Full Text of HB1866 102nd General Assembly
HB1866ham001 102ND GENERAL ASSEMBLY | Rep. Michael J. Zalewski Filed: 3/11/2021
| | 10200HB1866ham001 | | LRB102 16347 CPF 23034 a |
|
| 1 | | AMENDMENT TO HOUSE BILL 1866
| 2 | | AMENDMENT NO. ______. Amend House Bill 1866 by replacing | 3 | | everything after the enacting clause with the following:
| 4 | | "Section 5. The Environmental Protection Act is amended by | 5 | | changing Section 22.38 as follows:
| 6 | | (415 ILCS 5/22.38)
| 7 | | Sec. 22.38. Facilities accepting exclusively general | 8 | | construction or
demolition debris
for transfer, storage, or | 9 | | treatment.
| 10 | | (a) Facilities accepting exclusively general construction | 11 | | or demolition
debris for
transfer, storage, or treatment shall | 12 | | be subject to local zoning, ordinance,
and
land use | 13 | | requirements.
Those facilities shall be located in accordance | 14 | | with local zoning requirements
or, in the absence of local | 15 | | zoning requirements, shall be located so that no
part of the | 16 | | facility boundary is closer than 1,320 feet from the nearest
|
| | | 10200HB1866ham001 | - 2 - | LRB102 16347 CPF 23034 a |
|
| 1 | | property zoned for primarily residential use.
| 2 | | (b) An owner or operator of a facility accepting | 3 | | exclusively general
construction or demolition debris for | 4 | | transfer, storage, or treatment shall:
| 5 | | (1) Within 48 hours after receipt of the general | 6 | | construction or demolition
debris at the facility, sort | 7 | | the general construction or demolition debris to
separate | 8 | | the
recyclable general construction or demolition debris, | 9 | | recovered wood that is processed for use as fuel, and | 10 | | general construction or demolition debris that is | 11 | | processed for use at a landfill from the non-recyclable
| 12 | | general construction or demolition debris that is to be | 13 | | disposed of or discarded.
| 14 | | (2) Transport off site for disposal, in accordance | 15 | | with all applicable federal, State, and local requirements | 16 | | within 72 hours after its receipt at the facility, all | 17 | | non-usable or non-recyclable general
construction or | 18 | | demolition debris that is not recyclable general | 19 | | construction or demolition debris, recovered wood that is | 20 | | processed for use as fuel, or general construction or | 21 | | demolition debris that is processed for use at a landfill.
| 22 | | (3) Limit the percentage of incoming non-recyclable | 23 | | general construction
or demolition debris to the | 24 | | following: | 25 | | (A) 25% or
less of the total incoming general | 26 | | construction or demolition debris, so that 75% or more |
| | | 10200HB1866ham001 | - 3 - | LRB102 16347 CPF 23034 a |
|
| 1 | | of the general construction or demolition debris | 2 | | accepted, as calculated monthly on a rolling 12-month | 3 | | average, consists of recyclable general construction | 4 | | or demolition debris, recovered wood that is processed | 5 | | for use as fuel, or general construction or demolition | 6 | | debris that is processed for use at a landfill except | 7 | | that general construction or demolition debris | 8 | | processed for use at a landfill shall not exceed 35% of | 9 | | the general construction or demolition debris accepted | 10 | | on a rolling 12-month average basis. | 11 | | (B) If the facility is certified by the Recycling | 12 | | Certification Institute as an RCI Certified Facility, | 13 | | 50% or less of the total incoming general construction | 14 | | or demolition debris, so that 50% or more of the | 15 | | general construction or demolition debris accepted, as | 16 | | calculated monthly on a rolling 12-month average, | 17 | | consists of recyclable general construction or | 18 | | demolition debris, recovered wood that is processed | 19 | | for use as fuel, or general construction or demolition | 20 | | debris that is processed for use at a landfill, except | 21 | | that general construction or demolition debris | 22 | | processed for use at a landfill shall not exceed 20% of | 23 | | the general construction or demolition debris accepted | 24 | | on a rolling 12-month average basis. | 25 | | The percentages in this paragraph (3) of subsection (b) | 26 | | shall be calculated by weight, using scales located at the |
| | | 10200HB1866ham001 | - 4 - | LRB102 16347 CPF 23034 a |
|
| 1 | | facility that are certified under the Weights and Measures | 2 | | Act.
| 3 | | (4) Within 6 months after its receipt at the facility, | 4 | | transport: | 5 | | (A) all non-putrescible recyclable general | 6 | | construction or
demolition debris
for recycling or | 7 | | disposal; and | 8 | | (B) all non-putrescible general construction or | 9 | | demolition debris that is processed for use at a | 10 | | landfill to a MSWLF unit for use or disposal.
| 11 | | (5) Within 45 days after its receipt at the facility, | 12 | | transport: | 13 | | (A) all putrescible or combustible recyclable | 14 | | general
construction or demolition debris
(excluding | 15 | | recovered wood that is processed for use as fuel) for | 16 | | recycling or disposal; | 17 | | (B) all recovered wood that is processed for use | 18 | | as fuel to an intermediate processing facility for | 19 | | sizing, to a combustion facility for use as fuel, or to | 20 | | a disposal facility; and | 21 | | (C) all putrescible general construction or | 22 | | demolition debris that is processed for use at a | 23 | | landfill to a MSWLF unit for use or disposal.
| 24 | | (6) Employ tagging and recordkeeping procedures to (i) | 25 | | demonstrate
compliance
with this Section and (ii) identify | 26 | | the source and transporter of material
accepted by the |
| | | 10200HB1866ham001 | - 5 - | LRB102 16347 CPF 23034 a |
|
| 1 | | facility.
| 2 | | (7) Control odor, noise, combustion of materials, | 3 | | disease vectors, dust,
and litter.
| 4 | | (8) Control, manage, and dispose of any storm water | 5 | | runoff and leachate
generated at the facility in | 6 | | accordance with applicable federal, State, and
local | 7 | | requirements.
| 8 | | (9) Control access to the facility.
| 9 | | (10) Comply with all applicable federal, State, or | 10 | | local requirements for
the handling, storage, | 11 | | transportation, or disposal of asbestos-containing
| 12 | | material or other material accepted at the
facility that | 13 | | is not general construction or demolition debris.
| 14 | | (11) Prior to August 24, 2009 (the effective date of | 15 | | Public Act 96-611), submit to the Agency at least 30 days | 16 | | prior to the initial acceptance
of general construction or | 17 | | demolition debris at the facility, on forms provided
by | 18 | | the Agency, the following information:
| 19 | | (A) the name, address, and telephone number of | 20 | | both the facility owner
and operator;
| 21 | | (B) the street address and location of the | 22 | | facility;
| 23 | | (C) a description of facility operations;
| 24 | | (D) a description of the tagging and recordkeeping | 25 | | procedures the
facility will employ to (i) demonstrate | 26 | | compliance with this Section and (ii)
identify the |
| | | 10200HB1866ham001 | - 6 - | LRB102 16347 CPF 23034 a |
|
| 1 | | source and transporter of any material accepted by the | 2 | | facility;
| 3 | | (E) the name and location of the disposal sites to | 4 | | be used for the
disposal of any general construction | 5 | | or demolition debris received at the facility that | 6 | | must be disposed of;
| 7 | | (F) the name and location of an individual, | 8 | | facility, or business to
which recyclable materials | 9 | | will be transported;
| 10 | | (G) the name and location of intermediate | 11 | | processing facilities or combustion facilities to | 12 | | which recovered wood that is processed for use as fuel | 13 | | will be transported; and
| 14 | | (H) other information as specified on the form | 15 | | provided by the Agency.
| 16 | | (12) On or after August 24, 2009 (the effective date | 17 | | of Public Act 96-611), obtain a permit issued by the | 18 | | Agency prior to the initial acceptance of general | 19 | | construction or demolition debris at the facility.
| 20 | | When any of the information contained or processes | 21 | | described in the initial
notification form submitted to | 22 | | the Agency under paragraph (11) of subsection (b) of this | 23 | | Section changes, the owner and operator shall
submit an | 24 | | updated form within 14 days of the change.
| 25 | | (c) For purposes of this Section, the term "recyclable | 26 | | general
construction or demolition debris" means general |
| | | 10200HB1866ham001 | - 7 - | LRB102 16347 CPF 23034 a |
|
| 1 | | construction or demolition
debris that has been rendered | 2 | | reusable and is reused or that would otherwise
be disposed of | 3 | | or discarded but is collected, separated, or processed and
| 4 | | returned to the economic mainstream in the form of raw | 5 | | materials or products.
"Recyclable general construction or | 6 | | demolition debris" does not include (i) general
construction | 7 | | or demolition debris processed for use as fuel, incinerated,
| 8 | | burned, buried, or otherwise used as fill material or (ii) | 9 | | general construction or demolition debris that is processed | 10 | | for use at a landfill.
| 11 | | (d) For purposes of this Section, "treatment" means | 12 | | processing
designed to alter the physical nature of the | 13 | | general construction or
demolition debris, including but not | 14 | | limited to size reduction, crushing,
grinding, or
| 15 | | homogenization, but does not include processing designed to | 16 | | change the chemical
nature of the general construction or | 17 | | demolition debris.
| 18 | | (e) For purposes of this Section, "recovered wood that is | 19 | | processed for use as fuel" means wood that has been salvaged | 20 | | from general construction or demolition debris and processed | 21 | | for use as fuel, as authorized by the applicable state or | 22 | | federal environmental regulatory authority, and supplied only | 23 | | to intermediate processing facilities for sizing, or to | 24 | | combustion facilities for use as fuel, that have obtained all | 25 | | necessary waste management and air permits for handling and | 26 | | combustion of the fuel. |
| | | 10200HB1866ham001 | - 8 - | LRB102 16347 CPF 23034 a |
|
| 1 | | (f) For purposes of this Section, "non-recyclable general | 2 | | construction or demolition debris" does not include "recovered | 3 | | wood that is processed for use as fuel" or general | 4 | | construction or demolition debris that is processed for use at | 5 | | a landfill. | 6 | | (g) Recyclable general construction or demolition debris, | 7 | | recovered wood that is processed for use as fuel, and general | 8 | | construction or demolition debris that is processed for use at | 9 | | a landfill shall not be considered as meeting the 75% | 10 | | diversion requirement for purposes of subdivision (b)(3) of | 11 | | this Section if sent for disposal at the end of the applicable | 12 | | retention period. | 13 | | (h) For the purposes of this Section, "general | 14 | | construction or demolition debris that is processed for use at | 15 | | a landfill" means general construction or demolition debris | 16 | | that is processed for use at a MSWLF unit as alternative daily | 17 | | cover, road building material, or drainage structure building | 18 | | material in accordance with the MSWLF unit's waste disposal | 19 | | permit issued by the Agency under this Act. | 20 | | (i) For purposes of the 75% diversion requirement under | 21 | | subdivision (b)(3) of this Section, owners and operators of | 22 | | facilities accepting exclusively general construction or | 23 | | demolition debris for transfer, storage, or treatment may | 24 | | multiply by 2 the amount of accepted asphalt roofing shingles | 25 | | that are transferred to a facility for recycling in accordance | 26 | | with a beneficial use determination issued under Section 22.54 |
| | | 10200HB1866ham001 | - 9 - | LRB102 16347 CPF 23034 a |
|
| 1 | | of this Act. The owner or operator of the facility accepting | 2 | | exclusively general construction or demolition debris for | 3 | | transfer, storage, or treatment must maintain receipts from | 4 | | the shingle recycling facility that document the amounts of | 5 | | asphalt roofing shingles transferred for recycling in | 6 | | accordance with the beneficial use determination. All receipts | 7 | | must be maintained for a minimum of 3 years and must be made | 8 | | available to the Agency for inspection and copying during | 9 | | normal business hours. | 10 | | (Source: P.A. 96-235, eff. 8-11-09; 96-611, eff. 8-24-09; | 11 | | 96-1000, eff. 7-2-10; 97-230, eff. 7-28-11; 97-314, eff. | 12 | | 1-1-12; 97-813, eff. 7-13-12.)".
|
|