| Sec. 3.135. Coal combustion by-product; CCB.
|
8 |
| (a) "Coal combustion
by-product" (CCB) means coal |
9 |
| combustion waste when used beneficially in any of
the following |
10 |
| ways: |
11 |
| (1) The extraction or recovery of material compounds |
12 |
| contained within CCB.
|
13 |
| (2) The use of CCB as a raw ingredient or mineral |
14 |
| filler in the
manufacture of the following commercial |
15 |
| products: cement; concrete and concrete mortars; |
16 |
| cementious products
including block, pipe and |
17 |
| precast/prestressed components; asphalt or cementious |
18 |
| roofing products; plastic products including pipes and |
19 |
| fittings; paints
and metal alloys; kiln fired products |
20 |
| including bricks, blocks, and tiles; abrasive media; |
21 |
| gypsum wallboard; asphaltic concrete, or asphalt based |
22 |
| paving material. |
23 |
| (3) CCB used (A) in accordance with the Illinois |
|
|
|
HB4172 Engrossed |
- 2 - |
LRB095 14143 CMK 40004 b |
|
|
1 |
| Department of Transportation ("IDOT") standard
|
2 |
| specifications and subsection (a-5) of this Section or (B)
|
3 |
| under the
approval of the Department of Transportation for |
4 |
| IDOT projects.
|
5 |
| (4) Bottom ash used as antiskid material, athletic |
6 |
| tracks, or foot paths.
|
7 |
| (5) Use in the
stabilization or modification of
soils |
8 |
| providing the CCB meets the IDOT
specifications for soil |
9 |
| modifiers.
|
10 |
| (6) CCB used as a functionally equivalent substitute |
11 |
| for agricultural lime
as a soil conditioner.
|
12 |
| (7) Bottom ash used in non-IDOT pavement sub-base or
|
13 |
| base, pipe bedding, or foundation
backfill.
|
14 |
| (8) Structural fill, when used in an engineered |
15 |
| application or combined
with cement, sand, or water to |
16 |
| produce a controlled strength fill material
and covered |
17 |
| with 12 inches of soil , within 30 days after the final |
18 |
| placement and completion of the structural fill project or |
19 |
| if the project becomes inactive for more than 90 days, |
20 |
| unless infiltration is prevented by the
material itself or |
21 |
| other suitable cover material. CCB may be used under this |
22 |
| item (8) only if the structural fill is located no less |
23 |
| than 250 feet from any active or operating downgradient |
24 |
| well being used as a residential or municipal potable water |
25 |
| source. |
26 |
| Within 3 months after notification to the Agency under |
|
|
|
HB4172 Engrossed |
- 3 - |
LRB095 14143 CMK 40004 b |
|
|
1 |
| item (C) of subsection (a-5) of this Section, the Agency |
2 |
| must inspect the structural fill project to ensure that the |
3 |
| cover requirements of this item (8) are satisfied for each |
4 |
| project involving the use of coal combustion waste as |
5 |
| structural fill.
|
6 |
| (9) Mine subsidence, mine fire control, mine sealing, |
7 |
| and mine reclamation. |
8 |
| (a-5) Except to the extent that the uses are otherwise |
9 |
| authorized by law
without such restrictions, the uses specified |
10 |
| in items (a)(3)(A) and (a)(7) through (9) shall be subject to |
11 |
| the
following conditions:
|
12 |
| (A) CCB shall not have been mixed with hazardous waste |
13 |
| prior to use.
|
14 |
| (B) CCB shall not exceed Class I Groundwater Standards |
15 |
| for
metals when
tested utilizing test method ASTM D3987-85. |
16 |
| The sample or samples tested shall be representative of the |
17 |
| CCB being considered for use.
|
18 |
| (C) Unless otherwise exempted, users of CCB for the |
19 |
| purposes described in items (a)(3)(A) and (a)(7) through |
20 |
| (9) of this Section shall provide notification
to the |
21 |
| Agency for each project utilizing CCB documenting the |
22 |
| quantity of CCB
utilized and certification of compliance |
23 |
| with conditions (A) and (B) of this subsection.
|
24 |
| Notification shall not be required for users of CCB for |
25 |
| purposes described in items (a)(1), (a)(2), (a)(3)(B), |
26 |
| (a)(4), (a)(5) and (a)(6) of this Section, or as required |
|
|
|
HB4172 Engrossed |
- 4 - |
LRB095 14143 CMK 40004 b |
|
|
1 |
| specifically under a beneficial use determination as |
2 |
| provided under this Section, or pavement base, parking lot |
3 |
| base, or
building base projects utilizing less than 10,000 |
4 |
| tons, flowable fill/grout
projects utilizing less than |
5 |
| 1,000 cubic yards or other applications utilizing
less than |
6 |
| 100 tons.
|
7 |
| (D) Fly ash shall be managed in a manner that minimizes |
8 |
| the generation
of airborne particles and dust using |
9 |
| techniques such as moisture conditioning,
granulating, |
10 |
| inground application, or other demonstrated method.
|
11 |
| (E) CCB is not to be accumulated speculatively. CCB is |
12 |
| not accumulated
speculatively if during the calendar year, |
13 |
| the CCB used is equal to 75% of the
CCB by weight or volume |
14 |
| accumulated at the beginning of the period.
|
15 |
| (F) CCB shall include any prescribed mixture of fly |
16 |
| ash, bottom ash, boiler slag, flue gas desulfurization |
17 |
| scrubber sludge, fluidized bed combustion ash, and stoker |
18 |
| boiler ash and shall be tested as intended for use.
|
19 |
| (b) To encourage and promote the utilization of CCB in |
20 |
| productive and beneficial
applications, upon request by the |
21 |
| applicant, the Agency shall make a written beneficial use |
22 |
| determination that coal-combustion
waste is CCB when used in a |
23 |
| manner other than those uses specified in subsection (a) of |
24 |
| this Section if the applicant demonstrates that use of the |
25 |
| coal-combustion waste satisfies all of the following criteria: |
26 |
| the use will not cause, threaten, or allow the discharge of any |
|
|
|
HB4172 Engrossed |
- 5 - |
LRB095 14143 CMK 40004 b |
|
|
1 |
| contaminant into the environment; the use will otherwise |
2 |
| protect human health and safety and the environment; and the |
3 |
| use constitutes a legitimate use of the coal-combustion waste |
4 |
| as an ingredient or raw material that is an effective |
5 |
| substitute for an analogous ingredient or raw material.
|
6 |
| Notwithstanding the criteria set forth in this subsection |
7 |
| (b), the The Agency's beneficial use determinations may allow |
8 |
| the uses set forth in items (a)(3)(A) and (a)(7) through (9) of |
9 |
| this Section without the CCB being subject to the restrictions |
10 |
| set forth in subdivisions (a-5)(B) and (a-5)(E) of this |
11 |
| Section.
|
12 |
| Within 90 days after the receipt of an application for a |
13 |
| beneficial use determination under this subsection (b), the |
14 |
| Agency shall, in writing, approve, disapprove, or approve with |
15 |
| conditions the beneficial use. Any disapproval or approval with |
16 |
| conditions shall include the Agency's reasons for the |
17 |
| disapproval or conditions. Failure of the Agency to issue a |
18 |
| decision within 90 days shall constitute disapproval of the |
19 |
| beneficial use request. These beneficial use determinations |
20 |
| are subject to review under Section 40 of this Act.
|
21 |
| Any approval of a beneficial use under this subsection (b) |
22 |
| shall become effective upon the date of the Agency's written |
23 |
| decision and remain in effect for a period of 5 years. If an |
24 |
| applicant desires to continue a beneficial use after the |
25 |
| expiration of the 5-year period, the applicant must submit an |
26 |
| application for renewal no later than 90 days prior to the |
|
|
|
HB4172 Engrossed |
- 6 - |
LRB095 14143 CMK 40004 b |
|
|
1 |
| expiration. The beneficial use approval shall be automatically |
2 |
| extended unless denied by the Agency in writing with the |
3 |
| Agency's reasons for disapproval, or unless the Agency has |
4 |
| requested an extension for review, in which case the use will |
5 |
| continue to be allowed until an Agency determination is made. |
6 |
| Coal-combustion waste for which a beneficial use is |
7 |
| approved pursuant to this subsection (b) shall be considered |
8 |
| CCB during the effective period of the approval, and the |
9 |
| continued approval upon renewal may not be denied by the Agency |
10 |
| as long as it is used in accordance with the approval and any |
11 |
| conditions. Any determination under this subsection (b) is |
12 |
| subject to review under Section 40 of this Act. |
13 |
| Notwithstanding the other provisions of this subsection |
14 |
| (b), written beneficial use determination applications for the |
15 |
| use of CCB at sites governed by the federal Surface Mining |
16 |
| Control and Reclamation Act of 1977 (P.L. 95-87) or the rules |
17 |
| and regulations thereunder, or by any law or rule or regulation |
18 |
| adopted by the State of Illinois pursuant thereto, shall be |
19 |
| reviewed and approved by the Office of Mines and Minerals |
20 |
| within the Department of Natural Resources pursuant to 62 Ill. |
21 |
| Adm. Code §§ 1700-1850. Further, appeals of those |
22 |
| determinations shall be made pursuant to the Illinois |
23 |
| Administrative Review Law.
|
24 |
| The Board shall adopt rules establishing standards and |
25 |
| procedures for the Agency's issuance of beneficial use |
26 |
| determinations under this subsection (b). The Board rules may |
|
|
|
HB4172 Engrossed |
- 7 - |
LRB095 14143 CMK 40004 b |
|
|
1 |
| also, but are not required to, include standards and procedures |
2 |
| for the revocation of the beneficial use determinations. Prior |
3 |
| to the effective date of Board rules adopted under this |
4 |
| subsection (b), the Agency is authorized to make beneficial use |
5 |
| determinations in accordance with this subsection (b). |
6 |
| Notwithstanding any other rulemaking authority that may |
7 |
| exist, neither the Governor nor any agency or agency head under |
8 |
| the jurisdiction of the Governor shall make or promulgate rules |
9 |
| to implement or enforce the provisions of this amendatory Act |
10 |
| of the 95th General Assembly. Nothing contained in this |
11 |
| amendatory Act of the 95th General Assembly shall be |
12 |
| interpreted to grant rulemaking authority under any other |
13 |
| Illinois statute where such authority is not otherwise |
14 |
| explicitly given. For the purposes of this paragraph, "rules" |
15 |
| is given the meaning contained in Section 1-70 of the Illinois |
16 |
| Administrative Procedure Act, and "agency" and "agency head" |
17 |
| are given the meanings contained in Sections 1-20 and 1-25 of |
18 |
| the Illinois Administrative Procedure Act to the extent that |
19 |
| such definitions apply to agencies or agency heads under the |
20 |
| jurisdiction of the Governor. |
21 |
| No later than January 1, 2009, the Governor, in |
22 |
| coordination with the Agency and the Board, must propose rules |
23 |
| to the General Assembly by filing them with the Clerk of the |
24 |
| House and the Secretary of the Senate and request that the |
25 |
| General Assembly authorize such rulemaking by law, enact those |
26 |
| proposed rules into law, or take any other appropriate action |
|
|
|
HB4172 Engrossed |
- 8 - |
LRB095 14143 CMK 40004 b |
|
|
1 |
| in the General Assembly's discretion. The proposed rules must |
2 |
| concern the use of CCB under item (8) of subsection (a). The |
3 |
| proposed rules must include specific guidelines for the use of |
4 |
| CCB as structural fill and a site-approval process. The |
5 |
| proposed rules must specify that agency approval is not |
6 |
| required for a structural fill project if that project uses |
7 |
| less than 10,000 tons of CCB material or if the fill material |
8 |
| meets the ASTM D3987-85 standards for Class 1 Groundwater. The |
9 |
| proposed rules for a site-approval process must include, along |
10 |
| with other permits that may be required, (i) specific |
11 |
| timeframes for Agency approval and (ii) informal consultation |
12 |
| with the Department of Natural Resources on whether the |
13 |
| structural fill project will harm any endangered species. |
14 |
| The Agency is authorized to prepare and distribute guidance |
15 |
| documents relating to its administration of this Section. |
16 |
| Guidance documents prepared under this subsection are not rules |
17 |
| for the purposes of the Illinois Administrative Procedure Act.
|
18 |
| (c) In addition to the other penalties and remedies |
19 |
| provided in this Act, any person harmed by a violation of item |
20 |
| (8) of subsection (a) of this Section may bring a civil action |
21 |
| in the circuit court of the county of that person's residence |
22 |
| for damages or other appropriate legal or equitable remedies |
23 |
| against the violator. |
24 |
| (Source: P.A. 94-66, eff. 1-1-06.) |