|
| | 98TH GENERAL ASSEMBLY
State of Illinois
2013 and 2014 SB3081 Introduced 2/7/2014, by Sen. Daniel Biss SYNOPSIS AS INTRODUCED: |
| 105 ILCS 5/27A-6 | | 105 ILCS 5/27A-7 | |
|
Amends the Charter Schools Law of the School Code. Provides that (i) no renewal of a previously certified contract is effective unless and until the State Board certifies that the renewal is consistent with the Law and (ii) a material revision to a previously certified contract may go into effect immediately upon approval of both the local school board and the governing body of the charter school, unless either party requests certification by the State Board (instead of providing that no material revision to a previously certified contract or a renewal shall be effective unless and until certification is made by the State Board). Provides that the first day of the fiscal year of a charter school shall be July 1 (instead of no earlier than August 15 and no later than September 15 of a calendar year). Effective July 1, 2014.
|
| |
| | FISCAL NOTE ACT MAY APPLY | | STATE MANDATES ACT MAY REQUIRE REIMBURSEMENT |
| | A BILL FOR |
|
|
| | SB3081 | | LRB098 17510 NHT 52619 b |
|
|
1 | | AN ACT concerning education.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The School Code is amended by changing Sections |
5 | | 27A-6 and 27A-7 as follows:
|
6 | | (105 ILCS 5/27A-6)
|
7 | | Sec. 27A-6. Contract contents; applicability of laws and |
8 | | regulations.
|
9 | | (a) A certified charter shall constitute a binding contract |
10 | | and agreement
between
the charter school and a local school |
11 | | board under the terms of which the local
school board |
12 | | authorizes the governing body of the charter school to operate |
13 | | the
charter
school on the terms specified in the contract.
|
14 | | (b) Notwithstanding any other provision of this Article, |
15 | | the certified
charter
may
not waive or release the charter |
16 | | school from the State goals, standards, and
assessments |
17 | | established pursuant to Section 2-3.64.
Beginning with the |
18 | | 2003-2004 school year, the certified charter for a charter
|
19 | | school operating in a city having a population exceeding |
20 | | 500,000 shall
require the charter school to administer any |
21 | | other nationally recognized
standardized tests to its students |
22 | | that the chartering entity administers to
other
students, and |
23 | | the results on such tests shall be included in the
chartering |
|
| | SB3081 | - 2 - | LRB098 17510 NHT 52619 b |
|
|
1 | | entity's assessment reports.
|
2 | | (c) Subject to the provisions of subsection (e), a material |
3 | | revision to a
previously certified contract or a renewal shall |
4 | | be made with
the approval of both the local school board and |
5 | | the governing body of the
charter school.
|
6 | | (c-5) The proposed contract shall include a provision on |
7 | | how both parties
will address minor violations of the contract.
|
8 | | (d) The proposed contract between the governing body of a |
9 | | proposed charter
school and the local school board as described |
10 | | in Section 27A-7 must be
submitted to and certified by the |
11 | | State Board before it can take effect. If
the State Board |
12 | | recommends that the proposed contract be modified for
|
13 | | consistency with this Article before it can be certified, the |
14 | | modifications
must be consented to by both the governing body |
15 | | of
the charter school and the local school board, and |
16 | | resubmitted to the State
Board for its certification. If the |
17 | | proposed contract is resubmitted in a form
that is not |
18 | | consistent with this Article, the State
Board may refuse to |
19 | | certify the charter.
|
20 | | The State Board shall assign a number to each submission or |
21 | | resubmission in
chronological order of receipt, and shall |
22 | | determine whether the proposed
contract is consistent with the |
23 | | provisions of this Article. If the proposed
contract complies, |
24 | | the State Board shall so certify.
|
25 | | (e) No renewal of a previously certified contract is |
26 | | effective unless and until the State Board certifies that the |
|
| | SB3081 | - 3 - | LRB098 17510 NHT 52619 b |
|
|
1 | | renewal is consistent with the provisions of this Article. A |
2 | | material revision to a previously certified contract may go |
3 | | into effect immediately upon approval of both the local school |
4 | | board and the governing body of the charter school, unless |
5 | | either party requests in writing that the State Board certify |
6 | | that the material revision is consistent with the provisions of |
7 | | this Article. If such a request is made, the proposed material |
8 | | revision is not effective unless and until the State Board so |
9 | | certifies. No material revision to a previously certified |
10 | | contract or a renewal
shall be effective unless and until the |
11 | | State Board certifies that the revision
or renewal is |
12 | | consistent with the provisions of this Article.
|
13 | | (Source: P.A. 93-3, eff. 4-16-03.)
|
14 | | (105 ILCS 5/27A-7)
|
15 | | Sec. 27A-7. Charter submission.
|
16 | | (a) A proposal to establish a charter school shall be |
17 | | submitted to the
State Board and the local school board in the |
18 | | form of a proposed contract
entered
into between the local |
19 | | school board and the governing body of a proposed
charter |
20 | | school. The
charter school proposal as submitted to the State |
21 | | Board shall include:
|
22 | | (1) The name of the proposed charter school, which must |
23 | | include the words
"Charter School".
|
24 | | (2) The age or grade range, areas of focus, minimum and |
25 | | maximum numbers of
pupils to be enrolled in the charter |
|
| | SB3081 | - 4 - | LRB098 17510 NHT 52619 b |
|
|
1 | | school, and any other admission criteria
that would be |
2 | | legal if used by a school district.
|
3 | | (3) A description of and address for the physical plant |
4 | | in which the
charter school will be located; provided that |
5 | | nothing in the Article shall be
deemed to justify delaying |
6 | | or withholding favorable action on or approval of a
charter |
7 | | school proposal because the building or buildings in which |
8 | | the charter
school is to be located have not been acquired |
9 | | or rented at the time a charter
school proposal is |
10 | | submitted or approved or a charter school contract is
|
11 | | entered
into or submitted for certification or certified, |
12 | | so long as the proposal or
submission identifies and names |
13 | | at least 2 sites that are potentially available
as a |
14 | | charter school facility by the time the charter school is |
15 | | to open.
|
16 | | (4) The mission statement of the charter school, which |
17 | | must be consistent
with the General Assembly's declared |
18 | | purposes; provided that nothing in this
Article shall be |
19 | | construed to require that, in order to receive favorable
|
20 | | consideration and approval, a charter school proposal |
21 | | demonstrate unequivocally
that the charter school will be |
22 | | able to meet each of those declared purposes,
it
being the |
23 | | intention of the Charter Schools Law that those purposes be
|
24 | | recognized as goals that
charter schools must aspire to |
25 | | attain.
|
26 | | (5) The goals, objectives, and pupil performance |
|
| | SB3081 | - 5 - | LRB098 17510 NHT 52619 b |
|
|
1 | | standards to be achieved
by the charter school.
|
2 | | (6) In the case of a proposal to establish a charter |
3 | | school by
converting an existing public school or |
4 | | attendance center to charter school
status, evidence that |
5 | | the proposed formation of the charter school has received
|
6 | | the approval of certified teachers, parents
and
guardians, |
7 | | and, if applicable, a local school council as provided in
|
8 | | subsection
(b) of Section 27A-8.
|
9 | | (7) A description of the charter school's educational |
10 | | program, pupil
performance standards, curriculum, school |
11 | | year, school days, and hours of
operation.
|
12 | | (8) A description of the charter school's plan for |
13 | | evaluating pupil
performance, the types of assessments |
14 | | that will be used to measure pupil
progress towards |
15 | | achievement of the school's pupil performance standards, |
16 | | the
timeline for achievement of those standards, and the |
17 | | procedures for taking
corrective action in the event that |
18 | | pupil performance at the charter school
falls below those |
19 | | standards.
|
20 | | (9) Evidence that the terms of the charter as proposed |
21 | | are economically
sound
for both the charter school and the |
22 | | school district, a proposed budget for the
term of the |
23 | | charter, a description of the manner in which an annual
|
24 | | audit of the financial and administrative operations of the |
25 | | charter school,
including any services provided by the |
26 | | school district, are to be conducted,
and
a plan for the |
|
| | SB3081 | - 6 - | LRB098 17510 NHT 52619 b |
|
|
1 | | displacement of pupils, teachers, and other employees who |
2 | | will
not attend or be employed in the charter school.
|
3 | | (10) A description of the governance and operation of |
4 | | the charter school,
including the nature and extent of |
5 | | parental, professional educator, and
community involvement |
6 | | in the governance and operation of the charter school.
|
7 | | (11) An explanation of the relationship that will exist |
8 | | between the
charter school and its employees, including |
9 | | evidence that the terms and
conditions of employment have |
10 | | been addressed with affected employees and their
|
11 | | recognized representative, if any. However, a bargaining |
12 | | unit of charter
school employees shall be separate and
|
13 | | distinct from any bargaining units formed from employees of |
14 | | a school district
in
which the charter school is located.
|
15 | | (12) An agreement between the parties regarding their |
16 | | respective
legal liability and applicable insurance |
17 | | coverage.
|
18 | | (13) A description of how the charter school plans to |
19 | | meet the
transportation needs of its pupils, and a plan for |
20 | | addressing the
transportation needs
of low-income and |
21 | | at-risk pupils.
|
22 | | (14) The proposed effective date and term of the |
23 | | charter; provided that
the
first day of the first academic |
24 | | year and the first day of the fiscal year
shall be no |
25 | | earlier than August 15 and no later than September 15 of a
|
26 | | calendar year , and the first day of the fiscal year shall |
|
| | SB3081 | - 7 - | LRB098 17510 NHT 52619 b |
|
|
1 | | be July 1 .
|
2 | | (15) Any other information reasonably required by the |
3 | | State Board of
Education.
|
4 | | (b) A proposal to establish a charter school may be |
5 | | initiated by individuals
or organizations that will have
|
6 | | majority representation on the board of directors or other |
7 | | governing body of
the corporation or other discrete legal |
8 | | entity that is to be established to
operate the proposed |
9 | | charter school, by a board of education or an
intergovernmental |
10 | | agreement between or among boards of education, or by the
board |
11 | | of directors or other
governing body of a discrete legal entity |
12 | | already existing or established to
operate the proposed
charter |
13 | | school. The individuals or organizations referred to in this
|
14 | | subsection may be school teachers, school administrators, |
15 | | local school
councils, colleges or
universities or their |
16 | | faculty
members, public community colleges or their |
17 | | instructors or other
representatives, corporations, or other |
18 | | entities or their
representatives. The proposal shall be
|
19 | | submitted to the local school board for consideration and, if
|
20 | | appropriate, for
development of a proposed contract to be |
21 | | submitted to the State Board for
certification under
Section |
22 | | 27A-6.
|
23 | | (c) The local school board may not without the consent of |
24 | | the governing body
of the charter school condition its approval |
25 | | of a charter school proposal on
acceptance of an agreement to |
26 | | operate under State laws and regulations and
local school board |