| | 09900SB2803sam001 | - 2 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | to allow electric utilities to recover costs for reasonably and |
2 | | prudently incurred expenses for energy efficiency and |
3 | | demand-response measures. As used in this Section, |
4 | | "cost-effective" means that the measures satisfy the total |
5 | | resource cost test. The low-income measures described in |
6 | | subsection (f)(4) of this Section shall not be required to meet |
7 | | the total resource cost test. For purposes of this Section, the |
8 | | terms "energy-efficiency", "demand-response", "electric |
9 | | utility", and "total resource cost test" shall have the |
10 | | meanings set forth in the Illinois Power Agency Act. For |
11 | | purposes of this Section, the amount per kilowatthour means the |
12 | | total amount paid for electric service expressed on a per |
13 | | kilowatthour basis. For purposes of this Section, the total |
14 | | amount paid for electric service includes without limitation |
15 | | estimated amounts paid for supply, transmission, distribution, |
16 | | surcharges, and add-on-taxes. |
17 | | (b) Electric utilities shall implement cost-effective |
18 | | energy efficiency measures to meet the following incremental |
19 | | annual energy savings goals: |
20 | | (1) 0.2% of energy delivered in the year commencing |
21 | | June 1, 2008; |
22 | | (2) 0.4% of energy delivered in the year commencing |
23 | | June 1, 2009; |
24 | | (3) 0.6% of energy delivered in the year commencing |
25 | | June 1, 2010; |
26 | | (4) 0.8% of energy delivered in the year commencing |
|
| | 09900SB2803sam001 | - 3 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | June 1, 2011; |
2 | | (5) 1% of energy delivered in the year commencing June |
3 | | 1, 2012; |
4 | | (6) 1.4% of energy delivered in the year commencing |
5 | | June 1, 2013; |
6 | | (7) 1.8% of energy delivered in the year commencing |
7 | | June 1, 2014; and |
8 | | (8) 2% of energy delivered in the year commencing June |
9 | | 1, 2015 and each year thereafter. |
10 | | Electric utilities may comply with this subsection (b) by |
11 | | meeting the annual incremental savings goal in the applicable |
12 | | year or by showing that the total cumulative annual savings |
13 | | within a 3-year planning period associated with measures |
14 | | implemented after May 31, 2014 was equal to the sum of each |
15 | | annual incremental savings requirement from May 31, 2014 |
16 | | through the end of the applicable year. |
17 | | (c) Electric utilities shall implement cost-effective |
18 | | demand-response measures to reduce peak demand by 0.1% over the |
19 | | prior year for eligible retail customers, as defined in Section |
20 | | 16-111.5 of this Act, and for customers that elect hourly |
21 | | service from the utility pursuant to Section 16-107 of this |
22 | | Act, provided those customers have not been declared |
23 | | competitive. This requirement commences June 1, 2008 and |
24 | | continues for 10 years. |
25 | | (d) Notwithstanding the requirements of subsections (b) |
26 | | and (c) of this Section, an electric utility shall reduce the |
|
| | 09900SB2803sam001 | - 4 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | amount of energy efficiency and demand-response measures |
2 | | implemented over a 3-year planning period by an amount |
3 | | necessary to limit the estimated average annual increase in the |
4 | | amounts paid by retail customers in connection with electric |
5 | | service due to the cost of those measures to: |
6 | | (1) in 2008, no more than 0.5% of the amount paid per |
7 | | kilowatthour by those customers during the year ending May |
8 | | 31, 2007; |
9 | | (2) in 2009, the greater of an additional 0.5% of the |
10 | | amount paid per kilowatthour by those customers during the |
11 | | year ending May 31, 2008 or 1% of the amount paid per |
12 | | kilowatthour by those customers during the year ending May |
13 | | 31, 2007; |
14 | | (3) in 2010, the greater of an additional 0.5% of the |
15 | | amount paid per kilowatthour by those customers during the |
16 | | year ending May 31, 2009 or 1.5% of the amount paid per |
17 | | kilowatthour by those customers during the year ending May |
18 | | 31, 2007; |
19 | | (4) in 2011, the greater of an additional 0.5% of the |
20 | | amount paid per kilowatthour by those customers during the |
21 | | year ending May 31, 2010 or 2% of the amount paid per |
22 | | kilowatthour by those customers during the year ending May |
23 | | 31, 2007; and
|
24 | | (5) thereafter, the amount of energy efficiency and |
25 | | demand-response measures implemented for any single year |
26 | | shall be reduced by an amount necessary to limit the |
|
| | 09900SB2803sam001 | - 5 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | estimated average net increase due to the cost of these |
2 | | measures included in the amounts paid by eligible retail |
3 | | customers in connection with electric service to no more |
4 | | than the greater of 2.015% of the amount paid per |
5 | | kilowatthour by those customers during the year ending May |
6 | | 31, 2007 or the incremental amount per kilowatthour paid |
7 | | for these measures in 2011.
|
8 | | No later than June 30, 2011, the Commission shall review |
9 | | the limitation on the amount of energy efficiency and |
10 | | demand-response measures implemented pursuant to this Section |
11 | | and report to the General Assembly its findings as to whether |
12 | | that limitation unduly constrains the procurement of energy |
13 | | efficiency and demand-response measures. |
14 | | (e) Electric utilities shall be responsible for overseeing |
15 | | the design, development, and filing of energy efficiency and |
16 | | demand-response plans with the Commission. Electric utilities |
17 | | shall implement 100% of the demand-response measures in the |
18 | | plans. Electric utilities shall implement 75% of the energy |
19 | | efficiency measures approved by the Commission, and may, as |
20 | | part of that implementation, outsource various aspects of |
21 | | program development and implementation. The remaining 25% of |
22 | | those energy efficiency measures approved by the Commission |
23 | | shall be implemented by the Department of Commerce and Economic |
24 | | Opportunity, and must be designed in conjunction with the |
25 | | utility and the filing process. The Department may outsource |
26 | | development and implementation of energy efficiency measures. |
|
| | 09900SB2803sam001 | - 6 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | A minimum of 10% of the entire portfolio of cost-effective |
2 | | energy efficiency measures shall be procured from units of |
3 | | local government, municipal corporations, school districts, |
4 | | and community college districts. The Department shall |
5 | | coordinate the implementation of these measures. |
6 | | The apportionment of the dollars to cover the costs to |
7 | | implement the Department's share of the portfolio of energy |
8 | | efficiency measures shall be made to the Department once the |
9 | | Department has executed rebate agreements, grants, or |
10 | | contracts for energy efficiency measures and provided |
11 | | supporting documentation for those rebate agreements, grants, |
12 | | and contracts to the utility. The Department is authorized to |
13 | | adopt any rules necessary and prescribe procedures in order to |
14 | | ensure compliance by applicants in carrying out the purposes of |
15 | | rebate agreements for energy efficiency measures implemented |
16 | | by the Department made under this Section. The Department is |
17 | | also authorized to adopt any rules necessary and prescribe |
18 | | procedures in order to allow, after Department approval of an |
19 | | executed rebate agreement, grant, or contract for energy |
20 | | efficiency measures, that dollars to cover those costs be paid |
21 | | directly from the utility to applicants determined in |
22 | | compliance with Department standards. |
23 | | The details of the measures implemented by the Department |
24 | | shall be submitted by the Department to the Commission in |
25 | | connection with the utility's filing regarding the energy |
26 | | efficiency and demand-response measures that the utility |
|
| | 09900SB2803sam001 | - 7 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | implements. |
2 | | A utility providing approved energy efficiency and |
3 | | demand-response measures in the State shall be permitted to |
4 | | recover costs of those measures through an automatic adjustment |
5 | | clause tariff filed with and approved by the Commission. The |
6 | | tariff shall be established outside the context of a general |
7 | | rate case. Each year the Commission shall initiate a review to |
8 | | reconcile any amounts collected with the actual costs and to |
9 | | determine the required adjustment to the annual tariff factor |
10 | | to match annual expenditures. |
11 | | Each utility shall include, in its recovery of costs, the |
12 | | costs estimated for both the utility's and the Department's |
13 | | implementation of energy efficiency and demand-response |
14 | | measures. Costs collected by the utility for measures |
15 | | implemented by the Department shall be submitted to the |
16 | | Department pursuant to Section 605-323 of the Civil |
17 | | Administrative Code of Illinois, shall be deposited into the |
18 | | Energy Efficiency Portfolio Standards Fund, and shall be used |
19 | | by the Department solely for the purpose of implementing these |
20 | | measures. A utility shall not be required to advance any moneys |
21 | | to the Department but only to forward such funds as it has |
22 | | collected. In accordance with Department rules, the Department |
23 | | may also authorize direct payment from the utility to the |
24 | | Department's approved vendors for services provided by the |
25 | | vendors related to this Section. The Department shall report to |
26 | | the Commission on an annual basis regarding the costs actually |
|
| | 09900SB2803sam001 | - 8 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | incurred by the Department in the implementation of the |
2 | | measures. Any changes to the costs of energy efficiency |
3 | | measures as a result of plan modifications shall be |
4 | | appropriately reflected in amounts recovered by the utility and |
5 | | turned over to the Department. |
6 | | The portfolio of measures, administered by both the |
7 | | utilities and the Department, shall, in combination, be |
8 | | designed to achieve the annual savings targets described in |
9 | | subsections (b) and (c) of this Section, as modified by |
10 | | subsection (d) of this Section. |
11 | | The utility and the Department shall agree upon a |
12 | | reasonable portfolio of measures and determine the measurable |
13 | | corresponding percentage of the savings goals associated with |
14 | | measures implemented by the utility or Department. |
15 | | No utility shall be assessed a penalty under subsection (f) |
16 | | of this Section for failure to make a timely filing if that |
17 | | failure is the result of a lack of agreement with the |
18 | | Department with respect to the allocation of responsibilities |
19 | | or related costs or target assignments. In that case, the |
20 | | Department and the utility shall file their respective plans |
21 | | with the Commission and the Commission shall determine an |
22 | | appropriate division of measures and programs that meets the |
23 | | requirements of this Section. |
24 | | If the Department is unable to meet incremental annual |
25 | | performance goals for the portion of the portfolio implemented |
26 | | by the Department, then the utility and the Department shall |
|
| | 09900SB2803sam001 | - 9 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | jointly submit a modified filing to the Commission explaining |
2 | | the performance shortfall and recommending an appropriate |
3 | | course going forward, including any program modifications that |
4 | | may be appropriate in light of the evaluations conducted under |
5 | | item (7) of subsection (f) of this Section. In this case, the |
6 | | utility obligation to collect the Department's costs and turn |
7 | | over those funds to the Department under this subsection (e) |
8 | | shall continue only if the Commission approves the |
9 | | modifications to the plan proposed by the Department. |
10 | | (f) No later than November 15, 2007, each electric utility |
11 | | shall file an energy efficiency and demand-response plan with |
12 | | the Commission to meet the energy efficiency and |
13 | | demand-response standards for 2008 through 2010. No later than |
14 | | October 1, 2010, each electric utility shall file an energy |
15 | | efficiency and demand-response plan with the Commission to meet |
16 | | the energy efficiency and demand-response standards for 2011 |
17 | | through 2013. Every 3 years thereafter, each electric utility |
18 | | shall file, no later than September 1, an energy efficiency and |
19 | | demand-response plan with the Commission. If a utility does not |
20 | | file such a plan by September 1 of an applicable year, it shall |
21 | | face a penalty of $100,000 per day until the plan is filed. |
22 | | Each utility's plan shall set forth the utility's proposals to |
23 | | meet the utility's portion of the energy efficiency standards |
24 | | identified in subsection (b) and the demand-response standards |
25 | | identified in subsection (c) of this Section as modified by |
26 | | subsections (d) and (e), taking into account the unique |
|
| | 09900SB2803sam001 | - 10 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | circumstances of the utility's service territory. The |
2 | | Commission shall seek public comment on the utility's plan and |
3 | | shall issue an order approving or disapproving each plan within |
4 | | 5 months after its submission. If the Commission disapproves a |
5 | | plan, the Commission shall, within 30 days, describe in detail |
6 | | the reasons for the disapproval and describe a path by which |
7 | | the utility may file a revised draft of the plan to address the |
8 | | Commission's concerns satisfactorily. If the utility does not |
9 | | refile with the Commission within 60 days, the utility shall be |
10 | | subject to penalties at a rate of $100,000 per day until the |
11 | | plan is filed. This process shall continue, and penalties shall |
12 | | accrue, until the utility has successfully filed a portfolio of |
13 | | energy efficiency and demand-response measures. Penalties |
14 | | shall be deposited into the Energy Efficiency Trust Fund. In |
15 | | submitting proposed energy efficiency and demand-response |
16 | | plans and funding levels to meet the savings goals adopted by |
17 | | this Act the utility shall: |
18 | | (1) Demonstrate that its proposed energy efficiency |
19 | | and demand-response measures will achieve the requirements |
20 | | that are identified in subsections (b) and (c) of this |
21 | | Section, as modified by subsections (d) and (e). |
22 | | (2) Present specific proposals to implement new |
23 | | building and appliance standards that have been placed into |
24 | | effect. |
25 | | (3) Present estimates of the total amount paid for |
26 | | electric service expressed on a per kilowatthour basis |
|
| | 09900SB2803sam001 | - 11 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | associated with the proposed portfolio of measures |
2 | | designed to meet the requirements that are identified in |
3 | | subsections (b) and (c) of this Section, as modified by |
4 | | subsections (d) and (e). |
5 | | (4) Coordinate with the Department to present a |
6 | | portfolio of energy efficiency measures proportionate to |
7 | | the share of total annual utility revenues in Illinois from |
8 | | households at or below 150% of the poverty level. The |
9 | | energy efficiency programs shall be targeted to households |
10 | | with incomes at or below 80% of area median income. |
11 | | (5) Demonstrate that its overall portfolio of energy |
12 | | efficiency and demand-response measures, not including |
13 | | programs covered by item (4) of this subsection (f), are |
14 | | cost-effective using the total resource cost test and |
15 | | represent a diverse cross-section of opportunities for |
16 | | customers of all rate classes to participate in the |
17 | | programs. |
18 | | (6) Include a proposed cost-recovery tariff mechanism |
19 | | to fund the proposed energy efficiency and demand-response |
20 | | measures and to ensure the recovery of the prudently and |
21 | | reasonably incurred costs of Commission-approved programs. |
22 | | (7) Provide for an annual independent evaluation of the |
23 | | performance of the cost-effectiveness of the utility's |
24 | | portfolio of measures and the Department's portfolio of |
25 | | measures, as well as a full review of the 3-year results of |
26 | | the broader net program impacts and, to the extent |
|
| | 09900SB2803sam001 | - 12 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | practical, for adjustment of the measures on a |
2 | | going-forward basis as a result of the evaluations. The |
3 | | resources dedicated to evaluation shall not exceed 3% of |
4 | | portfolio resources in any given year. |
5 | | (g) No more than 3% of energy efficiency and |
6 | | demand-response program revenue may be allocated for |
7 | | demonstration of breakthrough equipment and devices. |
8 | | (h) This Section does not apply to an electric utility that |
9 | | on December 31, 2005 provided electric service to fewer than |
10 | | 100,000 customers in Illinois. |
11 | | (i) If, after 2 years, an electric utility fails to meet |
12 | | the efficiency standard specified in subsection (b) of this |
13 | | Section, as modified by subsections (d) and (e), it shall make |
14 | | a contribution to the Low-Income Home Energy Assistance |
15 | | Program. The combined total liability for failure to meet the |
16 | | goal shall be $1,000,000, which shall be assessed as follows: a |
17 | | large electric utility shall pay $665,000, and a medium |
18 | | electric utility shall pay $335,000. If, after 3 years, an |
19 | | electric utility fails to meet the efficiency standard |
20 | | specified in subsection (b) of this Section, as modified by |
21 | | subsections (d) and (e), it shall make a contribution to the |
22 | | Low-Income Home Energy Assistance Program. The combined total |
23 | | liability for failure to meet the goal shall be $1,000,000, |
24 | | which shall be assessed as follows: a large electric utility |
25 | | shall pay $665,000, and a medium electric utility shall pay |
26 | | $335,000. In addition, the responsibility for implementing the |
|
| | 09900SB2803sam001 | - 13 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | energy efficiency measures of the utility making the payment |
2 | | shall be transferred to the Illinois Power Agency if, after 3 |
3 | | years, or in any subsequent 3-year period, the utility fails to |
4 | | meet the efficiency standard specified in subsection (b) of |
5 | | this Section, as modified by subsections (d) and (e). The |
6 | | Agency shall implement a competitive procurement program to |
7 | | procure resources necessary to meet the standards specified in |
8 | | this Section as modified by subsections (d) and (e), with costs |
9 | | for those resources to be recovered in the same manner as |
10 | | products purchased through the procurement plan as provided in |
11 | | Section 16-111.5. The Director shall implement this |
12 | | requirement in connection with the procurement plan as provided |
13 | | in Section 16-111.5. |
14 | | For purposes of this Section, (i) a "large electric |
15 | | utility" is an electric utility that, on December 31, 2005, |
16 | | served more than 2,000,000 electric customers in Illinois; (ii) |
17 | | a "medium electric utility" is an electric utility that, on |
18 | | December 31, 2005, served 2,000,000 or fewer but more than |
19 | | 100,000 electric customers in Illinois; and (iii) Illinois |
20 | | electric utilities that are affiliated by virtue of a common |
21 | | parent company are considered a single electric utility. |
22 | | (j) If, after 3 years, or any subsequent 3-year period, the |
23 | | Department fails to implement the Department's share of energy |
24 | | efficiency measures required by the standards in subsection |
25 | | (b), then the Illinois Power Agency may assume responsibility |
26 | | for and control of the Department's share of the required |
|
| | 09900SB2803sam001 | - 14 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | energy efficiency measures. The Agency shall implement a |
2 | | competitive procurement program to procure resources necessary |
3 | | to meet the standards specified in this Section, with the costs |
4 | | of these resources to be recovered in the same manner as |
5 | | provided for the Department in this Section.
|
6 | | (k) No electric utility shall be deemed to have failed to |
7 | | meet the energy efficiency standards to the extent any such |
8 | | failure is due to a failure of the Department or the Agency.
|
9 | | (Source: P.A. 97-616, eff. 10-26-11; 97-841, eff. 7-20-12; |
10 | | 98-90, eff. 7-15-13.)
|
11 | | (220 ILCS 5/8-104)
|
12 | | Sec. 8-104. Natural gas energy efficiency programs. |
13 | | (a) It is the policy of the State that natural gas |
14 | | utilities and the Department of Commerce and Economic |
15 | | Opportunity are required to use cost-effective energy |
16 | | efficiency to reduce direct and indirect costs to consumers. It |
17 | | serves the public interest to allow natural gas utilities to |
18 | | recover costs for reasonably and prudently incurred expenses |
19 | | for cost-effective energy efficiency measures. |
20 | | (b) For purposes of this Section, "energy efficiency" means |
21 | | measures that reduce the amount of energy required to achieve a |
22 | | given end use. "Energy efficiency" also includes measures that |
23 | | reduce the total Btus of electricity and natural gas needed to |
24 | | meet the end use or uses. "Cost-effective" means that the |
25 | | measures satisfy the total resource cost test which, for |
|
| | 09900SB2803sam001 | - 15 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | purposes of this Section, means a standard that is met if, for |
2 | | an investment in energy efficiency, the benefit-cost ratio is |
3 | | greater than one. The benefit-cost ratio is the ratio of the |
4 | | net present value of the total benefits of the measures to the |
5 | | net present value of the total costs as calculated over the |
6 | | lifetime of the measures. The total resource cost test compares |
7 | | the sum of avoided natural gas utility costs, representing the |
8 | | benefits that accrue to the system and the participant in the |
9 | | delivery of those efficiency measures, as well as other |
10 | | quantifiable societal benefits, including avoided electric |
11 | | utility costs, to the sum of all incremental costs of end use |
12 | | measures (including both utility and participant |
13 | | contributions), plus costs to administer, deliver, and |
14 | | evaluate each demand-side measure, to quantify the net savings |
15 | | obtained by substituting demand-side measures for supply |
16 | | resources. In calculating avoided costs, reasonable estimates |
17 | | shall be included for financial costs likely to be imposed by |
18 | | future regulation of emissions of greenhouse gases. The |
19 | | low-income programs described in item (4) of subsection (f) of |
20 | | this Section shall not be required to meet the total resource |
21 | | cost test. |
22 | | (c) Natural gas utilities shall implement cost-effective |
23 | | energy efficiency measures to meet at least the following |
24 | | natural gas savings requirements, which shall be based upon the |
25 | | total amount of gas delivered to retail customers, other than |
26 | | the customers described in subsection (m) of this Section, |
|
| | 09900SB2803sam001 | - 16 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | during calendar year 2009 multiplied by the applicable |
2 | | percentage. Natural gas utilities may comply with this Section |
3 | | by meeting the annual incremental savings goal in the |
4 | | applicable year or by showing that total cumulative annual |
5 | | savings within a 3-year planning period associated with |
6 | | measures implemented after May 31, 2011 were equal to the sum |
7 | | of each annual incremental savings requirement from May 31, |
8 | | 2011 through the end of the applicable year: |
9 | | (1) 0.2% by May 31, 2012; |
10 | | (2) an additional 0.4% by May 31, 2013, increasing |
11 | | total savings to .6%; |
12 | | (3) an additional 0.6% by May 31, 2014, increasing |
13 | | total savings to 1.2%; |
14 | | (4) an additional 0.8% by May 31, 2015, increasing |
15 | | total savings to 2.0%; |
16 | | (5) an additional 1% by May 31, 2016, increasing total |
17 | | savings to 3.0%; |
18 | | (6) an additional 1.2% by May 31, 2017, increasing |
19 | | total savings to 4.2%; |
20 | | (7) an additional 1.4% by May 31, 2018, increasing |
21 | | total savings to 5.6%; |
22 | | (8) an additional 1.5% by May 31, 2019, increasing |
23 | | total savings to 7.1%; and |
24 | | (9) an additional 1.5% in each 12-month period |
25 | | thereafter. |
26 | | (d) Notwithstanding the requirements of subsection (c) of |
|
| | 09900SB2803sam001 | - 17 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | this Section, a natural gas utility shall limit the amount of |
2 | | energy efficiency implemented in any 3-year reporting period |
3 | | established by subsection (f) of Section 8-104 of this Act, by |
4 | | an amount necessary to limit the estimated average increase in |
5 | | the amounts paid by retail customers in connection with natural |
6 | | gas service to no more than 2% in the applicable 3-year |
7 | | reporting period. The energy savings requirements in |
8 | | subsection (c) of this Section may be reduced by the Commission |
9 | | for the subject plan, if the utility demonstrates by |
10 | | substantial evidence that it is highly unlikely that the |
11 | | requirements could be achieved without exceeding the |
12 | | applicable spending limits in any 3-year reporting period. No |
13 | | later than September 1, 2013, the Commission shall review the |
14 | | limitation on the amount of energy efficiency measures |
15 | | implemented pursuant to this Section and report to the General |
16 | | Assembly, in the report required by subsection (k) of this |
17 | | Section, its findings as to whether that limitation unduly |
18 | | constrains the procurement of energy efficiency measures. |
19 | | (e) Natural gas utilities shall be responsible for |
20 | | overseeing the design, development, and filing of their |
21 | | efficiency plans with the Commission. The utility shall utilize |
22 | | 75% of the available funding associated with energy efficiency |
23 | | programs approved by the Commission, and may outsource various |
24 | | aspects of program development and implementation. The |
25 | | remaining 25% of available funding shall be used by the |
26 | | Department of Commerce and Economic Opportunity to implement |
|
| | 09900SB2803sam001 | - 18 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | energy efficiency measures that achieve no less than 20% of the |
2 | | requirements of subsection (c) of this Section. Such measures |
3 | | shall be designed in conjunction with the utility and approved |
4 | | by the Commission. The Department may outsource development and |
5 | | implementation of energy efficiency measures. A minimum of 10% |
6 | | of the entire portfolio of cost-effective energy efficiency |
7 | | measures shall be procured from local government, municipal |
8 | | corporations, school districts, and community college |
9 | | districts. Five percent of the entire portfolio of |
10 | | cost-effective energy efficiency measures may be granted to |
11 | | local government and municipal corporations for market |
12 | | transformation initiatives. The Department shall coordinate |
13 | | the implementation of these measures and shall integrate |
14 | | delivery of natural gas efficiency programs with electric |
15 | | efficiency programs delivered pursuant to Section 8-103 of this |
16 | | Act, unless the Department can show that integration is not |
17 | | feasible. |
18 | | The apportionment of the dollars to cover the costs to |
19 | | implement the Department's share of the portfolio of energy |
20 | | efficiency measures shall be made to the Department once the |
21 | | Department has executed rebate agreements, grants, or |
22 | | contracts for energy efficiency measures and provided |
23 | | supporting documentation for those rebate agreements, grants, |
24 | | and contracts to the utility. The Department is authorized to |
25 | | adopt any rules necessary and prescribe procedures in order to |
26 | | ensure compliance by applicants in carrying out the purposes of |
|
| | 09900SB2803sam001 | - 19 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | rebate agreements for energy efficiency measures implemented |
2 | | by the Department made under this Section. The Department is |
3 | | also authorized to adopt any rules necessary and prescribe |
4 | | procedures in order to allow, after Department approval of an |
5 | | executed rebate agreement, grant, or contract for energy |
6 | | efficiency measures, that dollars to cover those costs be paid |
7 | | directly from the utility to applicants determined in |
8 | | compliance with Department standards. |
9 | | The details of the measures implemented by the Department |
10 | | shall be submitted by the Department to the Commission in |
11 | | connection with the utility's filing regarding the energy |
12 | | efficiency measures that the utility implements. |
13 | | A utility providing approved energy efficiency measures in |
14 | | this State shall be permitted to recover costs of those |
15 | | measures through an automatic adjustment clause tariff filed |
16 | | with and approved by the Commission. The tariff shall be |
17 | | established outside the context of a general rate case and |
18 | | shall be applicable to the utility's customers other than the |
19 | | customers described in subsection (m) of this Section. Each |
20 | | year the Commission shall initiate a review to reconcile any |
21 | | amounts collected with the actual costs and to determine the |
22 | | required adjustment to the annual tariff factor to match annual |
23 | | expenditures. |
24 | | Each utility shall include, in its recovery of costs, the |
25 | | costs estimated for both the utility's and the Department's |
26 | | implementation of energy efficiency measures. Costs collected |
|
| | 09900SB2803sam001 | - 20 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | by the utility for measures implemented by the Department shall |
2 | | be submitted to the Department pursuant to Section 605-323 of |
3 | | the Civil Administrative Code of Illinois, shall be deposited |
4 | | into the Energy Efficiency Portfolio Standards Fund, and shall |
5 | | be used by the Department solely for the purpose of |
6 | | implementing these measures. A utility shall not be required to |
7 | | advance any moneys to the Department but only to forward such |
8 | | funds as it has collected. In accordance with Department rules, |
9 | | the Department may also authorize direct payment from the |
10 | | utility to the Department's approved vendors for services |
11 | | provided by the vendors related to this Section. The Department |
12 | | shall report to the Commission on an annual basis regarding the |
13 | | costs actually incurred by the Department in the implementation |
14 | | of the measures. Any changes to the costs of energy efficiency |
15 | | measures as a result of plan modifications shall be |
16 | | appropriately reflected in amounts recovered by the utility and |
17 | | turned over to the Department. |
18 | | The portfolio of measures, administered by both the |
19 | | utilities and the Department, shall, in combination, be |
20 | | designed to achieve the annual energy savings requirements set |
21 | | forth in subsection (c) of this Section, as modified by |
22 | | subsection (d) of this Section. |
23 | | The utility and the Department shall agree upon a |
24 | | reasonable portfolio of measures and determine the measurable |
25 | | corresponding percentage of the savings goals associated with |
26 | | measures implemented by the Department. |
|
| | 09900SB2803sam001 | - 21 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | No utility shall be assessed a penalty under subsection (f) |
2 | | of this Section for failure to make a timely filing if that |
3 | | failure is the result of a lack of agreement with the |
4 | | Department with respect to the allocation of responsibilities |
5 | | or related costs or target assignments. In that case, the |
6 | | Department and the utility shall file their respective plans |
7 | | with the Commission and the Commission shall determine an |
8 | | appropriate division of measures and programs that meets the |
9 | | requirements of this Section. |
10 | | If the Department is unable to meet performance |
11 | | requirements for the portion of the portfolio implemented by |
12 | | the Department, then the utility and the Department shall |
13 | | jointly submit a modified filing to the Commission explaining |
14 | | the performance shortfall and recommending an appropriate |
15 | | course going forward, including any program modifications that |
16 | | may be appropriate in light of the evaluations conducted under |
17 | | item (8) of subsection (f) of this Section. In this case, the |
18 | | utility obligation to collect the Department's costs and turn |
19 | | over those funds to the Department under this subsection (e) |
20 | | shall continue only if the Commission approves the |
21 | | modifications to the plan proposed by the Department. |
22 | | (f) No later than October 1, 2010, each gas utility shall |
23 | | file an energy efficiency plan with the Commission to meet the |
24 | | energy efficiency standards through May 31, 2014. Every 3 years |
25 | | thereafter, each utility shall file, no later than October 1, |
26 | | an energy efficiency plan with the Commission. If a utility |
|
| | 09900SB2803sam001 | - 22 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | does not file such a plan by October 1 of the applicable year, |
2 | | then it shall face a penalty of $100,000 per day until the plan |
3 | | is filed. Each utility's plan shall set forth the utility's |
4 | | proposals to meet the utility's portion of the energy |
5 | | efficiency standards identified in subsection (c) of this |
6 | | Section, as modified by subsection (d) of this Section, taking |
7 | | into account the unique circumstances of the utility's service |
8 | | territory. The Commission shall seek public comment on the |
9 | | utility's plan and shall issue an order approving or |
10 | | disapproving each plan. If the Commission disapproves a plan, |
11 | | the Commission shall, within 30 days, describe in detail the |
12 | | reasons for the disapproval and describe a path by which the |
13 | | utility may file a revised draft of the plan to address the |
14 | | Commission's concerns satisfactorily. If the utility does not |
15 | | refile with the Commission within 60 days after the |
16 | | disapproval, the utility shall be subject to penalties at a |
17 | | rate of $100,000 per day until the plan is filed. This process |
18 | | shall continue, and penalties shall accrue, until the utility |
19 | | has successfully filed a portfolio of energy efficiency |
20 | | measures. Penalties shall be deposited into the Energy |
21 | | Efficiency Trust Fund and the cost of any such penalties may |
22 | | not be recovered from ratepayers. In submitting proposed energy |
23 | | efficiency plans and funding levels to meet the savings goals |
24 | | adopted by this Act the utility shall: |
25 | | (1) Demonstrate that its proposed energy efficiency |
26 | | measures will achieve the requirements that are identified |
|
| | 09900SB2803sam001 | - 23 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | in subsection (c) of this Section, as modified by |
2 | | subsection (d) of this Section. |
3 | | (2) Present specific proposals to implement new |
4 | | building and appliance standards that have been placed into |
5 | | effect. |
6 | | (3) Present estimates of the total amount paid for gas |
7 | | service expressed on a per therm basis associated with the |
8 | | proposed portfolio of measures designed to meet the |
9 | | requirements that are identified in subsection (c) of this |
10 | | Section, as modified by subsection (d) of this Section. |
11 | | (4) Coordinate with the Department to present a |
12 | | portfolio of energy efficiency measures proportionate to |
13 | | the share of total annual utility revenues in Illinois from |
14 | | households at or below 150% of the poverty level. Such |
15 | | programs shall be targeted to households with incomes at or |
16 | | below 80% of area median income. |
17 | | (5) Demonstrate that its overall portfolio of energy |
18 | | efficiency measures, not including programs covered by |
19 | | item (4) of this subsection (f), are cost-effective using |
20 | | the total resource cost test and represent a diverse cross |
21 | | section of opportunities for customers of all rate classes |
22 | | to participate in the programs. |
23 | | (6) Demonstrate that a gas utility affiliated with an |
24 | | electric utility that is required to comply with Section |
25 | | 8-103 of this Act has integrated gas and electric |
26 | | efficiency measures into a single program that reduces |
|
| | 09900SB2803sam001 | - 24 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | program or participant costs and appropriately allocates |
2 | | costs to gas and electric ratepayers. The Department shall |
3 | | integrate all gas and electric programs it delivers in any |
4 | | such utilities' service territories, unless the Department |
5 | | can show that integration is not feasible or appropriate. |
6 | | (7) Include a proposed cost recovery tariff mechanism |
7 | | to fund the proposed energy efficiency measures and to |
8 | | ensure the recovery of the prudently and reasonably |
9 | | incurred costs of Commission-approved programs. |
10 | | (8) Provide for quarterly status reports tracking |
11 | | implementation of and expenditures for the utility's |
12 | | portfolio of measures and the Department's portfolio of |
13 | | measures, an annual independent review, and a full |
14 | | independent evaluation of the 3-year results of the |
15 | | performance and the cost-effectiveness of the utility's |
16 | | and Department's portfolios of measures and broader net |
17 | | program impacts and, to the extent practical, for |
18 | | adjustment of the measures on a going forward basis as a |
19 | | result of the evaluations. The resources dedicated to |
20 | | evaluation shall not exceed 3% of portfolio resources in |
21 | | any given 3-year period. |
22 | | (g) No more than 3% of expenditures on energy efficiency |
23 | | measures may be allocated for demonstration of breakthrough |
24 | | equipment and devices. |
25 | | (h) Illinois natural gas utilities that are affiliated by |
26 | | virtue of a common parent company may, at the utilities' |
|
| | 09900SB2803sam001 | - 25 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | request, be considered a single natural gas utility for |
2 | | purposes of complying with this Section. |
3 | | (i) If, after 3 years, a gas utility fails to meet the |
4 | | efficiency standard specified in subsection (c) of this Section |
5 | | as modified by subsection (d), then it shall make a |
6 | | contribution to the Low-Income Home Energy Assistance Program. |
7 | | The total liability for failure to meet the goal shall be |
8 | | assessed as follows: |
9 | | (1) a large gas utility shall pay $600,000; |
10 | | (2) a medium gas utility shall pay $400,000; and |
11 | | (3) a small gas utility shall pay $200,000. |
12 | | For purposes of this Section, (i) a "large gas utility" is |
13 | | a gas utility that on December 31, 2008, served more than |
14 | | 1,500,000 gas customers in Illinois; (ii) a "medium gas |
15 | | utility" is a gas utility that on December 31, 2008, served |
16 | | fewer than 1,500,000, but more than 500,000 gas customers in |
17 | | Illinois; and (iii) a "small gas utility" is a gas utility that |
18 | | on December 31, 2008, served fewer than 500,000 and more than |
19 | | 100,000 gas customers in Illinois. The costs of this |
20 | | contribution may not be recovered from ratepayers. |
21 | | If a gas utility fails to meet the efficiency standard |
22 | | specified in subsection (c) of this Section, as modified by |
23 | | subsection (d) of this Section, in any 2 consecutive 3-year |
24 | | planning periods, then the responsibility for implementing the |
25 | | utility's energy efficiency measures shall be transferred to an |
26 | | independent program administrator selected by the Commission. |
|
| | 09900SB2803sam001 | - 26 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | Reasonable and prudent costs incurred by the independent |
2 | | program administrator to meet the efficiency standard |
3 | | specified in subsection (c) of this Section, as modified by |
4 | | subsection (d) of this Section, may be recovered from the |
5 | | customers of the affected gas utilities, other than customers |
6 | | described in subsection (m) of this Section. The utility shall |
7 | | provide the independent program administrator with all |
8 | | information and assistance necessary to perform the program |
9 | | administrator's duties including but not limited to customer, |
10 | | account, and energy usage data, and shall allow the program |
11 | | administrator to include inserts in customer bills. The utility |
12 | | may recover reasonable costs associated with any such |
13 | | assistance. |
14 | | (j) No utility shall be deemed to have failed to meet the |
15 | | energy efficiency standards to the extent any such failure is |
16 | | due to a failure of the Department. |
17 | | (k) Not later than January 1, 2012, the Commission shall |
18 | | develop and solicit public comment on a plan to foster |
19 | | statewide coordination and consistency between statutorily |
20 | | mandated natural gas and electric energy efficiency programs to |
21 | | reduce program or participant costs or to improve program |
22 | | performance. Not later than September 1, 2013, the Commission |
23 | | shall issue a report to the General Assembly containing its |
24 | | findings and recommendations. |
25 | | (l) This Section does not apply to a gas utility that on |
26 | | January 1, 2009, provided gas service to fewer than 100,000 |
|
| | 09900SB2803sam001 | - 27 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | customers in Illinois. |
2 | | (m) Subsections (a) through (k) of this Section do not |
3 | | apply to customers of a natural gas utility that have a North |
4 | | American Industry Classification System code number that is |
5 | | 22111 or any such code number beginning with the digits 31, 32, |
6 | | or 33 and (i) annual usage in the aggregate of 4 million therms |
7 | | or more within the service territory of the affected gas |
8 | | utility or with aggregate usage of 8 million therms or more in |
9 | | this State and complying with the provisions of item (l) of |
10 | | this subsection (m); or (ii) using natural gas as feedstock and |
11 | | meeting the usage requirements described in item (i) of this |
12 | | subsection (m), to the extent such annual feedstock usage is |
13 | | greater than 60% of the customer's total annual usage of |
14 | | natural gas. |
15 | | (1) Customers described in this subsection (m) of this |
16 | | Section shall apply, on a form approved on or before |
17 | | October 1, 2009 by the Department, to the Department to be |
18 | | designated as a self-directing customer ("SDC") or as an |
19 | | exempt customer using natural gas as a feedstock from which |
20 | | other products are made, including, but not limited to, |
21 | | feedstock for a hydrogen plant, on or before the 1st day of |
22 | | February, 2010. Thereafter, application may be made not |
23 | | less than 6 months before the filing date of the gas |
24 | | utility energy efficiency plan described in subsection (f) |
25 | | of this Section; however, a new customer that commences |
26 | | taking service from a natural gas utility after February 1, |
|
| | 09900SB2803sam001 | - 28 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | 2010 may apply to become a SDC or exempt customer up to 30 |
2 | | days after beginning service. Customers described in this |
3 | | subsection (m) that have not already been approved by the |
4 | | Department may apply to be designated a self-directing |
5 | | customer or exempt customer, on a form approved by the |
6 | | Department, between September 1, 2013 and September 30, |
7 | | 2013. Customer applications that are approved by the |
8 | | Department under this amendatory Act of the 98th General |
9 | | Assembly shall be considered to be a self-directing |
10 | | customer or exempt customer, as applicable, for the current |
11 | | 3-year planning period effective December 1, 2013. Such |
12 | | application shall contain the following: |
13 | | (A) the customer's certification that, at the time |
14 | | of its application, it qualifies to be a SDC or exempt |
15 | | customer described in this subsection (m) of this |
16 | | Section; |
17 | | (B) in the case of a SDC, the customer's |
18 | | certification that it has established or will |
19 | | establish by the beginning of the utility's 3-year |
20 | | planning period commencing subsequent to the |
21 | | application, and will maintain for accounting |
22 | | purposes, an energy efficiency reserve account and |
23 | | that the customer will accrue funds in said account to |
24 | | be held for the purpose of funding, in whole or in |
25 | | part, energy efficiency measures of the customer's |
26 | | choosing, which may include, but are not limited to, |
|
| | 09900SB2803sam001 | - 29 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | projects involving combined heat and power systems |
2 | | that use the same energy source both for the generation |
3 | | of electrical or mechanical power and the production of |
4 | | steam or another form of useful thermal energy or the |
5 | | use of combustible gas produced from biomass, or both; |
6 | | (C) in the case of a SDC, the customer's |
7 | | certification that annual funding levels for the |
8 | | energy efficiency reserve account will be equal to 2% |
9 | | of the customer's cost of natural gas, composed of the |
10 | | customer's commodity cost and the delivery service |
11 | | charges paid to the gas utility, or $150,000, whichever |
12 | | is less; |
13 | | (D) in the case of a SDC, the customer's |
14 | | certification that the required reserve account |
15 | | balance will be capped at 3 years' worth of accruals |
16 | | and that the customer may, at its option, make further |
17 | | deposits to the account to the extent such deposit |
18 | | would increase the reserve account balance above the |
19 | | designated cap level; |
20 | | (E) in the case of a SDC, the customer's |
21 | | certification that by October 1 of each year, beginning |
22 | | no sooner than October 1, 2012, the customer will |
23 | | report to the Department information, for the 12-month |
24 | | period ending May 31 of the same year, on all deposits |
25 | | and reductions, if any, to the reserve account during |
26 | | the reporting year, and to the extent deposits to the |
|
| | 09900SB2803sam001 | - 30 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | reserve account in any year are in an amount less than |
2 | | $150,000, the basis for such reduced deposits; reserve |
3 | | account balances by month; a description of energy |
4 | | efficiency measures undertaken by the customer and |
5 | | paid for in whole or in part with funds from the |
6 | | reserve account; an estimate of the energy saved, or to |
7 | | be saved, by the measure; and that the report shall |
8 | | include a verification by an officer or plant manager |
9 | | of the customer or by a registered professional |
10 | | engineer or certified energy efficiency trade |
11 | | professional that the funds withdrawn from the reserve |
12 | | account were used for the energy efficiency measures; |
13 | | (F) in the case of an exempt customer, the |
14 | | customer's certification of the level of gas usage as |
15 | | feedstock in the customer's operation in a typical year |
16 | | and that it will provide information establishing this |
17 | | level, upon request of the Department; |
18 | | (G) in the case of either an exempt customer or a |
19 | | SDC, the customer's certification that it has provided |
20 | | the gas utility or utilities serving the customer with |
21 | | a copy of the application as filed with the Department; |
22 | | (H) in the case of either an exempt customer or a |
23 | | SDC, certification of the natural gas utility or |
24 | | utilities serving the customer in Illinois including |
25 | | the natural gas utility accounts that are the subject |
26 | | of the application; and |
|
| | 09900SB2803sam001 | - 31 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | (I) in the case of either an exempt customer or a |
2 | | SDC, a verification signed by a plant manager or an |
3 | | authorized corporate officer attesting to the |
4 | | truthfulness and accuracy of the information contained |
5 | | in the application. |
6 | | (2) The Department shall review the application to |
7 | | determine that it contains the information described in |
8 | | provisions (A) through (I) of item (1) of this subsection |
9 | | (m), as applicable. The review shall be completed within 30 |
10 | | days after the date the application is filed with the |
11 | | Department. Absent a determination by the Department |
12 | | within the 30-day period, the applicant shall be considered |
13 | | to be a SDC or exempt customer, as applicable, for all |
14 | | subsequent 3-year planning periods, as of the date of |
15 | | filing the application described in this subsection (m). If |
16 | | the Department determines that the application does not |
17 | | contain the applicable information described in provisions |
18 | | (A) through (I) of item (1) of this subsection (m), it |
19 | | shall notify the customer, in writing, of its determination |
20 | | that the application does not contain the required |
21 | | information and identify the information that is missing, |
22 | | and the customer shall provide the missing information |
23 | | within 15 working days after the date of receipt of the |
24 | | Department's notification. |
25 | | (3) The Department shall have the right to audit the |
26 | | information provided in the customer's application and |
|
| | 09900SB2803sam001 | - 32 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | annual reports to ensure continued compliance with the |
2 | | requirements of this subsection. Based on the audit, if the |
3 | | Department determines the customer is no longer in |
4 | | compliance with the requirements of items (A) through (I) |
5 | | of item (1) of this subsection (m), as applicable, the |
6 | | Department shall notify the customer in writing of the |
7 | | noncompliance. The customer shall have 30 days to establish |
8 | | its compliance, and failing to do so, may have its status |
9 | | as a SDC or exempt customer revoked by the Department. The |
10 | | Department shall treat all information provided by any |
11 | | customer seeking SDC status or exemption from the |
12 | | provisions of this Section as strictly confidential. |
13 | | (4) Upon request, or on its own motion, the Commission |
14 | | may open an investigation, no more than once every 3 years |
15 | | and not before October 1, 2014, to evaluate the |
16 | | effectiveness of the self-directing program described in |
17 | | this subsection (m). |
18 | | Customers described in this subsection (m) that applied to |
19 | | the Department on January 3, 2013, were approved by the |
20 | | Department on February 13, 2013 to be a self-directing customer |
21 | | or exempt customer, and receive natural gas from a utility that |
22 | | provides gas service to at least 500,000 retail customers in |
23 | | Illinois and electric service to at least 1,000,000 retail |
24 | | customers in Illinois shall be considered to be a |
25 | | self-directing customer or exempt customer, as applicable, for |
26 | | the current 3-year planning period effective December 1, 2013. |
|
| | 09900SB2803sam001 | - 33 - | LRB099 20649 EGJ 45891 a |
|
|
1 | | (n) The applicability of this Section to customers |
2 | | described in subsection (m) of this Section is conditioned on |
3 | | the existence of the SDC program. In no event will any |
4 | | provision of this Section apply to such customers after January |
5 | | 1, 2020.
|
6 | | (Source: P.A. 97-813, eff. 7-13-12; 97-841, eff. 7-20-12; |
7 | | 98-90, eff. 7-15-13; 98-225, eff. 8-9-13; 98-604, eff. |
8 | | 12-17-13.)".
|