(735 ILCS 30/25-7-103.77)
(was 735 ILCS 5/7-103.77)
Sec. 25-7-103.77. Quick-take; City of Marion. Quick-take proceedings under Article 20 may be used
for a period of 18 months after July 30, 1999,
by the City of Marion for the acquisition of property
and temporary construction easements bounded by the following
lines for improvement of the Pentecost Road project:
A variable width strip of land lying parallel with and | ||
| ||
the NW1/4 NW1/4, Section 16; NE1/4 NE1/4, Section 17; | ||
| ||
(Source: P.A. 94-1055, eff. 1-1-07.)
|