Full Text of SB1998 94th General Assembly
SB1998sam001 94TH GENERAL ASSEMBLY
|
Sen. James F. Clayborne Jr.
Filed: 3/14/2005
|
|
09400SB1998sam001 |
|
LRB094 11736 MKM 43712 a |
|
| 1 |
| AMENDMENT TO SENATE BILL 1998
| 2 |
| AMENDMENT NO. ______. Amend Senate Bill 1998 by replacing | 3 |
| everything after the enacting clause with the following:
| 4 |
| "Section 5. The Public Utilities Act is amended by changing | 5 |
| Section 16-125 as follows:
| 6 |
| (220 ILCS 5/16-125)
| 7 |
| Sec. 16-125. Transmission and
and distribution reliability
| 8 |
| requirements. | 9 |
| (a) To assure the reliable delivery of electricity to all
| 10 |
| customers in this State and the effective implementation of
the | 11 |
| provisions of this Article, the Commission shall, within
180 | 12 |
| days of the effective date of this Article, adopt rules
and | 13 |
| regulations for assessing and assuring the reliability of
the | 14 |
| transmission and distribution systems and facilities that
are | 15 |
| under the Commission's jurisdiction.
| 16 |
| (b) These rules and regulations shall require each electric | 17 |
| utility or
alternative retail electric supplier owning, | 18 |
| controlling, or operating
transmission and distribution | 19 |
| facilities and equipment subject to the
Commission's | 20 |
| jurisdiction, referred to in this Section as "jurisdictional
| 21 |
| entities", to adopt and implement procedures for restoring | 22 |
| transmission and
distribution services to customers after | 23 |
| transmission or distribution outages
on a nondiscriminatory | 24 |
| basis without regard to whether a customer has chosen
the |
|
|
|
09400SB1998sam001 |
- 2 - |
LRB094 11736 MKM 43712 a |
|
| 1 |
| electric utility, an affiliate of the electric utility, or | 2 |
| another entity
as its provider of electric power and energy. | 3 |
| These rules and regulations
shall also, at a minimum, | 4 |
| specifically require each jurisdictional entity to
submit | 5 |
| annually to the Commission.
| 6 |
| (1) the number and duration of planned and
unplanned | 7 |
| outages during the prior year and their impacts
on | 8 |
| customers;
| 9 |
| (2) outages that were controllable and outages that
| 10 |
| were exacerbated in scope or duration by the condition of
| 11 |
| facilities, equipment or premises or by the actions or
| 12 |
| inactions of operating personnel or agents;
| 13 |
| (3) customer service interruptions that were due
| 14 |
| solely to the actions or inactions of an alternative
retail | 15 |
| electric supplier or a public utility in supplying
power or | 16 |
| energy;
| 17 |
| (4) a detailed report of the age, current
condition, | 18 |
| reliability and performance of the
jurisdictional entity's | 19 |
| existing transmission and
distribution facilities, which | 20 |
| shall include, without
limitation, the following data:
| 21 |
| (i) a summary of the jurisdictional entity's
| 22 |
| outages and voltage variances reportable under the
| 23 |
| Commission's rules;
| 24 |
| (ii) the jurisdictional entity's expenditures
for | 25 |
| transmission construction and maintenance, the
ratio | 26 |
| of those expenditures to the jurisdictional
entity's | 27 |
| transmission investment, and the average
remaining | 28 |
| depreciation lives of the entity's
transmission | 29 |
| facilities, expressed as a percentage
of total | 30 |
| depreciation lives;
| 31 |
| (iii) the jurisdictional entity's expenditures
for | 32 |
| distribution construction and maintenance, the
ratio | 33 |
| of those expenditures to the jurisdictional
entity's | 34 |
| distribution investment, and the average
remaining |
|
|
|
09400SB1998sam001 |
- 3 - |
LRB094 11736 MKM 43712 a |
|
| 1 |
| depreciation lives of the entity's
distribution | 2 |
| facilities, expressed as a percentage
of total | 3 |
| depreciation lives;
| 4 |
| (iv) a customer satisfaction survey covering,
| 5 |
| among other areas identified in Commission rules,
| 6 |
| reliability, customer service, and understandability
| 7 |
| of the jurisdictional entity's services and prices;
| 8 |
| and
| 9 |
| (v) the corresponding information, in the same
| 10 |
| format, for the previous 3 years, if available;
| 11 |
| (5) a plan for future investment and reliability
| 12 |
| improvements for the jurisdictional entity's transmission
| 13 |
| and distribution facilities that will ensure continued
| 14 |
| reliable delivery of energy to customers and provide the
| 15 |
| delivery reliability needed for fair and open competition; | 16 |
| and
| 17 |
| (6) a report of the jurisdictional entity's
| 18 |
| implementation of its plan filed pursuant to subparagraph | 19 |
| (5)
for the previous reporting period.
| 20 |
| (c) The Commission rules shall set forth the criteria
that | 21 |
| will be used to assess each jurisdictional entity's annual | 22 |
| report and
evaluate its reliability performance. Such criteria
| 23 |
| must take into account, at a minimum: the items required to be
| 24 |
| reported in subsection (b); the relevant characteristics of
the | 25 |
| area served; the age and condition of the system's
equipment | 26 |
| and facilities; good engineering practices; the
costs of | 27 |
| potential actions; and the benefits of avoiding the
risks of | 28 |
| service disruption.
| 29 |
| (d) At least every 3 years, beginning in the year
the | 30 |
| Commission issues the rules required by subsection
(a) or the | 31 |
| following year if the rules are issued after June
1, the | 32 |
| Commission shall assess the annual report of each
| 33 |
| jurisdictional entity and evaluate its reliability | 34 |
| performance. The
Commission's evaluation shall
include |
|
|
|
09400SB1998sam001 |
- 4 - |
LRB094 11736 MKM 43712 a |
|
| 1 |
| specific identification of, and recommendations
concerning, | 2 |
| any potential reliability problems that it has
identified as a | 3 |
| result of its evaluation.
| 4 |
| (e) In the event that more than 30,000 customers of an | 5 |
| electric
utility are subjected to a continuous power | 6 |
| interruption of
4 hours or more that results in the | 7 |
| transmission of power
at less than 50% of the standard voltage, | 8 |
| or that results in
the total loss of power transmission, the | 9 |
| utility shall be
responsible for compensating customers | 10 |
| affected by that interruption for 4
hours or more for all
| 11 |
| actual damages, which shall not include consequential
damages, | 12 |
| suffered as a result of the power interruption.
The utility | 13 |
| shall also reimburse the affected municipality,
county, or | 14 |
| other unit of local government in which the power
interruption | 15 |
| has taken place for all
emergency and contingency expenses | 16 |
| incurred by the unit of
local government as a result of the | 17 |
| interruption. A waiver
of the requirements of this subsection | 18 |
| may be granted by the
Commission in instances in which the | 19 |
| utility can show that
the power interruption was a result of | 20 |
| any
one or more of the following causes:
| 21 |
| (1) Unpreventable damage due to weather events or
| 22 |
| conditions.
| 23 |
| (2) Customer tampering.
| 24 |
| (3) Unpreventable damage due to civil or
international | 25 |
| unrest or animals.
| 26 |
| (4) Damage to utility equipment or other actions by a | 27 |
| party other
than the utility, its employees, agents, or
| 28 |
| contractors.
| 29 |
| Loss of revenue and expenses incurred in complying with this
| 30 |
| subsection may not be recovered from ratepayers.
| 31 |
| (f) In the event of a power surge or other fluctuation
that | 32 |
| causes damage and affects more than 30,000 customers, the | 33 |
| electric utility
shall pay to
affected customers the | 34 |
| replacement value of all goods
damaged as a result of the power |
|
|
|
09400SB1998sam001 |
- 5 - |
LRB094 11736 MKM 43712 a |
|
| 1 |
| surge or other fluctuation
unless the utility can show that the | 2 |
| power surge or other
fluctuation was due to one or more of the | 3 |
| following causes:
| 4 |
| (1) Unpreventable damage due to weather events or
| 5 |
| conditions.
| 6 |
| (2) Customer tampering.
| 7 |
| (3) Unpreventable damage due to civil or
international | 8 |
| unrest or animals.
| 9 |
| (4) Damage to utility equipment or other actions by a | 10 |
| party other
than the utility, its employees, agents, or
| 11 |
| contractors.
| 12 |
| Loss of revenue and expenses incurred in complying with this
| 13 |
| subsection may not be recovered from ratepayers. Customers with | 14 |
| respect to
whom a waiver has been granted by the Commission | 15 |
| pursuant to subparagraphs
(1)-(4) of subsections (e) and (f) | 16 |
| shall not count toward the 30,000 customers
required therein.
| 17 |
| (g) Whenever an electric utility must perform
planned or | 18 |
| routine maintenance or repairs on its equipment
that will | 19 |
| result in transmission of power at less than 50%
of the | 20 |
| standard voltage, loss of power, or power fluctuation
(as | 21 |
| defined in subsection (f)), the utility shall make
reasonable | 22 |
| efforts to notify potentially affected customers
no less than | 23 |
| 24 hours in advance of performance of the
repairs or | 24 |
| maintenance.
| 25 |
| (h) Remedies provided for under this Section may be
sought | 26 |
| exclusively through the Illinois Commerce Commission
as | 27 |
| provided under Section 10-109 of this Act. Damages
awarded | 28 |
| under this Section for a power interruption shall be
limited to | 29 |
| actual damages, which shall not include
consequential damages, | 30 |
| and litigation costs. Damage awards
may not be paid out of | 31 |
| utility rate funds.
| 32 |
| (i) The provisions of this Section shall not in any way
| 33 |
| diminish or replace other civil or administrative remedies
| 34 |
| available to a customer or a class of customers.
|
|
|
|
09400SB1998sam001 |
- 6 - |
LRB094 11736 MKM 43712 a |
|
| 1 |
| (j) The Commission shall by rule require an electric
| 2 |
| utility to maintain service records detailing
information on | 3 |
| each instance of transmission of power at
less than 50% of the | 4 |
| standard voltage, loss of power, or
power fluctuation (as | 5 |
| defined in subsection (f)), that
affects 10 or more customers. | 6 |
| Occurrences that are
momentary shall not be required to be | 7 |
| recorded or reported.
The service record shall include, for | 8 |
| each occurrence, the
following information:
| 9 |
| (1) The date.
| 10 |
| (2) The time of occurrence.
| 11 |
| (3) The duration of the incident.
| 12 |
| (4) The number of customers affected.
| 13 |
| (5) A description of the cause.
| 14 |
| (6) The geographic area affected.
| 15 |
| (7) The specific equipment involved in the
fluctuation | 16 |
| or interruption.
| 17 |
| (8) A description of measures taken to restore
service.
| 18 |
| (9) A description of measures taken to remedy the
cause | 19 |
| of the power interruption or fluctuation.
| 20 |
| (10) A description of measures taken to prevent
future | 21 |
| occurrence.
| 22 |
| (11) The amount of remuneration, if any, paid to
| 23 |
| affected customers.
| 24 |
| (12) A statement of whether the fixed charge was
waived | 25 |
| for affected customers.
| 26 |
| Copies of the records containing this information shall
be | 27 |
| available for public inspection at the utility's offices,
and | 28 |
| copies thereof may be obtained upon payment of a fee not
| 29 |
| exceeding the reasonable cost of reproduction. A copy of
each | 30 |
| record shall be filed with the Commission and shall be
| 31 |
| available for public inspection. Copies of the records may
be | 32 |
| obtained upon payment of a fee not exceeding the
reasonable | 33 |
| cost of reproduction.
| 34 |
| (k) The requirements of subsections (e) through (j) of
this |
|
|
|
09400SB1998sam001 |
- 7 - |
LRB094 11736 MKM 43712 a |
|
| 1 |
| Section shall apply only to an electric public utility
having | 2 |
| 1,000,000 or more customers.
| 3 |
| (Source: P.A. 90-561, eff. 12-16-97.)".
|
|