| | HB0163 Enrolled | | LRB098 04212 OMW 34237 b |
|
|
1 | | AN ACT concerning local government.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Counties Code is amended by adding Section |
5 | | 5-12001.2 as follows: |
6 | | (55 ILCS 5/5-12001.2 new) |
7 | | Sec. 5-12001.2. Regulation of telecommunications |
8 | | facilities; Lake County pilot project. |
9 | | In addition to any other requirements under this Division |
10 | | concerning the regulation of telecommunications facilities, |
11 | | the following applies to any new telecommunications facilities |
12 | | in Lake County that are not AM telecommunications towers or |
13 | | facilities: |
14 | | (a) For every new wireless telecommunications facility |
15 | | requiring a new tower structure, a telecommunications carrier |
16 | | shall provide the county with documentation consisting of the |
17 | | proposed location, a site plan, and an elevation that |
18 | | sufficiently describes a proposed wireless facility location. |
19 | | (b) The county shall have 7 days to review the facility |
20 | | proposal and contact the telecommunications carrier in writing |
21 | | via e-mail or other written means as specified by the |
22 | | telecommunications carrier. This written communication shall |
23 | | either approve the proposed location or request a meeting to |
|
| | HB0163 Enrolled | - 2 - | LRB098 04212 OMW 34237 b |
|
|
1 | | review other possible alternative locations. If requested, the |
2 | | meeting shall take place within 7 days after the date of the |
3 | | written communication. |
4 | | (c) At the meeting, the telecommunications carrier shall |
5 | | provide the county documentation consisting of radio frequency |
6 | | engineering criteria and a corresponding telecommunications |
7 | | facility search ring map, together with documentation of the |
8 | | carrier's efforts to site the proposed facility within the |
9 | | telecommunications facility search ring. |
10 | | (d) Within 21 days after receipt of the carrier's |
11 | | documentation, the county shall propose either an alternative |
12 | | site within the telecommunications facility search ring, or an |
13 | | alternative site outside of the telecommunications search ring |
14 | | that meets the radio frequency engineering criteria provided by |
15 | | the telecommunications carrier and that will not materially |
16 | | increase the construction budget beyond what was estimated on |
17 | | the original carrier proposed site. |
18 | | (e) If the county's proposed alternative site meets the |
19 | | radio frequency engineering criteria provided by the |
20 | | telecommunications carrier, and will not materially increase |
21 | | the construction budget beyond what was estimated on the |
22 | | original carrier proposed site, then the telecommunications |
23 | | carrier shall agree to build the facility at the alternative |
24 | | location, subject to the negotiation of a lease with |
25 | | commercially reasonable terms and the obtainment of the |
26 | | customary building permits. |
|
| | HB0163 Enrolled | - 3 - | LRB098 04212 OMW 34237 b |
|
|
1 | | (f) If the telecommunications carrier can demonstrate |
2 | | that: (i) the county's proposed alternative site does not meet |
3 | | the radio frequency engineering criteria, (ii) the county's |
4 | | proposed alternative site will materially increase the |
5 | | construction budget beyond what was estimated on the original |
6 | | carrier proposed site, (iii) the county has failed to provide |
7 | | an alternate site, or (iv) after a period of 90 days after |
8 | | receipt of the alternative site the telecommunications carrier |
9 | | has failed, after acting in good faith and with due diligence, |
10 | | to obtain a lease or at a minimum, a letter of intent to lease |
11 | | the alternative site at lease rates not materially greater than |
12 | | the lease rate for the original proposed site; then the carrier |
13 | | can proceed to permit and construct the site under the |
14 | | provisions and standards of Section 5-12001.1 of this Code.
|
15 | | Section 99. Effective date. This Act takes effect upon |
16 | | becoming law.
|