(225 ILCS 710/45.05) (from Ch. 96 1/2, par. 4258)
Sec. 45.05.
Loading and unloading cage.
At all mines where hoisting is
done by cage from 2 or more levels a person shall be employed whose duties
shall be to load and unload the cage and to give the signals to the hoisting
engineer. The superintendent shall be responsible for the enforcement of this
rule.
(Source: P.A. 87-1133.)
|