| | HB3595 Engrossed | - 2 - | LRB103 30450 CPF 56882 b |
|
|
1 | | through a stack, provided that nothing in this definition |
2 | | shall exempt any emission unit from compliance with any |
3 | | provision of 35 Ill. Adm. Code 212 otherwise applicable merely |
4 | | because of the absence of a stack. |
5 | | "Implosion" means the use of explosives for the demolition |
6 | | of buildings or other structures. |
7 | | "Owner or operator" means the owner or operator of a |
8 | | thermal power plant and includes agents, representatives, and |
9 | | any persons acting on behalf of an owner or operator of the |
10 | | thermal power plant. |
11 | | "Particulate emission potential" means the potential for |
12 | | particulates from existing soils at the site to be dispersed |
13 | | by wind or by physical disturbance as determined using the |
14 | | procedures described in subparagraph (C) of paragraph (3) of |
15 | | subsection (j). |
16 | | "Recognized environmental condition" means the presence or |
17 | | likely presence of any hazardous substance or petroleum |
18 | | product on a property under conditions that indicate an |
19 | | existing release, a past release, or a material threat of a |
20 | | release of any hazardous substance or petroleum product into a |
21 | | structure on the property or into the ground, ground water, or |
22 | | surface water of the property. |
23 | | "Sensitive area" means any residentially-zoned or |
24 | | mixed-used property with residential use, a park, a hospital, |
25 | | a clinic, a church, a day-care, or a school. |
26 | | "Site" means real property containing a building or |
|
| | HB3595 Engrossed | - 3 - | LRB103 30450 CPF 56882 b |
|
|
1 | | structure to be demolished, and all structures, equipment, and |
2 | | ancillary fixtures thereon, used in or to support the |
3 | | demolition. "Site" includes, but is not limited to, |
4 | | structures, buildings, scales, roadways, parking areas, |
5 | | queuing areas, fences, processing equipment, processing areas, |
6 | | staging or stockpiling areas, and monitoring stations. |
7 | | "Site cleanup plan" means the site cleanup plan required |
8 | | in paragraph (5) of subsection (j). |
9 | | "Thermal power plant" or "plant" means a facility that |
10 | | currently produces or has ever produced electricity using a |
11 | | thermal generation technology. "Thermal power plant" or |
12 | | "plant" includes generation facilities creating power using |
13 | | coal or gas as inputs. "Thermal power plant" or "plant" does |
14 | | not include buildings that are exclusively administrative or |
15 | | exclusively office buildings. |
16 | | (b) Before an owner or operator may initiate demolition of |
17 | | a thermal power plant via implosion, the owner or operator |
18 | | must satisfy the notification requirements under subsection |
19 | | (c) and obtain an Agency-approved air quality plan as |
20 | | specified under subsection (j). |
21 | | (c) Before an owner or operator may initiate demolition of |
22 | | a thermal power plant via implosion, the owner or operator |
23 | | must notify the public at least 60 days before the anticipated |
24 | | date of the implosion. Notification must be conducted through |
25 | | all of the following activities: |
26 | | (1) Posting notices in both physical and online form |
|
| | HB3595 Engrossed | - 4 - | LRB103 30450 CPF 56882 b |
|
|
1 | | in a newspaper of general circulation within 25 miles of |
2 | | where the thermal power plant is located. Where a |
3 | | newspaper is unavailable, the owner or operator may use |
4 | | appropriate broadcast media such as radio or television. |
5 | | (2) Mailing or hand-delivering notices to the Agency |
6 | | and all residents within at least a one-mile radius from |
7 | | the property line of the thermal power plant site; the |
8 | | radius requirement is subject to the discretion of the |
9 | | Agency and may be extended dependent on site-specific |
10 | | characteristics, including, but not limited to, |
11 | | surrounding area population density, method of demolition, |
12 | | and pollution constituents associated with the demolition |
13 | | site. |
14 | | (3) Posting the notices on-site and in conspicuous |
15 | | public locations, such as grocery stores, public |
16 | | libraries, schools, municipal buildings, and pharmacies. |
17 | | (4) Establishing and posting on a publicly accessible |
18 | | website that can be visited without providing login |
19 | | credentials and that functions as a repository, all |
20 | | demolition-related communications, notices, and documents |
21 | | as specified in subsection (e). |
22 | | (5) Creating and sending alerts to phone, email, and |
23 | | text lists to announce the public meeting and specific |
24 | | demolition dates. |
25 | | (6) Requesting that the Agency email the notices to |
26 | | the Agency's listserv, created under paragraph (7), for |
|
| | HB3595 Engrossed | - 5 - | LRB103 30450 CPF 56882 b |
|
|
1 | | the plant. |
2 | | (7) For each plant subject to this Act, the Agency |
3 | | must create and maintain a listserv. Each listserv must |
4 | | include the email addresses of all interested persons who |
5 | | notify the Agency in writing, either directly through the |
6 | | Agency or indirectly through the owner or operator, of the |
7 | | person's respective email addresses and that the person |
8 | | would like to receive emails of notices concerning the |
9 | | plant. |
10 | | (d) The notice required under subsection (c) must include |
11 | | the following information: |
12 | | (1) The owner or operator's contact information, as |
13 | | well as the business name of each company that will be |
14 | | performing the demolition in whole or in part. |
15 | | (2) The date and time of the scheduled demolition. |
16 | | (3) The portion of the plant that is set for |
17 | | demolition. |
18 | | (4) The amount of demolition debris anticipated, |
19 | | expressed in terms of both weight and volume and |
20 | | categorized according to waste stream if multiple waste |
21 | | streams will result from the demolition, how and where it |
22 | | will be transported, and how and where it will ultimately |
23 | | be disposed of or otherwise repurposed. |
24 | | (5) The date, time, and location of the public meeting |
25 | | required under subsection (g), along with a reference to |
26 | | the statute requiring the public meeting. |
|
| | HB3595 Engrossed | - 6 - | LRB103 30450 CPF 56882 b |
|
|
1 | | (6) The address of the publicly accessible website. |
2 | | (7) Instructions for how to join phone, email, or text |
3 | | lists required under paragraph (5) of subsection (c) for |
4 | | future notices, public meetings, and specific demolition |
5 | | dates. |
6 | | (e) The information posted to the website must be made |
7 | | available to the public on the website until 3 years after the |
8 | | demolition ends. The content of the notice shall be available |
9 | | on the home page of the website and the following information |
10 | | must be available through the publicly accessible website: |
11 | | (1) A copy of the notice with identical content. |
12 | | (2) The draft air quality plan and all documentation |
13 | | relied upon in making the air quality plan as described in |
14 | | subsection (j). |
15 | | (3) The date, time, and location of the public meeting |
16 | | required under subsection (g), along with a reference to |
17 | | the statute requiring the public meeting. |
18 | | (4) A description of potential demolition impacts, |
19 | | including, but not limited to, a list of potential |
20 | | contaminants in the demolition debris, broken down by |
21 | | major waste stream if applicable, dates, hours, and |
22 | | decibels of noise anticipated, and dates and hours of road |
23 | | closures anticipated. |
24 | | (5) Information on any applicable permits issued to |
25 | | the plant in relation to the demolition, including |
26 | | county-issued or municipality-issued permits, with express |
|
| | HB3595 Engrossed | - 7 - | LRB103 30450 CPF 56882 b |
|
|
1 | | instructions explaining how to access a copy of each |
2 | | permit, or a copy of each of the permits, if available. |
3 | | (6) Whether there are any unlined CCR surface |
4 | | impoundments, as defined in Section 3.143, at or nearby |
5 | | the plant or public water sources or private wells within |
6 | | 2,500 feet of the plant. |
7 | | (7) A detailed description of the preventative |
8 | | measures that will be implemented by the owner or operator |
9 | | to control, mitigate, or prevent from occurring any air, |
10 | | soil, or water pollution during the demolition. |
11 | | (8) When a proposed demolition is located in a |
12 | | community with 10% or more non-English speaking residents, |
13 | | non-English versions of all of the above reflecting local |
14 | | language prevalence. |
15 | | (f) The owner or operator shall submit proof of |
16 | | notification to the Agency. No earlier than one week and no |
17 | | less than 72 hours before the originally scheduled demolition, |
18 | | the owner or operator must advise the phone, email, and text |
19 | | lists required under paragraph (5) of subsection (c) of the |
20 | | upcoming demolition. |
21 | | If there is a change to the date and time of a scheduled |
22 | | demolition, the owner or operator must update the |
23 | | publicly-accessible website required under paragraph (4) of |
24 | | subsection (c) and advise the phone, email, and text lists |
25 | | required under paragraph (5) of subsection (c) that the date |
26 | | is changing within 24 hours of the schedule change and also |
|
| | HB3595 Engrossed | - 8 - | LRB103 30450 CPF 56882 b |
|
|
1 | | notice of a new planned date at least 16 hours prior to the new |
2 | | demolition date. |
3 | | (g) At least 30 days after providing notice pursuant to |
4 | | this Section, an owner or operator must hold at least one |
5 | | public meeting within the municipality in which the site is |
6 | | located to discuss the proposed demolition, subject to the |
7 | | following rules: |
8 | | (1) The public meeting must be not more than 5 miles |
9 | | from the site unless a suitable venue is not available |
10 | | within that distance. |
11 | | (2) The public meeting must begin after 5:00 p.m. and |
12 | | be located at a venue that is accessible to persons with |
13 | | disabilities. |
14 | | (3) The owner or operator must provide reasonable |
15 | | accommodations, as defined in paragraph (9) of Section |
16 | | 12111 of the federal Americans with Disabilities Act of |
17 | | 1990, 42 U.S.C. 12111(9), upon request. |
18 | | (h) When a proposed demolition is located in a community |
19 | | with 10% or more non-English speaking residents, the owner or |
20 | | operator must provide translation services during the public |
21 | | meeting required by this Section, if requested at least 72 |
22 | | hours in advance of the public meeting. |
23 | | (i) At the public meeting, the owner or operator must |
24 | | comply with the following: |
25 | | (1) Present the schedule and process for the |
26 | | demolition, which must cover the noise, air quality, |
|
| | HB3595 Engrossed | - 9 - | LRB103 30450 CPF 56882 b |
|
|
1 | | environmental, public health, and any other community |
2 | | impacts, such as road closures, expected from the |
3 | | demolition, as well as a summary of the air quality plan, |
4 | | including control equipment and best management practices |
5 | | that will be used to reduce fugitive dust. |
6 | | (2) Include a question and answer portion of the |
7 | | meeting to allow the public to ask questions. |
8 | | (3) Include a public comment portion of the meeting to |
9 | | allow the public to offer comments. |
10 | | (4) Ensure the presence of representatives from the |
11 | | owner or operator or the company that will be performing |
12 | | the demolition in whole or in part. The representative |
13 | | must be qualified and knowledgeable enough to answer the |
14 | | questions posed by the public. |
15 | | (5) The owner and operator shall engage a certified |
16 | | court reporter to be present at the public meeting and |
17 | | transcribe the entirety of the public meeting, including, |
18 | | but not limited to, all statements made by the owner or |
19 | | operator and all public comments offered at the public |
20 | | meeting. |
21 | | (6) The owner or operator shall make the transcript of |
22 | | the public meeting available on the owner or operator's |
23 | | publicly accessible website no later than 14 days after |
24 | | the public meeting. |
25 | | (7) The owner or operator shall create a summary of |
26 | | the public meeting, including issues raised by the public, |
|
| | HB3595 Engrossed | - 10 - | LRB103 30450 CPF 56882 b |
|
|
1 | | and respond to all questions in writing no later than 14 |
2 | | days after the meeting. The owner or operator shall post |
3 | | the summary and responses to the owner's or operator's |
4 | | publicly accessible website and advise the phone, email, |
5 | | and text lists when the documentation is available. |
6 | | (8) The public meeting shall be live-streamed in order |
7 | | to allow the public to watch and meaningfully participate |
8 | | in the meeting. The meeting shall also be recorded. The |
9 | | recording shall be made available on the owner's or |
10 | | operator's publicly accessible website. |
11 | | (j) Before an owner or operator may initiate demolition of |
12 | | a thermal power plant via implosion, the owner or operator |
13 | | must establish an air quality plan that is approved by the |
14 | | Agency. The owner or operator shall comply with the provisions |
15 | | of the approved air quality plan. |
16 | | The air quality plan, the transcript of the public meeting |
17 | | required under subsection (g), and the public meeting summary |
18 | | described in paragraph (7) of subsection (i) shall be |
19 | | submitted to the Agency no more than 45 days after the public |
20 | | meeting required under subsection (g). |
21 | | The air quality plan shall include, but is not limited to, |
22 | | the following: |
23 | | (1) An air dispersion modeling study using AERMOD. The |
24 | | study shall simulate dust propagation generated from the |
25 | | implosion under varying wind speeds, wind directions, and |
26 | | weather stability classes, such as unstable, neutral, and |
|
| | HB3595 Engrossed | - 11 - | LRB103 30450 CPF 56882 b |
|
|
1 | | stable. The model shall calculate the concentrations of |
2 | | PM10 in the dust plume generated from the impact of the |
3 | | collapsed building or structure with the ground. Its |
4 | | results shall inform the placement of air monitors, as |
5 | | well as the dust mitigation plan and the site cleanup |
6 | | plan, and traffic management plans and the siting of |
7 | | protection and exclusion zones on-site and off-site. The |
8 | | AERMOD model shall produce the following outputs |
9 | | superimposed over aerial or satellite imagery: |
10 | | (A) PM10 concentration contours. |
11 | | (B) PM10 concentration versus time at the source, |
12 | | in the surrounding public way, and at sensitive areas |
13 | | offsite within 1,000 feet of the site. |
14 | | (C) Maximum PM10 concentrations at the areas |
15 | | specified above. |
16 | | (D) Computer generated videos for the estimated |
17 | | dust cloud propagation and dissipation. |
18 | | (2) Air monitoring of the air upwind and downwind at |
19 | | the site, as well the air at sensitive areas within 1,000 |
20 | | feet of the site or within the plume modeled under |
21 | | paragraph (1), whichever distance is greater, for PM10. |
22 | | The monitoring shall be conducted for at least a 24-hour |
23 | | duration one week prior to the implosion, during the |
24 | | implosion, and one week following the implosion, or weekly |
25 | | until air monitoring confirms that the 24-hour PM10 levels |
26 | | are back to normal, pre-implosion levels. PM10 levels |
|
| | HB3595 Engrossed | - 12 - | LRB103 30450 CPF 56882 b |
|
|
1 | | shall be considered normal when the measured PM10 levels |
2 | | are within the historic mean, plus or minus the standard |
3 | | deviation, within the last 3 years, unless the Agency has |
4 | | reason to believe that the site is still causing PM10 |
5 | | levels to be elevated. Historic PM10 data shall be based |
6 | | on data collected by the owner or operator from the |
7 | | nearest ambient air quality station operated by the Agency |
8 | | or other data sources approved by the Agency. The air |
9 | | monitoring shall comply with the following: |
10 | | (A) All air monitoring data shall be published on |
11 | | the publicly accessible website within 4 hours after |
12 | | collecting the data. |
13 | | (B) In conjunction with the above PM10 monitoring, |
14 | | air samples shall be collected at all monitored |
15 | | locations for analysis of: lead using NIOSH Method |
16 | | 7300, 7302, or 7303; asbestos fibers using NIOSH |
17 | | Method 7400 or 7402; silica using NIOSH Method 7500 or |
18 | | 7602; respirable particulates using NIOSH Method 0600; |
19 | | and total dust using NIOSH Method 0500. The Agency may |
20 | | approve alternate test methods or require the use of |
21 | | United States Environmental Protection Agency methods, |
22 | | depending on site-specific factors. The Agency may |
23 | | also require the air sampling of any or all hazardous |
24 | | substances or petroleum products for which there is a |
25 | | recognized environmental condition that may be emitted |
26 | | into the air by the implosion. The PM10 monitoring |
|
| | HB3595 Engrossed | - 13 - | LRB103 30450 CPF 56882 b |
|
|
1 | | shall be conducted using instruments designated as |
2 | | Federal Equivalent Method (FEM) by the United States |
3 | | Environmental Protection Agency. |
4 | | (C) The air quality plan shall also include |
5 | | operation, according to manufacturer's specifications, |
6 | | of a weather station or other permanent device to |
7 | | monitor and record wind speed and wind direction, |
8 | | along with the corresponding temperature, barometric |
9 | | pressure, and relative humidity at or near the site. |
10 | | Such readings shall be taken at an unobstructed, |
11 | | unsheltered area, unimpacted by the implosion, and at |
12 | | a minimum height of 10 meters above ground level, |
13 | | unless another height is appropriate pursuant to |
14 | | applicable United States Environmental Protection |
15 | | Agency protocols and guidance. |
16 | | (3) A dust mitigation plan that ensures adequate |
17 | | precautions and use of best practices to minimize fugitive |
18 | | dust. The dust mitigation plan shall include, but is not |
19 | | limited to, the following: |
20 | | (A) The following best practices: |
21 | | (i) The thorough sweeping of paved surfaces |
22 | | using a sweeper effective at removing fine |
23 | | particulates. |
24 | | (ii) Adequate wetting of all unpaved areas. |
25 | | The operator shall ensure that surficial soils |
26 | | within the ground impact area and 50% beyond are |
|
| | HB3595 Engrossed | - 14 - | LRB103 30450 CPF 56882 b |
|
|
1 | | thoroughly saturated up to a depth of 4 inches, or |
2 | | otherwise treated using methods approved by the |
3 | | Agency, on the day of and within one hour prior to |
4 | | the implosion, or within the closest timeframe |
5 | | allowed by safety protocol. |
6 | | (iii) Employing misting cannons around the |
7 | | building or structure or at strategic locations |
8 | | and elevations determined based on the results of |
9 | | the air dispersion modeling under paragraph (1). |
10 | | (iv) Applying water to debris immediately |
11 | | following blast and safety clearance. |
12 | | (B) Restricting traffic and operations to paved |
13 | | areas or stabilized surfaces. Soils exhibiting a high |
14 | | particulate emission potential shall be fenced off or |
15 | | otherwise demarcated to prevent disturbance, or shall |
16 | | be effectively stabilized, removed, or covered if |
17 | | vehicle traffic or operations will occur over these |
18 | | areas. |
19 | | (C) Evaluation of on-site surficial soil for |
20 | | particulate emission potential, which shall be |
21 | | determined to be high based on its fines content as |
22 | | percent passing No. 200 sieve and optimum moisture |
23 | | content as percent by dry weight as follows: |
24 | | (i) if the fines content is greater than or |
25 | | equal to 15% and the optimum moisture content is |
26 | | greater than or equal to 11%, the particulate |
|
| | HB3595 Engrossed | - 15 - | LRB103 30450 CPF 56882 b |
|
|
1 | | emission potential is high; or |
2 | | (ii) if the fines content is greater than 50%, |
3 | | the particulate emission potential is high. |
4 | | The fines content shall be determined using ASTM |
5 | | D1140-17, or updates thereto, while the optimum |
6 | | moisture content shall be measured using ASTM D1557 or |
7 | | AASHTO T180-D, or updates thereto. Alternate methods |
8 | | may be used with prior written approval from the |
9 | | Agency. The results of the investigation shall be |
10 | | depicted on a site map showing the areas of high |
11 | | particulate emission potential of unpaved surfaces at |
12 | | the site. |
13 | | (4) A contingency plan describing the contingency |
14 | | measures to be implemented if the above control measures |
15 | | fail to adequately control dust emissions. In addition, |
16 | | the plan must describe the steps that will be taken to |
17 | | verify that a dust control measure is working and, upon |
18 | | discovery of an inadequacy, the steps that will be taken |
19 | | to initiate a contingency measure. |
20 | | (5) A site cleanup plan to remove dust, debris, and |
21 | | litter from the surrounding impacted area as expeditiously |
22 | | and as safely as possible to minimize disruption to the |
23 | | community. The site cleanup plan shall include, but is not |
24 | | limited to, the following: |
25 | | (A) The use of a street sweeper to clean impacted |
26 | | paved areas. The street sweeper shall be equipped with |
|
| | HB3595 Engrossed | - 16 - | LRB103 30450 CPF 56882 b |
|
|
1 | | a waterless dust suppression system comprised of |
2 | | vacuum assist and filtration for pickup and mitigation |
3 | | of potential fugitive fine particulates, and shall be |
4 | | PM10-certified. |
5 | | (B) The cleaning of impacted parkways and private |
6 | | properties, with owner permission. |
7 | | (C) Inspection protocols that ensure that impacted |
8 | | areas, including, but not limited to, public roadways |
9 | | adjacent to residential and public structures and |
10 | | utility lines, are returned to preimplosion |
11 | | conditions. |
12 | | (D) A staffing plan and equipment list necessary |
13 | | to execute the cleanup. |
14 | | (415 ILCS 5/42) (from Ch. 111 1/2, par. 1042) |
15 | | Sec. 42. Civil penalties. |
16 | | (a) Except as provided in this Section, any person that |
17 | | violates any
provision of this Act or any regulation adopted |
18 | | by the Board, or any permit
or term or condition thereof, or |
19 | | that violates any order of the Board pursuant
to this Act, |
20 | | shall be liable for a civil penalty of not to exceed
$50,000 |
21 | | for the violation and an additional civil penalty of not to |
22 | | exceed
$10,000 for each day during which the violation |
23 | | continues; such penalties may,
upon order of the Board or a |
24 | | court of competent jurisdiction, be made payable
to the |
25 | | Environmental Protection Trust Fund, to be used in accordance |
|
| | HB3595 Engrossed | - 17 - | LRB103 30450 CPF 56882 b |
|
|
1 | | with the
provisions of the Environmental Protection Trust Fund |
2 | | Act. |
3 | | (b) Notwithstanding the provisions of subsection (a) of |
4 | | this Section: |
5 | | (1) Any person that violates Section 12(f) of this Act |
6 | | or any
NPDES permit or term or condition thereof, or any |
7 | | filing requirement,
regulation or order relating to the |
8 | | NPDES permit program, shall be liable
to a civil penalty |
9 | | of not to exceed $10,000 per day of violation. |
10 | | (2) Any person that violates Section 12(g) of this Act |
11 | | or any UIC permit
or term or condition thereof, or any |
12 | | filing requirement, regulation or order
relating to the |
13 | | State UIC program for all wells, except Class II wells as
|
14 | | defined by the Board under this Act, shall be liable to a |
15 | | civil penalty
not to exceed $2,500 per day of violation; |
16 | | provided, however, that any person
who commits such |
17 | | violations relating to the State UIC program for Class
II |
18 | | wells, as defined by the Board under this Act, shall be |
19 | | liable to a civil
penalty of not to exceed $10,000 for the |
20 | | violation and an additional civil
penalty of not to exceed |
21 | | $1,000 for each day during which the violation
continues. |
22 | | (3) Any person that violates Sections 21(f), 21(g), |
23 | | 21(h) or 21(i) of
this Act, or any RCRA permit or term or |
24 | | condition thereof, or any filing
requirement, regulation |
25 | | or order relating to the State RCRA program, shall
be |
26 | | liable to a civil penalty of not to exceed $25,000 per day |
|
| | HB3595 Engrossed | - 18 - | LRB103 30450 CPF 56882 b |
|
|
1 | | of violation. |
2 | | (4)
In an administrative citation action under Section |
3 | | 31.1 of this Act,
any person found to have violated any |
4 | | provision of subsection (o) of
Section 21 of this Act |
5 | | shall pay a civil penalty of $500 for each
violation of |
6 | | each such provision, plus any hearing costs incurred by |
7 | | the Board
and the Agency. Such penalties shall be made |
8 | | payable to the Environmental
Protection Trust Fund, to be |
9 | | used in accordance with the provisions of the
|
10 | | Environmental Protection Trust Fund Act; except that if a |
11 | | unit of local
government issued the administrative |
12 | | citation, 50% of the civil penalty shall
be payable to the |
13 | | unit of local government. |
14 | | (4-5) In an administrative citation action under |
15 | | Section 31.1 of this
Act, any person found to have |
16 | | violated any
provision of subsection (p) of
Section 21, |
17 | | Section 22.38, Section 22.51, Section 22.51a, or |
18 | | subsection (k) of Section 55 of this Act shall pay a civil |
19 | | penalty of $1,500 for each violation
of
each such |
20 | | provision, plus any hearing costs incurred by the Board |
21 | | and the
Agency, except that the civil penalty amount shall |
22 | | be $3,000 for
each violation of any provision of |
23 | | subsection (p) of Section 21, Section 22.38, Section |
24 | | 22.51, Section 22.51a, or subsection (k) of Section 55 |
25 | | that is the
person's second or subsequent adjudication |
26 | | violation of that
provision. The penalties shall be |
|
| | HB3595 Engrossed | - 19 - | LRB103 30450 CPF 56882 b |
|
|
1 | | deposited into the
Environmental Protection Trust Fund, to |
2 | | be used in accordance with the
provisions of the |
3 | | Environmental Protection Trust Fund Act; except that if a
|
4 | | unit of local government issued the administrative |
5 | | citation, 50% of the civil
penalty shall be payable to the |
6 | | unit of local government. |
7 | | (5) Any person who violates subsection 6 of Section |
8 | | 39.5 of this Act
or any CAAPP permit, or term or condition |
9 | | thereof, or any fee or filing
requirement, or any duty to |
10 | | allow or carry out inspection, entry or
monitoring |
11 | | activities, or any regulation or order relating to the |
12 | | CAAPP
shall be liable for a civil penalty not to exceed |
13 | | $10,000 per day of violation. |
14 | | (6) Any owner or operator of a community water system |
15 | | that violates subsection (b) of Section 18.1 or subsection |
16 | | (a) of Section 25d-3 of this Act shall, for each day of |
17 | | violation, be liable for a civil penalty not to exceed $5 |
18 | | for each of the premises connected to the affected |
19 | | community water system. |
20 | | (7) Any person who violates Section 52.5 of this Act |
21 | | shall be liable for a civil penalty of up to $1,000 for the |
22 | | first violation of that Section and a civil penalty of up |
23 | | to $2,500 for a second or subsequent violation of that |
24 | | Section. |
25 | | (8) Any person who engages in demolition of a thermal |
26 | | power plant via implosion in violation of Section 3.141-5 |
|
| | HB3595 Engrossed | - 20 - | LRB103 30450 CPF 56882 b |
|
|
1 | | of this Act shall be liable for a civil penalty of up to |
2 | | $50,000 for the first violation and up to $250,000 for a |
3 | | second or subsequent violation. |
4 | | (b.5) In lieu of the penalties set forth in subsections |
5 | | (a) and (b) of
this Section, any person who fails to file, in a |
6 | | timely manner, toxic
chemical release forms with the Agency |
7 | | pursuant to Section 25b-2
of this Act
shall be liable for a |
8 | | civil penalty of $100 per day for
each day the forms are
late, |
9 | | not to exceed a maximum total penalty of $6,000. This daily |
10 | | penalty
shall begin accruing on the thirty-first day after the
|
11 | | date that the person receives the warning notice issued by the |
12 | | Agency pursuant
to Section 25b-6 of this Act; and the penalty |
13 | | shall be paid to the Agency. The
daily accrual of penalties |
14 | | shall cease as of January 1 of the following year.
All |
15 | | penalties collected by the Agency pursuant to this subsection |
16 | | shall be
deposited into the Environmental Protection Permit |
17 | | and Inspection Fund. |
18 | | (c) Any person that violates this Act, any rule or |
19 | | regulation adopted under
this Act, any permit or term or |
20 | | condition of a permit, or any Board order and
causes the death |
21 | | of fish
or aquatic life shall, in addition to the other |
22 | | penalties provided by
this Act, be liable to pay to the State |
23 | | an additional sum for the
reasonable value of the fish or |
24 | | aquatic life destroyed. Any money so
recovered shall be placed |
25 | | in the Wildlife and Fish Fund in the State
Treasury. |
26 | | (d) The penalties provided for in this Section may be |
|
| | HB3595 Engrossed | - 21 - | LRB103 30450 CPF 56882 b |
|
|
1 | | recovered in a
civil action. |
2 | | (e) The State's Attorney of the county in which the |
3 | | violation
occurred, or the Attorney General, may, at the |
4 | | request of the Agency or
on his own motion, institute a civil |
5 | | action for an injunction, prohibitory or mandatory, to
|
6 | | restrain violations of this Act, any rule or regulation |
7 | | adopted under this Act,
any permit or term or condition of a |
8 | | permit, or any Board order, or to require such other actions as |
9 | | may be necessary to address violations of this Act, any rule or |
10 | | regulation adopted under this Act, any permit or term or |
11 | | condition of a permit, or any Board order. |
12 | | (f) The State's Attorney of the county in which the |
13 | | violation
occurred, or the Attorney General, shall bring such |
14 | | actions in the name
of the people of the State of Illinois.
|
15 | | Without limiting any other authority which may exist for the |
16 | | awarding
of attorney's fees and costs, the Board or a court of |
17 | | competent
jurisdiction may award costs and reasonable |
18 | | attorney's fees, including the
reasonable costs of expert |
19 | | witnesses and consultants, to the State's
Attorney or the |
20 | | Attorney General in a case where he has prevailed against a
|
21 | | person who has committed a willful, knowing, or repeated |
22 | | violation of this Act,
any rule or regulation adopted under |
23 | | this Act, any permit or term or condition
of a permit, or any |
24 | | Board order. |
25 | | Any funds collected under this subsection (f) in which the |
26 | | Attorney
General has prevailed shall be deposited in the
|
|
| | HB3595 Engrossed | - 22 - | LRB103 30450 CPF 56882 b |
|
|
1 | | Hazardous Waste Fund created in Section 22.2 of this Act. Any |
2 | | funds
collected under this subsection (f) in which a State's |
3 | | Attorney has
prevailed shall be retained by the county in |
4 | | which he serves. |
5 | | (g) All final orders imposing civil penalties pursuant to |
6 | | this Section
shall prescribe the time for payment of such |
7 | | penalties. If any such
penalty is not paid within the time |
8 | | prescribed, interest on such penalty
at the rate set forth in |
9 | | subsection (a) of Section 1003 of the Illinois Income
Tax Act, |
10 | | shall be paid for the period from the date payment is due until |
11 | | the
date payment is received. However, if the time for payment |
12 | | is stayed during
the pendency of an appeal, interest shall not |
13 | | accrue during such stay. |
14 | | (h) In determining the appropriate civil penalty to be |
15 | | imposed under
subdivisions (a), (b)(1), (b)(2), (b)(3), |
16 | | (b)(5), (b)(6), or (b)(7) of this
Section, the Board is |
17 | | authorized to consider any matters of record in
mitigation or |
18 | | aggravation of penalty, including, but not limited to, the
|
19 | | following factors: |
20 | | (1) the duration and gravity of the violation; |
21 | | (2) the presence or absence of due diligence on the |
22 | | part of the
respondent in attempting to comply with |
23 | | requirements of this
Act and regulations thereunder or to |
24 | | secure relief therefrom as provided by
this Act; |
25 | | (3) any economic benefits accrued by the respondent
|
26 | | because of delay in compliance with requirements, in which |
|
| | HB3595 Engrossed | - 23 - | LRB103 30450 CPF 56882 b |
|
|
1 | | case the economic
benefits shall be determined by the |
2 | | lowest cost alternative for achieving
compliance; |
3 | | (4) the amount of monetary penalty which will serve to |
4 | | deter further
violations by the respondent and to |
5 | | otherwise aid in enhancing
voluntary
compliance with this |
6 | | Act by the respondent and other persons
similarly
subject |
7 | | to the Act; |
8 | | (5) the number, proximity in time, and gravity of |
9 | | previously
adjudicated violations of this Act by the |
10 | | respondent; |
11 | | (6) whether the respondent voluntarily self-disclosed, |
12 | | in accordance
with subsection (i) of this Section, the |
13 | | non-compliance to the Agency; |
14 | | (7) whether the respondent has agreed to undertake a |
15 | | "supplemental
environmental project", which means an |
16 | | environmentally beneficial project that
a respondent |
17 | | agrees to undertake in settlement of an enforcement action |
18 | | brought
under this Act, but which the respondent is not |
19 | | otherwise legally required to
perform; and |
20 | | (8) whether the respondent has successfully completed |
21 | | a Compliance Commitment Agreement under subsection (a) of |
22 | | Section 31 of this Act to remedy the violations that are |
23 | | the subject of the complaint. |
24 | | In determining the appropriate civil penalty to be imposed |
25 | | under subsection
(a) or paragraph (1), (2), (3), (5), (6), or |
26 | | (7) of subsection (b) of this Section, the
Board shall ensure, |
|
| | HB3595 Engrossed | - 24 - | LRB103 30450 CPF 56882 b |
|
|
1 | | in all cases, that the penalty is at least as great as the
|
2 | | economic benefits, if any, accrued by the respondent as a |
3 | | result of the
violation, unless the Board finds that |
4 | | imposition of such penalty would result
in an arbitrary or |
5 | | unreasonable financial hardship. However, such civil
penalty
|
6 | | may be off-set in whole or in part pursuant to a supplemental
|
7 | | environmental project agreed to by the complainant and the |
8 | | respondent. |
9 | | (i) A person who voluntarily self-discloses non-compliance |
10 | | to the Agency,
of which the Agency had been unaware, is |
11 | | entitled to a 100% reduction in the
portion of the penalty that |
12 | | is not based on the economic benefit of
non-compliance if the |
13 | | person can
establish the following: |
14 | | (1) that either the regulated entity is a small entity |
15 | | or the non-compliance was discovered through an |
16 | | environmental
audit or a compliance management system |
17 | | documented by the regulated entity as
reflecting the |
18 | | regulated entity's due diligence in preventing, detecting, |
19 | | and
correcting violations; |
20 | | (2) that the non-compliance was disclosed in writing |
21 | | within 30 days of
the date on which the person discovered |
22 | | it; |
23 | | (3) that the non-compliance was discovered and |
24 | | disclosed prior to: |
25 | | (i) the commencement of an Agency inspection, |
26 | | investigation, or request
for information; |
|
| | HB3595 Engrossed | - 25 - | LRB103 30450 CPF 56882 b |
|
|
1 | | (ii) notice of a citizen suit; |
2 | | (iii) the filing of a complaint by a citizen, the |
3 | | Illinois Attorney
General, or the State's Attorney of |
4 | | the county in which the violation occurred; |
5 | | (iv) the reporting of the non-compliance by an |
6 | | employee of the person
without that person's |
7 | | knowledge; or |
8 | | (v) imminent discovery of the non-compliance by |
9 | | the Agency; |
10 | | (4) that the non-compliance is being corrected and any |
11 | | environmental
harm is being remediated in a timely |
12 | | fashion; |
13 | | (5) that the person agrees to prevent a recurrence of |
14 | | the non-compliance; |
15 | | (6) that no related non-compliance events have |
16 | | occurred in the
past 3 years at the same facility or in the |
17 | | past 5 years as part of a
pattern at multiple facilities |
18 | | owned or operated by the person; |
19 | | (7) that the non-compliance did not result in serious |
20 | | actual
harm or present an imminent and substantial |
21 | | endangerment to human
health or the environment or violate |
22 | | the specific terms of any judicial or
administrative order |
23 | | or consent agreement; |
24 | | (8) that the person cooperates as reasonably requested |
25 | | by the Agency
after the disclosure; and |
26 | | (9) that the non-compliance was identified voluntarily |
|
| | HB3595 Engrossed | - 26 - | LRB103 30450 CPF 56882 b |
|
|
1 | | and not through a
monitoring, sampling, or auditing |
2 | | procedure that is required by statute, rule,
permit, |
3 | | judicial or administrative order, or consent agreement. |
4 | | If a person can establish all of the elements under this |
5 | | subsection except
the element set forth in paragraph (1) of |
6 | | this subsection, the person is
entitled to a 75% reduction in |
7 | | the portion of the penalty that is not based
upon the economic |
8 | | benefit of non-compliance. |
9 | | For the purposes of this subsection (i), "small entity" |
10 | | has the same meaning as in Section 221 of the federal Small |
11 | | Business Regulatory Enforcement Fairness Act of 1996 (5 U.S.C. |
12 | | 601). |
13 | | (j) In addition to any other remedy or penalty that may
|
14 | | apply, whether civil or criminal, any person who violates |
15 | | Section 22.52 of this Act shall be liable for an additional |
16 | | civil penalty of up to 3 times the gross amount of any |
17 | | pecuniary gain resulting from the violation.
|
18 | | (k) In addition to any other remedy or penalty that may |
19 | | apply, whether civil or criminal, any person who violates |
20 | | subdivision (a)(7.6) of Section 31 of this Act shall be liable |
21 | | for an additional civil penalty of $2,000. |
22 | | (Source: P.A. 102-310, eff. 8-6-21.) |
23 | | (415 ILCS 5/3.141 rep.) |
24 | | Section 10. The Environmental Protection Act is amended by |
25 | | repealing Section 3.141.
|