(220 ILCS 75/15)
    Sec. 15. Scope. This Act applies to the application process for the issuance of a certificate of authority by an owner or operator of a pipeline designed, constructed, and operated to transport and to sequester carbon dioxide.
(Source: P.A. 103-651, eff. 7-18-24.)