(65 ILCS 90/19) (from Ch. 24, par. 1419)
Sec. 19.
Not less than 60 days prior to the date of the performance of
any work other than an annual inspection or routine maintenance, a municipality
shall provide notice of the following to the owner of property and the resident
of the property on which the work will be performed:
(a) a description of the deficiency which necessitates the work;
(b) a description of the entire work to be performed;
(c) an estimate of the length of time needed to complete the work; and
(d) the proposed date for beginning of the work.
The municipality shall proceed to perform the work at the end of the 60
day notice period.
(Source: P.A. 80-1371.)
|