|
| | 99TH GENERAL ASSEMBLY
State of Illinois
2015 and 2016 SB2200 Introduced 12/4/2015, by Sen. Jennifer Bertino-Tarrant SYNOPSIS AS INTRODUCED: |
| |
Amends the Counties Code. Adds Will County to a pilot project concerning regulation of new telecommunication facilities.
|
| |
| | A BILL FOR |
|
|
| | SB2200 | | LRB099 12393 AWJ 35651 b |
|
|
1 | | AN ACT concerning local government.
|
2 | | Be it enacted by the People of the State of Illinois,
|
3 | | represented in the General Assembly:
|
4 | | Section 5. The Counties Code is amended by changing Section |
5 | | 5-12001.2 as follows: |
6 | | (55 ILCS 5/5-12001.2) |
7 | | Sec. 5-12001.2. Regulation of telecommunications |
8 | | facilities; Lake County and Will County pilot project. In |
9 | | addition to any other requirements under this Division |
10 | | concerning the regulation of telecommunications facilities, |
11 | | the following applies to any new telecommunications facilities |
12 | | in Lake County and Will County that are not AM |
13 | | telecommunications towers or facilities: |
14 | | (a) For every new wireless telecommunications facility |
15 | | requiring a new tower structure, a telecommunications |
16 | | carrier shall provide the county with documentation |
17 | | consisting of the proposed location, a site plan, and an |
18 | | elevation that sufficiently describes a proposed wireless |
19 | | facility location. |
20 | | (b) The county shall have 7 days to review the facility |
21 | | proposal and contact the telecommunications carrier in |
22 | | writing via e-mail or other written means as specified by |
23 | | the telecommunications carrier. This written communication |
|
| | SB2200 | - 2 - | LRB099 12393 AWJ 35651 b |
|
|
1 | | shall either approve the proposed location or request a |
2 | | meeting to review other possible alternative locations. If |
3 | | requested, the meeting shall take place within 7 days after |
4 | | the date of the written communication. |
5 | | (c) At the meeting, the telecommunications carrier |
6 | | shall provide the county documentation consisting of radio |
7 | | frequency engineering criteria and a corresponding |
8 | | telecommunications facility search ring map, together with |
9 | | documentation of the carrier's efforts to site the proposed |
10 | | facility within the telecommunications facility search |
11 | | ring. |
12 | | (d) Within 21 days after receipt of the carrier's |
13 | | documentation, the county shall propose either an |
14 | | alternative site within the telecommunications facility |
15 | | search ring, or an alternative site outside of the |
16 | | telecommunications search ring that meets the radio |
17 | | frequency engineering criteria provided by the |
18 | | telecommunications carrier and that will not materially |
19 | | increase the construction budget beyond what was estimated |
20 | | on the original carrier proposed site. |
21 | | (e) If the county's proposed alternative site meets the |
22 | | radio frequency engineering criteria provided by the |
23 | | telecommunications carrier, and will not materially |
24 | | increase the construction budget beyond what was estimated |
25 | | on the original carrier proposed site, then the |
26 | | telecommunications carrier shall agree to build the |
|
| | SB2200 | - 3 - | LRB099 12393 AWJ 35651 b |
|
|
1 | | facility at the alternative location, subject to the |
2 | | negotiation of a lease with commercially reasonable terms |
3 | | and the obtainment of the customary building permits. |
4 | | (f) If the telecommunications carrier can demonstrate |
5 | | that: (i) the county's proposed alternative site does not |
6 | | meet the radio frequency engineering criteria, (ii) the |
7 | | county's proposed alternative site will materially |
8 | | increase the construction budget beyond what was estimated |
9 | | on the original carrier proposed site, (iii) the county has |
10 | | failed to provide an alternative site, or (iv) after a |
11 | | period of 90 days after receipt of the alternative site, |
12 | | the telecommunications carrier has failed, after acting in |
13 | | good faith and with due diligence, to obtain a lease or, at |
14 | | a minimum, a letter of intent to lease the alternative site |
15 | | at lease rates not materially greater than the lease rate |
16 | | for the original proposed site; then the carrier can |
17 | | proceed to permit and construct the site under the |
18 | | provisions and standards of Section 5-12001.1 of this Code.
|
19 | | (Source: P.A. 98-197, eff. 8-9-13; 98-756, eff. 7-16-14.)
|