|
| | SB0839 Engrossed | | LRB103 03297 CPF 48303 b |
|
|
1 | | AN ACT concerning safety. |
2 | | Be it enacted by the People of the State of Illinois, |
3 | | represented in the General Assembly: |
4 | | Section 5. The Environmental Protection Act is amended by |
5 | | changing Section 3.475 and by adding Section 22.23e as |
6 | | follows: |
7 | | (415 ILCS 5/3.475) (was 415 ILCS 5/3.45) |
8 | | Sec. 3.475. Special waste. "Special waste" means any of |
9 | | the following: |
10 | | (a) potentially infectious medical waste; |
11 | | (b) hazardous waste, as determined in conformance with |
12 | | RCRA hazardous waste determination requirements set forth in |
13 | | Section 722.111 of Title 35 of the Illinois Administrative |
14 | | Code, including a residue from burning or processing hazardous |
15 | | waste in a boiler or industrial furnace unless the residue has |
16 | | been tested in accordance with Section 726.212 of Title 35 of |
17 | | the Illinois Administrative Code and proven to be |
18 | | nonhazardous; |
19 | | (c) industrial process waste or pollution control waste, |
20 | | except: |
21 | | (1) any such waste certified by its generator, |
22 | | pursuant to Section 22.48 of this Act, not to be any of the |
23 | | following: |
|
| | SB0839 Engrossed | - 2 - | LRB103 03297 CPF 48303 b |
|
|
1 | | (A) a liquid, as determined using the paint filter |
2 | | test set forth in subdivision (3)(A) of subsection (m) |
3 | | of Section 811.107 of Title 35 of the Illinois |
4 | | Administrative Code; |
5 | | (B) regulated asbestos-containing waste materials, |
6 | | as defined under the National Emission Standards for |
7 | | Hazardous Air Pollutants in 40 CFR Section 61.141; |
8 | | (C) polychlorinated biphenyls (PCB's) regulated |
9 | | pursuant to 40 CFR Part 761; |
10 | | (D) an industrial process waste or pollution |
11 | | control waste subject to the waste analysis and |
12 | | recordkeeping requirements of Section 728.107 of Title |
13 | | 35 of the Illinois Administrative Code under the land |
14 | | disposal restrictions of Part 728 of Title 35 of the |
15 | | Illinois Administrative Code; and |
16 | | (E) a waste material generated by processing |
17 | | recyclable metals by shredding and required to be |
18 | | managed as a special waste under Section 22.29 of this |
19 | | Act; |
20 | | (2) any empty portable device or container, including |
21 | | but not limited to a drum, in which a special waste has |
22 | | been stored, transported, treated, disposed of, or |
23 | | otherwise handled, provided that the generator has |
24 | | certified that the device or container is empty and does |
25 | | not contain a liquid, as determined pursuant to item (A) |
26 | | of subdivision (1) of this subsection. For purposes of |
|
| | SB0839 Engrossed | - 3 - | LRB103 03297 CPF 48303 b |
|
|
1 | | this subdivision, "empty portable device or container" |
2 | | means a device or container in which removal of special |
3 | | waste, except for a residue that shall not exceed one inch |
4 | | in thickness, has been accomplished by a practice commonly |
5 | | employed to remove materials of that type. An inner liner |
6 | | used to prevent contact between the special waste and the |
7 | | container shall be removed and managed as a special waste; |
8 | | or |
9 | | (3) as may otherwise be determined under Section 22.9 |
10 | | of this Act. |
11 | | "Special waste" does not mean fluorescent and high |
12 | | intensity discharge lamps as defined in subsection (a) of |
13 | | Section 22.23a of this Act, paint and paint-related waste as |
14 | | defined in subsection (a) of Section 22.23e of this Act, waste |
15 | | that is managed in accordance with the universal waste |
16 | | requirements set forth in Title 35 of the Illinois |
17 | | Administrative Code, Subtitle G, Chapter I, Subchapter c, Part |
18 | | 733, or waste that is subject to rules adopted pursuant to |
19 | | subsection (c)(2) of Section 22.23a of this Act or subsection |
20 | | (b) of Section 22.23e of this Act . |
21 | | (Source: P.A. 92-574, eff. 6-26-02.) |
22 | | (415 ILCS 5/22.23e new) |
23 | | Sec. 22.23e. Paint and paint-related wastes. |
24 | | (a) As used in this Section: |
25 | | "Paint" means a pigmented or unpigmented powder coating, |
|
| | SB0839 Engrossed | - 4 - | LRB103 03297 CPF 48303 b |
|
|
1 | | or a pigmented or unpigmented mixture of binder and suitable |
2 | | liquid, that forms an adherent coating when applied to a |
3 | | surface. Powder coating is a surface coating that is applied |
4 | | as a dry powder and is fused into a continuous coating film |
5 | | through the use of heat. "Paint" includes architectural paint |
6 | | as defined in the Paint Stewardship Act. |
7 | | "Paint-related waste" is (i) material contaminated with |
8 | | paint that results from the packaging of paint, wholesale and |
9 | | retail operations, paint manufacturing, and paint application |
10 | | or removal activities or (ii) material derived from the |
11 | | reclamation of paint-related wastes that is recycled in a |
12 | | manner other than burning for energy recovery or used in a |
13 | | manner constituting disposal. |
14 | | (b)(1) Paint and paint-related waste that are hazardous |
15 | | waste are hereby designated as a category of universal waste |
16 | | subject to the streamlined hazardous waste rules set forth in |
17 | | 35 Ill. Adm. Code 733. Within 60 days after the effective date |
18 | | of this amendatory Act of the 103rd General Assembly, the |
19 | | Agency shall propose, and within 180 days after receipt of the |
20 | | Agency's proposal the Board shall adopt, rules that reflect |
21 | | this designation and that prescribe procedures and standards |
22 | | for the management of hazardous waste paint and paint-related |
23 | | waste as a universal waste consistent with the provisions set |
24 | | forth within this Section. |
25 | | (2) If the United States Environmental Protection Agency |
26 | | adopts streamlined hazardous waste regulations pertaining to |
|
| | SB0839 Engrossed | - 5 - | LRB103 03297 CPF 48303 b |
|
|
1 | | the management of hazardous waste paint or paint-related |
2 | | waste, or otherwise exempts such paint or paint-related waste |
3 | | from regulation as hazardous waste, the Board shall adopt an |
4 | | equivalent rule in accordance with Section 7.2 of this Act |
5 | | within 180 days of adoption of the federal regulation. The |
6 | | equivalent Board rule may serve as an alternative to the rules |
7 | | adopted under paragraph (1) of this subsection (b). |
8 | | (c) Until the Board adopts rules pursuant to paragraph (1) |
9 | | of subsection (b) that prescribe procedures and standards for |
10 | | the management of hazardous waste paint and paint-related |
11 | | waste by small quantity handlers of universal waste, the |
12 | | following requirements shall apply to small quantity handlers |
13 | | of universal waste managing hazardous waste paint and |
14 | | paint-related waste as a universal waste: |
15 | | (1) Waste Management. A small quantity handler of |
16 | | universal waste shall manage universal waste paint and |
17 | | paint-related waste in a way that prevents releases of any |
18 | | universal waste or any component of universal waste to the |
19 | | environment, including, but not limited to, in accordance |
20 | | with the following requirements: |
21 | | (A) The small quantity handler of universal waste |
22 | | shall collect and store universal waste paint and |
23 | | paint-related waste in containers that are |
24 | | structurally sound, leakproof, and compatible with the |
25 | | universal waste paint and paint-related waste. |
26 | | (B) The small quantity handler of universal waste |
|
| | SB0839 Engrossed | - 6 - | LRB103 03297 CPF 48303 b |
|
|
1 | | shall ensure that containers in which the universal |
2 | | waste paint and paint-related waste are contained do |
3 | | not leak and remain closed, except when wastes are |
4 | | being added to or removed from the container. |
5 | | (C) The small quantity handler of universal waste, |
6 | | upon detection of a release of universal waste paint |
7 | | and paint-related waste, shall do the following: |
8 | | (i) Stop the release. |
9 | | (ii) Contain the released universal waste |
10 | | paint and paint-related waste. |
11 | | (iii) Clean up and properly manage the |
12 | | released universal waste paint and paint-related |
13 | | waste and other materials generated from the |
14 | | cleanup. |
15 | | (iv) Remove any leaking container from service |
16 | | by transferring the contents to another container. |
17 | | (v) Repair any leaking container before |
18 | | returning it to service. |
19 | | (D) A small quantity handler of universal waste |
20 | | shall manage universal waste paint and paint-related |
21 | | waste that is ignitable or reactive in accordance with |
22 | | local fire codes. |
23 | | (E) A small quantity handler of universal waste |
24 | | shall manage universal waste paint and paint-related |
25 | | waste that are incompatible in separate containers. |
26 | | (F) A small quantity handler of universal waste |
|
| | SB0839 Engrossed | - 7 - | LRB103 03297 CPF 48303 b |
|
|
1 | | shall design, maintain, and operate areas of its |
2 | | facility where universal waste paints and |
3 | | paint-related wastes are collected and stored to |
4 | | minimize the possibility of a fire, explosion, or |
5 | | unplanned sudden or non-sudden release of universal |
6 | | waste or hazardous constituents to air, soil, or |
7 | | surface water which could threaten human health or the |
8 | | environment. |
9 | | (2) Labeling or marking. Each container in which |
10 | | universal waste paint and paint-related waste is |
11 | | accumulated shall be labeled to identify the contents of |
12 | | the container. |
13 | | (3) Accumulation time limits. |
14 | | (A) A small quantity handler of universal waste |
15 | | may accumulate universal waste paint and paint-related |
16 | | waste for no longer than one year from the date the |
17 | | universal waste is generated. However, handlers may |
18 | | accumulate universal waste for longer than one year if |
19 | | the activity is solely for the purpose of accumulating |
20 | | quantities to facilitate proper recovery, treatment, |
21 | | or disposal. The handler bears the burden of proving |
22 | | that this activity is solely for the purpose of |
23 | | accumulation of the quantities of universal waste |
24 | | necessary to facilitate proper recovery, treatment, or |
25 | | disposal. |
26 | | (B) A small quantity handler of universal waste |
|
| | SB0839 Engrossed | - 8 - | LRB103 03297 CPF 48303 b |
|
|
1 | | who accumulates universal waste must be able to |
2 | | demonstrate the length of time that the universal |
3 | | waste has been accumulated. The handler may make this |
4 | | demonstration by any of the following methods: |
5 | | (i) placing the universal waste paint and |
6 | | paint-related waste in a container and marking or |
7 | | labeling the container with the earliest date that |
8 | | universal waste paint or paint-related waste in |
9 | | the container became a waste or was received; |
10 | | (ii) marking or labeling each individual item |
11 | | of universal waste paint and paint-related waste |
12 | | with the date the universal waste paint and |
13 | | paint-related waste became a waste or was |
14 | | received; |
15 | | (iii) maintaining an inventory system on-site |
16 | | that identifies the date each unit of universal |
17 | | waste paint and paint-related waste became a waste |
18 | | or was received; |
19 | | (iv) placing universal waste paint and |
20 | | paint-related waste in a specific accumulation |
21 | | area and identifying the earliest date that any of |
22 | | the universal waste paint and paint-related waste |
23 | | in the area became a waste or was received; or |
24 | | (v) any other method that clearly demonstrates |
25 | | the length of time the universal waste paint and |
26 | | paint-related waste have been accumulated from the |
|
| | SB0839 Engrossed | - 9 - | LRB103 03297 CPF 48303 b |
|
|
1 | | date they become a waste or are received. |
2 | | (4) Employee training. A small quantity handler of |
3 | | universal waste shall inform all employees who handle or |
4 | | have responsibility for managing universal waste paint and |
5 | | paint-related waste. The information shall describe proper |
6 | | handling and emergency procedures appropriate to the |
7 | | universal waste paint and paint-related waste. |
8 | | (5) Response to releases. |
9 | | (A) A small quantity handler of universal waste |
10 | | must immediately contain all releases of universal |
11 | | waste paint and paint-related waste and other residues |
12 | | from universal waste paint and paint-related waste. |
13 | | (B) A small quantity handler of universal waste |
14 | | must determine whether any material resulting from the |
15 | | release is hazardous waste and, if so, must manage the |
16 | | hazardous waste in compliance with all applicable |
17 | | hazardous waste requirements of this Act and rules |
18 | | adopted under this Act. The handler is considered the |
19 | | generator of the material resulting from the release |
20 | | and must manage the material in compliance with this |
21 | | Act and rules adopted under this Act. |
22 | | (6) Off-site shipments. |
23 | | (A) A small quantity handler of universal waste is |
24 | | prohibited from sending or taking universal waste |
25 | | paint and paint-related waste to a place other than |
26 | | another universal waste handler, a destination |
|
| | SB0839 Engrossed | - 10 - | LRB103 03297 CPF 48303 b |
|
|
1 | | facility, or a foreign destination. |
2 | | (B) If a small quantity handler of universal waste |
3 | | self-transports universal waste paint and |
4 | | paint-related waste offsite, the handler becomes a |
5 | | universal waste transporter for those |
6 | | self-transportation activities and shall comply with |
7 | | the Board's existing rules for universal waste |
8 | | transporters. |
9 | | (C) If universal waste paint and paint-related |
10 | | waste being offered for off-site transportation meets |
11 | | the definition of hazardous materials under 49 CFR |
12 | | Parts 171 to 180, a small quantity handler of |
13 | | universal waste shall package, label, mark and placard |
14 | | the shipment, and prepare the proper shipping papers |
15 | | in accordance with the applicable United States |
16 | | Department of Transportation regulations under 49 CFR |
17 | | Parts 172 to 180. |
18 | | (D) Prior to sending a shipment of universal waste |
19 | | paint and paint-related waste to another universal |
20 | | waste handler, the originating handler shall ensure |
21 | | that the receiving handler agrees to receive the |
22 | | shipment. |
23 | | (E) If a small quantity handler of universal waste |
24 | | sends a shipment of universal waste paint and |
25 | | paint-related waste to another handler or to a |
26 | | destination facility and if the shipment is rejected |
|
| | SB0839 Engrossed | - 11 - | LRB103 03297 CPF 48303 b |
|
|
1 | | by the receiving handler or destination facility, the |
2 | | originating handler shall either: |
3 | | (i) receive the universal waste paint and |
4 | | paint-related waste back when notified that the |
5 | | shipment has been rejected; or |
6 | | (ii) agree with the receiving handler on a |
7 | | destination facility to which the shipment will be |
8 | | sent. |
9 | | (F) A small quantity handler of universal waste |
10 | | may reject a shipment containing universal waste paint |
11 | | and paint-related waste, or a portion of a shipment |
12 | | containing universal waste paint and paint-related |
13 | | waste, received from another handler. If a handler |
14 | | rejects a shipment or a portion of a shipment, the |
15 | | rejecting handler shall contact the originating |
16 | | handler to notify the originating handler of the |
17 | | rejection and to discuss reshipment of the load. The |
18 | | receiving handler shall: |
19 | | (i) send the shipment back to the originating |
20 | | handler; or |
21 | | (ii) if agreed to by both the originating and |
22 | | receiving handler, send the shipment to a |
23 | | destination facility. |
24 | | (G) If a small quantity handler of universal waste |
25 | | receives a shipment of nonhazardous, non-universal |
26 | | waste, the handler may manage the waste in any way that |
|
| | SB0839 Engrossed | - 12 - | LRB103 03297 CPF 48303 b |
|
|
1 | | is in compliance with applicable law. |
2 | | (d) Until the Board adopts rules pursuant to subsection |
3 | | (b), the following additional requirements shall apply: |
4 | | (1) Paints and paint-related wastes that are exempt |
5 | | household wastes or very small quantity generator wastes |
6 | | under existing Board rules remain exempt from the |
7 | | hazardous waste rules but may be managed as universal |
8 | | wastes under 35 Ill. Adm. Code 733.108. |
9 | | (2) Universal waste transporters that transport paints |
10 | | or paint-related wastes that are universal wastes are |
11 | | subject to the existing Board rules for universal waste |
12 | | transporters. |
13 | | (3) Universal waste destination facilities that manage |
14 | | paints or paint-related wastes that are universal wastes |
15 | | are subject to the existing Board rules for universal |
16 | | waste destination facilities. |
17 | | Section 10. The Paint Stewardship Act is amended by |
18 | | changing Sections 15, 25, and 40 as follows: |
19 | | (415 ILCS 175/15) |
20 | | Sec. 15. Paint stewardship program plan. |
21 | | (a) Each manufacturer of architectural paint sold or |
22 | | offered for sale at retail in the State shall submit to the |
23 | | Agency a plan for the establishment of a postconsumer paint |
24 | | stewardship program. The program shall seek to reduce the |
|
| | SB0839 Engrossed | - 13 - | LRB103 03297 CPF 48303 b |
|
|
1 | | generation of postconsumer paint, promote its reuse and |
2 | | recycling, and manage the postconsumer paint waste stream |
3 | | using environmentally sound management practices. |
4 | | (b) A plan submitted under this Section shall: |
5 | | (1) Provide a list of participating manufacturers and |
6 | | brands covered by the program. |
7 | | (2) Provide information on the architectural paint |
8 | | products covered under the program, such as interior or |
9 | | exterior water-based and oil-based coatings, primers, |
10 | | sealers, or wood coatings. |
11 | | (3) Describe how it will provide for the statewide |
12 | | collection of postconsumer architectural paint in the |
13 | | State. The manufacturer or representative organization may |
14 | | coordinate the program with existing household hazardous |
15 | | waste collection infrastructure as is mutually agreeable |
16 | | with the person operating the household waste collection |
17 | | infrastructure. |
18 | | (4) Provide a goal of sufficient number and geographic |
19 | | distribution of collection sites, collection services, or |
20 | | collection events for postconsumer architectural paint to |
21 | | meet the following criteria: |
22 | | (A) at least 90% of State residents shall have a |
23 | | collection site, collection service, or collection |
24 | | event within a 15-mile radius; and |
25 | | (B) at least one collection site, collection |
26 | | service, or collection event for every 50,000 |
|
| | SB0839 Engrossed | - 14 - | LRB103 03297 CPF 48303 b |
|
|
1 | | residents of the State. |
2 | | (5) Describe how postconsumer paint will be managed |
3 | | using the following strategies: reuse, recycling, and |
4 | | disposal. |
5 | | (6) Describe education and outreach efforts to inform |
6 | | consumers about the program. These efforts should include: |
7 | | (A) information about collection opportunities for |
8 | | postconsumer paint; |
9 | | (B) information about the fee for the operation of |
10 | | the program that shall be included in the purchase |
11 | | price of all architectural paint sold in the State; |
12 | | and |
13 | | (C) efforts to promote the source reduction, |
14 | | reuse, and recycling of architectural paint. |
15 | | (7) Include a certification from an independent |
16 | | auditor that any added fee to paint sold in the State as a |
17 | | result of the postconsumer paint stewardship program does |
18 | | not exceed the costs to operate and sustain the program in |
19 | | accordance with sound management practices. The |
20 | | independent auditor shall verify that the amount added to |
21 | | each unit of paint will cover the costs and sustain the |
22 | | postconsumer paint stewardship program. |
23 | | (8) Describe how the paint stewardship program will |
24 | | incorporate and compensate service providers for |
25 | | activities conducted under the program that may include: |
26 | | (A) the collection of postconsumer architectural |
|
| | SB0839 Engrossed | - 15 - | LRB103 03297 CPF 48303 b |
|
|
1 | | paint and architectural paint containers through |
2 | | permanent collection sites, collection events, or |
3 | | curbside services; |
4 | | (B) the reuse or processing of postconsumer |
5 | | architectural paint at a permanent collection site; |
6 | | and |
7 | | (C) the transportation, recycling, and proper |
8 | | disposal of postconsumer architectural paint. |
9 | | (c) Independent audits conducted for the purposes of this |
10 | | Act must be conducted in accordance with generally accepted |
11 | | auditing standards. The work product of the independent |
12 | | auditor shall be submitted to the Agency as part of the annual |
13 | | report required by Section 40. The cost of any work performed |
14 | | by the independent auditor shall be funded by the program. |
15 | | (d) Not later than 90 60 days after submission of the plan |
16 | | under this Section, the Agency shall determine in writing |
17 | | whether to approve the plan as submitted or disapprove the |
18 | | plan. The Agency shall approve a plan if it contains all of the |
19 | | information required under subsection (b). If the plan is |
20 | | disapproved, the manufacturer or representative organization |
21 | | shall resubmit a plan within 45 calendar days of receipt of the |
22 | | notice of disapproval. |
23 | | (e) If a manufacturer or representative organization |
24 | | determines that the paint stewardship fee should be adjusted |
25 | | because the independent audit reveals that the cost of |
26 | | administering the program exceeds the revenues generated by |
|
| | SB0839 Engrossed | - 16 - | LRB103 03297 CPF 48303 b |
|
|
1 | | the paint stewardship fee, the manufacturer or representative |
2 | | organization shall submit to the Agency a justification for |
3 | | the adjustment as well as financial reports to support the |
4 | | adjustment, including a 5-year projection of the financial |
5 | | status of the organization. The submission shall include a |
6 | | certification from an independent auditor that the proposed |
7 | | fee adjustment will generate revenues necessary and sufficient |
8 | | to pay the program expenses, including any accumulated debt, |
9 | | and develop a reasonable reserve level sufficient to sustain |
10 | | the program. The Agency shall approve the fee adjustment if |
11 | | the submission contains all of the information required under |
12 | | this subsection. |
13 | | (f) Within 45 calendar days after Agency approval of a |
14 | | plan, the Agency shall post on its website, and the |
15 | | manufacturer or representative organization shall post on its |
16 | | website, the names of the manufacturers participating in the |
17 | | plan, the brands of architectural paint covered by the |
18 | | program, and a copy of the plan. |
19 | | (g) Each manufacturer under the plan shall include in the |
20 | | price of any architectural paint sold to retailers or |
21 | | distributors in the State the per container amount of the fee |
22 | | set forth in the plan or fee adjustment. If a representative |
23 | | organization is implementing the plan for a manufacturer, the |
24 | | manufacturer is responsible for filing, reporting, and |
25 | | remitting the paint stewardship fee assessment for each |
26 | | container of architectural paint to the representative |
|
| | SB0839 Engrossed | - 17 - | LRB103 03297 CPF 48303 b |
|
|
1 | | organization. A retailer or distributor shall not deduct the |
2 | | amount of the fee from the purchase price of any paint it |
3 | | sells. |
4 | | (Source: P.A. 103-372, eff. 1-1-24 .) |
5 | | (415 ILCS 175/25) |
6 | | Sec. 25. Plan submission. The plan required by Section 15 |
7 | | shall be submitted not later than July 1, 2025 12 months after |
8 | | the effective date of this Act. |
9 | | (Source: P.A. 103-372, eff. 1-1-24 .) |
10 | | (415 ILCS 175/40) |
11 | | Sec. 40. Annual report. By July 1, 2028 2026 , and each July |
12 | | 1 thereafter, a manufacturer or representative organization |
13 | | shall submit a report to the Agency that details the |
14 | | implementation of the manufacturer's or representative |
15 | | organization's program during the prior calendar year. The |
16 | | report shall include: |
17 | | (1) a description of the methods used to collect and |
18 | | transport the postconsumer paint collected by the program; |
19 | | (2) the volume and type of postconsumer paint |
20 | | collected and a description of the methods used to process |
21 | | the paint, including reuse, recycling, and other methods; |
22 | | (3) samples of the educational materials provided to |
23 | | consumers of architectural paint; and |
24 | | (4) the total cost of the program and an independent |
|
| | SB0839 Engrossed | - 18 - | LRB103 03297 CPF 48303 b |
|
|
1 | | financial audit of the program. An independent financial |
2 | | auditor shall be chosen by the manufacturer or |
3 | | representative organization. |
4 | | The Agency and the manufacturer or manufacturer's |
5 | | representative organization shall post a copy of each annual |
6 | | report on their websites. |
7 | | (Source: P.A. 103-372, eff. 1-1-24 .) |