Updating the database of the Illinois Compiled Statutes (ILCS) is an ongoing process.
Recent laws may not yet be included in the ILCS database, but they are found on this site as
Public
Acts soon after they become law. For information concerning the relationship between statutes and Public Acts, refer to the
Guide.
Because the statute database is maintained primarily for legislative drafting purposes,
statutory changes are sometimes included in the statute database before they take effect.
If the source note at the end of a Section of the statutes includes a Public Act that has
not yet taken effect, the version of the law that is currently in effect may have already
been removed from the database and you should refer to that Public Act to see the changes
made to the current law.
(50 ILCS 20/20.4) (Section scheduled to be repealed on July 1, 2025)
Sec. 20.4. Development of design-build scope and performance criteria.
(a) The Commission shall develop, with the assistance of a
licensed design professional, a request
for proposal, which shall include scope and performance criteria.
The scope and performance criteria must be in sufficient detail and contain
adequate information to reasonably apprise the qualified design-build entities
of the Commission's overall programmatic needs and goals,
including criteria and preliminary design plans,
general budget parameters, schedule, and delivery requirements.
(b) Each request for proposal shall also include a description of the level
of design to be provided in the proposals. This description must include the
scope and type of renderings, drawings, and specifications that, at a minimum,
will be required by the Commission to be produced by the
design-build entities.
(c) The scope and performance criteria shall be prepared by a design
professional who is an employee of the Commission, or the Commission may
contract with an independent design professional selected under the
Local Government Professional Services Selection Act (50 ILCS 510/) to provide these services.
(d) The design professional that prepares the scope and performance criteria
is prohibited from participating in any design-build entity proposal for the
project.
(e) This Section is repealed on July 1, 2025; provided that any design-build contracts entered into before such date or any procurement of a project under this Act commenced before such date, and the contracts resulting from those procurements, shall remain effective.