1 | AN ACT concerning State government.
| |||||||||||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||||||||||||
4 | Section 5. The Business Assistance and Regulatory Reform | |||||||||||||||||||||||||||||
5 | Act is amended by changing Sections 5, 10, and 15 and by adding | |||||||||||||||||||||||||||||
6 | Sections 7, 25, and 30 as follows:
| |||||||||||||||||||||||||||||
7 | (20 ILCS 608/5)
| |||||||||||||||||||||||||||||
8 | Sec. 5. Goal. The goal of this Act is to improve the | |||||||||||||||||||||||||||||
9 | State's business
climate by making it easier for small and | |||||||||||||||||||||||||||||
10 | mid-size businesses to deal with
State requirements for doing | |||||||||||||||||||||||||||||
11 | business. This goal will be achieved through
providing quick, | |||||||||||||||||||||||||||||
12 | accurate information on existing requirements , and avoiding
| |||||||||||||||||||||||||||||
13 | unnecessary requirements , and expediting permit issuance .
| |||||||||||||||||||||||||||||
14 | (Source: P.A. 88-404.)
| |||||||||||||||||||||||||||||
15 | (20 ILCS 608/7 new) | |||||||||||||||||||||||||||||
16 | Sec. 7. Definitions. As used in this Act: | |||||||||||||||||||||||||||||
17 | "Authorization" means any license, permit, approval, | |||||||||||||||||||||||||||||
18 | finding, determination, or other administrative decision | |||||||||||||||||||||||||||||
19 | issued by an agency and any interagency consultation that is | |||||||||||||||||||||||||||||
20 | required or authorized under State law in order to site, | |||||||||||||||||||||||||||||
21 | construct, reconstruct, or commence operations of a covered | |||||||||||||||||||||||||||||
22 | project administered by a State agency or, in the case of a |
| |||||||
| |||||||
1 | unit of local government that chooses to participate in the | ||||||
2 | environmental review and authorization process in accordance | ||||||
3 | with subparagraph (A) of paragraph (3) of subsection (c) of | ||||||
4 | Section 30, a local permitting authority. | ||||||
5 | "Committee" means the Interagency Permitting Advisory | ||||||
6 | Committee established under Section 25. | ||||||
7 | "Covered project" means any activity in Illinois with | ||||||
8 | authorization or environmental review by an agency involving | ||||||
9 | construction of infrastructure for renewable or conventional | ||||||
10 | energy production, electricity transmission, surface | ||||||
11 | transportation, aviation, ports and waterways, water resource | ||||||
12 | projects, broadband, pipelines, manufacturing, or any other | ||||||
13 | sector as determined by a majority vote of the Committee that: | ||||||
14 | (1) is subject to permitting requirements pursuant to | ||||||
15 | the Environmental Protection Act, is likely to require a | ||||||
16 | total investment of more than $20,000,000, and does not | ||||||
17 | qualify for abbreviated authorization or environmental | ||||||
18 | review processes under any applicable law; or | ||||||
19 | (2) is subject to permitting requirements pursuant to | ||||||
20 | the Environmental Protection Act and the size and | ||||||
21 | complexity of which, in the opinion of the Committee, | ||||||
22 | makes the project likely to benefit from enhanced | ||||||
23 | oversight and coordination, including a project likely to | ||||||
24 | require authorization from or environmental review | ||||||
25 | involving more than 2 agencies. | ||||||
26 | "Project sponsor" means an entity, including any private, |
| |||||||
| |||||||
1 | public, or public-private entity, seeking an authorization for | ||||||
2 | a covered project.
| ||||||
3 | (20 ILCS 608/10)
| ||||||
4 | Sec. 10. Executive Office. There is created an Office of | ||||||
5 | Business
Permits and Regulatory Assistance (hereinafter | ||||||
6 | referred to as "office")
within the Department of Commerce and | ||||||
7 | Community Affairs (now Department of Commerce and Economic | ||||||
8 | Opportunity)
which shall consolidate existing programs
| ||||||
9 | throughout State government, provide assistance to businesses | ||||||
10 | with fewer than
500
employees in meeting State requirements | ||||||
11 | for doing business , consolidate existing programs throughout | ||||||
12 | State government, and perform other
functions specified in | ||||||
13 | this Act. The office shall implement reforms to improve | ||||||
14 | interagency coordination that allow for expeditious permitting | ||||||
15 | issuance. The office shall utilize information technology | ||||||
16 | tools to track project schedules and metrics to improve | ||||||
17 | transparency and accountability of the permitting process, | ||||||
18 | reduce uncertainty and delays, and reduce costs and risks to | ||||||
19 | taxpayers. The
By March 1, 1994, the office shall complete and | ||||||
20 | file with the Governor and the
General Assembly a plan for the | ||||||
21 | implementation of this Act. Thereafter, the
office shall carry | ||||||
22 | out the provisions of this Act, subject to funding
through | ||||||
23 | appropriation.
| ||||||
24 | (Source: P.A. 98-463, eff. 8-16-13.)
|
| |||||||
| |||||||
1 | (20 ILCS 608/15)
| ||||||
2 | Sec. 15. Providing Information and Expediting Permit | ||||||
3 | Reviews.
| ||||||
4 | (a) The office shall provide an online information system | ||||||
5 | using a website toll-free
business assistance number. The | ||||||
6 | number shall be advertised throughout the
State. Interested | ||||||
7 | businesses shall If requested, the caller will be sent a basic | ||||||
8 | business kit, describing
the basic requirements and procedures | ||||||
9 | for doing business in Illinois. If
requested, the caller shall | ||||||
10 | be directed to one or more of the additional
services provided | ||||||
11 | by the office. All persons providing advice to callers on
| ||||||
12 | behalf of
the office and all persons responsible for directly | ||||||
13 | providing services to
persons visiting the office or one of | ||||||
14 | its branches shall be persons with small
business experience | ||||||
15 | in an administrative or managerial capacity.
| ||||||
16 | (b) (Blank).
| ||||||
17 | (c) Any applicant for permits required for a business | ||||||
18 | activity may confer
with the office to obtain assistance in | ||||||
19 | the prompt and efficient processing and
review of | ||||||
20 | applications. The office shall may designate an employee of | ||||||
21 | the office to
act as a permit assistance manager to:
| ||||||
22 | (1) facilitate contacts for the applicant with | ||||||
23 | responsible agencies;
| ||||||
24 | (2) arrange conferences to clarify the requirements of | ||||||
25 | interested
agencies;
| ||||||
26 | (3) consider with State agencies the feasibility of |
| |||||||
| |||||||
1 | consolidating
hearings and data required of the applicant;
| ||||||
2 | (4) assist the applicant in resolution of outstanding | ||||||
3 | issues identified by
State agencies; and
| ||||||
4 | (5) coordinate federal, State and local regulatory | ||||||
5 | procedures and permit
review actions to the extent | ||||||
6 | possible.
| ||||||
7 | (d) The office shall publish an online a directory of | ||||||
8 | State business permits and State
programs to assist small | ||||||
9 | businesses.
| ||||||
10 | (e) The office shall attempt to establish
agreements with | ||||||
11 | local governments to
allow the office to provide assistance to | ||||||
12 | applicants for permits required by
these local governments.
| ||||||
13 | (f) (Blank). Interested
State agencies shall, to the | ||||||
14 | maximum extent feasible, establish procedures to
expedite | ||||||
15 | applications for infrastructure projects. Applications for | ||||||
16 | permits
for infrastructure projects shall be approved or | ||||||
17 | disapproved within 45 days of
submission, unless law or | ||||||
18 | regulations specify a different period. If the
interested | ||||||
19 | agency is unable to act within that period, the agency shall | ||||||
20 | provide
a written notification to the office specifying | ||||||
21 | reasons for its inability to
act and the date by which approval | ||||||
22 | or disapproval shall be determined. The
office may require any | ||||||
23 | interested State agency to designate an employee who
will | ||||||
24 | coordinate the handling of permits in that area.
| ||||||
25 | (g) In addition to its responsibilities in connection with | ||||||
26 | permit
assistance, the office shall provide general regulatory |
| |||||||
| |||||||
1 | information by
directing businesses to appropriate officers in | ||||||
2 | State agencies to supply the
information requested.
| ||||||
3 | (h) The office shall help businesses to locate and apply | ||||||
4 | to training
programs available to train current employees in | ||||||
5 | particular skills, techniques
or areas of knowledge relevant | ||||||
6 | to the employees' present or anticipated job
duties. In | ||||||
7 | pursuit of this objective, the office shall provide businesses | ||||||
8 | with
pertinent information about training programs offered by | ||||||
9 | State agencies, units
of local government, public universities | ||||||
10 | and colleges, community colleges, and
school districts in | ||||||
11 | Illinois.
| ||||||
12 | (i) The office shall help businesses to locate and apply | ||||||
13 | to State programs
offering to businesses grants, loans, loan | ||||||
14 | or bond guarantees, investment
partnerships, technology or | ||||||
15 | productivity consultation, or other forms of
business | ||||||
16 | assistance.
| ||||||
17 | (j) To the extent authorized by federal law, the office | ||||||
18 | shall assist
businesses in ascertaining and complying with the | ||||||
19 | requirements of the federal
Americans with Disabilities Act.
| ||||||
20 | (k) The office shall provide confidential on-site | ||||||
21 | assistance in identifying
problems and solutions in compliance | ||||||
22 | with requirements of State and federal
environmental | ||||||
23 | regulations. The office shall work through and contract with | ||||||
24 | the Illinois Sustainable Technology
Center to provide | ||||||
25 | confidential on-site
consultation audits that (i) assist | ||||||
26 | regulatory compliance and (ii) identify
pollution prevention |
| |||||||
| |||||||
1 | opportunities.
| ||||||
2 | (k-5) Until July 1, 2012, the office shall provide | ||||||
3 | confidential on-site assistance, including, but not limited | ||||||
4 | to, consultation audits, to identify
problems and solutions | ||||||
5 | regarding compliance with the requirements of the federal
| ||||||
6 | Occupational Safety and Health Administration. On and after | ||||||
7 | July 1, 2012, the Department of Labor shall provide | ||||||
8 | confidential on-site assistance, including, but not limited | ||||||
9 | to, consultation audits, to identify
problems and solutions | ||||||
10 | regarding compliance with the requirements of the federal
| ||||||
11 | Occupational Safety and Health Administration. | ||||||
12 | (l) The office shall provide information on existing loan | ||||||
13 | and business
assistance programs provided by the State.
| ||||||
14 | (m) Each State agency having jurisdiction to approve or | ||||||
15 | deny a permit shall
have the continuing power heretofore or | ||||||
16 | hereafter vested in it to make such
determinations. The | ||||||
17 | provisions of this Act shall not lessen or reduce such
powers | ||||||
18 | and shall modify the procedures followed in carrying out such | ||||||
19 | powers
only to the extent provided in this Act.
| ||||||
20 | (n) (1) Each State agency shall fully cooperate with the | ||||||
21 | office in
providing information, documentation, personnel or | ||||||
22 | facilities requested by the
office.
| ||||||
23 | (2) Each State agency having jurisdiction of any permit to | ||||||
24 | which the
master application procedure is applicable shall | ||||||
25 | designate an employee to act
as permit liaison office with the | ||||||
26 | office in carrying out the provisions of this
Act.
|
| |||||||
| |||||||
1 | (o) (1) The office shall identify, develop, and track | ||||||
2 | metrics for timeliness of permit reviews, permit decisions, | ||||||
3 | and project outcomes has authority, but is not required, to | ||||||
4 | keep and analyze
appropriate statistical data regarding the | ||||||
5 | number of permits issued by State
agencies, the amount of time | ||||||
6 | necessary for the permits to be issued, the cost
of obtaining | ||||||
7 | such permits, the types of projects for which specific permits | ||||||
8 | are
issued, a geographic distribution of permits, and other | ||||||
9 | pertinent data the
office deems appropriate .
| ||||||
10 | The office shall administer and expand the use of online | ||||||
11 | transparency tools providing: | ||||||
12 | (i) tracking and reporting metrics; | ||||||
13 | (ii) development and posting of schedules for permit | ||||||
14 | reviews and permit decisions; | ||||||
15 | (iii) the sharing of best practices relating to | ||||||
16 | efficient project permitting and reviews; and | ||||||
17 | (iv) the visual display of relevant geospatial data to | ||||||
18 | support the permitting process. make such data and any | ||||||
19 | analysis of the data available to
the public.
| ||||||
20 | (2) The office shall has authority, but is not required, | ||||||
21 | to conduct or cause to be
conducted a thorough review of any | ||||||
22 | agency's permit requirements and the need
by the State to | ||||||
23 | require such permits. The office shall draw on the review, on
| ||||||
24 | its direct experience, and on its statistical analyses to | ||||||
25 | prepare
recommendations regarding how to:
| ||||||
26 | (i) eliminate unnecessary or antiquated permit |
| |||||||
| |||||||
1 | requirements;
| ||||||
2 | (ii) consolidate duplicative or overlapping permit | ||||||
3 | requirements;
| ||||||
4 | (iii) simplify overly complex or lengthy application | ||||||
5 | procedures;
| ||||||
6 | (iv) expedite time-consuming agency review and | ||||||
7 | approval procedures; or
| ||||||
8 | (v) otherwise improve the permitting processes in the | ||||||
9 | State.
| ||||||
10 | The office shall submit copies of all recommendations | ||||||
11 | within 5 days of
issuance to the affected agency, the | ||||||
12 | Governor, the General Assembly, and the
Joint Committee on | ||||||
13 | Administrative Rules.
| ||||||
14 | (p) The office shall has authority to review State forms | ||||||
15 | on its own initiative or
upon the request of another State | ||||||
16 | agency to ascertain the burden, if any, of
complying with | ||||||
17 | those forms. If the office determines that a form is unduly
| ||||||
18 | burdensome to business, it may recommend to the agency issuing | ||||||
19 | the form either
that the form be eliminated or that specific | ||||||
20 | changes be made in the form.
| ||||||
21 | (q) Not later than March 1 of each year, beginning March 1, | ||||||
22 | 1995, the office
shall submit an annual
report of its | ||||||
23 | activities during the preceding year to the Governor and | ||||||
24 | General
Assembly. The report shall describe the activities of | ||||||
25 | the office during the
preceding year and shall contain | ||||||
26 | statistical information on the permit
assistance activities of |
| |||||||
| |||||||
1 | the office.
| ||||||
2 | (Source: P.A. 97-787, eff. 7-13-12; 98-346, eff. 8-14-13.)
| ||||||
3 | (20 ILCS 608/25 new) | ||||||
4 | Sec. 25. Interagency Permitting Advisory Committee. | ||||||
5 | (a) The Director of each permitting agency shall designate | ||||||
6 | a representative of the agency to serve on the committee and | ||||||
7 | represent the agency as agency chief environmental review and | ||||||
8 | permitting officer as required by this Act. | ||||||
9 | (b) The head of each of the following agencies, or his or | ||||||
10 | her designee, shall serve on the committee: | ||||||
11 | (1) the Office of Business Permits and Regulatory | ||||||
12 | Assistance; | ||||||
13 | (2) the Environmental Protection Agency; | ||||||
14 | (3) the Department of Transportation; | ||||||
15 | (4) the Department of Natural Resources; | ||||||
16 | (5) the Illinois Commerce Commission; | ||||||
17 | (6) the Office of State Fire Marshal; and | ||||||
18 | (7) the Department of Public Health. | ||||||
19 | (20 ILCS 608/30 new) | ||||||
20 | Sec. 30. Permitting process improvement. | ||||||
21 | (a) Project initiation and designation of participating | ||||||
22 | agencies. | ||||||
23 | (1) Notice. | ||||||
24 | (A) A project sponsor of a covered project shall |
| |||||||
| |||||||
1 | submit to the office notice of the initiation of a | ||||||
2 | proposed covered project. | ||||||
3 | (B) Each notice described in subparagraph (A) | ||||||
4 | shall include: | ||||||
5 | (i) a statement of the purposes and objectives | ||||||
6 | of the proposed project; | ||||||
7 | (ii) a concise description, including the | ||||||
8 | general location of the proposed project and a | ||||||
9 | summary of geospatial information, if available, | ||||||
10 | illustrating the project area and the locations, | ||||||
11 | if any, of environmental, cultural, and historic | ||||||
12 | resources; | ||||||
13 | (iii) a statement regarding the technical and | ||||||
14 | financial ability of the project sponsor to | ||||||
15 | construct the proposed project; | ||||||
16 | (iv) a statement of any financing, and | ||||||
17 | authorizations anticipated to be required to | ||||||
18 | complete the proposed project; and | ||||||
19 | (v) an assessment that the proposed project | ||||||
20 | meets the definition of a covered project under | ||||||
21 | Section 7 and a statement of reasons supporting | ||||||
22 | the assessment. | ||||||
23 | (2) Invitation. | ||||||
24 | (A) Not later than 21 calendar days after the date | ||||||
25 | on which the office makes a specific entry for the | ||||||
26 | project on the Permitting Dashboard under paragraph |
| |||||||
| |||||||
1 | (1) of subsection (b), the office, with input from the | ||||||
2 | agency chief environmental review and permitting | ||||||
3 | officer shall: | ||||||
4 | (i) identify agencies and governmental | ||||||
5 | entities likely to have financing, environmental | ||||||
6 | review, authorization, or other responsibilities | ||||||
7 | with respect to the proposed project; and | ||||||
8 | (ii) invite all agencies identified under | ||||||
9 | clause (i) to become a cooperating agency, in the | ||||||
10 | environmental review and authorization management | ||||||
11 | process described in this Section. | ||||||
12 | (B) Each invitation made under subparagraph (A) | ||||||
13 | shall include a 14 calendar day deadline for a | ||||||
14 | response to be submitted to the office. | ||||||
15 | (3) Cooperating agencies. | ||||||
16 | (A) An agency invited under paragraph (2) shall be | ||||||
17 | designated as a cooperating agency for a covered | ||||||
18 | project, unless the agency informs the office in | ||||||
19 | writing before the deadline under subparagraph (B) of | ||||||
20 | paragraph (2) that the agency: | ||||||
21 | (i) has no jurisdiction or authority with | ||||||
22 | respect to the proposed project; or | ||||||
23 | (ii) does not intend to exercise authority | ||||||
24 | related to, or submit comments on, the proposed | ||||||
25 | project. | ||||||
26 | (B) On request and a showing of changed |
| |||||||
| |||||||
1 | circumstances, the office may designate an agency that | ||||||
2 | has opted out under subparagraph (A)(ii) of this | ||||||
3 | paragraph (3) to be a cooperating agency. | ||||||
4 | (4) The designation described in paragraph (3) shall | ||||||
5 | not: | ||||||
6 | (A) give the cooperating agency authority or | ||||||
7 | jurisdiction over the covered project; or | ||||||
8 | (B) expand any jurisdiction or authority a | ||||||
9 | cooperating agency may have over the proposed project. | ||||||
10 | (b) Permitting Dashboard. | ||||||
11 | (1) Requirement to maintain. | ||||||
12 | (A) The office, in coordination with the | ||||||
13 | Department of Innovation and Technology, shall | ||||||
14 | maintain an online database to be known as the | ||||||
15 | "Permitting Dashboard" to track the status of | ||||||
16 | environmental reviews and authorizations for any cover | ||||||
17 | project. | ||||||
18 | (B) If the office determines that the project is | ||||||
19 | not a covered project, the project sponsor may submit | ||||||
20 | a further explanation as to why the project is a | ||||||
21 | covered project not later than 14 days after the date | ||||||
22 | of being notified of the determination. | ||||||
23 | (C) Not later than 14 days after receiving an | ||||||
24 | explanation described in subparagraph (B), the office | ||||||
25 | shall: | ||||||
26 | (i) make a final and conclusive determination |
| |||||||
| |||||||
1 | as to whether the project is a covered project; | ||||||
2 | and | ||||||
3 | (ii) if the office determines that the project | ||||||
4 | is a covered project, create a specific entry on | ||||||
5 | the Permitting Dashboard for the covered project. | ||||||
6 | (2) Postings by agencies. | ||||||
7 | (A) For each covered project added to the | ||||||
8 | Permitting Dashboard under paragraph (1), the office | ||||||
9 | and each cooperating and agency shall post to the | ||||||
10 | Permitting Dashboard: | ||||||
11 | (i) a hyperlink that directs to a website that | ||||||
12 | contains, to the extent consistent with applicable | ||||||
13 | law: | ||||||
14 | (I) the notification submitted under | ||||||
15 | paragraph (1) of subsection (a); | ||||||
16 | (II) where practicable: (aa) the | ||||||
17 | applications and supporting documents that | ||||||
18 | have been submitted by a project sponsor for | ||||||
19 | any required environmental review or | ||||||
20 | authorization; or (bb) a notice explaining how | ||||||
21 | the public may obtain access to such | ||||||
22 | documents; | ||||||
23 | (III) a description of any agency action | ||||||
24 | taken or decision made that materially affects | ||||||
25 | the status of a covered project; | ||||||
26 | (IV) any significant document that |
| |||||||
| |||||||
1 | supports the action or decision described in | ||||||
2 | subclause (III); and | ||||||
3 | (V) a description of the status of any | ||||||
4 | litigation to which the agency is a party that | ||||||
5 | is directly related to the project, including, | ||||||
6 | if practicable, any judicial document made | ||||||
7 | available on an electronic docket maintained | ||||||
8 | by a federal, State, or local court; and | ||||||
9 | (ii) any document described in clause (i) that | ||||||
10 | is not available by hyperlink on another website. | ||||||
11 | (B) The information described in subparagraph (A) | ||||||
12 | shall be posted to the website made available by | ||||||
13 | hyperlink on the Permitting Dashboard not later than 5 | ||||||
14 | business days after the date on which the agency | ||||||
15 | receives the information. | ||||||
16 | (3) Postings by the office. The office shall publish | ||||||
17 | to the Permitting Dashboard: | ||||||
18 | (A) the permitting timetable established under | ||||||
19 | paragraph (2) of subsection (c); | ||||||
20 | (B) the status of the compliance of each agency | ||||||
21 | with the permitting timetable; | ||||||
22 | (C) any modifications of the permitting timetable; | ||||||
23 | (D) an explanation of each modification described | ||||||
24 | in subparagraph (C); and | ||||||
25 | (E) any memorandum of understanding established | ||||||
26 | under subparagraph (C) of paragraph (3) of subsection |
| |||||||
| |||||||
1 | (c). | ||||||
2 | (c) Coordination and timetables. | ||||||
3 | (1) Coordinated project plan. | ||||||
4 | (A) Not later than 60 days after the date on which | ||||||
5 | the office makes a specific entry for the project on | ||||||
6 | the Permitting Dashboard, in consultation with each | ||||||
7 | agency chief environmental review and permitting | ||||||
8 | officer, shall establish a concise plan for | ||||||
9 | coordinating public and agency participation in, and | ||||||
10 | completion of, any required environmental review and | ||||||
11 | authorization for the project. | ||||||
12 | (B) The coordinated project plan shall include the | ||||||
13 | following information and be updated by the office, as | ||||||
14 | applicable, at least once per quarter: | ||||||
15 | (i) A list of, and roles and responsibilities | ||||||
16 | for, all entities with environmental review or | ||||||
17 | authorization responsibility for the project. | ||||||
18 | (ii) A permitting timetable, as described in | ||||||
19 | paragraph (2), setting forth a comprehensive | ||||||
20 | schedule of dates by which all environmental | ||||||
21 | reviews and authorizations, and to the maximum | ||||||
22 | extent practicable, other jurisdictions' permits, | ||||||
23 | reviews, and approvals must be made. | ||||||
24 | (iii) A discussion of potential avoidance, | ||||||
25 | minimization, and mitigation strategies, if | ||||||
26 | required by applicable law and known. |
| |||||||
| |||||||
1 | (iv) Plans and a schedule for public outreach | ||||||
2 | and coordination, to the extent required by | ||||||
3 | applicable law. | ||||||
4 | (C) The coordinated project plan described in | ||||||
5 | subparagraph (A) may be incorporated into a memorandum | ||||||
6 | of understanding. | ||||||
7 | (2) Permitting timetable. | ||||||
8 | (A) As part of the coordination project plan under | ||||||
9 | paragraph (1), the office, in consultation with each | ||||||
10 | agency chief environmental review and permitting | ||||||
11 | officer, the project sponsor, and any unit of local | ||||||
12 | government in which the project is located, and, | ||||||
13 | subject to subparagraph (C), with the concurrence of | ||||||
14 | each cooperating agency, shall establish a permitting | ||||||
15 | timetable that includes intermediate and final | ||||||
16 | completion dates for action by each cooperating agency | ||||||
17 | on any environmental review or authorization required | ||||||
18 | for the project. The final completion states shall be | ||||||
19 | based on relevant historical data but with the aim of | ||||||
20 | completing all required authorizations within 2 years. | ||||||
21 | (B) In establishing the permitting timetable under | ||||||
22 | subparagraph (A), the office may vary the timetable | ||||||
23 | based on relevant factors including: | ||||||
24 | (i) the size and complexity of the covered | ||||||
25 | project; | ||||||
26 | (ii) the resources available to each |
| |||||||
| |||||||
1 | participating agency; | ||||||
2 | (iii) the regional or national economic | ||||||
3 | significance of the project; | ||||||
4 | (iv) the sensitivity of the natural or | ||||||
5 | historic resources that may be affected by the | ||||||
6 | project; | ||||||
7 | (v) the financing plan for the project; and | ||||||
8 | (vi)the extent to which similar projects in | ||||||
9 | geographic proximity to the project were recently | ||||||
10 | subject to environmental review or similar | ||||||
11 | procedures under State law. | ||||||
12 | (C) Dispute resolution. | ||||||
13 | (i) The office, in consultation with | ||||||
14 | appropriate agency chief environmental review and | ||||||
15 | permitting officers and the project sponsor, | ||||||
16 | shall, as necessary, mediate any disputes | ||||||
17 | regarding the permitting timetable referred to | ||||||
18 | under subparagraph (A). | ||||||
19 | (ii) If a dispute remains unresolved 30 days | ||||||
20 | after the date on which the dispute was submitted | ||||||
21 | to the office, the Director of the Governor's | ||||||
22 | Office of Management and Budget shall facilitate a | ||||||
23 | resolution of the dispute and direct the agencies | ||||||
24 | party to the dispute to resolve the dispute by the | ||||||
25 | end of the 60-day period beginning on the date of | ||||||
26 | submission of the dispute to the office. |
| |||||||
| |||||||
1 | (iii) Any action taken by the Director of the | ||||||
2 | Governor's Office of Management and Budget in the | ||||||
3 | resolution of a dispute under clause (ii) shall: | ||||||
4 | (I) be final and conclusive; and | ||||||
5 | (II) not be subject to judicial review. | ||||||
6 | (D) Modification after approval. | ||||||
7 | (i) The office may modify a permitting | ||||||
8 | timetable established under subparagraph (A) only | ||||||
9 | if: | ||||||
10 | (I) the affected cooperating agencies, | ||||||
11 | after consultation with the project sponsor, | ||||||
12 | agree to a different completion date; | ||||||
13 | (II) the affected cooperating agency | ||||||
14 | provides a written justification for the | ||||||
15 | modification; and | ||||||
16 | (III) in the case of a modification that | ||||||
17 | would necessitate an extension of a final | ||||||
18 | completion date under a permitting timetable | ||||||
19 | established under subparagraph (A) to a date | ||||||
20 | more than 30 days after the final completion | ||||||
21 | date originally established under subparagraph | ||||||
22 | (A), the office shall consult with the project | ||||||
23 | sponsor and make a determination on the | ||||||
24 | record, based on consideration of the relevant | ||||||
25 | factors described under subparagraph (B), | ||||||
26 | whether to make such modification. |
| |||||||
| |||||||
1 | (ii) A completion date in the permitting | ||||||
2 | timetable may not be modified within 30 days after | ||||||
3 | the completion date. | ||||||
4 | (iii) Limitation on length of modifications. | ||||||
5 | (I) Except as provided in subclause (II), | ||||||
6 | the total length of all modifications to a | ||||||
7 | permitting timetable authorized or made under | ||||||
8 | this subparagraph (D), other than for reasons | ||||||
9 | outside the control of federal, State, local, | ||||||
10 | or tribal governments, may not extend the | ||||||
11 | permitting timetable for a period of time | ||||||
12 | greater than half of the amount of time from | ||||||
13 | the establishment of the permitting timetable | ||||||
14 | under subparagraph (A) to the last final | ||||||
15 | completion date originally established under | ||||||
16 | subparagraph (A). | ||||||
17 | (II) The Director of the Governor's Office | ||||||
18 | of Management and Budget, after consultation | ||||||
19 | with the project sponsor, may permit the | ||||||
20 | office to authorize additional extensions of a | ||||||
21 | permitting timetable beyond the limit | ||||||
22 | prescribed by subclause (I). In such a case, | ||||||
23 | the Director of the Governor's Office of | ||||||
24 | Management and Budget shall transmit, not | ||||||
25 | later than 5 days after making a determination | ||||||
26 | to permit an authorization of extension under |
| |||||||
| |||||||
1 | this subclause (II), a report to the General | ||||||
2 | Assembly explaining why such modification is | ||||||
3 | required. Such report shall explain to the | ||||||
4 | General Assembly with specificity why the | ||||||
5 | original permitting timetable and the | ||||||
6 | modifications authorized by the office failed | ||||||
7 | to be adequate. The office shall transmit to | ||||||
8 | the Director of the Governor's Office of | ||||||
9 | Management and Budget, a supplemental report | ||||||
10 | on progress toward the final completion date | ||||||
11 | each year thereafter, until the permit review | ||||||
12 | is completed or the project sponsor withdraws | ||||||
13 | its notice or application or other request to | ||||||
14 | which this Section applies. | ||||||
15 | (iv) The following shall not be subject to | ||||||
16 | judicial review: | ||||||
17 | (I) A determination by the office under | ||||||
18 | subclause (III) of clause (i). | ||||||
19 | (II) A determination under subclause (II) | ||||||
20 | of clause (iii) by the Director of the | ||||||
21 | Governor's Office of Management and Budget to | ||||||
22 | permit the office to authorize extensions of a | ||||||
23 | permitting timetable. | ||||||
24 | (E) A permitting timetable established under | ||||||
25 | subparagraph (A) shall be consistent with any other | ||||||
26 | relevant time period established under law and shall |
| |||||||
| |||||||
1 | not prevent any cooperating agency from discharging | ||||||
2 | any obligation under law in connection with the | ||||||
3 | project. | ||||||
4 | (F) Conforming to permitting timetables. | ||||||
5 | (i) Each agency shall conform to the | ||||||
6 | completion dates set forth in the permitting | ||||||
7 | timetable established under subparagraph (A), or | ||||||
8 | with any completion date modified under | ||||||
9 | subparagraph (D). | ||||||
10 | (ii) If an agency fails to conform with a | ||||||
11 | completion date for agency action on a covered | ||||||
12 | project or is at significant risk of failing to | ||||||
13 | conform with such a completion date, the agency | ||||||
14 | shall: | ||||||
15 | (I) promptly submit to the office for | ||||||
16 | publication on the Permitting Dashboard an | ||||||
17 | explanation of the specific reasons for | ||||||
18 | failing or significantly risking failing to | ||||||
19 | conform to the completion date and a proposal | ||||||
20 | for an
alternative completion date; | ||||||
21 | (II) in consultation with the office | ||||||
22 | establish, an alternative completion date; and | ||||||
23 | (III) each month thereafter until the | ||||||
24 | agency has taken final action on the delayed | ||||||
25 | authorization or review, submit to the office | ||||||
26 | for posting on the Permitting Dashboard a |
| |||||||
| |||||||
1 | status report describing any agency activity | ||||||
2 | related to the project. | ||||||
3 | (G) Abandonment of covered project. | ||||||
4 | (i) If the office has a reasonable basis to | ||||||
5 | doubt the continuing technical or financial | ||||||
6 | ability of the project sponsor to construct the | ||||||
7 | covered project, the office may request the | ||||||
8 | project sponsor provide an updated statement | ||||||
9 | regarding the ability of the project sponsor to | ||||||
10 | complete the project. | ||||||
11 | (ii) If the project sponsor fails to respond | ||||||
12 | to a request described in clause (i) by the date | ||||||
13 | that is 30 days after receiving the request, the | ||||||
14 | office shall publish an appropriate notice on the | ||||||
15 | Permitting Dashboard. | ||||||
16 | (iii) On publication of a notice under clause | ||||||
17 | (ii), the completion dates in the permitting | ||||||
18 | timetable shall be tolled and agencies shall be | ||||||
19 | relieved of the obligation to comply with | ||||||
20 | subparagraph (F) until the project sponsor submits | ||||||
21 | to the office an updated statement regarding the | ||||||
22 | technical and financial ability of the project | ||||||
23 | sponsor to construct the project. | ||||||
24 | (3) Cooperating local governments. | ||||||
25 | (A) If the environmental review is being | ||||||
26 | implemented within the boundaries of a unit of local |
| |||||||
| |||||||
1 | government, it may choose to participate in the | ||||||
2 | environmental review and authorization process under | ||||||
3 | this subsection and to make subject to the process all | ||||||
4 | local authorities that: | ||||||
5 | (i) have jurisdiction over the covered | ||||||
6 | project; | ||||||
7 | (ii) are required to conduct or issue a | ||||||
8 | review, analysis, opinion, or statement for the | ||||||
9 | covered project; or | ||||||
10 | (iii) are required to make a determination on | ||||||
11 | issuing a permit, license, or other approval or | ||||||
12 | decision for the covered project. | ||||||
13 | (B) To the maximum extent practicable
under | ||||||
14 | applicable law, the office shall coordinate the | ||||||
15 | environmental review and authorization processes under | ||||||
16 | this subsection (c) with any local authority | ||||||
17 | responsible for conducting any separate review or | ||||||
18 | authorization of the covered project to ensure timely | ||||||
19 | and efficient completion of environmental reviews and | ||||||
20 | authorizations. | ||||||
21 | (C) Any coordination plan between the office and | ||||||
22 | any local authority shall, to the maximum extent | ||||||
23 | practicable, be included in a memorandum of | ||||||
24 | understanding. | ||||||
25 | (d) Early consultation. The office shall provide an | ||||||
26 | expeditious process for project sponsors to confer with each |
| |||||||
| |||||||
1 | cooperating agency involved and, not later than 60 days after | ||||||
2 | the date on which the project sponsor submits a request under | ||||||
3 | this subsection, to have each such agency provide to the | ||||||
4 | project sponsor information concerning: | ||||||
5 | (1) the availability of information and tools, | ||||||
6 | including pre-application toolkits, to facilitate early | ||||||
7 | planning efforts; | ||||||
8 | (2) key issues of concern to each agency and to the | ||||||
9 | public; and | ||||||
10 | (3) issues that must be addressed before an | ||||||
11 | environmental review or authorization can be completed.
|