(735 ILCS 30/25-7-103.48)
(was 735 ILCS 5/7-103.48)
Sec. 25-7-103.48. Quick-take; MetroLink Light Rail System. Quick-take proceedings under Article 20 may be used
for a period of 48 months after January 16, 1997, by
the Bi-State Development Agency of the Missouri-Illinois Metropolitan District
for the acquisition of rights of way and related property necessary for the
construction and operation of the MetroLink Light Rail System, beginning in
East St. Louis, Illinois, and terminating at Mid America Airport, St. Clair
County, Illinois.
(Source: P.A. 94-1055, eff. 1-1-07.)
|