| | SB1929 Enrolled | | LRB097 09577 JDS 49714 b |
|
|
1 | | AN ACT concerning safety.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Environmental Protection Act is amended by |
5 | | changing Section 22.38 as follows:
|
6 | | (415 ILCS 5/22.38)
|
7 | | Sec. 22.38. Facilities accepting exclusively general |
8 | | construction or
demolition debris
for transfer, storage, or |
9 | | treatment.
|
10 | | (a) Facilities accepting exclusively general construction |
11 | | or demolition
debris for
transfer, storage, or treatment shall |
12 | | be subject to local zoning, ordinance,
and
land use |
13 | | requirements.
Those facilities shall be located in accordance |
14 | | with local zoning requirements
or, in the absence of local |
15 | | zoning requirements, shall be located so that no
part of the |
16 | | facility boundary is closer than 1,320 feet from the nearest
|
17 | | property zoned for primarily residential use.
|
18 | | (b) An owner or operator of a facility accepting |
19 | | exclusively general
construction or demolition debris for |
20 | | transfer, storage, or treatment shall:
|
21 | | (1) Within 48 hours after of receipt of the general |
22 | | construction or demolition
debris at the facility, sort the |
23 | | general construction or demolition debris to
separate the
|
|
| | SB1929 Enrolled | - 2 - | LRB097 09577 JDS 49714 b |
|
|
1 | | recyclable general construction or demolition debris , and |
2 | | recovered wood that is processed for use as fuel , and |
3 | | general construction or demolition debris that is |
4 | | processed for use at a landfill from the non-recyclable
|
5 | | general construction or demolition debris that is to be |
6 | | disposed of or discarded.
|
7 | | (2) Transport off site for disposal , in accordance with |
8 | | all applicable federal, State, and local requirements |
9 | | within 72 hours after its receipt at the facility, all |
10 | | non-usable or non-recyclable general
construction or |
11 | | demolition debris that is not neither recyclable general |
12 | | construction or demolition debris , nor recovered wood that |
13 | | is processed for use as fuel , or general construction or |
14 | | demolition debris that is processed for use at a landfill |
15 | | in
accordance with all applicable federal, State, and local |
16 | | requirements within 72
hours of its receipt at the |
17 | | facility .
|
18 | | (3) Limit the percentage of incoming non-recyclable |
19 | | general construction
or demolition debris to 25% or
less of |
20 | | the total incoming general construction or demolition |
21 | | debris ,
as calculated on a daily basis , so that 75% or more |
22 | | of the general construction or demolition debris accepted , |
23 | | as calculated monthly on a rolling 12-month average, on a |
24 | | daily basis consists of recyclable general construction or |
25 | | demolition debris, recovered wood that is processed for use |
26 | | as fuel, or general construction or demolition debris that |
|
| | SB1929 Enrolled | - 3 - | LRB097 09577 JDS 49714 b |
|
|
1 | | is processed for use at a landfill except that general |
2 | | construction or demolition debris processed for use at a |
3 | | landfill shall not exceed 35% of the general construction |
4 | | or demolition debris accepted on a rolling 12-month average |
5 | | basis both . The percentages in this paragraph (3) of |
6 | | subsection (b) shall be calculated by weight, using scales |
7 | | located at the facility that are certified under the |
8 | | Weights and Measures Act.
|
9 | | (4) Within 6 months after its receipt at the facility, |
10 | | transport: |
11 | | (A) Transport all non-putrescible recyclable |
12 | | general construction or
demolition debris
for |
13 | | recycling or disposal ; and |
14 | | (B) all non-putrescible general construction or |
15 | | demolition debris that is processed for use at a |
16 | | landfill to a MSWLF unit for use or disposal within 6 |
17 | | months of its receipt at the facility .
|
18 | | (5) Within 45 days after of its receipt at the |
19 | | facility, transport : |
20 | | (A) (i) all putrescible or combustible recyclable |
21 | | general
construction or demolition debris
(excluding |
22 | | recovered wood that is processed for use as fuel) for |
23 | | recycling or disposal ; and |
24 | | (B) (ii) all recovered wood that is processed for |
25 | | use as fuel to an intermediate processing facility for |
26 | | sizing, to a combustion facility for use as fuel, or to |
|
| | SB1929 Enrolled | - 4 - | LRB097 09577 JDS 49714 b |
|
|
1 | | a disposal facility ; and |
2 | | (C) all putrescible general construction or |
3 | | demolition debris that is processed for use at a |
4 | | landfill to a MSWLF unit for use or disposal .
|
5 | | (6) Employ tagging and recordkeeping procedures to (i) |
6 | | demonstrate
compliance
with this Section and (ii) identify |
7 | | the source and transporter of material
accepted by the |
8 | | facility.
|
9 | | (7) Control odor, noise, combustion of materials, |
10 | | disease vectors, dust,
and litter.
|
11 | | (8) Control, manage, and dispose of any storm water |
12 | | runoff and leachate
generated at the facility in accordance |
13 | | with applicable federal, State, and
local requirements.
|
14 | | (9) Control access to the facility.
|
15 | | (10) Comply with all applicable federal, State, or |
16 | | local requirements for
the handling, storage, |
17 | | transportation, or disposal of asbestos-containing
|
18 | | material or other material accepted at the
facility that is |
19 | | not general construction or demolition debris.
|
20 | | (11) Prior to August 24, 2009 (the effective date of |
21 | | Public Act 96-611), submit to the Agency at least 30 days |
22 | | prior to the initial acceptance
of general construction or |
23 | | demolition debris at the facility, on forms provided
by the |
24 | | Agency, the following information:
|
25 | | (A) the name, address, and telephone number of both |
26 | | the facility owner
and operator;
|
|
| | SB1929 Enrolled | - 5 - | LRB097 09577 JDS 49714 b |
|
|
1 | | (B) the street address and location of the |
2 | | facility;
|
3 | | (C) a description of facility operations;
|
4 | | (D) a description of the tagging and recordkeeping |
5 | | procedures the
facility will employ to (i) demonstrate |
6 | | compliance with this Section and (ii)
identify the |
7 | | source and transporter of any material accepted by the |
8 | | facility;
|
9 | | (E) the name and location of the disposal sites to |
10 | | be used for the
disposal of any general construction or |
11 | | demolition debris received at the facility that must be |
12 | | disposed of;
|
13 | | (F) the name and location of an individual, |
14 | | facility, or business to
which recyclable materials |
15 | | will be transported;
|
16 | | (G) the name and location of intermediate |
17 | | processing facilities or combustion facilities to |
18 | | which recovered wood that is processed for use as fuel |
19 | | will be transported; and
|
20 | | (H) other information as specified on the form |
21 | | provided by the Agency.
|
22 | | (12) On or after August 24, 2009 (the effective date of |
23 | | Public Act 96-611), obtain a permit issued by the Agency |
24 | | prior to the initial acceptance of general construction or |
25 | | demolition debris at the facility.
|
26 | | When any of the information contained or processes |
|
| | SB1929 Enrolled | - 6 - | LRB097 09577 JDS 49714 b |
|
|
1 | | described in the initial
notification form submitted to the |
2 | | Agency under paragraph (11) of subsection (b) of this |
3 | | Section changes, the owner and operator shall
submit an |
4 | | updated form within 14 days of the change.
|
5 | | (c) For purposes of this Section, the term "recyclable |
6 | | general
construction or demolition debris" means general |
7 | | construction or demolition
debris that has been rendered |
8 | | reusable and is reused or that would otherwise
be disposed of |
9 | | or discarded but is collected, separated, or processed and
|
10 | | returned to the economic mainstream in the form of raw |
11 | | materials or products.
"Recyclable general construction or |
12 | | demolition debris" does not include (i) general
construction or |
13 | | demolition debris processed for use as fuel, incinerated,
|
14 | | burned, buried, or otherwise used as fill material or (ii) |
15 | | general construction or demolition debris that is processed for |
16 | | use at a landfill .
|
17 | | (d) For purposes of this Section, "treatment" means |
18 | | processing
designed to alter the physical nature of the general |
19 | | construction or
demolition debris, including but not limited to |
20 | | size reduction, crushing,
grinding, or
homogenization, but |
21 | | does not include processing designed to change the chemical
|
22 | | nature of the general construction or demolition debris.
|
23 | | (e) For purposes of this Section, "recovered wood that is |
24 | | processed for use as fuel" means wood that has been salvaged |
25 | | from general construction or demolition debris and processed |
26 | | for use as fuel, as authorized by the applicable state or |
|
| | SB1929 Enrolled | - 7 - | LRB097 09577 JDS 49714 b |
|
|
1 | | federal environmental regulatory authority, and supplied only |
2 | | to intermediate processing facilities for sizing, or to |
3 | | combustion facilities for use as fuel, that have obtained all |
4 | | necessary waste management and air permits for handling and |
5 | | combustion of the fuel. |
6 | | (f) For purposes of this Section, "non-recyclable general |
7 | | construction or demolition debris" does not include " recovered |
8 | | wood that is processed for use as fuel " or general construction |
9 | | or demolition debris that is processed for use at a landfill . |
10 | | (g) Recyclable general construction or demolition debris , |
11 | | or recovered wood that is processed for use as fuel , and |
12 | | general construction or demolition debris that is processed for |
13 | | use at a landfill that is sent for disposal at the end of the |
14 | | applicable retention period shall not be considered as meeting |
15 | | the 75% diversion requirement for purposes of subdivision |
16 | | (b)(3) of this Section if sent for disposal at the end of the |
17 | | applicable retention period . |
18 | | (h) For the purposes of this Section, "general construction |
19 | | or demolition debris that is processed for use at a landfill" |
20 | | means general construction or demolition debris that is |
21 | | processed for use at a MSWLF unit as alternative daily cover, |
22 | | road building material, or drainage structure building |
23 | | material in accordance with the MSWLF unit's waste disposal |
24 | | permit issued by the Agency under this Act. |
25 | | (Source: P.A. 96-235, eff. 8-11-09; 96-611, eff. 8-24-09; |
26 | | 96-1000, eff. 7-2-10.)
|