Illinois General Assembly - Full Text of HB2332
Illinois General Assembly

Previous General Assemblies

Full Text of HB2332  94th General Assembly

HB2332 94TH GENERAL ASSEMBLY


 


 
94TH GENERAL ASSEMBLY
State of Illinois
2005 and 2006
HB2332

 

Introduced 2/16/2005, by Rep. Frank J. Mautino

 

SYNOPSIS AS INTRODUCED:
 
    Authorizes the State to release easements for highway purposes in LaSalle County, Henry County, Logan County, Kankakee County, Montgomery County, and Schuyler County. Authorizes the Department of Transportation to convey various described parcels of property in Logan County, Rock Island County, and Sangamon County to the listed recipients. Effective immediately.


LRB094 03671 LCB 33676 b

FISCAL NOTE ACT MAY APPLY

 

 

A BILL FOR

 

HB2332 LRB094 03671 LCB 33676 b

1     AN ACT concerning land.
 
2     Be it enacted by the People of the State of Illinois,
3 represented in the General Assembly:
 
4     Section 5. Upon the payment of the sum of $9,800 to the
5 State of Illinois, and subject to the conditions set forth in
6 Section 900 of this Act, the easement for highway purposes
7 acquired by the People of the State of Illinois is released
8 over and through the following described land in LaSalle
9 County, Illinois:
 
10 Parcel No. 3LR0077
 
11     That part of the East 12.00 acres of the North One Half of
12     the Northeast Quarter of the Southwest Quarter of Section
13     5, Township 33 North, Range 2 East of the Third Principal
14     Meridian, LaSalle County, Illinois, described as follows:
15     Commencing at the northwest corner of the Southwest Quarter
16     of said Section 5; thence North 89 degrees 59 minutes 26
17     seconds East, 1,824.63 feet along the north line of the
18     Southwest Quarter of said Section 5 to the Point of
19     Beginning, said point being on the west line of the East
20     12.00 acres of the North One Half of the Northeast Quarter
21     of the Southwest Quarter of said Section 5; thence
22     continuing North 89 degrees 59 minutes 26 seconds East,
23     631.74 feet along the north line of the Southwest Quarter
24     of said Section 5; thence South 00 degrees 00 minutes 34
25     seconds East, 30.00 feet to the north right of way line of
26     existing U.S. Route 6; thence South 89 degrees 59 minutes
27     26 seconds West, 281.04 feet; thence South 89 degrees 04
28     minutes 26 seconds West, 125.62 feet; thence South 84
29     degrees 16 minutes 26 seconds West, 125.62 feet; thence
30     South 76 degrees 29 minutes 26 seconds West, 77.13 feet;
31     thence South 73 degrees 21 minutes 26 seconds West, 26.2

 

 

HB2332 - 2 - LRB094 03671 LCB 33676 b

1     feet to the west line of said East 12.00 acres; thence
2     North 00 degrees 21 minutes 50 seconds West, 70.0 feet
3     along said west line to the Point of Beginning, said tract
4     containing 0.522 acre, more or less, situated in Utica
5     Township, LaSalle County, Illinois.
 
6     Section 10. Upon the payment of the sum of $1 to the State
7 of Illinois, and subject to the conditions set forth in Section
8 900 of this Act, the easement for highway purposes acquired by
9 the People of the State of Illinois is released over and
10 through the following described land in Henry County, Illinois:
 
11 Parcel No. 2DHY010
 
12     A part of the Southeast Quarter of Section 7, Township 25
13     North, Range 3 East of the Fourth Principal Meridian, Henry
14     County, State of Illinois, described as follows:
15     Commencing at the northeast corner of the Southeast Quarter
16     of said Section 7; thence South 00 degrees 29 minutes 46
17     seconds West, 630.78 feet (Bearings assumed for
18     description purposes only) on the east line of said
19     Southeast Quarter; thence North 58 degrees 46 minutes 14
20     seconds West, 63.72 feet to the Point of Beginning.
21     From the Point of Beginning; thence North 58 degrees 46
22     minutes 14 seconds West, 296.41 feet on the southerly right
23     of way line of an abandoned railroad to the northeast
24     corner of Lot 9 in Block 29 as designated upon the Plat of
25     Gould's Addition to the Village of Cambridge; thence South
26     00 degrees 28 minutes 21 seconds West, 76.01 feet on the
27     east line of Lot 9 in said Block 29, to the southeast
28     corner of Lot 9 in said Block 29; thence South 89 degrees
29     48 minutes 24 seconds East, 66.00 feet on the easterly
30     extension of the south line of said Block 29; thence South
31     00 degrees 28 minutes 20 seconds West, 43.85 feet; thence
32     South 54 degrees 20 minutes 39 seconds East, 77.10 feet;
33     thence South 42 degrees 23 minutes 31 seconds East, 65.83

 

 

HB2332 - 3 - LRB094 03671 LCB 33676 b

1     feet; thence North 53 degrees 37 minutes 34 seconds East,
2     101.11 feet to the Point of Beginning, containing 17,775
3     square feet (0.408 acres), more or less.
4     The said Real Estate being also shown by the plat hereto
5     attached and made a part hereof.
 
6     Section 15. Upon the payment of the sum of $3,000 to the
7 State of Illinois, and subject to the conditions set forth in
8 Section 900 of this Act, the Secretary of the Department of
9 Transportation is authorized to convey by quitclaim deed all
10 right, title and interest in and to the following described
11 land in Logan County, Illinois, to Investment Trust, c/o Thomas
12 Davies, Morton, Illinois:
 
13 Parcel No. 675X240
 
14     A part of the East 10 acres of the Northeast Quarter of the
15     Northeast Quarter of Section 23, Township 18 North, Range 2
16     West of the Third Principal Meridian, Logan County,
17     Illinois, said tract being referenced to the relocated
18     centerline of Survey and Plans for Federal Aid Route 73,
19     Section 117,134(X,RS), on file in the office of the
20     Department of Public Works and Buildings of the State of
21     Illinois in Springfield, Illinois, and as acquired by
22     Condemnation December 24, 1975 as Case No. 74-ED-5 and
23     described as follows:
24     Beginning at the northeast corner of said Section 23;
25     thence North 89 degrees 23 minutes West, 973.9 feet to a
26     point on the centerline of the proposed highway; thence
27     around a curve to the left (tangent to a line at that point
28     having a bearing of South 16 degrees 45 minutes East)
29     having a radius of 2291.8 feet, for a distance of 1205.8
30     feet to the Point of Beginning.
31     From said Point of Beginning North, 69.2 feet; thence
32     around a curve to the left (tangent to a line at that point
33     having a bearing of South 45 degrees 41 minutes East)

 

 

HB2332 - 4 - LRB094 03671 LCB 33676 b

1     having a radius of 2241.8 feet, for a distance of 457.8
2     feet; thence South 0 degrees 06 minutes West, 96.9 feet;
3     thence North 68 degrees 14 minutes West, 385.1 feet; thence
4     North 169.2 feet to the Point of Beginning, containing 0.96
5     acres, excluding the existing highway right of way.
 
6     Section 20. Upon the payment of the sum of $8,000 to the
7 State of Illinois, and subject to the conditions set forth in
8 Section 900 of this Act, the easement for highway purposes and
9 all additional real property interests acquired by the People
10 of the State of Illinois are released over and through the
11 following described land in Logan County, Illinois:
 
12 Parcel No. 675X228
 
13     A part of the West Half of Section 7, Township 18 North,
14     Range 3 West of the Third Principal Meridian in Logan
15     County, described as follows:
16     Commencing at the southwest corner of the Southwest Quarter
17     of said Section 7; thence North 00 degrees 44 minutes 04
18     seconds West along the west line of the Southwest Quarter
19     of Said Section 7, a distance of 339.45 feet to the
20     existing centerline of FA Route 5; thence North 35 degrees
21     23 minutes 03 seconds East along the existing centerline of
22     FA Route 5, a distance of 1492.38 feet; thence North 54
23     degrees 36 minutes 57 seconds West, a distance of 8.00 feet
24     to the Point of Beginning; thence continuing North 54
25     degrees 36 minutes 57 seconds West, a distance of 114.08
26     feet to a point on the existing westerly right of way line
27     of FA Route 5; thence North 43 degrees 19 minutes 05
28     seconds East, a distance of 87.51 feet; thence North 34
29     degrees 25 minutes 45 seconds East, a distance of 900.12
30     feet; thence North 35 degrees 36 minutes 16 seconds East, a
31     distance of 507.38 feet; thence northerly 302.52 feet along
32     a curve to the left having a radius of 5890.66 feet, the
33     chord of said curve bears North 47 degrees 48 minutes 07

 

 

HB2332 - 5 - LRB094 03671 LCB 33676 b

1     seconds East, a distance of 302.49 feet; thence South 54
2     degrees 36 minutes 57 seconds East, a distance of 50.00
3     feet; thence South 35 degrees 23 minutes 03 seconds West
4     along a line 8.00 feet northwest of and parallel with the
5     existing centerline of FA Route 5, a distance of 1789.46
6     feet to the Point of Beginning, containing 4.380 acres,
7     more or less.
 
8     Section 25. Upon the payment of the sum of $97,410 to the
9 State of Illinois, and subject to the conditions set forth in
10 Section 900 of this Act, the Secretary of the Department of
11 Transportation is authorized to convey by quitclaim deed all
12 right, title and interest in and to the following described
13 land in Rock Island County, Illinois, to Diwali, Inc:
 
14 Parcel No. 200P21G
 
15     A part of the Northeast Quarter of Section 21, Township 17
16     North, Range 1 West of the Fourth Principal Meridian, Rock
17     Island County, State of Illinois, described as follows:
18     Commencing at a concrete monument at the northwest corner
19     of the Northeast Quarter of said Section 21; thence North
20     88 degrees 33 minutes 08 seconds East, (Bearings assumed
21     for description purposes only) 40.90 feet to the center
22     line of a public highway designated FA Route 138 (US 150);
23     thence South 00 degrees 05 minutes 09 seconds West on said
24     center line 837.61 feet to a point of curve; thence South
25     00 degrees 05 minutes 09 seconds West on the tangent of
26     said curve 240.16 feet to the westerly extension of the
27     north line of the premises conveyed to Midway Oil Company
28     from Althea Beal by Warranty Deed recorded March 23, 1954
29     in Book 473 at Page 160 in the Recorder's Office of Rock
30     Island County; thence North 89 degrees 10 minutes 00
31     seconds East on said north line and westerly extension
32     139.85 feet to the Point of Beginning.
33     From the Point of Beginning, thence North 89 degrees 10

 

 

HB2332 - 6 - LRB094 03671 LCB 33676 b

1     minutes 00 seconds East 211.79 feet on the north line of
2     said premises so conveyed to the northeast corner of said
3     premises so conveyed; thence South 00 degrees 59 minutes 55
4     seconds East 191.22 feet on the east line of said premises
5     so conveyed; thence northwesterly 288.10 feet on a
6     non-tangential curve to the right, having a radius of
7     650.00 feet, a central angle of 25 degrees 23 minutes 42
8     seconds and the long chord of said curve bears North 48
9     degrees 49 minutes 47 seconds West, a chord distance of
10     285.75 feet to the Point of Beginning, containing 0.535
11     acre, more or less.
12 It is understood and agreed that there is no existing right of
13 access nor will access be permitted in the future by the State
14 of Illinois, Department of Transportation, from or over the
15 premises above described to and from FA Route 138 (US Route
16 150), previously declared a freeway.
 
17     Section 30. Upon the payment of the sum of $2,000 to the
18 State of Illinois, and subject to the conditions set forth in
19 Section 900 of this Act, the easement for highway purposes
20 acquired by the People of the State of Illinois is released
21 over and through the following described land in Kankakee
22 County, Illinois:
 
23 Parcel No. 3LR0091
 
24     A part of the Northeast Quarter of Section 6, Township 32
25     North, Range 12 East of the Third Principal Meridian,
26     Kankakee County, Illinois, described as follows:
27     Commencing at an iron pipe at the northeast corner of said
28     Northeast Quarter; thence South 00 degrees 16 minutes 05
29     seconds West 432.03 feet along the east line of said
30     Northeast Quarter; thence North 89 degrees 44 minutes 25
31     seconds West 28.16 feet to the easterly right of way line
32     of U.S. Route 45, said point being 25 feet left of Station
33     595+85; thence North 31 degrees 38 minutes 30 seconds West

 

 

HB2332 - 7 - LRB094 03671 LCB 33676 b

1     287.74 feet along said right of way line to the Point of
2     Beginning, said point being 18 feet left of Station 599+21;
3     thence continuing North 31 degrees 38 minutes 30 seconds
4     West 88.50 feet; thence North 03 degrees 03 minutes 55
5     seconds East 96.47 feet to the north line of SBI Route 44,
6     as described in the above mentioned right of way plat;
7     thence South 89 degrees 44 minutes 05 seconds East 195.35
8     feet along said right of way line, said point being 212
9     feet right of Station 599+21; thence South 42 degrees 03
10     minutes 30 seconds West 230.00 feet along the east right of
11     way line to the Point of Beginning, containing 19,179
12     square feet more or less.
 
13     Section 35. Upon the payment of the sum of $400 to the
14 State of Illinois, and subject to the conditions set forth in
15 Section 900 of this Act, the Secretary of the Department of
16 Transportation is authorized to convey by quitclaim deed all
17 right, title and interest in and to the following described
18 land in Logan County, Illinois, to Inland Tool Company:
 
19 Parcel No. 675X267
 
20     A part of the Northwest Quarter of the Northeast Quarter of
21     Section 14, Township 18 North, Range 2 West of the Third
22     Principal Meridian as recorded in a Final Judgment Order,
23     Parcel 12F, filed as Cause Number 74-ED-4, January 13, 1975
24     in the Circuit Clerk's Office in Logan County, Illinois.
25     Beginning at the northwest corner of the Southeast Quarter
26     of the Southeast Quarter of Section 11, Township 18 North,
27     Range 2 West of the Third Principal Meridian; thence North
28     89 degrees 35 minutes West, 915.0 feet to a point on the
29     centerline of the proposed highway; thence South 25 degrees
30     20 minutes East, along and with said centerline of the
31     proposed highway, 1850.7 feet; thence around a curve
32     tangent to the last named bearing (having a radius of
33     3819.7 feet) for a distance of 1046.8 feet to a point on

 

 

HB2332 - 8 - LRB094 03671 LCB 33676 b

1     the south line of the North Half of the Northeast Quarter
2     of said Section 14; thence South 89 degrees 59 minutes West
3     along the said south line 205.2 feet, to the Point of
4     Beginning.
5     From said Point of Beginning South 89 degrees 59 minutes
6     West along the said south line, 162.5 feet; thence around a
7     curve to the left (tangent to a line at that point having a
8     bearing of North 37 degrees 15 minutes West) having a
9     radius of 1031.6 feet, for a distance of 100.0 feet; thence
10     North 47 degrees 12 minutes East, 40.0 feet; thence South
11     65 degrees 29 minutes East, 109.60 feet; thence North 89
12     degrees 59 minutes East, 94.8 feet; thence South 00 degrees
13     20 minutes West, 55.0 feet to the Point of Beginning.
14     Excluding the existing right of way of Township Road 197A
15     and excluding existing right of way of SBI 121 (Illinois
16     Route 121) (0.18 acre) as both now located.
 
17     Section 40. Upon the payment of the sum of $7,750 to the
18 State of Illinois, and subject to the conditions set forth in
19 Section 900 of this Act, the Secretary of the Department of
20 Transportation is authorized to convey by quitclaim deed all
21 right, title and interest in and to the following described
22 land in Logan County, Illinois, to Douglas A. Muck and Laurie
23 E. Muck as joint tenants:
 
24 Parcel No. 675X271
 
25     A part of the Northeast Quarter of the Northeast Quarter of
26     Section 14, Township 18 North, Range 2 West of the Third
27     Principal Meridian, said tract being referenced to the
28     relocated centerline of Survey and Plans for Federal Aid
29     Route 73, Section 117,134(X,RS), on file in the office of
30     the Department of Transportation of the State of Illinois
31     in Springfield, Illinois, and recorded as Card No. D-9283
32     as Document No. 2680777 on April 2, 1974 in the Office of
33     Recorder in Logan County, Illinois.
 

 

 

HB2332 - 9 - LRB094 03671 LCB 33676 b

1      TRACT A:
2     Beginning at the northwest corner of the Southeast Quarter
3     of the Southeast Quarter of Section 11, Township 18 North,
4     Range 2 West of the Third Principal Meridian, thence North
5     89 degrees 35 minutes West, 915.0 feet to a point on the
6     centerline of the proposed highway; thence South 25 degrees
7     20 minutes East, along and with said centerline of the
8     proposed highway, 1850.7 feet; thence around a curve to the
9     right tangent to the last named bearing (having a radius of
10     3819.7 feet) for a distance of 285.6 feet to a point on the
11     west line of the Northeast Quarter of the Northeast Quarter
12     of said Section 14, said point being the Point of
13     Beginning.
14     From said Point of Beginning North 00 degrees 20 minutes
15     East, along said west line, 156.3 feet; thence around a
16     curve to the right (tangent to a line at that point having
17     a bearing of South 23 degrees 12 minutes East) having a
18     radius of 3879.7 feet, for a distance of 367.6 feet; thence
19     South 00 degrees 20 minutes West, 541.3 feet to a point on
20     the south line of the Northeast Quarter of the Northeast
21     Quarter of said Section 14; thence South 89 degrees 59
22     minutes West, along said south line, 132.0 feet; thence
23     North 00 degrees 01 minute West, 55.0 feet; thence North 89
24     degrees 59 minutes East, 81.2 feet; thence North 33 degrees
25     42 minutes East, 66.6 feet; thence around a curve to the
26     left (tangent to a line at that point having a bearing of
27     North 11 degrees 31 minutes West) having a radius of 3754.7
28     feet, for a distance of 448.0 feet; thence North 00 degrees
29     20 minutes East, 190.0 feet to the Point of Beginning,
30     containing 1.48 acres, more or less.
 
31     TRACT B:
32     Beginning at the northwest corner of the Southeast Quarter
33     of the Southeast Quarter of Section 11, Township 18 North,
34     Range 2 West of the Third Principal Meridian, thence North

 

 

HB2332 - 10 - LRB094 03671 LCB 33676 b

1     89 degrees 35 minutes West, 915.0 feet to a point on the
2     centerline of the proposed highway; thence South 25 degrees
3     20 minutes East, 1850.7 feet; thence around a curve to the
4     right tangent to the last named bearing (having a radius of
5     3819.7 feet) for a distance of 1046.8 feet to a point on
6     the south line of the Northeast Quarter of the Northeast
7     Quarter of said Section 14; thence North 89 degrees 59
8     minutes East along said south line, 157.8 feet to the Point
9     of Beginning.
10     From said Point of Beginning North 00 degrees 20 minutes
11     East, 53.7 feet; thence South 78 degrees 35 minutes East,
12     100.8 feet; thence South 00 degrees 20 minutes West, 33.7
13     feet to a point on the said south line; thence South 89
14     degrees 59 minutes West along said south line 99.0 feet to
15     the Point of Beginning, containing 0.04 acres, more or
16     less.
17     Excluding the existing right of way (0.13 acre) for
18     Township Road 197A as now located.
19     The total area contained in Tract A and Tract B is 1.52
20     acres, more or less.
 
21 Parcel No. 675X272
 
22     A part of the Northeast Quarter of the Northeast Quarter of
23     Section 14, Township 18 North, Range 2, West of the Third
24     Principal Meridian, said tract being referenced to the
25     relocated centerline of Survey and Plans for Federal Aid
26     Route 73, Section 117,134(X,RS) on file in the office of
27     the Department of Transportation of the State of Illinois
28     in Springfield, Illinois, and recorded on Card No. D-9282
29     as Document No. 268075 filed April 2, 1974 in the Office of
30     Recorder in Logan County, Illinois.
31     Beginning at the northwest corner of the Southeast Quarter
32     of the Southeast Quarter of Section 11, Township 18 North,
33     Range 2 West of the Third Principal Meridian, thence North
34     89 degrees 35 minutes West, 915.0 feet to a point on the

 

 

HB2332 - 11 - LRB094 03671 LCB 33676 b

1     centerline of the proposed highway; thence South 25 degrees
2     20 minutes East, along and with said centerline of the
3     proposed highway, 1850.7 feet; thence around a curve
4     tangent to the last named bearing (having a radius of
5     3819.7 feet) for a distance of 725.5 feet to the Point of
6     Beginning.
7     From said Point of Beginning North 00 degrees 20 minutes
8     East, 210.7 feet; thence around a curve to the right
9     (tangent to a line at that point having a bearing of South
10     17 degrees 46 minutes East) having a radius of 3879.7 feet,
11     for a distance of 438.8 feet; thence South 48 degrees 55
12     minutes East, 84.3 feet; thence South 78 degrees 35 minutes
13     East, 57.0 feet; thence South 00 degrees 20 minutes West,
14     53.7 feet to a point on the south line of the Northeast
15     Quarter, of the Northeast Quarter of said Section 14;
16     thence South 89 degrees 59 minutes West along the said
17     south line, 231.0 feet; thence North 00 degrees 20 minutes
18     East, 330.6 feet to the Point of Beginning, containing 0.97
19     acres, more or less.
20     Excluding the existing right of way (0.13 acre) for
21     Township Road 197A as now located.
 
22     Section 45. Upon the payment of the sum of $200 to the
23 State of Illinois, the rights or easements of access, crossing,
24 light, air and view from, to and over the following described
25 line and FA Route 49 are restored subject to permit
26 requirements of the State of Illinois, Department of
27 Transportation:
 
28 Parcel No. 675X264
 
29      A part of the West Half of the Northeast Quarter of
30     Section 15, Township 16 North, Range 4 West of the Third
31     Principal Meridian, Sangamon County, Illinois, being part
32     of the following tract surveyed by J. Colby Beekman,
33     Recorded in Book 412, Page 544, document no. 238435

 

 

HB2332 - 12 - LRB094 03671 LCB 33676 b

1     beginning at a point that is 411.17 feet south and 3935.7
2     feet east of the northwest corner of said Section 15,
3     Township 16 North, Range 4 West of the Third Principal
4     Meridian; thence South 13 minutes East, 1568.3 feet; thence
5     West 876 feet; thence North 1560 feet; thence East 874 feet
6     to the place of beginning.
7     Commencing 148.0 feet east of a found pipe at the southwest
8     corner of aforesaid tract; thence North and parallel with
9     said west line 435.80 feet (436.27 feet measured) to a
10     point on the south existing right of way line of FA Route
11     49 being a found iron pin being 58.88 feet right of Station
12     128+75.14 and also being the northwest corner of Lot 1 on
13     the proposed final plat of Taylor Minor Subdivision, said
14     point also being the Point of Beginning of the release of
15     access control; thence northeasterly along the south
16     existing right of way line along a curve to the right
17     having a radius of 3,075.67 feet an arc distance of 460.11
18     feet and having a chord bearing North 72 degrees 35 minutes
19     04 seconds East, 459.68 feet to the Point of Termination
20     being 59.84 feet right of Station 133+26.35 and also being
21     the northeast corner of Lot 2 in said Taylor Minor
22     Subdivision.
 
23     Section 50. Upon the payment of the sum of $3,500 to the
24 State of Illinois, and subject to the conditions set forth in
25 Section 900 of this Act, the Secretary of the Department of
26 Transportation is authorized to convey by quitclaim deed all
27 right, title and interest in and to the following described
28 land in Sangamon County, Illinois, to Ralph H. Faught and
29 Rebecca J. Faught as joint tenants:
 
30 Parcel No. 675X245
 
31     A part of the Southeast Quarter of Section 3, Township 14
32     North, Range 5 West of the Third Principal Meridian,
33     Sangamon County, Illinois and being more particularly

 

 

HB2332 - 13 - LRB094 03671 LCB 33676 b

1     described as follows:
2     Beginning at the northeast corner of Lot 3 of Hunting
3     Meadows subdivision, the plat thereof being recorded in
4     Plat Cabinet A in Slide 302 of the Sangamon County
5     Recorder's Office; thence South 73 degrees 36 minutes 39
6     seconds West (Bearings are based on the Illinois State
7     Plane Coordinate System N.A.D. 1983, West Zone), 80.08 feet
8     along the north line of said Lot 3 to the northwest corner
9     of said Lot 3; thence North 16 degrees 28 minutes 58
10     seconds West, 75.00 feet along the northerly prolongation
11     of the west line of said Lot 3; thence North 72 degrees 45
12     minutes 48 seconds East, 80.10 feet to the northerly
13     prolongation of the east line of said Lot 3; thence South
14     16 degrees 28 minutes 05 seconds East, 76.18 feet along
15     said northerly prolongation of the east line of Lot 3 to
16     the point of beginning, containing 6,054 Square Feet, more
17     or less.
18     Subject to the existing easement on the property described
19     below.
 
20
PERMANENT EASEMENT

 
21     A part of the Southeast Quarter of Section 3, Township 14
22     North, Range 5 West of the Third Principal Meridian,
23     Sangamon County, Illinois and being more particularly
24     described as follows:
25     Beginning at the northeast corner of Lot 3 of Hunting
26     Meadows subdivision, the plat thereof being recorded in
27     Plat Cabinet A in Slide 302 of the Sangamon County
28     Recorder's Office; thence South 73 degrees 36 minutes 39
29     seconds West (Bearings are based on the Illinois State
30     Plane Coordinate System N.A.D. 1983, West Zone), 80.08 feet
31     along the north line of said Lot 3 to the northwest corner
32     of said Lot 3; thence North 16 degrees 28 minutes 58
33     seconds West, 20.00 feet; thence North 73 degrees 30
34     minutes 46 seconds East, 80.08 feet; thence South 16

 

 

HB2332 - 14 - LRB094 03671 LCB 33676 b

1     degrees 28 minutes 05 seconds East, 20.13 feet to the Point
2     of Beginning, containing 1,607 Square Feet, more or less.
3 It is understood and agreed that there is no existing right of
4 access nor will access be permitted in the future by the State
5 of Illinois, Department of Transportation, from or over the
6 premises above described to and from FAI Route 55, previously
7 declared a freeway.
 
8     Section 55. Upon the payment of the sum of $850 to the
9 State of Illinois, and subject to the conditions set forth in
10 Section 900 of this Act, the easement for highway purposes
11 acquired by the People of the State of Illinois is released
12 over and through the following described land in Montgomery
13 County, Illinois:
 
14 Parcel No. 675X230
 
15     A part of the Southeast Quarter of the Northwest Quarter of
16     Section 36, Township 8 North, Range 3 West, of the Third
17     Principal Meridian, Montgomery County, Illinois, described
18     as follows:
19     Beginning at a found 5/8 inch rebar being at the
20     intersection of the southerly existing right of way line of
21     the Norfolk Southern railroad and the east line of the
22     Southeast Quarter of the Northwest Quarter of said Section
23     36; thence along said section line South 00 degrees 11
24     minutes 34 seconds West, 75.13 feet to a point on a line
25     being 45.00 feet left of the existing centerline of County
26     Highway 9; thence along said line, South 73 degrees 47
27     minutes 27 seconds West, 22.47 feet to a found right of way
28     marker; thence North 07 degrees 09 minutes 18 seconds West,
29     10.13 feet to a found right of way marker on a line being
30     55.00 feet left of the existing centerline of County
31     Highway 9; thence along said line, South 73 degrees 47
32     minutes 26 seconds West, 1247.82 feet to the south line of
33     the Southeast Quarter of the Northwest Quarter of said

 

 

HB2332 - 15 - LRB094 03671 LCB 33676 b

1     Section 36; thence along said section line, South 87
2     degrees 05 minutes 55 seconds West, 104.63 feet to a found
3     5/8 inch rebar at the southwest corner of the Southeast
4     Quarter of the Northwest Quarter of said Section 36; thence
5     North 00 degrees 07 minutes 20 seconds East, 40.07 feet
6     along the west line of the Southeast Quarter of the
7     Northwest Quarter of said Section 36 to the southerly
8     existing right of way line of the Norfolk Southern
9     railroad; thence along said right of way line, North 73
10     degrees 48 minutes 36 seconds East, 1380.46 feet to the
11     Point of Beginning, containing 1.950 acres of existing
12     right of way.
 
13     Section 60. Upon the payment of the sum of $3,000 to the
14 State of Illinois, and subject to the conditions set forth in
15 Section 900 of this Act, the easement for highway purposes
16 acquired by the People of the State of Illinois is released
17 over and through the following described land in Schuyler
18 County, Illinois:
 
19 Parcel No. 675X236
 
20     A part of the Southwest Quarter of the Southeast Quarter of
21     Section 25, Township 2 North, Range 2 West, Fourth
22     Principal Meridian, Schuyler County, Illinois, described
23     as follows:
24     Commencing at a found ¼" pipe marking the South Quarter
25     Corner of said Section 25; thence South 89 degrees 59
26     minutes 17 seconds East, 268.00 feet to a point on the west
27     existing right of way line of F.A. Route 4 (US Route 67) as
28     acquired from Bert Hartman and Mary Hartman as shown as
29     recorded in Book 2 Page 188 as document no. 177458, said
30     point being the Point of Beginning; thence along said west
31     right of way line, North 00 degrees 39 minutes 21 seconds
32     East, 94.74 feet to the easterly extension of the north
33     line of Lot 33 in Parkview Addition to Rushville, Illinois;

 

 

HB2332 - 16 - LRB094 03671 LCB 33676 b

1     thence along said easterly extension, North 89 degrees 55
2     minutes 37 seconds East, 43.82 feet to a point being 62.96
3     feet left of F.A. Route 4 (US Route 67) centerline Station
4     469+41.11; thence South 28 degrees 40 minutes 21 seconds
5     East, 108.06 feet to a found concrete right of marker at
6     60.00 feet left of centerline Station 468+33.09; thence
7     North 89 degrees 59 minutes 17 seconds West, 96.76 feet to
8     the Point of Beginning, containing 0.153 acres.
 
9     Section 900. The Secretary of Transportation shall obtain a
10 certified copy of the portion of this Act containing the title,
11 enacting clause, the effective date, the appropriate Section
12 containing the land description of the property to be
13 transferred or otherwise affected under this Act within 60 days
14 after its effective date and, upon receipt of payment required
15 by the Section shall record the certified document in the
16 Recorder's Office in the county which the land is located.
 
17     Section 999. Effective date. This Act takes effect upon
18 becoming law.