SB2258 - 104th General Assembly

Sen. Robert Peters

Filed: 3/14/2025

 

 


 

 


 
10400SB2258sam001LRB104 12071 AAS 23973 a

1
AMENDMENT TO SENATE BILL 2258

2    AMENDMENT NO. ______. Amend Senate Bill 2258 on page 6,
3line 20, by replacing "supplies thermal energy." with
4"supplies non-combusting thermal energy. "Thermal energy
5network" includes real estate, fixtures, and personal property
6that is operated, owned, or used by multiple parties."; and
 
7on page 8, lines 24 and 25, by replacing "be focused on
8existing electric heat customers." with "include an industrial
9heat application that may additionally include residential and
10commercial applications. Priority shall be given to pilot
11proposals that replace leak-prone natural gas distribution
12infrastructure with distribution infrastructure that supplies
13non-combusting thermal energy or that replaces thermal energy
14for buildings currently heated with electric resistance
15heat."; and
 
16on page 10, immediately below line 7, by inserting the

 

 

10400SB2258sam001- 2 -LRB104 12071 AAS 23973 a

1following:
2    "(d-5) The Commission shall require projects submitted to
3the utility-scale renewable thermal energy network program for
4approval to include a proposed rate structure for thermal
5energy services supplied to network end users and consumer
6protection plans for end users. The Commission may approve the
7proposed rate structure if the projected heating and cooling
8costs for end users is not greater than the heating and cooling
9costs the end users would have incurred if the end users had
10not participated in the program."; and
 
11on page 11, lines 10 through 12, by replacing "after the
12completion of the construction of all thermal energy network
13projects under this Section" with "after the effective date of
14this amendatory Act of the 104th General Assembly"; and
 
15on page 12, line 6, after "16-108.18.", by inserting "A gas
16public utility, electric public utility, or combination public
17utility developing a thermal energy network project that
18includes an industrial heat application may recover rates
19proportionally from each class of customer.".