HB1201 - 104th General Assembly
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| 1 | AN ACT concerning local government. | |||||||||||||||||||
| 2 | Be it enacted by the People of the State of Illinois, | |||||||||||||||||||
| 3 | represented in the General Assembly: | |||||||||||||||||||
| 4 | Section 5. The Counties Code is amended by changing | |||||||||||||||||||
| 5 | Section 5-12020 as follows: | |||||||||||||||||||
| 6 | (55 ILCS 5/5-12020) | |||||||||||||||||||
| 7 | Sec. 5-12020. Wind farms, electric-generating wind | |||||||||||||||||||
| 8 | devices, and commercial Commercial wind energy facilities and | |||||||||||||||||||
| 9 | commercial solar energy facilities. | |||||||||||||||||||
| 10 | (a) As used in this Section: | |||||||||||||||||||
| 11 | "Commercial solar energy facility" means a "commercial | |||||||||||||||||||
| 12 | solar energy system" as defined in Section 10-720 of the | |||||||||||||||||||
| 13 | Property Tax Code. "Commercial solar energy facility" does not | |||||||||||||||||||
| 14 | mean a utility-scale solar energy facility being constructed | |||||||||||||||||||
| 15 | at a site that was eligible to participate in a procurement | |||||||||||||||||||
| 16 | event conducted by the Illinois Power Agency pursuant to | |||||||||||||||||||
| 17 | subsection (c-5) of Section 1-75 of the Illinois Power Agency | |||||||||||||||||||
| 18 | Act. | |||||||||||||||||||
| 19 | "Commercial wind energy facility" means a wind energy | |||||||||||||||||||
| 20 | conversion facility of equal or greater than 500 kilowatts in | |||||||||||||||||||
| 21 | total nameplate generating capacity. "Commercial wind energy | |||||||||||||||||||
| 22 | facility" includes a wind energy conversion facility seeking | |||||||||||||||||||
| 23 | an extension of a permit to construct granted by a county or | |||||||||||||||||||
| |||||||
| |||||||
| 1 | municipality before January 27, 2023 (the effective date of | ||||||
| 2 | Public Act 102-1123). | ||||||
| 3 | "Facility owner" means (i) a person with a direct | ||||||
| 4 | ownership interest in a commercial wind energy facility or a | ||||||
| 5 | commercial solar energy facility, or both, regardless of | ||||||
| 6 | whether the person is involved in acquiring the necessary | ||||||
| 7 | rights, permits, and approvals or otherwise planning for the | ||||||
| 8 | construction and operation of the facility, and (ii) at the | ||||||
| 9 | time the facility is being developed, a person who is acting as | ||||||
| 10 | a developer of the facility by acquiring the necessary rights, | ||||||
| 11 | permits, and approvals or by planning for the construction and | ||||||
| 12 | operation of the facility, regardless of whether the person | ||||||
| 13 | will own or operate the facility. | ||||||
| 14 | "Nonparticipating property" means real property that is | ||||||
| 15 | not a participating property. | ||||||
| 16 | "Nonparticipating residence" means a residence that is | ||||||
| 17 | located on nonparticipating property and that is existing and | ||||||
| 18 | occupied on the date that an application for a permit to | ||||||
| 19 | develop the commercial wind energy facility or the commercial | ||||||
| 20 | solar energy facility is filed with the county. | ||||||
| 21 | "Occupied community building" means any one or more of the | ||||||
| 22 | following buildings that is existing and occupied on the date | ||||||
| 23 | that the application for a permit to develop the commercial | ||||||
| 24 | wind energy facility or the commercial solar energy facility | ||||||
| 25 | is filed with the county: a school, place of worship, day care | ||||||
| 26 | facility, public library, or community center. | ||||||
| |||||||
| |||||||
| 1 | "Participating property" means real property that is the | ||||||
| 2 | subject of a written agreement between a facility owner and | ||||||
| 3 | the owner of the real property that provides the facility | ||||||
| 4 | owner an easement, option, lease, or license to use the real | ||||||
| 5 | property for the purpose of constructing a commercial wind | ||||||
| 6 | energy facility, a commercial solar energy facility, or | ||||||
| 7 | supporting facilities. "Participating property" also includes | ||||||
| 8 | real property that is owned by a facility owner for the purpose | ||||||
| 9 | of constructing a commercial wind energy facility, a | ||||||
| 10 | commercial solar energy facility, or supporting facilities. | ||||||
| 11 | "Participating residence" means a residence that is | ||||||
| 12 | located on participating property and that is existing and | ||||||
| 13 | occupied on the date that an application for a permit to | ||||||
| 14 | develop the commercial wind energy facility or the commercial | ||||||
| 15 | solar energy facility is filed with the county. | ||||||
| 16 | "Protected lands" means real property that is: | ||||||
| 17 | (1) subject to a permanent conservation right | ||||||
| 18 | consistent with the Real Property Conservation Rights Act; | ||||||
| 19 | or | ||||||
| 20 | (2) registered or designated as a nature preserve, | ||||||
| 21 | buffer, or land and water reserve under the Illinois | ||||||
| 22 | Natural Areas Preservation Act. | ||||||
| 23 | "Supporting facilities" means the transmission lines, | ||||||
| 24 | substations, access roads, meteorological towers, storage | ||||||
| 25 | containers, and equipment associated with the generation and | ||||||
| 26 | storage of electricity by the commercial wind energy facility | ||||||
| |||||||
| |||||||
| 1 | or commercial solar energy facility. | ||||||
| 2 | "Wind tower" includes the wind turbine tower, nacelle, and | ||||||
| 3 | blades. | ||||||
| 4 | (b) Notwithstanding any other provision of law or whether | ||||||
| 5 | the county has formed a zoning commission and adopted formal | ||||||
| 6 | zoning under Section 5-12007, a county may establish standards | ||||||
| 7 | for wind farms and electric-generating wind devices commercial | ||||||
| 8 | wind energy facilities, commercial solar energy facilities, or | ||||||
| 9 | both. The standards may include , without limitation, the | ||||||
| 10 | height of the devices and the number of devices that may be | ||||||
| 11 | located within a geographic area all of the requirements | ||||||
| 12 | specified in this Section but may not include requirements for | ||||||
| 13 | commercial wind energy facilities or commercial solar energy | ||||||
| 14 | facilities that are more restrictive than specified in this | ||||||
| 15 | Section. A county may also regulate the siting of wind farms | ||||||
| 16 | and electric-generating wind devices commercial wind energy | ||||||
| 17 | facilities with standards that are not more restrictive than | ||||||
| 18 | the requirements specified in this Section in unincorporated | ||||||
| 19 | areas of the county that are outside the zoning jurisdiction | ||||||
| 20 | of a municipality and that are outside the 1.5-mile radius | ||||||
| 21 | surrounding the zoning jurisdiction of a municipality. | ||||||
| 22 | (c) If a county has elected to establish standards under | ||||||
| 23 | subsection (b), before the county grants siting approval or a | ||||||
| 24 | special use permit for a commercial wind energy facility or a | ||||||
| 25 | commercial solar energy facility, or modification of an | ||||||
| 26 | approved siting or special use permit, the county board of the | ||||||
| |||||||
| |||||||
| 1 | county in which the facility is to be sited or the zoning board | ||||||
| 2 | of appeals for the county shall hold at least one public | ||||||
| 3 | hearing. The public hearing shall be conducted in accordance | ||||||
| 4 | with the Open Meetings Act and shall be held not more than 60 | ||||||
| 5 | days after the filing of the application for the facility. The | ||||||
| 6 | county shall allow interested parties to a special use permit | ||||||
| 7 | an opportunity to present evidence and to cross-examine | ||||||
| 8 | witnesses at the hearing, but the county may impose reasonable | ||||||
| 9 | restrictions on the public hearing, including reasonable time | ||||||
| 10 | limitations on the presentation of evidence and the | ||||||
| 11 | cross-examination of witnesses. The county shall also allow | ||||||
| 12 | public comment at the public hearing in accordance with the | ||||||
| 13 | Open Meetings Act. The county shall make its siting and | ||||||
| 14 | permitting decisions There shall be at least one public | ||||||
| 15 | hearing not more than 30 days prior to a siting decision by the | ||||||
| 16 | county board after the conclusion of the public hearing. | ||||||
| 17 | Notice of the hearing shall be published in a newspaper of | ||||||
| 18 | general circulation in the county. A commercial wind energy | ||||||
| 19 | facility owner , as defined in the Renewable Energy Facilities | ||||||
| 20 | Agricultural Impact Mitigation Act, must enter into an | ||||||
| 21 | agricultural impact mitigation agreement with the Department | ||||||
| 22 | of Agriculture prior to the date of the required public | ||||||
| 23 | hearing. A commercial wind energy facility owner seeking an | ||||||
| 24 | extension of a permit granted by a county prior to July 24, | ||||||
| 25 | 2015 (the effective date of Public Act 99-132) must enter into | ||||||
| 26 | an agricultural impact mitigation agreement with the | ||||||
| |||||||
| |||||||
| 1 | Department of Agriculture prior to a decision by the county to | ||||||
| 2 | grant the permit extension. Counties may allow test wind | ||||||
| 3 | towers or test solar energy systems to be sited without formal | ||||||
| 4 | approval by the county board. Any provision of a county zoning | ||||||
| 5 | ordinance pertaining to wind farms, commercial wind energy | ||||||
| 6 | facilities, or commercial solar energy facilities that was in | ||||||
| 7 | effect before January 27, 2023 may continue in effect | ||||||
| 8 | notwithstanding any changes made in Public Act 102-1123 and, | ||||||
| 9 | if applicable, any provision of a county zoning ordinance | ||||||
| 10 | pertaining to wind farms that was in effect before August 16, | ||||||
| 11 | 2007 may continue in effect notwithstanding the changes made | ||||||
| 12 | in Public Act 95-203. | ||||||
| 13 | (d) A county with an existing zoning ordinance in conflict | ||||||
| 14 | with this Section shall amend that zoning ordinance to be in | ||||||
| 15 | compliance with this Section within 120 days after January 27, | ||||||
| 16 | 2023 (the effective date of Public Act 102-1123). | ||||||
| 17 | (e) A county may not require a wind tower or other | ||||||
| 18 | renewable energy system that is used exclusively by an end | ||||||
| 19 | user to be setback more than 1.1 times the height of the | ||||||
| 20 | renewable energy system from the end user's property line. : | ||||||
| 21 | (1) a wind tower of a commercial wind energy facility | ||||||
| 22 | to be sited as follows, with setback distances measured | ||||||
| 23 | from the center of the base of the wind tower: | ||||||
| 24 | Setback Description Setback Distance | ||||||
| |||||||
| |||||||
| 1 | Occupied Community 2.1 times the maximum blade tip | ||||||
| 2 | Buildings height of the wind tower to the | ||||||
| 3 | nearest point on the outside | ||||||
| 4 | wall of the structure | ||||||
| 5 | Participating Residences 1.1 times the maximum blade tip | ||||||
| 6 | height of the wind tower to the | ||||||
| 7 | nearest point on the outside | ||||||
| 8 | wall of the structure | ||||||
| 9 | Nonparticipating Residences 2.1 times the maximum blade tip | ||||||
| 10 | height of the wind tower to the | ||||||
| 11 | nearest point on the outside | ||||||
| 12 | wall of the structure | ||||||
| 13 | Boundary Lines of None | ||||||
| 14 | Participating Property | ||||||
| 15 | Boundary Lines of 1.1 times the maximum blade tip | ||||||
| 16 | Nonparticipating Property height of the wind tower to the | ||||||
| 17 | nearest point on the property | ||||||
| 18 | line of the nonparticipating | ||||||
| 19 | property | ||||||
| 20 | Public Road Rights-of-Way 1.1 times the maximum blade tip | ||||||
| 21 | height of the wind tower | ||||||
| |||||||
| |||||||
| 1 | to the center point of the | ||||||
| 2 | public road right-of-way | ||||||
| 3 | Overhead Communication and 1.1 times the maximum blade tip | ||||||
| 4 | Electric Transmission height of the wind tower to the | ||||||
| 5 | and Distribution Facilities nearest edge of the property | ||||||
| 6 | (Not Including Overhead line, easement, or | ||||||
| 7 | Utility Service Lines to right-of-way | ||||||
| 8 | Individual Houses or containing the overhead line | ||||||
| 9 | Outbuildings) | ||||||
| 10 | Overhead Utility Service None | ||||||
| 11 | Lines to Individual | ||||||
| 12 | Houses or Outbuildings | ||||||
| 13 | Fish and Wildlife Areas 2.1 times the maximum blade | ||||||
| 14 | and Illinois Nature tip height of the wind tower | ||||||
| 15 | Preserve Commission to the nearest point on the | ||||||
| 16 | Protected Lands property line of the fish and | ||||||
| 17 | wildlife area or protected | ||||||
| 18 | land | ||||||
| 19 | This Section does not exempt or excuse compliance with | ||||||
| 20 | electric facility clearances approved or required by the | ||||||
| 21 | National Electrical Code, The National Electrical Safety | ||||||
| 22 | Code, Illinois Commerce Commission, Federal Energy | ||||||
| 23 | Regulatory Commission, and their designees or successors. | ||||||
| |||||||
| |||||||
| 1 | (2) a wind tower of a commercial wind energy facility | ||||||
| 2 | to be sited so that industry standard computer modeling | ||||||
| 3 | indicates that any occupied community building or | ||||||
| 4 | nonparticipating residence will not experience more than | ||||||
| 5 | 30 hours per year of shadow flicker under planned | ||||||
| 6 | operating conditions; | ||||||
| 7 | (3) a commercial solar energy facility to be sited as | ||||||
| 8 | follows, with setback distances measured from the nearest | ||||||
| 9 | edge of any component of the facility: | ||||||
| 10 | Setback Description Setback Distance | ||||||
| 11 | Occupied Community 150 feet from the nearest | ||||||
| 12 | Buildings and Dwellings on point on the outside wall | ||||||
| 13 | Nonparticipating Properties of the structure | ||||||
| 14 | Boundary Lines of None | ||||||
| 15 | Participating Property | ||||||
| 16 | Public Road Rights-of-Way 50 feet from the nearest | ||||||
| 17 | edge | ||||||
| 18 | Boundary Lines of 50 feet to the nearest | ||||||
| 19 | Nonparticipating Property point on the property | ||||||
| 20 | line of the nonparticipating | ||||||
| 21 | property | ||||||
| |||||||
| |||||||
| 1 | (4) a commercial solar energy facility to be sited so | ||||||
| 2 | that the facility's perimeter is enclosed by fencing | ||||||
| 3 | having a height of at least 6 feet and no more than 25 | ||||||
| 4 | feet; and | ||||||
| 5 | (5) a commercial solar energy facility to be sited so | ||||||
| 6 | that no component of a solar panel has a height of more | ||||||
| 7 | than 20 feet above ground when the solar energy facility's | ||||||
| 8 | arrays are at full tilt. | ||||||
| 9 | The requirements set forth in this subsection (e) may be | ||||||
| 10 | waived subject to the written consent of the owner of each | ||||||
| 11 | affected nonparticipating property. | ||||||
| 12 | (f) A county may not set a sound limitation for wind towers | ||||||
| 13 | in commercial wind energy facilities or any components in | ||||||
| 14 | commercial solar energy facilities that is more restrictive | ||||||
| 15 | than the sound limitations established by the Illinois | ||||||
| 16 | Pollution Control Board under 35 Ill. Adm. Code Parts 900, | ||||||
| 17 | 901, and 910. | ||||||
| 18 | (g) A county may not place any restriction on the | ||||||
| 19 | installation or use of a commercial wind energy facility or a | ||||||
| 20 | commercial solar energy facility unless it adopts an ordinance | ||||||
| 21 | that complies with this Section. A county may not establish | ||||||
| 22 | siting standards for supporting facilities that preclude | ||||||
| 23 | development of commercial wind energy facilities or commercial | ||||||
| 24 | solar energy facilities. | ||||||
| 25 | A request for siting approval or a special use permit for a | ||||||
| |||||||
| |||||||
| 1 | commercial wind energy facility or a commercial solar energy | ||||||
| 2 | facility, or modification of an approved siting or special use | ||||||
| 3 | permit, shall be approved if the request is in compliance with | ||||||
| 4 | the standards and conditions imposed in this Act, the zoning | ||||||
| 5 | ordinance adopted consistent with this Code, and the | ||||||
| 6 | conditions imposed under State and federal statutes and | ||||||
| 7 | regulations. | ||||||
| 8 | (h) A county may not adopt zoning regulations that | ||||||
| 9 | disallow, permanently or temporarily, commercial wind energy | ||||||
| 10 | facilities or commercial solar energy facilities from being | ||||||
| 11 | developed or operated in any district zoned to allow | ||||||
| 12 | agricultural or industrial uses. | ||||||
| 13 | (i) A county may not require permit application fees for a | ||||||
| 14 | commercial wind energy facility or commercial solar energy | ||||||
| 15 | facility that are unreasonable. All application fees imposed | ||||||
| 16 | by the county shall be consistent with fees for projects in the | ||||||
| 17 | county with similar capital value and cost. | ||||||
| 18 | (j) Except as otherwise provided in this Section, a county | ||||||
| 19 | shall not require standards for construction, decommissioning, | ||||||
| 20 | or deconstruction of a commercial wind energy facility or | ||||||
| 21 | commercial solar energy facility or related financial | ||||||
| 22 | assurances that are more restrictive than those included in | ||||||
| 23 | the Department of Agriculture's standard wind farm | ||||||
| 24 | agricultural impact mitigation agreement, template 81818, or | ||||||
| 25 | standard solar agricultural impact mitigation agreement, | ||||||
| 26 | version 8.19.19, as applicable and in effect on December 31, | ||||||
| |||||||
| |||||||
| 1 | 2022. The amount of any decommissioning payment shall be in | ||||||
| 2 | accordance with the financial assurance required by those | ||||||
| 3 | agricultural impact mitigation agreements. | ||||||
| 4 | (j-5) A commercial wind energy facility or a commercial | ||||||
| 5 | solar energy facility shall file a farmland drainage plan with | ||||||
| 6 | the county and impacted drainage districts outlining how | ||||||
| 7 | surface and subsurface drainage of farmland will be restored | ||||||
| 8 | during and following construction or deconstruction of the | ||||||
| 9 | facility. The plan is to be created independently by the | ||||||
| 10 | facility developer and shall include the location of any | ||||||
| 11 | potentially impacted drainage district facilities to the | ||||||
| 12 | extent this information is publicly available from the county | ||||||
| 13 | or the drainage district, plans to repair any subsurface | ||||||
| 14 | drainage affected during construction or deconstruction using | ||||||
| 15 | procedures outlined in the agricultural impact mitigation | ||||||
| 16 | agreement entered into by the commercial wind energy facility | ||||||
| 17 | owner or commercial solar energy facility owner, and | ||||||
| 18 | procedures for the repair and restoration of surface drainage | ||||||
| 19 | affected during construction or deconstruction. All surface | ||||||
| 20 | and subsurface damage shall be repaired as soon as reasonably | ||||||
| 21 | practicable. | ||||||
| 22 | (k) A county may not condition approval of a commercial | ||||||
| 23 | wind energy facility or commercial solar energy facility on a | ||||||
| 24 | property value guarantee and may not require a facility owner | ||||||
| 25 | to pay into a neighboring property devaluation escrow account. | ||||||
| 26 | (l) A county may require certain vegetative screening | ||||||
| |||||||
| |||||||
| 1 | surrounding a commercial wind energy facility or commercial | ||||||
| 2 | solar energy facility but may not require earthen berms or | ||||||
| 3 | similar structures. | ||||||
| 4 | (m) A county may set blade tip height limitations for wind | ||||||
| 5 | towers in commercial wind energy facilities but may not set a | ||||||
| 6 | blade tip height limitation that is more restrictive than the | ||||||
| 7 | height allowed under a Determination of No Hazard to Air | ||||||
| 8 | Navigation by the Federal Aviation Administration under 14 CFR | ||||||
| 9 | Part 77. | ||||||
| 10 | (n) A county may require that a commercial wind energy | ||||||
| 11 | facility owner or commercial solar energy facility owner | ||||||
| 12 | provide: | ||||||
| 13 | (1) the results and recommendations from consultation | ||||||
| 14 | with the Illinois Department of Natural Resources that are | ||||||
| 15 | obtained through the Ecological Compliance Assessment Tool | ||||||
| 16 | (EcoCAT) or a comparable successor tool; and | ||||||
| 17 | (2) the results of the United States Fish and Wildlife | ||||||
| 18 | Service's Information for Planning and Consulting | ||||||
| 19 | environmental review or a comparable successor tool that | ||||||
| 20 | is consistent with (i) the "U.S. Fish and Wildlife | ||||||
| 21 | Service's Land-Based Wind Energy Guidelines" and (ii) any | ||||||
| 22 | applicable United States Fish and Wildlife Service solar | ||||||
| 23 | wildlife guidelines that have been subject to public | ||||||
| 24 | review. | ||||||
| 25 | Only a county may establish standards for wind farms, | ||||||
| 26 | electric-generating wind devices, and commercial wind energy | ||||||
| |||||||
| |||||||
| 1 | facilities, as that term is defined in Section 10 of the | ||||||
| 2 | Renewable Energy Facilities Agricultural Impact Mitigation | ||||||
| 3 | Act, in unincorporated areas of the county outside of the | ||||||
| 4 | zoning jurisdiction of a municipality and outside the 1.5-mile | ||||||
| 5 | radius surrounding the zoning jurisdiction of a municipality. | ||||||
| 6 | (o) A county may require a commercial wind energy facility | ||||||
| 7 | or commercial solar energy facility to adhere to the | ||||||
| 8 | recommendations provided by the Illinois Department of Natural | ||||||
| 9 | Resources in an EcoCAT natural resource review report under 17 | ||||||
| 10 | Ill. Adm. Code Part 1075. | ||||||
| 11 | (p) A county may require a facility owner to: | ||||||
| 12 | (1) demonstrate avoidance of protected lands as | ||||||
| 13 | identified by the Illinois Department of Natural Resources | ||||||
| 14 | and the Illinois Nature Preserve Commission; or | ||||||
| 15 | (2) consider the recommendations of the Illinois | ||||||
| 16 | Department of Natural Resources for setbacks from | ||||||
| 17 | protected lands, including areas identified by the | ||||||
| 18 | Illinois Nature Preserve Commission. | ||||||
| 19 | (q) A county may require that a facility owner provide | ||||||
| 20 | evidence of consultation with the Illinois State Historic | ||||||
| 21 | Preservation Office to assess potential impacts on | ||||||
| 22 | State-registered historic sites under the Illinois State | ||||||
| 23 | Agency Historic Resources Preservation Act. | ||||||
| 24 | (r) To maximize community benefits, including, but not | ||||||
| 25 | limited to, reduced stormwater runoff, flooding, and erosion | ||||||
| 26 | at the ground mounted solar energy system, improved soil | ||||||
| |||||||
| |||||||
| 1 | health, and increased foraging habitat for game birds, | ||||||
| 2 | songbirds, and pollinators, a county may (1) require a | ||||||
| 3 | commercial solar energy facility owner to plant, establish, | ||||||
| 4 | and maintain for the life of the facility vegetative ground | ||||||
| 5 | cover, consistent with the goals of the Pollinator-Friendly | ||||||
| 6 | Solar Site Act and (2) require the submittal of a vegetation | ||||||
| 7 | management plan that is in compliance with the agricultural | ||||||
| 8 | impact mitigation agreement in the application to construct | ||||||
| 9 | and operate a commercial solar energy facility in the county | ||||||
| 10 | if the vegetative ground cover and vegetation management plan | ||||||
| 11 | comply with the requirements of the underlying agreement with | ||||||
| 12 | the landowner or landowners where the facility will be | ||||||
| 13 | constructed. | ||||||
| 14 | No later than 90 days after January 27, 2023 (the | ||||||
| 15 | effective date of Public Act 102-1123), the Illinois | ||||||
| 16 | Department of Natural Resources shall develop guidelines for | ||||||
| 17 | vegetation management plans that may be required under this | ||||||
| 18 | subsection for commercial solar energy facilities. The | ||||||
| 19 | guidelines must include guidance for short-term and long-term | ||||||
| 20 | property management practices that provide and maintain native | ||||||
| 21 | and non-invasive naturalized perennial vegetation to protect | ||||||
| 22 | the health and well-being of pollinators. | ||||||
| 23 | (s) If a facility owner enters into a road use agreement | ||||||
| 24 | with the Illinois Department of Transportation, a road | ||||||
| 25 | district, or other unit of local government relating to a | ||||||
| 26 | commercial wind energy facility or a commercial solar energy | ||||||
| |||||||
| |||||||
| 1 | facility, the road use agreement shall require the facility | ||||||
| 2 | owner to be responsible for (i) the reasonable cost of | ||||||
| 3 | improving roads used by the facility owner to construct the | ||||||
| 4 | commercial wind energy facility or the commercial solar energy | ||||||
| 5 | facility and (ii) the reasonable cost of repairing roads used | ||||||
| 6 | by the facility owner during construction of the commercial | ||||||
| 7 | wind energy facility or the commercial solar energy facility | ||||||
| 8 | so that those roads are in a condition that is safe for the | ||||||
| 9 | driving public after the completion of the facility's | ||||||
| 10 | construction. Roadways improved in preparation for and during | ||||||
| 11 | the construction of the commercial wind energy facility or | ||||||
| 12 | commercial solar energy facility shall be repaired and | ||||||
| 13 | restored to the improved condition at the reasonable cost of | ||||||
| 14 | the developer if the roadways have degraded or were damaged as | ||||||
| 15 | a result of construction-related activities. | ||||||
| 16 | The road use agreement shall not require the facility | ||||||
| 17 | owner to pay costs, fees, or charges for road work that is not | ||||||
| 18 | specifically and uniquely attributable to the construction of | ||||||
| 19 | the commercial wind energy facility or the commercial solar | ||||||
| 20 | energy facility. Road-related fees, permit fees, or other | ||||||
| 21 | charges imposed by the Illinois Department of Transportation, | ||||||
| 22 | a road district, or other unit of local government under a road | ||||||
| 23 | use agreement with the facility owner shall be reasonably | ||||||
| 24 | related to the cost of administration of the road use | ||||||
| 25 | agreement. | ||||||
| 26 | (s-5) The facility owner shall also compensate landowners | ||||||
| |||||||
| |||||||
| 1 | for crop losses or other agricultural damages resulting from | ||||||
| 2 | damage to the drainage system caused by the construction of | ||||||
| 3 | the commercial wind energy facility or the commercial solar | ||||||
| 4 | energy facility. The commercial wind energy facility owner or | ||||||
| 5 | commercial solar energy facility owner shall repair or pay for | ||||||
| 6 | the repair of all damage to the subsurface drainage system | ||||||
| 7 | caused by the construction of the commercial wind energy | ||||||
| 8 | facility or the commercial solar energy facility in accordance | ||||||
| 9 | with the agriculture impact mitigation agreement requirements | ||||||
| 10 | for repair of drainage. The commercial wind energy facility | ||||||
| 11 | owner or commercial solar energy facility owner shall repair | ||||||
| 12 | or pay for the repair and restoration of surface drainage | ||||||
| 13 | caused by the construction or deconstruction of the commercial | ||||||
| 14 | wind energy facility or the commercial solar energy facility | ||||||
| 15 | as soon as reasonably practicable. | ||||||
| 16 | (t) Notwithstanding any other provision of law, a facility | ||||||
| 17 | owner with siting approval from a county to construct a | ||||||
| 18 | commercial wind energy facility or a commercial solar energy | ||||||
| 19 | facility is authorized to cross or impact a drainage system, | ||||||
| 20 | including, but not limited to, drainage tiles, open drainage | ||||||
| 21 | ditches, culverts, and water gathering vaults, owned or under | ||||||
| 22 | the control of a drainage district under the Illinois Drainage | ||||||
| 23 | Code without obtaining prior agreement or approval from the | ||||||
| 24 | drainage district in accordance with the farmland drainage | ||||||
| 25 | plan required by subsection (j-5). | ||||||
| 26 | (u) The amendments to this Section adopted in Public Act | ||||||
| |||||||
| |||||||
| 1 | 102-1123 do not apply to: (1) an application for siting | ||||||
| 2 | approval or for a special use permit for a commercial wind | ||||||
| 3 | energy facility or commercial solar energy facility if the | ||||||
| 4 | application was submitted to a unit of local government before | ||||||
| 5 | January 27, 2023 (the effective date of Public Act 102-1123); | ||||||
| 6 | (2) a commercial wind energy facility or a commercial solar | ||||||
| 7 | energy facility if the facility owner has submitted an | ||||||
| 8 | agricultural impact mitigation agreement to the Department of | ||||||
| 9 | Agriculture before January 27, 2023 (the effective date of | ||||||
| 10 | Public Act 102-1123); or (3) a commercial wind energy or | ||||||
| 11 | commercial solar energy development on property that is | ||||||
| 12 | located within an enterprise zone certified under the Illinois | ||||||
| 13 | Enterprise Zone Act, that was classified as industrial by the | ||||||
| 14 | appropriate zoning authority on or before January 27, 2023, | ||||||
| 15 | and that is located within 4 miles of the intersection of | ||||||
| 16 | Interstate 88 and Interstate 39. | ||||||
| 17 | (Source: P.A. 102-1123, eff. 1-27-23; 103-81, eff. 6-9-23; | ||||||
| 18 | 103-580, eff. 12-8-23; revised 7-29-24.) | ||||||