(735 ILCS 30/25-7-103.112)
(was 735 ILCS 5/7-103.112) Sec. 25-7-103.112.
Quick-take; Bi-State Development Agency; MetroLink Light
Rail
System. Quick-take proceedings under Article 20 may be used for a period
from
September 1, 2003 through September 1, 2004 by the Bi-State Development Agency
of the Missouri-Illinois Metropolitan District for station area development,
transit oriented development and economic development initiatives in support of
the MetroLink Light Rail System, beginning in East St. Louis, Illinois, and
terminating at MidAmerica Airport, St. Clair County, Illinois.
(Source: P.A. 93-603, eff. 11-19-03; 94-1055, eff. 1-1-07.) |