waste
4    incineration units combusting municipal waste which shall
5    be issued for fixed terms of 12 years and except CAAPP
6    permits for affected sources for acid deposition which
7    shall be issued for initial terms to expire on December 31,
8    1999, and for fixed terms of 5 years thereafter.
9        c. The Agency shall have the authority to issue a State
10    operating permit for a source under subsection (a) of
11    Section 39 of this Act, as amended, and regulations
12    promulgated thereunder, which includes federally
13    enforceable conditions limiting the "potential to emit" of
14    the source to a level below the major source threshold for
15    that source as described in paragraph (c) of subsection 2
16    of this Section, thereby excluding the source from the
17    CAAPP, when requested by the applicant pursuant to
18    paragraph (u) of subsection 5 of this Section. The public
19    notice requirements of this Section applicable to CAAPP
20    permits shall also apply to the initial issuance of permits
21    under this paragraph.
22        d. For purposes of this Act, a permit issued by USEPA
23    under Section 505 of the Clean Air Act, as now and
24    hereafter amended, shall be deemed to be a permit issued by
25    the Agency pursuant to Section 39.5 of this Act.
 

 

 

SB2213- 31 -LRB100 13060 MJP 27439 b

1    4. Transition.
2        a. An owner or operator of a CAAPP source shall not be
3    required to renew an existing State operating permit for
4    any emission unit at such CAAPP source once a CAAPP
5    application timely submitted prior to expiration of the
6    State operating permit has been deemed complete. For
7    purposes other than permit renewal, the obligation upon the
8    owner or operator of a CAAPP source to obtain a State
9    operating permit is not removed upon submittal of the
10    complete CAAPP permit application. An owner or operator of
11    a CAAPP source seeking to make a modification to a source
12    prior to the issuance of its CAAPP permit shall be required
13    to obtain a construction permit, operating permit, or both
14    as required for such modification in accordance with the
15    State permit program under subsection (a) of Section 39 of
16    this Act, as amended, and regulations promulgated
17    thereunder. The application for such construction permit,
18    operating permit, or both shall be considered an amendment
19    to the CAAPP application submitted for such source.
20        b. An owner or operator of a CAAPP source shall
21    continue to operate in accordance with the terms and
22    conditions of its applicable State operating permit
23    notwithstanding the expiration of the State operating
24    permit until the source's CAAPP permit has been issued.
25        c. An owner or operator of a CAAPP source shall submit
26    its initial CAAPP application to the Agency no later than

 

 

SB2213- 32 -LRB100 13060 MJP 27439 b

1    12 months after the effective date of the CAAPP. The Agency
2    may request submittal of initial CAAPP applications during
3    this 12-month period according to a schedule set forth
4    within Agency procedures, however, in no event shall the
5    Agency require such submittal earlier than 3 months after
6    such effective date of the CAAPP. An owner or operator may
7    voluntarily submit its initial CAAPP application prior to
8    the date required within this paragraph or applicable
9    procedures, if any, subsequent to the date the Agency
10    submits the CAAPP to USEPA for approval.
11        d. The Agency shall act on initial CAAPP applications
12    in accordance with paragraph (j) of subsection 5 of this
13    Section.
14        e. For purposes of this Section, the term "initial
15    CAAPP application" shall mean the first CAAPP application
16    submitted for a source existing as of the effective date of
17    the CAAPP.
18        f. The Agency shall provide owners or operators of
19    CAAPP sources with at least 3 months advance notice of the
20    date on which their applications are required to be
21    submitted. In determining which sources shall be subject to
22    early submittal, the Agency shall include among its
23    considerations the complexity of the permit application,
24    and the burden that such early submittal will have on the
25    source.
26        g. The CAAPP permit shall upon becoming effective

 

 

SB2213- 33 -LRB100 13060 MJP 27439 b

1    supersede the State operating permit.
2        h. The Agency shall have the authority to adopt
3    procedural rules, in accordance with the Illinois
4    Administrative Procedure Act, as the Agency deems
5    necessary, to implement this subsection.
 
6    5. Applications and Completeness.
7        a. An owner or operator of a CAAPP source shall submit
8    its complete CAAPP application consistent with the Act and
9    applicable regulations.
10        b. An owner or operator of a CAAPP source shall submit
11    a single complete CAAPP application covering all emission
12    units at that source.
13        c. To be deemed complete, a CAAPP application must
14    provide all information, as requested in Agency
15    application forms, sufficient to evaluate the subject
16    source and its application and to determine all applicable
17    requirements, pursuant to the Clean Air Act, and
18    regulations thereunder, this Act and regulations
19    thereunder. Such Agency application forms shall be
20    finalized and made available prior to the date on which any
21    CAAPP application is required.
22        d. An owner or operator of a CAAPP source shall submit,
23    as part of its complete CAAPP application, a compliance
24    plan, including a schedule of compliance, describing how
25    each emission unit will comply with all applicable

 

 

SB2213- 34 -LRB100 13060 MJP 27439 b

1    requirements. Any such schedule of compliance shall be
2    supplemental to, and shall not sanction noncompliance
3    with, the applicable requirements on which it is based.
4        e. Each submitted CAAPP application shall be certified
5    for truth, accuracy, and completeness by a responsible
6    official in accordance with applicable regulations.
7        f. The Agency shall provide notice to a CAAPP applicant
8    as to whether a submitted CAAPP application is complete.
9    Unless the Agency notifies the applicant of
10    incompleteness, within 60 days after receipt of the CAAPP
11    application, the application shall be deemed complete. The
12    Agency may request additional information as needed to make
13    the completeness determination. The Agency may to the
14    extent practicable provide the applicant with a reasonable
15    opportunity to correct deficiencies prior to a final
16    determination of completeness.
17        g. If after the determination of completeness the
18    Agency finds that additional information is necessary to
19    evaluate or take final action on the CAAPP application, the
20    Agency may request in writing such information from the
21    source with a reasonable deadline for response.
22        h. If the owner or operator of a CAAPP source submits a
23    timely and complete CAAPP application, the source's
24    failure to have a CAAPP permit shall not be a violation of
25    this Section until the Agency takes final action on the
26    submitted CAAPP application, provided, however, where the

 

 

SB2213- 35 -LRB100 13060 MJP 27439 b

1    applicant fails to submit the requested information under
2    paragraph (g) of this subsection 5 within the time frame
3    specified by the Agency, this protection shall cease to
4    apply.
5        i. Any applicant who fails to submit any relevant facts
6    necessary to evaluate the subject source and its CAAPP
7    application or who has submitted incorrect information in a
8    CAAPP application shall, upon becoming aware of such
9    failure or incorrect submittal, submit supplementary facts
10    or correct information to the Agency. In addition, an
11    applicant shall provide to the Agency additional
12    information as necessary to address any requirements which
13    become applicable to the source subsequent to the date the
14    applicant submitted its complete CAAPP application but
15    prior to release of the draft CAAPP permit.
16        j. The Agency shall issue or deny the CAAPP permit
17    within 18 months after the date of receipt of the complete
18    CAAPP application, with the following exceptions: (i)
19    permits for affected sources for acid deposition shall be
20    issued or denied within 6 months after receipt of a
21    complete application in accordance with subsection 17 of
22    this Section; (ii) the Agency shall act on initial CAAPP
23    applications within 24 months after the date of receipt of
24    the complete CAAPP application; (iii) the Agency shall act
25    on complete applications containing early reduction
26    demonstrations under Section 112(i)(5) of the Clean Air Act

 

 

SB2213- 36 -LRB100 13060 MJP 27439 b

1    within 9 months of receipt of the complete CAAPP
2    application.
3        Where the Agency does not take final action on the
4    permit within the required time period, the permit shall
5    not be deemed issued; rather, the failure to act shall be
6    treated as a final permit action for purposes of judicial
7    review pursuant to Sections 40.2 and 41 of this Act.
8        k. The submittal of a complete CAAPP application shall
9    not affect the requirement that any source have a
10    preconstruction permit under Title I of the Clean Air Act.
11        l. Unless a timely and complete renewal application has
12    been submitted consistent with this subsection, a CAAPP
13    source operating upon the expiration of its CAAPP permit
14    shall be deemed to be operating without a CAAPP permit.
15    Such operation is prohibited under this Act.
16        m. Permits being renewed shall be subject to the same
17    procedural requirements, including those for public
18    participation and federal review and objection, that apply
19    to original permit issuance.
20        n. For purposes of permit renewal, a timely application
21    is one that is submitted no less than 9 months prior to the
22    date of permit expiration.
23        o. The terms and conditions of a CAAPP permit shall
24    remain in effect until the issuance of a CAAPP renewal
25    permit provided a timely and complete CAAPP application has
26    been submitted.

 

 

SB2213- 37 -LRB100 13060 MJP 27439 b

1        p. The owner or operator of a CAAPP source seeking a
2    permit shield pursuant to paragraph (j) of subsection 7 of
3    this Section shall request such permit shield in the CAAPP
4    application regarding that source.
5        q. The Agency shall make available to the public all
6    documents submitted by the applicant to the Agency,
7    including each CAAPP application, compliance plan
8    (including the schedule of compliance), and emissions or
9    compliance monitoring report, with the exception of
10    information entitled to confidential treatment pursuant to
11    Section 7 of this Act.
12        r. The Agency shall use the standardized forms required
13    under Title IV of the Clean Air Act and regulations
14    promulgated thereunder for affected sources for acid
15    deposition.
16        s. An owner or operator of a CAAPP source may include
17    within its CAAPP application a request for permission to
18    operate during a startup, malfunction, or breakdown
19    consistent with applicable Board regulations.
20        t. An owner or operator of a CAAPP source, in order to
21    utilize the operational flexibility provided under
22    paragraph (l) of subsection 7 of this Section, must request
23    such use and provide the necessary information within its
24    CAAPP application.
25        u. An owner or operator of a CAAPP source which seeks
26    exclusion from the CAAPP through the imposition of

 

 

SB2213- 38 -LRB100 13060 MJP 27439 b

1    federally enforceable conditions, pursuant to paragraph
2    (c) of subsection 3 of this Section, must request such
3    exclusion within a CAAPP application submitted consistent
4    with this subsection on or after the date that the CAAPP
5    application for the source is due. Prior to such date, but
6    in no case later than 9 months after the effective date of
7    the CAAPP, such owner or operator may request the
8    imposition of federally enforceable conditions pursuant to
9    paragraph (b) of subsection 1.1 of this Section.
10        v. CAAPP applications shall contain accurate
11    information on allowable emissions to implement the fee
12    provisions of subsection 18 of this Section.
13        w. An owner or operator of a CAAPP source shall submit
14    within its CAAPP application emissions information
15    regarding all regulated air pollutants emitted at that
16    source consistent with applicable Agency procedures.
17    Emissions information regarding insignificant activities
18    or emission levels, as determined by the Agency pursuant to
19    Board regulations, may be submitted as a list within the
20    CAAPP application. The Agency shall propose regulations to
21    the Board defining insignificant activities or emission
22    levels, consistent with federal regulations, if any, no
23    later than 18 months after the effective date of this
24    amendatory Act of 1992, consistent with Section 112(n)(1)
25    of the Clean Air Act. The Board shall adopt final
26    regulations defining insignificant activities or emission

 

 

SB2213- 39 -LRB100 13060 MJP 27439 b

1    levels no later than 9 months after the date of the
2    Agency's proposal.
3        x. The owner or operator of a new CAAPP source shall
4    submit its complete CAAPP application consistent with this
5    subsection within 12 months after commencing operation of
6    such source. The owner or operator of an existing source
7    that has been excluded from the provisions of this Section
8    under subsection 1.1 or paragraph (c) of subsection 3 of
9    this Section and that becomes subject to the CAAPP solely
10    due to a change in operation at the source shall submit its
11    complete CAAPP application consistent with this subsection
12    at least 180 days before commencing operation in accordance
13    with the change in operation.
14        y. The Agency shall have the authority to adopt
15    procedural rules, in accordance with the Illinois
16    Administrative Procedure Act, as the Agency deems
17    necessary to implement this subsection.
 
18    6. Prohibitions.
19        a. It shall be unlawful for any person to violate any
20    terms or conditions of a permit issued under this Section,
21    to operate any CAAPP source except in compliance with a
22    permit issued by the Agency under this Section or to
23    violate any other applicable requirements. All terms and
24    conditions of a permit issued under this Section are
25    enforceable by USEPA and citizens under the Clean Air Act,

 

 

SB2213- 40 -LRB100 13060 MJP 27439 b

1    except those, if any, that are specifically designated as
2    not being federally enforceable in the permit pursuant to
3    paragraph (m) of subsection 7 of this Section.
4        b. After the applicable CAAPP permit or renewal
5    application submittal date, as specified in subsection 5 of
6    this Section, no person shall operate a CAAPP source
7    without a CAAPP permit unless the complete CAAPP permit or
8    renewal application for such source has been timely
9    submitted to the Agency.
10        c. No owner or operator of a CAAPP source shall cause
11    or threaten or allow the continued operation of an emission
12    source during malfunction or breakdown of the emission
13    source or related air pollution control equipment if such
14    operation would cause a violation of the standards or
15    limitations applicable to the source, unless the CAAPP
16    permit granted to the source provides for such operation
17    consistent with this Act and applicable Board regulations.
 
18    7. Permit Content.
19        a. All CAAPP permits shall contain emission
20    limitations and standards and other enforceable terms and
21    conditions, including but not limited to operational
22    requirements, and schedules for achieving compliance at
23    the earliest reasonable date, which are or will be required
24    to accomplish the purposes and provisions of this Act and
25    to assure compliance with all applicable requirements.

 

 

SB2213- 41 -LRB100 13060 MJP 27439 b

1        b. The Agency shall include among such conditions
2    applicable monitoring, reporting, record keeping and
3    compliance certification requirements, as authorized by
4    paragraphs (d), (e), and (f) of this subsection, that the
5    Agency deems necessary to assure compliance with the Clean
6    Air Act, the regulations promulgated thereunder, this Act,
7    and applicable Board regulations. When monitoring,
8    reporting, record keeping, and compliance certification
9    requirements are specified within the Clean Air Act,
10    regulations promulgated thereunder, this Act, or
11    applicable regulations, such requirements shall be
12    included within the CAAPP permit. The Board shall have
13    authority to promulgate additional regulations where
14    necessary to accomplish the purposes of the Clean Air Act,
15    this Act, and regulations promulgated thereunder.
16        c. The Agency shall assure, within such conditions, the
17    use of terms, test methods, units, averaging periods, and
18    other statistical conventions consistent with the
19    applicable emission limitations, standards, and other
20    requirements contained in the permit.
21        d. To meet the requirements of this subsection with
22    respect to monitoring, the permit shall:
23            i. Incorporate and identify all applicable
24        emissions monitoring and analysis procedures or test
25        methods required under the Clean Air Act, regulations
26        promulgated thereunder, this Act, and applicable Board

 

 

SB2213- 42 -LRB100 13060 MJP 27439 b

1        regulations, including any procedures and methods
2        promulgated by USEPA pursuant to Section 504(b) or
3        Section 114 (a)(3) of the Clean Air Act.
4            ii. Where the applicable requirement does not
5        require periodic testing or instrumental or
6        noninstrumental monitoring (which may consist of
7        recordkeeping designed to serve as monitoring),
8        require periodic monitoring sufficient to yield
9        reliable data from the relevant time period that is
10        representative of the source's compliance with the
11        permit, as reported pursuant to paragraph (f) of this
12        subsection. The Agency may determine that
13        recordkeeping requirements are sufficient to meet the
14        requirements of this subparagraph.
15            iii. As necessary, specify requirements concerning
16        the use, maintenance, and when appropriate,
17        installation of monitoring equipment or methods.
18        e. To meet the requirements of this subsection with
19    respect to record keeping, the permit shall incorporate and
20    identify all applicable recordkeeping requirements and
21    require, where applicable, the following:
22            i. Records of required monitoring information that
23        include the following:
24                A. The date, place and time of sampling or
25            measurements.
26                B. The date(s) analyses were performed.

 

 

SB2213- 43 -LRB100 13060 MJP 27439 b

1                C. The company or entity that performed the
2            analyses.
3                D. The analytical techniques or methods used.
4                E. The results of such analyses.
5                F. The operating conditions as existing at the
6            time of sampling or measurement.
7            ii. Retention of records of all monitoring data and
8        support information for a period of at least 5 years
9        from the date of the monitoring sample, measurement,
10        report, or application. Support information includes
11        all calibration and maintenance records, original
12        strip-chart recordings for continuous monitoring
13        instrumentation, and copies of all reports required by
14        the permit.
15        f. To meet the requirements of this subsection with
16    respect to reporting, the permit shall incorporate and
17    identify all applicable reporting requirements and require
18    the following:
19            i. Submittal of reports of any required monitoring
20        every 6 months. More frequent submittals may be
21        requested by the Agency if such submittals are
22        necessary to assure compliance with this Act or
23        regulations promulgated by the Board thereunder. All
24        instances of deviations from permit requirements must
25        be clearly identified in such reports. All required
26        reports must be certified by a responsible official

 

 

SB2213- 44 -LRB100 13060 MJP 27439 b

1        consistent with subsection 5 of this Section.
2            ii. Prompt reporting of deviations from permit
3        requirements, including those attributable to upset
4        conditions as defined in the permit, the probable cause
5        of such deviations, and any corrective actions or
6        preventive measures taken.
7        g. Each CAAPP permit issued under subsection 10 of this
8    Section shall include a condition prohibiting emissions
9    exceeding any allowances that the source lawfully holds
10    under Title IV of the Clean Air Act or the regulations
11    promulgated thereunder, consistent with subsection 17 of
12    this Section and applicable regulations, if any.
13        h. All CAAPP permits shall state that, where another
14    applicable requirement of the Clean Air Act is more
15    stringent than any applicable requirement of regulations
16    promulgated under Title IV of the Clean Air Act, both
17    provisions shall be incorporated into the permit and shall
18    be State and federally enforceable.
19        i. Each CAAPP permit issued under subsection 10 of this
20    Section shall include a severability clause to ensure the
21    continued validity of the various permit requirements in
22    the event of a challenge to any portions of the permit.
23        j. The following shall apply with respect to owners or
24    operators requesting a permit shield:
25            i. The Agency shall include in a CAAPP permit, when
26        requested by an applicant pursuant to paragraph (p) of

 

 

SB2213- 45 -LRB100 13060 MJP 27439 b

1        subsection 5 of this Section, a provision stating that
2        compliance with the conditions of the permit shall be
3        deemed compliance with applicable requirements which
4        are applicable as of the date of release of the
5        proposed permit, provided that:
6                A. The applicable requirement is specifically
7            identified within the permit; or
8                B. The Agency in acting on the CAAPP
9            application or revision determines in writing that
10            other requirements specifically identified are not
11            applicable to the source, and the permit includes
12            that determination or a concise summary thereof.
13            ii. The permit shall identify the requirements for
14        which the source is shielded. The shield shall not
15        extend to applicable requirements which are
16        promulgated after the date of release of the proposed
17        permit unless the permit has been modified to reflect
18        such new requirements.
19            iii. A CAAPP permit which does not expressly
20        indicate the existence of a permit shield shall not
21        provide such a shield.
22            iv. Nothing in this paragraph or in a CAAPP permit
23        shall alter or affect the following:
24                A. The provisions of Section 303 (emergency
25            powers) of the Clean Air Act, including USEPA's
26            authority under that section.

 

 

SB2213- 46 -LRB100 13060 MJP 27439 b

1                B. The liability of an owner or operator of a
2            source for any violation of applicable
3            requirements prior to or at the time of permit
4            issuance.
5                C. The applicable requirements of the acid
6            rain program consistent with Section 408(a) of the
7            Clean Air Act.
8                D. The ability of USEPA to obtain information
9            from a source pursuant to Section 114
10            (inspections, monitoring, and entry) of the Clean
11            Air Act.
12        k. Each CAAPP permit shall include an emergency
13    provision providing an affirmative defense of emergency to
14    an action brought for noncompliance with technology-based
15    emission limitations under a CAAPP permit if the following
16    conditions are met through properly signed,
17    contemporaneous operating logs, or other relevant
18    evidence:
19            i. An emergency occurred and the permittee can
20        identify the cause(s) of the emergency.
21            ii. The permitted facility was at the time being
22        properly operated.
23            iii. The permittee submitted notice of the
24        emergency to the Agency within 2 working days after the
25        time when emission limitations were exceeded due to the
26        emergency. This notice must contain a detailed

 

 

SB2213- 47 -LRB100 13060 MJP 27439 b

1        description of the emergency, any steps taken to
2        mitigate emissions, and corrective actions taken.
3            iv. During the period of the emergency the
4        permittee took all reasonable steps to minimize levels
5        of emissions that exceeded the emission limitations,
6        standards, or requirements in the permit.
7        For purposes of this subsection, "emergency" means any
8    situation arising from sudden and reasonably unforeseeable
9    events beyond the control of the source, such as an act of
10    God, that requires immediate corrective action to restore
11    normal operation, and that causes the source to exceed a
12    technology-based emission limitation under the permit, due
13    to unavoidable increases in emissions attributable to the
14    emergency. An emergency shall not include noncompliance to
15    the extent caused by improperly designed equipment, lack of
16    preventative maintenance, careless or improper operation,
17    or operation error.
18        In any enforcement proceeding, the permittee seeking
19    to establish the occurrence of an emergency has the burden
20    of proof. This provision is in addition to any emergency or
21    upset provision contained in any applicable requirement.
22    This provision does not relieve a permittee of any
23    reporting obligations under existing federal or state laws
24    or regulations.
25        l. The Agency shall include in each permit issued under
26    subsection 10 of this Section:

 

 

SB2213- 48 -LRB100 13060 MJP 27439 b

1            i. Terms and conditions for reasonably anticipated
2        operating scenarios identified by the source in its
3        application. The permit terms and conditions for each
4        such operating scenario shall meet all applicable
5        requirements and the requirements of this Section.
6                A. Under this subparagraph, the source must
7            record in a log at the permitted facility a record
8            of the scenario under which it is operating
9            contemporaneously with making a change from one
10            operating scenario to another.
11                B. The permit shield described in paragraph
12            (j) of subsection 7 of this Section shall extend to
13            all terms and conditions under each such operating
14            scenario.
15            ii. Where requested by an applicant, all terms and
16        conditions allowing for trading of emissions increases
17        and decreases between different emission units at the
18        CAAPP source, to the extent that the applicable
19        requirements provide for trading of such emissions
20        increases and decreases without a case-by-case
21        approval of each emissions trade. Such terms and
22        conditions:
23                A. Shall include all terms required under this
24            subsection to determine compliance;
25                B. Must meet all applicable requirements;
26                C. Shall extend the permit shield described in

 

 

SB2213- 49 -LRB100 13060 MJP 27439 b

1            paragraph (j) of subsection 7 of this Section to
2            all terms and conditions that allow such increases
3            and decreases in emissions.
4        m. The Agency shall specifically designate as not being
5    federally enforceable under the Clean Air Act any terms and
6    conditions included in the permit that are not specifically
7    required under the Clean Air Act or federal regulations
8    promulgated thereunder. Terms or conditions so designated
9    shall be subject to all applicable state requirements,
10    except the requirements of subsection 7 (other than this
11    paragraph, paragraph q of subsection 7, subsections 8
12    through 11, and subsections 13 through 16 of this Section.
13    The Agency shall, however, include such terms and
14    conditions in the CAAPP permit issued to the source.
15        n. Each CAAPP permit issued under subsection 10 of this
16    Section shall specify and reference the origin of and
17    authority for each term or condition, and identify any
18    difference in form as compared to the applicable
19    requirement upon which the term or condition is based.
20        o. Each CAAPP permit issued under subsection 10 of this
21    Section shall include provisions stating the following:
22            i. Duty to comply. The permittee must comply with
23        all terms and conditions of the CAAPP permit. Any
24        permit noncompliance constitutes a violation of the
25        Clean Air Act and the Act, and is grounds for any or
26        all of the following: enforcement action; permit

 

 

SB2213- 50 -LRB100 13060 MJP 27439 b

1        termination, revocation and reissuance, or
2        modification; or denial of a permit renewal
3        application.
4            ii. Need to halt or reduce activity not a defense.
5        It shall not be a defense for a permittee in an
6        enforcement action that it would have been necessary to
7        halt or reduce the permitted activity in order to
8        maintain compliance with the conditions of this
9        permit.
10            iii. Permit actions. The permit may be modified,
11        revoked, reopened, and reissued, or terminated for
12        cause in accordance with the applicable subsections of
13        Section 39.5 of this Act. The filing of a request by
14        the permittee for a permit modification, revocation
15        and reissuance, or termination, or of a notification of
16        planned changes or anticipated noncompliance does not
17        stay any permit condition.
18            iv. Property rights. The permit does not convey any
19        property rights of any sort, or any exclusive
20        privilege.
21            v. Duty to provide information. The permittee
22        shall furnish to the Agency within a reasonable time
23        specified by the Agency any information that the Agency
24        may request in writing to determine whether cause
25        exists for modifying, revoking and reissuing, or
26        terminating the permit or to determine compliance with

 

 

SB2213- 51 -LRB100 13060 MJP 27439 b

1        the permit. Upon request, the permittee shall also
2        furnish to the Agency copies of records required to be
3        kept by the permit or, for information claimed to be
4        confidential, the permittee may furnish such records
5        directly to USEPA along with a claim of
6        confidentiality.
7            vi. Duty to pay fees. The permittee must pay fees
8        to the Agency consistent with the fee schedule approved
9        pursuant to subsection 18 of this Section, and submit
10        any information relevant thereto.
11            vii. Emissions trading. No permit revision shall
12        be required for increases in emissions allowed under
13        any approved economic incentives, marketable permits,
14        emissions trading, and other similar programs or
15        processes for changes that are provided for in the
16        permit and that are authorized by the applicable
17        requirement.
18        p. Each CAAPP permit issued under subsection 10 of this
19    Section shall contain the following elements with respect
20    to compliance:
21            i. Compliance certification, testing, monitoring,
22        reporting, and record keeping requirements sufficient
23        to assure compliance with the terms and conditions of
24        the permit. Any document (including reports) required
25        by a CAAPP permit shall contain a certification by a
26        responsible official that meets the requirements of

 

 

SB2213- 52 -LRB100 13060 MJP 27439 b

1        subsection 5 of this Section and applicable
2        regulations.
3            ii. Inspection and entry requirements that
4        necessitate that, upon presentation of credentials and
5        other documents as may be required by law and in
6        accordance with constitutional limitations, the
7        permittee shall allow the Agency, or an authorized
8        representative to perform the following:
9                A. Enter upon the permittee's premises where a
10            CAAPP source is located or emissions-related
11            activity is conducted, or where records must be
12            kept under the conditions of the permit.
13                B. Have access to and copy, at reasonable
14            times, any records that must be kept under the
15            conditions of the permit.
16                C. Inspect at reasonable times any facilities,
17            equipment (including monitoring and air pollution
18            control equipment), practices, or operations
19            regulated or required under the permit.
20                D. Sample or monitor any substances or
21            parameters at any location:
22                    1. As authorized by the Clean Air Act, at
23                reasonable times, for the purposes of assuring
24                compliance with the CAAPP permit or applicable
25                requirements; or
26                    2. As otherwise authorized by this Act.

 

 

SB2213- 53 -LRB100 13060 MJP 27439 b

1            iii. A schedule of compliance consistent with
2        subsection 5 of this Section and applicable
3        regulations.
4            iv. Progress reports consistent with an applicable
5        schedule of compliance pursuant to paragraph (d) of
6        subsection 5 of this Section and applicable
7        regulations to be submitted semiannually, or more
8        frequently if the Agency determines that such more
9        frequent submittals are necessary for compliance with
10        the Act or regulations promulgated by the Board
11        thereunder. Such progress reports shall contain the
12        following:
13                A. Required dates for achieving the
14            activities, milestones, or compliance required by
15            the schedule of compliance and dates when such
16            activities, milestones or compliance were
17            achieved.
18                B. An explanation of why any dates in the
19            schedule of compliance were not or will not be met,
20            and any preventive or corrective measures adopted.
21            v. Requirements for compliance certification with
22        terms and conditions contained in the permit,
23        including emission limitations, standards, or work
24        practices. Permits shall include each of the
25        following:
26                A. The frequency (annually or more frequently

 

 

SB2213- 54 -LRB100 13060 MJP 27439 b

1            as specified in any applicable requirement or by
2            the Agency pursuant to written procedures) of
3            submissions of compliance certifications.
4                B. A means for assessing or monitoring the
5            compliance of the source with its emissions
6            limitations, standards, and work practices.
7                C. A requirement that the compliance
8            certification include the following:
9                    1. The identification of each term or
10                condition contained in the permit that is the
11                basis of the certification.
12                    2. The compliance status.
13                    3. Whether compliance was continuous or
14                intermittent.
15                    4. The method(s) used for determining the
16                compliance status of the source, both
17                currently and over the reporting period
18                consistent with subsection 7 of this Section.
19                D. A requirement that all compliance
20            certifications be submitted to USEPA as well as to
21            the Agency.
22                E. Additional requirements as may be specified
23            pursuant to Sections 114(a)(3) and 504(b) of the
24            Clean Air Act.
25                F. Other provisions as the Agency may require.
26        q. If the owner or operator of CAAPP source can

 

 

SB2213- 55 -LRB100 13060 MJP 27439 b

1    demonstrate in its CAAPP application, including an
2    application for a significant modification, that an
3    alternative emission limit would be equivalent to that
4    contained in the applicable Board regulations, the Agency
5    shall include the alternative emission limit in the CAAPP
6    permit, which shall supersede the emission limit set forth
7    in the applicable Board regulations, and shall include
8    conditions that insure that the resulting emission limit is
9    quantifiable, accountable, enforceable, and based on
10    replicable procedures.
11    8. Public Notice; Affected State Review.
12        a. The Agency shall provide notice to the public,
13    including an opportunity for public comment and a hearing,
14    on each draft CAAPP permit for issuance, renewal or
15    significant modification, subject to Section 7.1 and
16    subsection (a) of Section 7 of this Act.
17        b. The Agency shall prepare a draft CAAPP permit and a
18    statement that sets forth the legal and factual basis for
19    the draft CAAPP permit conditions, including references to
20    the applicable statutory or regulatory provisions. The
21    Agency shall provide this statement to any person who
22    requests it.
23        c. The Agency shall give notice of each draft CAAPP
24    permit to the applicant and to any affected State on or
25    before the time that the Agency has provided notice to the
26    public, except as otherwise provided in this Act.

 

 

SB2213- 56 -LRB100 13060 MJP 27439 b

1        d. The Agency, as part of its submittal of a proposed
2    permit to USEPA (or as soon as possible after the submittal
3    for minor permit modification procedures allowed under
4    subsection 14 of this Section), shall notify USEPA and any
5    affected State in writing of any refusal of the Agency to
6    accept all of the recommendations for the proposed permit
7    that an affected State submitted during the public or
8    affected State review period. The notice shall include the
9    Agency's reasons for not accepting the recommendations.
10    The Agency is not required to accept recommendations that
11    are not based on applicable requirements or the
12    requirements of this Section.
13        e. The Agency shall make available to the public any
14    CAAPP permit application, compliance plan (including the
15    schedule of compliance), CAAPP permit, and emissions or
16    compliance monitoring report. If an owner or operator of a
17    CAAPP source is required to submit information entitled to
18    protection from disclosure under Section 7.1 and
19    subsection (a) of Section 7 of this Act, the owner or
20    operator shall submit such information separately. The
21    requirements of Section 7.1 and subsection (a) of Section 7
22    of this Act shall apply to such information, which shall
23    not be included in a CAAPP permit unless required by law.
24    The contents of a CAAPP permit shall not be entitled to
25    protection under Section 7.1 and subsection (a) of Section
26    7 of this Act.

 

 

SB2213- 57 -LRB100 13060 MJP 27439 b

1        f. The Agency shall have the authority to adopt
2    procedural rules, in accordance with the Illinois
3    Administrative Procedure Act, as the Agency deems
4    necessary, to implement this subsection.
5        g. If requested by the permit applicant, the Agency
6    shall provide the permit applicant with a copy of the draft
7    CAAPP permit prior to any public review period. If
8    requested by the permit applicant, the Agency shall provide
9    the permit applicant with a copy of the final CAAPP permit
10    prior to issuance of the CAAPP permit.
 
11    9. USEPA Notice and Objection.
12        a. The Agency shall provide to USEPA for its review a
13    copy of each CAAPP application (including any application
14    for permit modification), statement of basis as provided in
15    paragraph (b) of subsection 8 of this Section, proposed
16    CAAPP permit, CAAPP permit, and, if the Agency does not
17    incorporate any affected State's recommendations on a
18    proposed CAAPP permit, a written statement of this decision
19    and its reasons for not accepting the recommendations,
20    except as otherwise provided in this Act or by agreement
21    with USEPA. To the extent practicable, the preceding
22    information shall be provided in computer readable format
23    compatible with USEPA's national database management
24    system.
25        b. The Agency shall not issue the proposed CAAPP permit

 

 

SB2213- 58 -LRB100 13060 MJP 27439 b

1    if USEPA objects in writing within 45 days after receipt of
2    the proposed CAAPP permit and all necessary supporting
3    information.
4        c. If USEPA objects in writing to the issuance of the
5    proposed CAAPP permit within the 45-day period, the Agency
6    shall respond in writing and may revise and resubmit the
7    proposed CAAPP permit in response to the stated objection,
8    to the extent supported by the record, within 90 days after
9    the date of the objection. Prior to submitting a revised
10    permit to USEPA, the Agency shall provide the applicant and
11    any person who participated in the public comment process,
12    pursuant to subsection 8 of this Section, with a 10-day
13    period to comment on any revision which the Agency is
14    proposing to make to the permit in response to USEPA's
15    objection in accordance with Agency procedures.
16        d. Any USEPA objection under this subsection,
17    according to the Clean Air Act, will include a statement of
18    reasons for the objection and a description of the terms
19    and conditions that must be in the permit, in order to
20    adequately respond to the objections. Grounds for a USEPA
21    objection include the failure of the Agency to: (1) submit
22    the items and notices required under this subsection; (2)
23    submit any other information necessary to adequately
24    review the proposed CAAPP permit; or (3) process the permit
25    under subsection 8 of this Section except for minor permit
26    modifications.

 

 

SB2213- 59 -LRB100 13060 MJP 27439 b

1        e. If USEPA does not object in writing to issuance of a
2    permit under this subsection, any person may petition USEPA
3    within 60 days after expiration of the 45-day review period
4    to make such objection.
5        f. If the permit has not yet been issued and USEPA
6    objects to the permit as a result of a petition, the Agency
7    shall not issue the permit until USEPA's objection has been
8    resolved. The Agency shall provide a 10-day comment period
9    in accordance with paragraph c of this subsection. A
10    petition does not, however, stay the effectiveness of a
11    permit or its requirements if the permit was issued after
12    expiration of the 45-day review period and prior to a USEPA
13    objection.
14        g. If the Agency has issued a permit after expiration
15    of the 45-day review period and prior to receipt of a USEPA
16    objection under this subsection in response to a petition
17    submitted pursuant to paragraph e of this subsection, the
18    Agency may, upon receipt of an objection from USEPA, revise
19    and resubmit the permit to USEPA pursuant to this
20    subsection after providing a 10-day comment period in
21    accordance with paragraph c of this subsection. If the
22    Agency fails to submit a revised permit in response to the
23    objection, USEPA shall modify, terminate or revoke the
24    permit. In any case, the source will not be in violation of
25    the requirement to have submitted a timely and complete
26    application.

 

 

SB2213- 60 -LRB100 13060 MJP 27439 b

1        h. The Agency shall have the authority to adopt
2    procedural rules, in accordance with the Illinois
3    Administrative Procedure Act, as the Agency deems
4    necessary, to implement this subsection.
 
5    10. Final Agency Action.
6        a. The Agency shall issue a CAAPP permit, permit
7    modification, or permit renewal if all of the following
8    conditions are met:
9            i. The applicant has submitted a complete and
10        certified application for a permit, permit
11        modification, or permit renewal consistent with
12        subsections 5 and 14 of this Section, as applicable,
13        and applicable regulations.
14            ii. The applicant has submitted with its complete
15        application an approvable compliance plan, including a
16        schedule for achieving compliance, consistent with
17        subsection 5 of this Section and applicable
18        regulations.
19            iii. The applicant has timely paid the fees
20        required pursuant to subsection 18 of this Section and
21        applicable regulations.
22            iv. The Agency has received a complete CAAPP
23        application and, if necessary, has requested and
24        received additional information from the applicant
25        consistent with subsection 5 of this Section and

 

 

SB2213- 61 -LRB100 13060 MJP 27439 b

1        applicable regulations.
2            v. The Agency has complied with all applicable
3        provisions regarding public notice and affected State
4        review consistent with subsection 8 of this Section and
5        applicable regulations.
6            vi. The Agency has provided a copy of each CAAPP
7        application, or summary thereof, pursuant to agreement
8        with USEPA and proposed CAAPP permit required under
9        subsection 9 of this Section to USEPA, and USEPA has
10        not objected to the issuance of the permit in
11        accordance with the Clean Air Act and 40 CFR Part 70.
12        b. The Agency shall have the authority to deny a CAAPP
13    permit, permit modification, or permit renewal if the
14    applicant has not complied with the requirements of
15    subparagraphs (i) through (iv) of paragraph (a) of this
16    subsection or if USEPA objects to its issuance.
17        c. i. Prior to denial of a CAAPP permit, permit
18        modification, or permit renewal under this Section,
19        the Agency shall notify the applicant of the possible
20        denial and the reasons for the denial.
21            ii. Within such notice, the Agency shall specify an
22        appropriate date by which the applicant shall
23        adequately respond to the Agency's notice. Such date
24        shall not exceed 15 days from the date the notification
25        is received by the applicant. The Agency may grant a
26        reasonable extension for good cause shown.

 

 

SB2213- 62 -LRB100 13060 MJP 27439 b

1            iii. Failure by the applicant to adequately
2        respond by the date specified in the notification or by
3        any granted extension date shall be grounds for denial
4        of the permit.
5            For purposes of obtaining judicial review under
6        Sections 40.2 and 41 of this Act, the Agency shall
7        provide to USEPA and each applicant, and, upon request,
8        to affected States, any person who participated in the
9        public comment process, and any other person who could
10        obtain judicial review under Sections 40.2 and 41 of
11        this Act, a copy of each CAAPP permit or notification
12        of denial pertaining to that party.
13        d. The Agency shall have the authority to adopt
14    procedural rules, in accordance with the Illinois
15    Administrative Procedure Act, as the Agency deems
16    necessary, to implement this subsection.
 
17    11. General Permits.
18        a. The Agency may issue a general permit covering
19    numerous similar sources, except for affected sources for
20    acid deposition unless otherwise provided in regulations
21    promulgated under Title IV of the Clean Air Act.
22        b. The Agency shall identify, in any general permit,
23    criteria by which sources may qualify for the general
24    permit.
25        c. CAAPP sources that would qualify for a general

 

 

SB2213- 63 -LRB100 13060 MJP 27439 b

1    permit must apply for coverage under the terms of the
2    general permit or must apply for a CAAPP permit consistent
3    with subsection 5 of this Section and applicable
4    regulations.
5        d. The Agency shall comply with the public comment and
6    hearing provisions of this Section as well as the USEPA and
7    affected State review procedures prior to issuance of a
8    general permit.
9        e. When granting a subsequent request by a qualifying
10    CAAPP source for coverage under the terms of a general
11    permit, the Agency shall not be required to repeat the
12    public notice and comment procedures. The granting of such
13    request shall not be considered a final permit action for
14    purposes of judicial review.
15        f. The Agency may not issue a general permit to cover
16    any discrete emission unit at a CAAPP source if another
17    CAAPP permit covers emission units at the source.
18        g. The Agency shall have the authority to adopt
19    procedural rules, in accordance with the Illinois
20    Administrative Procedure Act, as the Agency deems
21    necessary, to implement this subsection.
 
22    12. Operational Flexibility.
23        a. An owner or operator of a CAAPP source may make
24    changes at the CAAPP source without requiring a prior
25    permit revision, consistent with subparagraphs (i) through

 

 

SB2213- 64 -LRB100 13060 MJP 27439 b

1    (iii) of paragraph (a) of this subsection, so long as the
2    changes are not modifications under any provision of Title
3    I of the Clean Air Act and they do not exceed the emissions
4    allowable under the permit (whether expressed therein as a
5    rate of emissions or in terms of total emissions), provided
6    that the owner or operator of the CAAPP source provides
7    USEPA and the Agency with written notification as required
8    below in advance of the proposed changes, which shall be a
9    minimum of 7 days, unless otherwise provided by the Agency
10    in applicable regulations regarding emergencies. The owner
11    or operator of a CAAPP source and the Agency shall each
12    attach such notice to their copy of the relevant permit.
13            i. An owner or operator of a CAAPP source may make
14        Section 502 (b) (10) changes without a permit revision,
15        if the changes are not modifications under any
16        provision of Title I of the Clean Air Act and the
17        changes do not exceed the emissions allowable under the
18        permit (whether expressed therein as a rate of
19        emissions or in terms of total emissions).
20                A. For each such change, the written
21            notification required above shall include a brief
22            description of the change within the source, the
23            date on which the change will occur, any change in
24            emissions, and any permit term or condition that is
25            no longer applicable as a result of the change.
26                B. The permit shield described in paragraph

 

 

SB2213- 65 -LRB100 13060 MJP 27439 b

1            (j) of subsection 7 of this Section shall not apply
2            to any change made pursuant to this subparagraph.
3            ii. An owner or operator of a CAAPP source may
4        trade increases and decreases in emissions in the CAAPP
5        source, where the applicable implementation plan
6        provides for such emission trades without requiring a
7        permit revision. This provision is available in those
8        cases where the permit does not already provide for
9        such emissions trading.
10                A. Under this subparagraph (ii) of paragraph
11            (a) of this subsection, the written notification
12            required above shall include such information as
13            may be required by the provision in the applicable
14            implementation plan authorizing the emissions
15            trade, including at a minimum, when the proposed
16            changes will occur, a description of each such
17            change, any change in emissions, the permit
18            requirements with which the source will comply
19            using the emissions trading provisions of the
20            applicable implementation plan, and the pollutants
21            emitted subject to the emissions trade. The notice
22            shall also refer to the provisions in the
23            applicable implementation plan with which the
24            source will comply and provide for the emissions
25            trade.
26                B. The permit shield described in paragraph

 

 

SB2213- 66 -LRB100 13060 MJP 27439 b

1            (j) of subsection 7 of this Section shall not apply
2            to any change made pursuant to subparagraph (ii) of
3            paragraph (a) of this subsection. Compliance with
4            the permit requirements that the source will meet
5            using the emissions trade shall be determined
6            according to the requirements of the applicable
7            implementation plan authorizing the emissions
8            trade.
9            iii. If requested within a CAAPP application, the
10        Agency shall issue a CAAPP permit which contains terms
11        and conditions, including all terms required under
12        subsection 7 of this Section to determine compliance,
13        allowing for the trading of emissions increases and
14        decreases at the CAAPP source solely for the purpose of
15        complying with a federally-enforceable emissions cap
16        that is established in the permit independent of
17        otherwise applicable requirements. The owner or
18        operator of a CAAPP source shall include in its CAAPP
19        application proposed replicable procedures and permit
20        terms that ensure the emissions trades are
21        quantifiable and enforceable. The permit shall also
22        require compliance with all applicable requirements.
23                A. Under this subparagraph (iii) of paragraph
24            (a), the written notification required above shall
25            state when the change will occur and shall describe
26            the changes in emissions that will result and how

 

 

SB2213- 67 -LRB100 13060 MJP 27439 b

1            these increases and decreases in emissions will
2            comply with the terms and conditions of the permit.
3                B. The permit shield described in paragraph
4            (j) of subsection 7 of this Section shall extend to
5            terms and conditions that allow such increases and
6            decreases in emissions.
7        b. An owner or operator of a CAAPP source may make
8    changes that are not addressed or prohibited by the permit,
9    other than those which are subject to any requirements
10    under Title IV of the Clean Air Act or are modifications
11    under any provisions of Title I of the Clean Air Act,
12    without a permit revision, in accordance with the following
13    requirements:
14            (i) Each such change shall meet all applicable
15        requirements and shall not violate any existing permit
16        term or condition;
17            (ii) Sources must provide contemporaneous written
18        notice to the Agency and USEPA of each such change,
19        except for changes that qualify as insignificant under
20        provisions adopted by the Agency or the Board. Such
21        written notice shall describe each such change,
22        including the date, any change in emissions,
23        pollutants emitted, and any applicable requirement
24        that would apply as a result of the change;
25            (iii) The change shall not qualify for the shield
26        described in paragraph (j) of subsection 7 of this

 

 

SB2213- 68 -LRB100 13060 MJP 27439 b

1        Section; and
2            (iv) The permittee shall keep a record describing
3        changes made at the source that result in emissions of
4        a regulated air pollutant subject to an applicable
5        Clean Air Act requirement, but not otherwise regulated
6        under the permit, and the emissions resulting from
7        those changes.
8        c. The Agency shall have the authority to adopt
9    procedural rules, in accordance with the Illinois
10    Administrative Procedure Act, as the Agency deems
11    necessary to implement this subsection.
 
12    13. Administrative Permit Amendments.
13        a. The Agency shall take final action on a request for
14    an administrative permit amendment within 60 days after
15    receipt of the request. Neither notice nor an opportunity
16    for public and affected State comment shall be required for
17    the Agency to incorporate such revisions, provided it
18    designates the permit revisions as having been made
19    pursuant to this subsection.
20        b. The Agency shall submit a copy of the revised permit
21    to USEPA.
22        c. For purposes of this Section the term
23    "administrative permit amendment" shall be defined as a
24    permit revision that can accomplish one or more of the
25    changes described below:

 

 

SB2213- 69 -LRB100 13060 MJP 27439 b

1            i. Corrects typographical errors;
2            ii. Identifies a change in the name, address, or
3        phone number of any person identified in the permit, or
4        provides a similar minor administrative change at the
5        source;
6            iii. Requires more frequent monitoring or
7        reporting by the permittee;
8            iv. Allows for a change in ownership or operational
9        control of a source where the Agency determines that no
10        other change in the permit is necessary, provided that
11        a written agreement containing a specific date for
12        transfer of permit responsibility, coverage, and
13        liability between the current and new permittees has
14        been submitted to the Agency;
15            v. Incorporates into the CAAPP permit the
16        requirements from preconstruction review permits
17        authorized under a USEPA-approved program, provided
18        the program meets procedural and compliance
19        requirements substantially equivalent to those
20        contained in this Section;
21            vi. (Blank); or
22            vii. Any other type of change which USEPA has
23        determined as part of the approved CAAPP permit program
24        to be similar to those included in this subsection.
25        d. The Agency shall, upon taking final action granting
26    a request for an administrative permit amendment, allow

 

 

SB2213- 70 -LRB100 13060 MJP 27439 b

1    coverage by the permit shield in paragraph (j) of
2    subsection 7 of this Section for administrative permit
3    amendments made pursuant to subparagraph (v) of paragraph
4    (c) of this subsection which meet the relevant requirements
5    for significant permit modifications.
6        e. Permit revisions and modifications, including
7    administrative amendments and automatic amendments
8    (pursuant to Sections 408(b) and 403(d) of the Clean Air
9    Act or regulations promulgated thereunder), for purposes
10    of the acid rain portion of the permit shall be governed by
11    the regulations promulgated under Title IV of the Clean Air
12    Act. Owners or operators of affected sources for acid
13    deposition shall have the flexibility to amend their
14    compliance plans as provided in the regulations
15    promulgated under Title IV of the Clean Air Act.
16        f. The CAAPP source may implement the changes addressed
17    in the request for an administrative permit amendment
18    immediately upon submittal of the request.
19        g. The Agency shall have the authority to adopt
20    procedural rules, in accordance with the Illinois
21    Administrative Procedure Act, as the Agency deems
22    necessary, to implement this subsection.
 
23    14. Permit Modifications.
24        a. Minor permit modification procedures.
25            i. The Agency shall review a permit modification

 

 

SB2213- 71 -LRB100 13060 MJP 27439 b

1        using the "minor permit" modification procedures only
2        for those permit modifications that:
3                A. Do not violate any applicable requirement;
4                B. Do not involve significant changes to
5            existing monitoring, reporting, or recordkeeping
6            requirements in the permit;
7                C. Do not require a case-by-case determination
8            of an emission limitation or other standard, or a
9            source-specific determination of ambient impacts,
10            or a visibility or increment analysis;
11                D. Do not seek to establish or change a permit
12            term or condition for which there is no
13            corresponding underlying requirement and which
14            avoids an applicable requirement to which the
15            source would otherwise be subject. Such terms and
16            conditions include:
17                    1. A federally enforceable emissions cap
18                assumed to avoid classification as a
19                modification under any provision of Title I of
20                the Clean Air Act; and
21                    2. An alternative emissions limit approved
22                pursuant to regulations promulgated under
23                Section 112(i)(5) of the Clean Air Act;
24                E. Are not modifications under any provision
25            of Title I of the Clean Air Act; and
26                F. Are not required to be processed as a

 

 

SB2213- 72 -LRB100 13060 MJP 27439 b

1            significant modification.
2            ii. Notwithstanding subparagraph (i) of paragraph
3        (a) and subparagraph (ii) of paragraph (b) of this
4        subsection, minor permit modification procedures may
5        be used for permit modifications involving the use of
6        economic incentives, marketable permits, emissions
7        trading, and other similar approaches, to the extent
8        that such minor permit modification procedures are
9        explicitly provided for in an applicable
10        implementation plan or in applicable requirements
11        promulgated by USEPA.
12            iii. An applicant requesting the use of minor
13        permit modification procedures shall meet the
14        requirements of subsection 5 of this Section and shall
15        include the following in its application:
16                A. A description of the change, the emissions
17            resulting from the change, and any new applicable
18            requirements that will apply if the change occurs;
19                B. The source's suggested draft permit;
20                C. Certification by a responsible official,
21            consistent with paragraph (e) of subsection 5 of
22            this Section and applicable regulations, that the
23            proposed modification meets the criteria for use
24            of minor permit modification procedures and a
25            request that such procedures be used; and
26                D. Completed forms for the Agency to use to

 

 

SB2213- 73 -LRB100 13060 MJP 27439 b

1            notify USEPA and affected States as required under
2            subsections 8 and 9 of this Section.
3            iv. Within 5 working days after receipt of a
4        complete permit modification application, the Agency
5        shall notify USEPA and affected States of the requested
6        permit modification in accordance with subsections 8
7        and 9 of this Section. The Agency promptly shall send
8        any notice required under paragraph (d) of subsection 8
9        of this Section to USEPA.
10            v. The Agency may not issue a final permit
11        modification until after the 45-day review period for
12        USEPA or until USEPA has notified the Agency that USEPA
13        will not object to the issuance of the permit
14        modification, whichever comes first, although the
15        Agency can approve the permit modification prior to
16        that time. Within 90 days after the Agency's receipt of
17        an application under the minor permit modification
18        procedures or 15 days after the end of USEPA's 45-day
19        review period under subsection 9 of this Section,
20        whichever is later, the Agency shall:
21                A. Issue the permit modification as proposed;
22                B. Deny the permit modification application;
23                C. Determine that the requested modification
24            does not meet the minor permit modification
25            criteria and should be reviewed under the
26            significant modification procedures; or

 

 

SB2213- 74 -LRB100 13060 MJP 27439 b

1                D. Revise the draft permit modification and
2            transmit to USEPA the new proposed permit
3            modification as required by subsection 9 of this
4            Section.
5            vi. Any CAAPP source may make the change proposed
6        in its minor permit modification application
7        immediately after it files such application. After the
8        CAAPP source makes the change allowed by the preceding
9        sentence, and until the Agency takes any of the actions
10        specified in items (A) through (C) of subparagraph (v)
11        of paragraph (a) of this subsection, the source must
12        comply with both the applicable requirements governing
13        the change and the proposed permit terms and
14        conditions. During this time period, the source need
15        not comply with the existing permit terms and
16        conditions it seeks to modify. If the source fails to
17        comply with its proposed permit terms and conditions
18        during this time period, the existing permit terms and
19        conditions which it seeks to modify may be enforced
20        against it.
21            vii. The permit shield under paragraph (j) of
22        subsection 7 of this Section may not extend to minor
23        permit modifications.
24            viii. If a construction permit is required,
25        pursuant to subsection (a) of Section 39 of this Act
26        and regulations thereunder, for a change for which the

 

 

SB2213- 75 -LRB100 13060 MJP 27439 b

1        minor permit modification procedures are applicable,
2        the source may request that the processing of the
3        construction permit application be consolidated with
4        the processing of the application for the minor permit
5        modification. In such cases, the provisions of this
6        Section, including those within subsections 5, 8, and
7        9, shall apply and the Agency shall act on such
8        applications pursuant to subparagraph (v) of paragraph
9        (a) of subsection 14 of this Section. The source may
10        make the proposed change immediately after filing its
11        application for the minor permit modification. Nothing
12        in this subparagraph shall otherwise affect the
13        requirements and procedures applicable to construction
14        permits.
15        b. Group Processing of Minor Permit Modifications.
16            i. Where requested by an applicant within its
17        application, the Agency shall process groups of a
18        source's applications for certain modifications
19        eligible for minor permit modification processing in
20        accordance with the provisions of this paragraph (b).
21            ii. Permit modifications may be processed in
22        accordance with the procedures for group processing,
23        for those modifications:
24                A. Which meet the criteria for minor permit
25            modification procedures under subparagraph (i) of
26            paragraph (a) of subsection 14 of this Section; and

 

 

SB2213- 76 -LRB100 13060 MJP 27439 b

1                B. That collectively are below 10 percent of
2            the emissions allowed by the permit for the
3            emissions unit for which change is requested, 20
4            percent of the applicable definition of major
5            source set forth in subsection 2 of this Section,
6            or 5 tons per year, whichever is least.
7            iii. An applicant requesting the use of group
8        processing procedures shall meet the requirements of
9        subsection 5 of this Section and shall include the
10        following in its application:
11                A. A description of the change, the emissions
12            resulting from the change, and any new applicable
13            requirements that will apply if the change occurs.
14                B. The source's suggested draft permit.
15                C. Certification by a responsible official
16            consistent with paragraph (e) of subsection 5 of
17            this Section, that the proposed modification meets
18            the criteria for use of group processing
19            procedures and a request that such procedures be
20            used.
21                D. A list of the source's other pending
22            applications awaiting group processing, and a
23            determination of whether the requested
24            modification, aggregated with these other
25            applications, equals or exceeds the threshold set
26            under item (B) of subparagraph (ii) of paragraph

 

 

SB2213- 77 -LRB100 13060 MJP 27439 b

1            (b) of this subsection.
2                E. Certification, consistent with paragraph
3            (e) of subsection 5 of this Section, that the
4            source has notified USEPA of the proposed
5            modification. Such notification need only contain
6            a brief description of the requested modification.
7                F. Completed forms for the Agency to use to
8            notify USEPA and affected states as required under
9            subsections 8 and 9 of this Section.
10            iv. On a quarterly basis or within 5 business days
11        after receipt of an application demonstrating that the
12        aggregate of a source's pending applications equals or
13        exceeds the threshold level set forth within item (B)
14        of subparagraph (ii) of paragraph (b) of this
15        subsection, whichever is earlier, the Agency shall
16        promptly notify USEPA and affected States of the
17        requested permit modifications in accordance with
18        subsections 8 and 9 of this Section. The Agency shall
19        send any notice required under paragraph (d) of
20        subsection 8 of this Section to USEPA.
21            v. The provisions of subparagraph (v) of paragraph
22        (a) of this subsection shall apply to modifications
23        eligible for group processing, except that the Agency
24        shall take one of the actions specified in items (A)
25        through (D) of subparagraph (v) of paragraph (a) of
26        this subsection within 180 days after receipt of the

 

 

SB2213- 78 -LRB100 13060 MJP 27439 b

1        application or 15 days after the end of USEPA's 45-day
2        review period under subsection 9 of this Section,
3        whichever is later.
4            vi. The provisions of subparagraph (vi) of
5        paragraph (a) of this subsection shall apply to
6        modifications for group processing.
7            vii. The provisions of paragraph (j) of subsection
8        7 of this Section shall not apply to modifications
9        eligible for group processing.
10        c. Significant Permit Modifications.
11            i. Significant modification procedures shall be
12        used for applications requesting significant permit
13        modifications and for those applications that do not
14        qualify as either minor permit modifications or as
15        administrative permit amendments.
16            ii. Every significant change in existing
17        monitoring permit terms or conditions and every
18        relaxation of reporting or recordkeeping requirements
19        shall be considered significant. A modification shall
20        also be considered significant if in the judgment of
21        the Agency action on an application for modification
22        would require decisions to be made on technically
23        complex issues. Nothing herein shall be construed to
24        preclude the permittee from making changes consistent
25        with this Section that would render existing permit
26        compliance terms and conditions irrelevant.

 

 

SB2213- 79 -LRB100 13060 MJP 27439 b

1            iii. Significant permit modifications must meet
2        all the requirements of this Section, including those
3        for applications (including completeness review),
4        public participation, review by affected States, and
5        review by USEPA applicable to initial permit issuance
6        and permit renewal. The Agency shall take final action
7        on significant permit modifications within 9 months
8        after receipt of a complete application.
9        d. The Agency shall have the authority to adopt
10    procedural rules, in accordance with the Illinois
11    Administrative Procedure Act, as the Agency deems
12    necessary, to implement this subsection.
 
13    15. Reopenings for Cause by the Agency.
14        a. Each issued CAAPP permit shall include provisions
15    specifying the conditions under which the permit will be
16    reopened prior to the expiration of the permit. Such
17    revisions shall be made as expeditiously as practicable. A
18    CAAPP permit shall be reopened and revised under any of the
19    following circumstances, in accordance with procedures
20    adopted by the Agency:
21            i. Additional requirements under the Clean Air Act
22        become applicable to a major CAAPP source for which 3
23        or more years remain on the original term of the
24        permit. Such a reopening shall be completed not later
25        than 18 months after the promulgation of the applicable

 

 

SB2213- 80 -LRB100 13060 MJP 27439 b

1        requirement. No such revision is required if the
2        effective date of the requirement is later than the
3        date on which the permit is due to expire.
4            ii. Additional requirements (including excess
5        emissions requirements) become applicable to an
6        affected source for acid deposition under the acid rain
7        program. Excess emissions offset plans shall be deemed
8        to be incorporated into the permit upon approval by
9        USEPA.
10            iii. The Agency or USEPA determines that the permit
11        contains a material mistake or that inaccurate
12        statements were made in establishing the emissions
13        standards, limitations, or other terms or conditions
14        of the permit.
15            iv. The Agency or USEPA determines that the permit
16        must be revised or revoked to assure compliance with
17        the applicable requirements.
18        b. In the event that the Agency determines that there
19    are grounds for revoking a CAAPP permit, for cause,
20    consistent with paragraph a of this subsection, it shall
21    file a petition before the Board setting forth the basis
22    for such revocation. In any such proceeding, the Agency
23    shall have the burden of establishing that the permit
24    should be revoked under the standards set forth in this Act
25    and the Clean Air Act. Any such proceeding shall be
26    conducted pursuant to the Board's procedures for

 

 

SB2213- 81 -LRB100 13060 MJP 27439 b

1    adjudicatory hearings and the Board shall render its
2    decision within 120 days of the filing of the petition. The
3    Agency shall take final action to revoke and reissue a
4    CAAPP permit consistent with the Board's order.
5        c. Proceedings regarding a reopened CAAPP permit shall
6    follow the same procedures as apply to initial permit
7    issuance and shall affect only those parts of the permit
8    for which cause to reopen exists.
9        d. Reopenings under paragraph (a) of this subsection
10    shall not be initiated before a notice of such intent is
11    provided to the CAAPP source by the Agency at least 30 days
12    in advance of the date that the permit is to be reopened,
13    except that the Agency may provide a shorter time period in
14    the case of an emergency.
15        e. The Agency shall have the authority to adopt
16    procedural rules, in accordance with the Illinois
17    Administrative Procedure Act, as the Agency deems
18    necessary, to implement this subsection.
 
19    16. Reopenings for Cause by USEPA.
20        a. When USEPA finds that cause exists to terminate,
21    modify, or revoke and reissue a CAAPP permit pursuant to
22    subsection 15 of this Section, and thereafter notifies the
23    Agency and the permittee of such finding in writing, the
24    Agency shall forward to USEPA and the permittee a proposed
25    determination of termination, modification, or revocation

 

 

SB2213- 82 -LRB100 13060 MJP 27439 b

1    and reissuance as appropriate, in accordance with
2    paragraph (b) of this subsection. The Agency's proposed
3    determination shall be in accordance with the record, the
4    Clean Air Act, regulations promulgated thereunder, this
5    Act and regulations promulgated thereunder. Such proposed
6    determination shall not affect the permit or constitute a
7    final permit action for purposes of this Act or the
8    Administrative Review Law. The Agency shall forward to
9    USEPA such proposed determination within 90 days after
10    receipt of the notification from USEPA. If additional time
11    is necessary to submit the proposed determination, the
12    Agency shall request a 90-day extension from USEPA and
13    shall submit the proposed determination within 180 days
14    after receipt of notification from USEPA.
15            b. i. Prior to the Agency's submittal to USEPA of a
16        proposed determination to terminate or revoke and
17        reissue the permit, the Agency shall file a petition
18        before the Board setting forth USEPA's objection, the
19        permit record, the Agency's proposed determination,
20        and the justification for its proposed determination.
21        The Board shall conduct a hearing pursuant to the rules
22        prescribed by Section 32 of this Act, and the burden of
23        proof shall be on the Agency.
24            ii. After due consideration of the written and oral
25        statements, the testimony and arguments that shall be
26        submitted at hearing, the Board shall issue and enter

 

 

SB2213- 83 -LRB100 13060 MJP 27439 b

1        an interim order for the proposed determination, which
2        shall set forth all changes, if any, required in the
3        Agency's proposed determination. The interim order
4        shall comply with the requirements for final orders as
5        set forth in Section 33 of this Act. Issuance of an
6        interim order by the Board under this paragraph,
7        however, shall not affect the permit status and does
8        not constitute a final action for purposes of this Act
9        or the Administrative Review Law.
10            iii. The Board shall cause a copy of its interim
11        order to be served upon all parties to the proceeding
12        as well as upon USEPA. The Agency shall submit the
13        proposed determination to USEPA in accordance with the
14        Board's Interim Order within 180 days after receipt of
15        the notification from USEPA.
16        c. USEPA shall review the proposed determination to
17    terminate, modify, or revoke and reissue the permit within
18    90 days after receipt.
19            i. When USEPA reviews the proposed determination
20        to terminate or revoke and reissue and does not object,
21        the Board shall, within 7 days after receipt of USEPA's
22        final approval, enter the interim order as a final
23        order. The final order may be appealed as provided by
24        Title XI of this Act. The Agency shall take final
25        action in accordance with the Board's final order.
26            ii. When USEPA reviews such proposed determination

 

 

SB2213- 84 -LRB100 13060 MJP 27439 b

1        to terminate or revoke and reissue and objects, the
2        Agency shall submit USEPA's objection and the Agency's
3        comments and recommendation on the objection to the
4        Board and permittee. The Board shall review its interim
5        order in response to USEPA's objection and the Agency's
6        comments and recommendation and issue a final order in
7        accordance with Sections 32 and 33 of this Act. The
8        Agency shall, within 90 days after receipt of such
9        objection, respond to USEPA's objection in accordance
10        with the Board's final order.
11            iii. When USEPA reviews such proposed
12        determination to modify and objects, the Agency shall,
13        within 90 days after receipt of the objection, resolve
14        the objection and modify the permit in accordance with
15        USEPA's objection, based upon the record, the Clean Air
16        Act, regulations promulgated thereunder, this Act, and
17        regulations promulgated thereunder.
18        d. If the Agency fails to submit the proposed
19    determination pursuant to paragraph a of this subsection or
20    fails to resolve any USEPA objection pursuant to paragraph
21    c of this subsection, USEPA will terminate, modify, or
22    revoke and reissue the permit.
23        e. The Agency shall have the authority to adopt
24    procedural rules, in accordance with the Illinois
25    Administrative Procedure Act, as the Agency deems
26    necessary, to implement this subsection.
 

 

 

SB2213- 85 -LRB100 13060 MJP 27439 b

1    17. Title IV; Acid Rain Provisions.
2        a. The Agency shall act on initial CAAPP applications
3    for affected sources for acid deposition in accordance with
4    this Section and Title V of the Clean Air Act and
5    regulations promulgated thereunder, except as modified by
6    Title IV of the Clean Air Act and regulations promulgated
7    thereunder. The Agency shall issue initial CAAPP permits to
8    the affected sources for acid deposition which shall become
9    effective no earlier than January 1, 1995, and which shall
10    terminate on December 31, 1999, in accordance with this
11    Section. Subsequent CAAPP permits issued to affected
12    sources for acid deposition shall be issued for a fixed
13    term of 5 years. Title IV of the Clean Air Act and
14    regulations promulgated thereunder, including but not
15    limited to 40 C.F.R. Part 72, as now or hereafter amended,
16    are applicable to and enforceable under this Act.
17        b. A designated representative of an affected source
18    for acid deposition shall submit a timely and complete
19    Phase II acid rain permit application and compliance plan
20    to the Agency, not later than January 1, 1996, that meets
21    the requirements of Titles IV and V of the Clean Air Act
22    and regulations. The Agency shall act on the Phase II acid
23    rain permit application and compliance plan in accordance
24    with this Section and Title V of the Clean Air Act and
25    regulations promulgated thereunder, except as modified by

 

 

SB2213- 86 -LRB100 13060 MJP 27439 b

1    Title IV of the Clean Air Act and regulations promulgated
2    thereunder. The Agency shall issue the Phase II acid rain
3    permit to an affected source for acid deposition no later
4    than December 31, 1997, which shall become effective on
5    January 1, 2000, in accordance with this Section, except as
6    modified by Title IV and regulations promulgated
7    thereunder; provided that the designated representative of
8    the source submitted a timely and complete Phase II permit
9    application and compliance plan to the Agency that meets
10    the requirements of Title IV and V of the Clean Air Act and
11    regulations.
12        c. Each Phase II acid rain permit issued in accordance
13    with this subsection shall have a fixed term of 5 years.
14    Except as provided in paragraph b above, the Agency shall
15    issue or deny a Phase II acid rain permit within 18 months
16    of receiving a complete Phase II permit application and
17    compliance plan.
18        d. A designated representative of a new unit, as
19    defined in Section 402 of the Clean Air Act, shall submit a
20    timely and complete Phase II acid rain permit application
21    and compliance plan that meets the requirements of Titles
22    IV and V of the Clean Air Act and its regulations. The
23    Agency shall act on the new unit's Phase II acid rain
24    permit application and compliance plan in accordance with
25    this Section and Title V of the Clean Air Act and its
26    regulations, except as modified by Title IV of the Clean

 

 

SB2213- 87 -LRB100 13060 MJP 27439 b

1    Air Act and its regulations. The Agency shall reopen the
2    new unit's CAAPP permit for cause to incorporate the
3    approved Phase II acid rain permit in accordance with this
4    Section. The Phase II acid rain permit for the new unit
5    shall become effective no later than the date required
6    under Title IV of the Clean Air Act and its regulations.
7        e. A designated representative of an affected source
8    for acid deposition shall submit a timely and complete
9    Title IV NOx permit application to the Agency, not later
10    than January 1, 1998, that meets the requirements of Titles
11    IV and V of the Clean Air Act and its regulations. The
12    Agency shall reopen the Phase II acid rain permit for cause
13    and incorporate the approved NOx provisions into the Phase
14    II acid rain permit not later than January 1, 1999, in
15    accordance with this Section, except as modified by Title
16    IV of the Clean Air Act and regulations promulgated
17    thereunder. Such reopening shall not affect the term of the
18    Phase II acid rain permit.
19        f. The designated representative of the affected
20    source for acid deposition shall renew the initial CAAPP
21    permit and Phase II acid rain permit in accordance with
22    this Section and Title V of the Clean Air Act and
23    regulations promulgated thereunder, except as modified by
24    Title IV of the Clean Air Act and regulations promulgated
25    thereunder.
26        g. In the case of an affected source for acid

 

 

SB2213- 88 -LRB100 13060 MJP 27439 b

1    deposition for which a complete Phase II acid rain permit
2    application and compliance plan are timely received under
3    this subsection, the complete permit application and
4    compliance plan, including amendments thereto, shall be
5    binding on the owner, operator and designated
6    representative, all affected units for acid deposition at
7    the affected source, and any other unit, as defined in
8    Section 402 of the Clean Air Act, governed by the Phase II
9    acid rain permit application and shall be enforceable as an
10    acid rain permit for purposes of Titles IV and V of the
11    Clean Air Act, from the date of submission of the acid rain
12    permit application until a Phase II acid rain permit is
13    issued or denied by the Agency.
14        h. The Agency shall not include or implement any
15    measure which would interfere with or modify the
16    requirements of Title IV of the Clean Air Act or
17    regulations promulgated thereunder.
18        i. Nothing in this Section shall be construed as
19    affecting allowances or USEPA's decision regarding an
20    excess emissions offset plan, as set forth in Title IV of
21    the Clean Air Act or regulations promulgated thereunder.
22            i. No permit revision shall be required for
23        increases in emissions that are authorized by
24        allowances acquired pursuant to the acid rain program,
25        provided that such increases do not require a permit
26        revision under any other applicable requirement.

 

 

SB2213- 89 -LRB100 13060 MJP 27439 b

1            ii. No limit shall be placed on the number of
2        allowances held by the source. The source may not,
3        however, use allowances as a defense to noncompliance
4        with any other applicable requirement.
5            iii. Any such allowance shall be accounted for
6        according to the procedures established in regulations
7        promulgated under Title IV of the Clean Air Act.
8        j. To the extent that the federal regulations
9    promulgated under Title IV, including but not limited to 40
10    C.F.R. Part 72, as now or hereafter amended, are
11    inconsistent with the federal regulations promulgated
12    under Title V, the federal regulations promulgated under
13    Title IV shall take precedence.
14        k. The USEPA may intervene as a matter of right in any
15    permit appeal involving a Phase II acid rain permit
16    provision or denial of a Phase II acid rain permit.
17        l. It is unlawful for any owner or operator to violate
18    any terms or conditions of a Phase II acid rain permit
19    issued under this subsection, to operate any affected
20    source for acid deposition except in compliance with a
21    Phase II acid rain permit issued by the Agency under this
22    subsection, or to violate any other applicable
23    requirements.
24        m. The designated representative of an affected source
25    for acid deposition shall submit to the Agency the data and
26    information submitted quarterly to USEPA, pursuant to 40

 

 

SB2213- 90 -LRB100 13060 MJP 27439 b

1    CFR 75.64, concurrently with the submission to USEPA. The
2    submission shall be in the same electronic format as
3    specified by USEPA.
4        n. The Agency shall act on any petition for exemption
5    of a new unit or retired unit, as those terms are defined
6    in Section 402 of the Clean Air Act, from the requirements
7    of the acid rain program in accordance with Title IV of the
8    Clean Air Act and its regulations.
9        o. The Agency shall have the authority to adopt
10    procedural rules, in accordance with the Illinois
11    Administrative Procedure Act, as the Agency deems
12    necessary to implement this subsection.
 
13    18. Fee Provisions.
14        a. A source subject to this Section or excluded under
15    subsection 1.1 or paragraph (c) of subsection 3 of this
16    Section, shall pay a fee as provided in this paragraph (a)
17    of subsection 18. However, a source that has been excluded
18    from the provisions of this Section under subsection 1.1 or
19    under paragraph (c) of subsection 3 of this Section because
20    the source emits less than 25 tons per year of any
21    combination of regulated air pollutants, except greenhouse
22    gases, shall pay fees in accordance with paragraph (1) of
23    subsection (b) of Section 9.6.
24            i. The fee for a source allowed to emit less than
25        100 tons per year of any combination of regulated air

 

 

SB2213- 91 -LRB100 13060 MJP 27439 b

1        pollutants, except greenhouse gases, shall be $1,800
2        per year, and that fee shall increase, beginning
3        January 1, 2012, to $2,150 per year.
4            ii. The fee for a source allowed to emit 100 tons
5        or more per year of any combination of regulated air
6        pollutants, except greenhouse gases and those
7        regulated air pollutants excluded in paragraph (f) of
8        this subsection 18, shall be as follows:
9                A. The Agency shall assess a fee of $18 per
10            ton, per year for the allowable emissions of
11            regulated air pollutants subject to this
12            subparagraph (ii) of paragraph (a) of subsection
13            18, and that fee shall increase, beginning January
14            1, 2012, to $21.50 per ton, per year. These fees
15            shall be used by the Agency and the Board to fund
16            the activities required by Title V of the Clean Air
17            Act including such activities as may be carried out
18            by other State or local agencies pursuant to
19            paragraph (d) of this subsection. The amount of
20            such fee shall be based on the information supplied
21            by the applicant in its complete CAAPP permit
22            application or in the CAAPP permit if the permit
23            has been granted and shall be determined by the
24            amount of emissions that the source is allowed to
25            emit annually, provided however, that the maximum
26            fee for a CAAPP permit under this subparagraph (ii)

 

 

SB2213- 92 -LRB100 13060 MJP 27439 b

1            of paragraph (a) of subsection 18 is $250,000, and
2            increases, beginning January 1, 2012, to $294,000.
3            Beginning January 1, 2012, the maximum fee under
4            this subparagraph (ii) of paragraph (a) of
5            subsection 18 for a source that has been excluded
6            under subsection 1.1 of this Section or under
7            paragraph (c) of subsection 3 of this Section is
8            $4,112. The Agency shall provide as part of the
9            permit application form required under subsection
10            5 of this Section a separate fee calculation form
11            which will allow the applicant to identify the
12            allowable emissions and calculate the fee. In no
13            event shall the Agency raise the amount of
14            allowable emissions requested by the applicant
15            unless such increases are required to demonstrate
16            compliance with terms of a CAAPP permit.
17                Notwithstanding the above, any applicant may
18            seek a change in its permit which would result in
19            increases in allowable emissions due to an
20            increase in the hours of operation or production
21            rates of an emission unit or units and such a
22            change shall be consistent with the construction
23            permit requirements of the existing State permit
24            program, under subsection (a) of Section 39 of this
25            Act and applicable provisions of this Section.
26            Where a construction permit is required, the

 

 

SB2213- 93 -LRB100 13060 MJP 27439 b

1            Agency shall expeditiously grant such construction
2            permit and shall, if necessary, modify the CAAPP
3            permit based on the same application.
4                B. The applicant or permittee may pay the fee
5            annually or semiannually for those fees greater
6            than $5,000. However, any applicant paying a fee
7            equal to or greater than $100,000 shall pay the
8            full amount on July 1, for the subsequent fiscal
9            year, or pay 50% of the fee on July 1 and the
10            remaining 50% by the next January 1. The Agency may
11            change any annual billing date upon reasonable
12            notice, but shall prorate the new bill so that the
13            permittee or applicant does not pay more than its
14            required fees for the fee period for which payment
15            is made.
16        b. (Blank).
17        c. (Blank).
18        d. There is hereby created in the State Treasury a
19    special fund to be known as the Clean Air Act Permit Fund
20    (formerly known as the CAA Permit Fund). All Funds
21    collected by the Agency pursuant to this subsection shall
22    be deposited into the Fund. The General Assembly shall
23    appropriate monies from this Fund to the Agency and to the
24    Board to carry out their obligations under this Section.
25    The General Assembly may also authorize monies to be
26    granted by the Agency from this Fund to other State and

 

 

SB2213- 94 -LRB100 13060 MJP 27439 b

1    local agencies which perform duties related to the CAAPP.
2    Interest generated on the monies deposited in this Fund
3    shall be returned to the Fund.
4        e. The Agency shall have the authority to adopt
5    procedural rules, in accordance with the Illinois
6    Administrative Procedure Act, as the Agency deems
7    necessary to implement this subsection.
8        f. For purposes of this subsection, the term "regulated
9    air pollutant" shall have the meaning given to it under
10    subsection 1 of this Section but shall exclude the
11    following:
12            i. carbon monoxide;
13            ii. any Class I or II substance which is a
14        regulated air pollutant solely because it is listed
15        pursuant to Section 602 of the Clean Air Act; and
16            iii. any pollutant that is a regulated air
17        pollutant solely because it is subject to a standard or
18        regulation under Section 112(r) of the Clean Air Act
19        based on the emissions allowed in the permit effective
20        in that calendar year, at the time the applicable bill
21        is generated.
 
22    19. Air Toxics Provisions.
23        a. In the event that the USEPA fails to promulgate in a
24    timely manner a standard pursuant to Section 112(d) of the
25    Clean Air Act, the Agency shall have the authority to issue

 

 

SB2213- 95 -LRB100 13060 MJP 27439 b

1    permits, pursuant to Section 112(j) of the Clean Air Act
2    and regulations promulgated thereunder, which contain
3    emission limitations which are equivalent to the emission
4    limitations that would apply to a source if an emission
5    standard had been promulgated in a timely manner by USEPA
6    pursuant to Section 112(d). Provided, however, that the
7    owner or operator of a source shall have the opportunity to
8    submit to the Agency a proposed emission limitation which
9    it determines to be equivalent to the emission limitations
10    that would apply to such source if an emission standard had
11    been promulgated in a timely manner by USEPA. If the Agency
12    refuses to include the emission limitation proposed by the
13    owner or operator in a CAAPP permit, the owner or operator
14    may petition the Board to establish whether the emission
15    limitation proposal submitted by the owner or operator
16    provides for emission limitations which are equivalent to
17    the emission limitations that would apply to the source if
18    the emission standard had been promulgated by USEPA in a
19    timely manner. The Board shall determine whether the
20    emission limitation proposed by the owner or operator or an
21    alternative emission limitation proposed by the Agency
22    provides for the level of control required under Section
23    112 of the Clean Air Act, or shall otherwise establish an
24    appropriate emission limitation, pursuant to Section 112
25    of the Clean Air Act.
26        b. Any Board proceeding brought under paragraph (a) or

 

 

SB2213- 96 -LRB100 13060 MJP 27439 b

1    (e) of this subsection shall be conducted according to the
2    Board's procedures for adjudicatory hearings and the Board
3    shall render its decision within 120 days of the filing of
4    the petition. Any such decision shall be subject to review
5    pursuant to Section 41 of this Act. Where USEPA promulgates
6    an applicable emission standard prior to the issuance of
7    the CAAPP permit, the Agency shall include in the permit
8    the promulgated standard, provided that the source shall
9    have the compliance period provided under Section 112(i) of
10    the Clean Air Act. Where USEPA promulgates an applicable
11    standard subsequent to the issuance of the CAAPP permit,
12    the Agency shall revise such permit upon the next renewal
13    to reflect the promulgated standard, providing a
14    reasonable time for the applicable source to comply with
15    the standard, but no longer than 8 years after the date on
16    which the source is first required to comply with the
17    emissions limitation established under this subsection.
18        c. The Agency shall have the authority to implement and
19    enforce complete or partial emission standards promulgated
20    by USEPA pursuant to Section 112(d), and standards
21    promulgated by USEPA pursuant to Sections 112(f), 112(h),
22    112(m), and 112(n), and may accept delegation of authority
23    from USEPA to implement and enforce Section 112(l) and
24    requirements for the prevention and detection of
25    accidental releases pursuant to Section 112(r) of the Clean
26    Air Act.

 

 

SB2213- 97 -LRB100 13060 MJP 27439 b

1        d. The Agency shall have the authority to issue permits
2    pursuant to Section 112(i)(5) of the Clean Air Act.
3        e. The Agency has the authority to implement Section
4    112(g) of the Clean Air Act consistent with the Clean Air
5    Act and federal regulations promulgated thereunder. If the
6    Agency refuses to include the emission limitations
7    proposed in an application submitted by an owner or
8    operator for a case-by-case maximum achievable control
9    technology (MACT) determination, the owner or operator may
10    petition the Board to determine whether the emission
11    limitation proposed by the owner or operator or an
12    alternative emission limitation proposed by the Agency
13    provides for a level of control required by Section 112 of
14    the Clean Air Act, or to otherwise establish an appropriate
15    emission limitation under Section 112 of the Clean Air Act.
 
16    20. Small Business.
17        a. For purposes of this subsection:
18        "Program" is the Small Business Stationary Source
19    Technical and Environmental Compliance Assistance Program
20    created within this State pursuant to Section 507 of the
21    Clean Air Act and guidance promulgated thereunder, to
22    provide technical assistance and compliance information to
23    small business stationary sources;
24        "Small Business Assistance Program" is a component of
25    the Program responsible for providing sufficient

 

 

SB2213- 98 -LRB100 13060 MJP 27439 b

1    communications with small businesses through the
2    collection and dissemination of information to small
3    business stationary sources; and
4        "Small Business Stationary Source" means a stationary
5    source that:
6            1. is owned or operated by a person that employs
7        100 or fewer individuals;
8            2. is a small business concern as defined in the
9        "Small Business Act";
10            3. is not a major source as that term is defined in
11        subsection 2 of this Section;
12            4. does not emit 50 tons or more per year of any
13        regulated air pollutant, except greenhouse gases; and
14            5. emits less than 75 tons per year of all
15        regulated pollutants, except greenhouse gases.
16        b. The Agency shall adopt and submit to USEPA, after
17    reasonable notice and opportunity for public comment, as a
18    revision to the Illinois state implementation plan, plans
19    for establishing the Program.
20        c. The Agency shall have the authority to enter into
21    such contracts and agreements as the Agency deems necessary
22    to carry out the purposes of this subsection.
23        d. The Agency may establish such procedures as it may
24    deem necessary for the purposes of implementing and
25    executing its responsibilities under this subsection.
26        e. There shall be appointed a Small Business Ombudsman

 

 

SB2213- 99 -LRB100 13060 MJP 27439 b

1    (hereinafter in this subsection referred to as
2    "Ombudsman") to monitor the Small Business Assistance
3    Program. The Ombudsman shall be a nonpartisan designated
4    official, with the ability to independently assess whether
5    the goals of the Program are being met.
6        f. The State Ombudsman Office shall be located in an
7    existing Ombudsman office within the State or in any State
8    Department.
9        g. There is hereby created a State Compliance Advisory
10    Panel (hereinafter in this subsection referred to as
11    "Panel") for determining the overall effectiveness of the
12    Small Business Assistance Program within this State.
13        h. The selection of Panel members shall be by the
14    following method:
15            1. The Governor shall select two members who are
16        not owners or representatives of owners of small
17        business stationary sources to represent the general
18        public;
19            2. The Director of the Agency shall select one
20        member to represent the Agency; and
21            3. The State Legislature shall select four members
22        who are owners or representatives of owners of small
23        business stationary sources. Both the majority and
24        minority leadership in both Houses of the Legislature
25        shall appoint one member of the panel.
26        i. Panel members should serve without compensation but

 

 

SB2213- 100 -LRB100 13060 MJP 27439 b

1    will receive full reimbursement for expenses including
2    travel and per diem as authorized within this State.
3        j. The Panel shall select its own Chair by a majority
4    vote. The Chair may meet and consult with the Ombudsman and
5    the head of the Small Business Assistance Program in
6    planning the activities for the Panel.
 
7    21. Temporary Sources.
8        a. The Agency may issue a single permit authorizing
9    emissions from similar operations by the same source owner
10    or operator at multiple temporary locations, except for
11    sources which are affected sources for acid deposition
12    under Title IV of the Clean Air Act.
13        b. The applicant must demonstrate that the operation is
14    temporary and will involve at least one change of location
15    during the term of the permit.
16        c. Any such permit shall meet all applicable
17    requirements of this Section and applicable regulations,
18    and include conditions assuring compliance with all
19    applicable requirements at all authorized locations and
20    requirements that the owner or operator notify the Agency
21    at least 10 days in advance of each change in location.
 
22    22. Solid Waste Incineration Units.
23        a. A CAAPP permit for a solid waste incineration unit
24    combusting municipal waste subject to standards

 

 

SB2213- 101 -LRB100 13060 MJP 27439 b

1    promulgated under Section 129(e) of the Clean Air Act shall
2    be issued for a period of 12 years and shall be reviewed
3    every 5 years, unless the Agency requires more frequent
4    review through Agency procedures.
5        b. During the review in paragraph (a) of this
6    subsection, the Agency shall fully review the previously
7    submitted CAAPP permit application and corresponding
8    reports subsequently submitted to determine whether the
9    source is in compliance with all applicable requirements.
10        c. If the Agency determines that the source is not in
11    compliance with all applicable requirements it shall
12    revise the CAAPP permit as appropriate.
13        d. The Agency shall have the authority to adopt
14    procedural rules, in accordance with the Illinois
15    Administrative Procedure Act, as the Agency deems
16    necessary, to implement this subsection.
17(Source: P.A. 99-380, eff. 8-17-15; 99-933, eff. 1-27-17.)
 
18    (415 ILCS 5/Tit. XVIII heading new)
19
TITLE XVIII: PROTECTION OF ENVIRONMENT, NATURAL RESOURCES, AND
20
PUBLIC HEALTH

 
21    (415 ILCS 5/59 new)
22    Sec. 59. Findings. The General Assembly finds and declares
23that:
24    (1) For over 4 decades, Illinois and its residents have

 

 

SB2213- 102 -LRB100 13060 MJP 27439 b

1relied on federal laws, including the federal Clean Air Act,
2the Federal Water Pollution Control Act (Clean Water Act), the
3federal Safe Drinking Water Act, and the federal Endangered
4Species Act, along with their implementing regulations and
5remedies, to protect our State's public health, environment,
6and natural resources.
7    (2) These federal laws establish standards that serve as
8the baseline level of public health and environmental
9protection, while expressly authorizing states like Illinois
10to adopt more protective measures.
11    (3) Beginning in 2017, a new presidential administration
12and a United States Congress are controlled by one party that
13has signaled a series of direct challenges to these federal
14laws and the protections they provide, as well as to the
15underlying science that makes these protections necessary, and
16to the rights of the states to protect their own environment,
17natural resources, and public health as they see fit.
18    (4) It is therefore necessary for the Illinois General
19Assembly to enact legislation that will ensure continued
20protections for the environment, natural resources, and public
21health in the State even if the federal laws specified in
22subsection (a) are undermined, amended, or repealed.
 
23    (415 ILCS 5/59.1 new)
24    Sec. 59.1. Intent. It is the intent of this Title to:
25    (1) Retain protections afforded under the federal laws

 

 

SB2213- 103 -LRB100 13060 MJP 27439 b

1specified in paragraph (1) of Section 59 and regulations
2implementing those federal laws in existence as of January 1,
32017, regardless of actions taken at the federal level.
4    (2) Protect public health and welfare from any actual or
5potential adverse effect that reasonably may be anticipated to
6occur from pollution, including the effects of climate change.
7    (3) Preserve, protect, and enhance the environment and
8natural resources in Illinois, including, but not limited to,
9the State's national parks, national wilderness areas,
10national monuments, national waterways, including Lake
11Michigan and the Mississippi River, and other areas with
12special national or regional natural, recreational, scenic, or
13historic value.
14    (4) Ensure that economic growth will occur in a manner
15consistent with the protection of public health and the
16environment and preservation of existing natural resources.
17    (5) Ensure that any decision made by a public agency that
18may adversely impact public health, the environment, or natural
19resources is made only after careful evaluation of all the
20consequences of that decision and after adequate procedural
21opportunities for informed public participation in the
22decision-making process.
 
23    (415 ILCS 5/59.2 new)
24    Sec. 59.2. Definitions. As used in this Title:
25    "Baseline federal law standards" means the authorizations,

 

 

SB2213- 104 -LRB100 13060 MJP 27439 b

1policies, objectives, rules, requirements, and standards
2contained in federal laws or federal regulations implementing
3the federal laws in existence as of January 1, 2017.
4    "Baseline federal standards for other federal statutes"
5means the authorizations, policies, objectives, rules,
6requirements, and standards contained in other federal
7statutes or federal regulations implementing the other federal
8statutes in existence as of January 1, 2017.
9    "Federal law" means any of the following:
10        (1) The federal Clean Air Act.
11        (2) The Federal Water Pollution Control Act.
12        (3) The federal Safe Drinking Water Act.
13        (4) The federal Endangered Species Act.
14    "Other federal statutes" means any other federal statute
15not specified in paragraphs (1) through (4) of the definition
16of "federal law" relating to environmental protection, natural
17resources, or public health.
 
18    (415 ILCS 5/59.3 new)
19    Sec. 59.3. Operative provisions.
20    (a) A State or local agency shall not amend or revise its
21rules and regulations to be less stringent than the baseline
22federal law standards.
23    (b) A State or local agency may adopt rules for Illinois
24that are more stringent than the baseline federal law
25standards.

 

 

SB2213- 105 -LRB100 13060 MJP 27439 b

1    (c) To the extent required by federal law, a State or local
2agency that is delegated the authority to enforce other federal
3statutes or that implements the State law that is an analog to
4the other federal statutes shall not amend or revise its rules
5to be less stringent than the baseline federal standards for
6other federal statutes, but may adopt rules for Illinois that
7are more stringent than the baseline federal standards for
8other federal statutes.
 
9    (415 ILCS 5/60 new)
10    Sec. 60. Air.
11    (a) The General Assembly finds all of the following:
12        (1) Title II of the Environmental Protection Act is the
13    State analog to the federal Clean Air Act.
14        (2) The Pollution Control Board and the Environmental
15    Protection Agency formulate and adopt the state
16    implementation plans (SIPs) for Illinois under the federal
17    Clean Air Act, and issue permits governing the emission of
18    certain substances, including greenhouse gases, into the
19    air.
20    (b) Except as otherwise authorized by State law, all of the
21following apply:
22        (1) The Pollution Control Board and the Environmental
23    Protection Agency shall maintain and enforce all air
24    quality requirements and standards that are at least as
25    stringent as required by the baseline federal law

 

 

SB2213- 106 -LRB100 13060 MJP 27439 b

1    standards, in addition to those required under State law.
2        (2) If the Pollution Control Board and the
3    Environmental Protection Agency have not established a
4    standard or requirement for an air pollutant for which a
5    standard or requirement exists in the baseline federal law
6    standards, then the Pollution Control Board and the
7    Environmental Protection Agency shall adopt the standard
8    or requirement to be at least as stringent as the baseline
9    federal law standards.
10        (3) The Pollution Control Board and the Environmental
11    Protection Agency shall adopt state implementation plans
12    for Illinois that meet requirements that are at least as
13    stringent as those required by the applicable baseline
14    federal law standards, in addition to those required by
15    State law.
16        (4) If the federal transportation conformity program
17    becomes less stringent than the applicable baseline
18    federal law standards, then the Pollution Control Board and
19    the Environmental Protection Agency shall adopt and
20    implement equivalent requirements that are at least as
21    stringent as those required by the applicable baseline
22    federal law standards, in addition to those required by
23    State law.
 
24    (415 ILCS 5/61 new)
25    Sec. 61. Water.

 

 

SB2213- 107 -LRB100 13060 MJP 27439 b

1    (a) The General Assembly finds all of the following:
2        (1) Title III of the Environmental Protection Act is
3    the State analog to the Federal Water Pollution Control
4    Act, otherwise known as the federal Clean Water Act.
5        (2) Title IV and Title IV-A of the Environmental
6    Protection Act are the State analog to the federal Safe
7    Drinking Water Act.
8        (3) The Environmental Protection Agency, the
9    Department of Public Health, the Department of Natural
10    Resources, and the Pollution Control Board administer
11    water rights and implement the federal Clean Water Act and
12    the Environmental Protection Act to preserve, protect,
13    enhance, and restore water quality by setting statewide
14    policy, formulating and adopting water quality control
15    plans, setting standards, issuing permits and waste
16    discharge requirements, determining compliance with those
17    permits and waste discharge requirements, and taking
18    appropriate enforcement actions.
19        (4) The Environmental Protection Agency, the
20    Department of Public Health, the Department of Natural
21    Resources, and the Pollution Control Board regulate public
22    drinking water systems under the federal Safe Drinking
23    Water Act and the Environmental Protection Act to ensure
24    the delivery of safe drinking water to Illinoisans.
25    (b) Except as otherwise authorized by State law, the
26following apply:

 

 

SB2213- 108 -LRB100 13060 MJP 27439 b

1        (1) The Environmental Protection Agency, the
2    Department of Public Health, the Department of Natural
3    Resources, and the Pollution Control Board shall maintain
4    and enforce all water supply and water quality standards
5    and permitting requirements that are at least as stringent
6    as required by the applicable baseline federal law
7    standards, in addition to those required by State law.
8        (2) The Environmental Protection Agency, the
9    Department of Public Health, the Department of Natural
10    Resources, and the Pollution Control Board shall maintain
11    and enforce all drinking water standards that are at least
12    as stringent as required by the applicable baseline federal
13    law standards, in addition to those required by State law,
14    including the level of lead in drinking water.
15        (3) If the Environmental Protection Agency, the
16    Department of Public Health, the Department of Natural
17    Resources, and the Pollution Control Board have not
18    established a water supply or water quality standard or
19    requirement for which a standard or requirement exists in
20    the baseline federal law standards, then the Environmental
21    Protection Agency, the Department of Public Health, the
22    Department of Natural Resources, and the Pollution Control
23    Board shall adopt the standard or requirement to be at
24    least as stringent as the baseline federal law standards.
25        (4) If the Environmental Protection Agency, the
26    Department of Public Health, the Department of Natural

 

 

SB2213- 109 -LRB100 13060 MJP 27439 b

1    Resources, and the Pollution Control Board have not
2    established a drinking water standard or requirement for
3    which a standard or requirement exists in the baseline
4    federal law standards, then the Environmental Protection
5    Agency, the Department of Public Health, the Department of
6    Natural Resources, and the Pollution Control Board shall
7    adopt the standard or requirement to be at least as
8    stringent as the baseline federal law standards.
9        (5) Waste discharge requirements and permits that are
10    issued on and after January 1, 2018, shall be at least as
11    protective of the environment and comply with all
12    applicable water quality standards, effluent limitations,
13    and restrictions as required by the applicable baseline
14    federal law standards, in addition to those required by
15    State law.
16        (6) Drinking water supply permits that are issued on
17    and after January 1, 2018, shall be at least as protective
18    of public health and comply with all applicable drinking
19    water standards as required by the applicable baseline
20    federal law standards, in addition to those required by
21    State law.
22        (7) A water quality management plan adopted on or after
23    January 1, 2018, shall be at least as protective of the
24    environment pursuant to, and in compliance with, all
25    applicable water quality standards, effluent limitations,
26    and restrictions as required by the applicable baseline

 

 

SB2213- 110 -LRB100 13060 MJP 27439 b

1    federal law standards, in addition to those required by
2    State law.
3        (8) When a waste discharge requirement or water quality
4    management plan is renewed or amended, any water quality
5    standards, effluent limitations, restrictions, and
6    conditions shall be at least as protective of the
7    environment pursuant to, and in compliance with, all
8    applicable water quality standards, effluent limitations,
9    and restrictions as required by the applicable baseline
10    federal law standards, in addition to those required by
11    State law.
 
12    (415 ILCS 5/62 new)
13    Sec. 62. Endangered and threatened species.
14    (a) The General Assembly finds all of the following:
15        (1) The Illinois Endangered Species Protection Act is
16    the State analog to the federal Endangered Species Act.
17        (2) The Illinois Endangered Species Protection Act
18    prohibits the taking of any species that the Department of
19    Natural Resources determines to be endangered or
20    threatened, unless the Department of Natural Resources
21    allows for take incidental to otherwise lawful activity
22    under Section 4 of the Illinois Endangered Species
23    Protection Act.
24    (b) Except as otherwise authorized by State law, both of
25the following apply:

 

 

SB2213- 111 -LRB100 13060 MJP 27439 b

1        (1) All native species not already listed under the
2    Illinois Endangered Species Protection Act that are listed
3    as endangered or threatened under the federal Endangered
4    Species Act as of January 1, 2017, shall be listed as an
5    endangered or threatened species, as appropriate, under
6    the Illinois Endangered Species Protection Act. The
7    Department of Natural Resources may review and modify the
8    listing of species in accordance with this Section.
9        (2) Any new or revised consistency determination or
10    incidental take permit issued to a permittee on or after
11    January 1, 2018, shall only authorize incidental take if it
12    requires conditions at least as stringent as required by
13    the relevant baseline federal law standards, including,
14    but not limited to, any federal incidental take statement,
15    incidental take permit, or biological opinion in effect and
16    applicable to a permittee or project as of January 1, 2017.
17    This subsection does not modify the requirements of Section
18    5.5 of the Illinois Endangered Species Protection Act.
 
19    (415 ILCS 5/63 new)
20    Sec. 63. Implementation; reporting. Every State agency
21shall undertake all feasible efforts using its authority under
22State and federal law to implement and enforce this amendatory
23Act of the 100th General Assembly. Every State agency that
24takes steps to enforce this amendatory Act of the 100th General
25Assembly shall submit a report to the General Assembly at least

 

 

SB2213- 112 -LRB100 13060 MJP 27439 b

1once every 6 months describing its compliance with this Title.
 
2    Section 97. Severability. The provisions of this Act are
3severable. If any provision of this Act or its application is
4held invalid, that invalidity shall not affect other provisions
5or applications that can be given effect without the invalid
6provision or application.

 

 

SB2213- 113 -LRB100 13060 MJP 27439 b

1 INDEX
2 Statutes amended in order of appearance
3    New Act
4    415 ILCS 5/9.15
5    415 ILCS 5/34.1 new
6    415 ILCS 5/34.9 new
7    415 ILCS 5/39.5from Ch. 111 1/2, par. 1039.5
8    415 ILCS 5/Tit. XVIII
9    heading new
10    415 ILCS 5/59 new
11    415 ILCS 5/59.1 new
12    415 ILCS 5/59.2 new
13    415 ILCS 5/59.3 new
14    415 ILCS 5/60 new
15    415 ILCS 5/61 new
16    415 ILCS 5/62 new
17    415 ILCS 5/63 new